ML20150E922: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 13: | Line 13: | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| page count = 3 | | page count = 3 | ||
| project = | |||
| stage = Other | |||
}} | }} | ||
Revision as of 07:05, 11 December 2021
| ML20150E922 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/11/1988 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| IEB-88-003, IEB-88-3, TXX-88545, NUDOCS 8807180052 | |
| Download: ML20150E922 (3) | |
Text
.. _. -
., ?
.. 4 M
F T- Log # TXX 88545 File # 10119 n --
Ref. # NRCB 88-03 illELECTRIC July 11, 1988 William G. Counsil Executive Vke President V. S. Nuclear Regulatory Conunission Attn: Document Control Desk Washington, D.C. 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50-445 AND 50-446 RESPONSE TO NRC BULLETIN 88-03: INADEQUATE LATCH ENGAGEMENT IN HFA TYPE LATCHING RELAYS MANUFACTURED BY GENERAL ELECTRIC (GE) COMPANY Gentlemen:
The following information is given in response to NRC Bulletin 88-03, "Inadequate Latch Engagement in HFA Type Latching Relays Manufactured by General Electric (GE) ',ompany" :
NRC Request:
Perform inspections to ensure that all GE latching-type HFA relays installed in Class IE (safety-related) applications have adequate latch engagement and that those relays which fail to meet acceptance criteria be repaired or replaced, if you do not have HFA latching-type relays subject'to this bulletin, provide a letter stating this fact.
TV Electric Response:
At CPSES, HFA relays are not used in Class 1E (safety-related) applications.
Additional Requested Information:
- 1. Staff time to perform the requested inspections and corrective actions. l Response: NA
)
i
- 2. Staf f time to prepare the requested dr:umentation.
Response: 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> l
l 8807180052 880711 PDR ADOCK 05000445 ,
G PNV u < l khI[
/
j l 0 M*o North Olin Street LB81 Dallas, Texas 73201
TXX-88545 July 11, 1988 Page 2 of 2
- 3. Additional cost incurred as a result of the inspection findings (e.g.,
cists of corrective actions, cost of down time).
Response: NA Very truly yours, s
- ffdw.
W. G. Counsil VPC/grr c - Mr. R. D. Martin, Region IV Residentinspectors,CPSES(3)
'. l Attachment to 1XX-88545 July 11, 1988 UNITED STATES OF AMERICA -)
NUCLEAR REGULATORY COMMISSION 1
In the Matter of )
) .
Texas Utilities Electric Company ) Docket Nos. 50-445
) 50-446 (Comanche Peak Steam Electric )
Station, Units 1 & 2) )
VFIDAVIT W. G. Counsil.being duly sworn, hereby deposes and says that he is Executive Vice President, Nuclear Engineering and Operations of TV Electric, the Applicant herein; that he is duly authorized to sign and file with the Nv'. lear Regulator;; Commission this response to NRC Bulletin 88-03; that he is
'amiliar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief. '
Yldtab W . G . ' C'ou n s i '
Executive Vice President, Nuclear Engineering and Operations STATE OF TEXAS COUNTY OF DALLAS Subscribed and sworn to before me, a Notary Public in and for v on this // d day of V #t h , 1988.
. A)/# ,
V- O c aA4 dmw Notary /Public My commission exp{res: 3 / A /40 .
t it
, _ . _ . . _ . . _ _ _ _ - - . _ . - - , -