ML20150E922

From kanterella
Jump to navigation Jump to search
Responds to NRC Bulletin 88-003, Inadequate Latch Engagement in Hfa Type Latching Relays Mfg by Ge. Use of Hfa Relays in Class 1E Applications Not Used at Facility
ML20150E922
Person / Time
Site: Comanche Peak  
Issue date: 07/11/1988
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
IEB-88-003, IEB-88-3, TXX-88545, NUDOCS 8807180052
Download: ML20150E922 (3)


Text

..

?

4 MF T-Log # TXX 88545 File # 10119 n

Ref. # NRCB 88-03 illELECTRIC July 11, 1988 William G. Counsil Executive Vke President V. S. Nuclear Regulatory Conunission Attn:

Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05. 50-445 AND 50-446 RESPONSE TO NRC BULLETIN 88-03:

INADEQUATE LATCH ENGAGEMENT IN HFA TYPE LATCHING RELAYS MANUFACTURED BY GENERAL ELECTRIC (GE) COMPANY Gentlemen:

The following information is given in response to NRC Bulletin 88-03, "Inadequate Latch Engagement in HFA Type Latching Relays Manufactured by General Electric (GE) ',ompany" :

NRC Request:

Perform inspections to ensure that all GE latching-type HFA relays installed in Class IE (safety-related) applications have adequate latch engagement and that those relays which fail to meet acceptance criteria be repaired or

replaced, if you do not have HFA latching-type relays subject'to this bulletin, provide a letter stating this fact.

TV Electric Response:

At CPSES, HFA relays are not used in Class 1E (safety-related) applications.

Additional Requested Information:

1.

Staff time to perform the requested inspections and corrective actions.

Response

NA i

2.

Staf f time to prepare the requested dr:umentation.

Response: 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> 8807180052 880711 PDR ADOCK 05000445 G

PNV u

khI[

j

/

l 0 M*o North Olin Street LB81 Dallas, Texas 73201

TXX-88545 July 11, 1988 Page 2 of 2 3.

Additional cost incurred as a result of the inspection findings (e.g.,

cists of corrective actions, cost of down time).

Response: NA Very truly yours, s

  1. ffdw.

W. G. Counsil VPC/grr c - Mr. R. D. Martin, Region IV Residentinspectors,CPSES(3)

Attachment to 1XX-88545 July 11, 1988 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

Texas Utilities Electric Company

)

Docket Nos. 50-445

)

50-446 (Comanche Peak Steam Electric

)

Station, Units 1 & 2)

)

VFIDAVIT W. G. Counsil.being duly sworn, hereby deposes and says that he is Executive Vice President, Nuclear Engineering and Operations of TV Electric, the Applicant herein; that he is duly authorized to sign and file with the Nv'. lear Regulator;; Commission this response to NRC Bulletin 88-03; that he is

'amiliar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.

Yldtab W. G. ' C'ou n s i '

Executive Vice President, Nuclear Engineering and Operations STATE OF TEXAS COUNTY OF DALLAS Subscribed and sworn to before me, a Notary Public in and for

. A)/#

on this

// d day of V #t h

, 1988.

v V-O c aA4 dmw Notary /Public My commission exp{res:

3 / A /40 t

it

. - ~ ~ - - -

- -, -