ML20154H400: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 2: | Line 2: | ||
| number = ML20154H400 | | number = ML20154H400 | ||
| issue date = 09/30/1998 | | issue date = 09/30/1998 | ||
| title = Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With | | title = Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With | ||
| author name = Matthews W | | author name = Matthews W | ||
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | | author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = 98-608, NUDOCS 9810140166 | | document report number = 98-608, NUDOCS 9810140166 | ||
| title reference date = 10-09-1998 | |||
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT | | document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT | ||
| page count = 10 | | page count = 10 | ||
Revision as of 06:43, 10 December 2021
| ML20154H400 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 09/30/1998 |
| From: | Matthews W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 98-608, NUDOCS 9810140166 | |
| Download: ML20154H400 (10) | |
Text
. _ . ._ __
VINGINIA ELECTRIC AND POWER COMPANY Ricitwonn,VIHOINIA 20201 October 9,1998 United States Nuclear Regulatory Commission ' Serial No.98-608 i Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the September 1998 Monthly Operating Report for North Anna Power -
Station Units 1 and 2.
i i
Very truly yours, tuAW W. R. Matthews Site Vice President i Enclosure 1
Commitments made in this letter: None. l cc: U. S. Nuclear Regulatory Commission Region ll l Atlanta Federal Center .
61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 '
Mr. M. J. Morgan b NRC Senior Resident inspector
/y North Anna Power Station 9810140166 990930 '~
PDR R ADOCK 05000338 pgg
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT SEPTEMBER 1998 Approved: b e> -
2 /d 29[ '
Site Vice President Date I
l l
l w -
r . . l i
I- OPERATING DATA REPORT Docket No : Sc 338 l Date: 10/05/98
Contact:
W. R. Matthews l- Telephone: (540) 894-2101 l
- 1. Unit Name: . . .. . . - . North Anna Unit 1 '
- 2. Reporting Period:. .. . . September,1998 )
i: 3. . Licensed Thermal Power (MWt): . . . 2,893 ;
- 4. Nameplate Rating (Gross MWe): . 979.74
)
- 5. Design Electrical Rating (Net MWe): . 907 l
- 6. - Maximum Dependable Capacity (Gross MWe)
- . 940 i
- l. 7. Maximum Dependable Capacity (Net MWe): . 893 8; if Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted, if Any (Net MWe): N/A 10; Reasons For Restrictions, if Any: N/A This Month Year-To-Date Cumulative
- 11. Hours in Reporting Period 720.0 6.551.0 177,731.0
- 12. Hours Reactor Was Critical 289.3 6,120.3 139,375.3
- 13. Reactor Reserve Shutdown Hours 14.0 14.9 7,109.9
- 14. Hours Generator On-Line 288.6 6,061.6 136,229.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 829,075.8 17,414,868.1 367,949,340.6
- 17. Gross Electrical Energy Generated (MWH) 269,615.0 5,674,967.0 157,845,620.0
- 18. Net Electrical Energy Generated (MWH) 256,230.0 5,396,315.0 114,540,498.0
- 19. Unit Service Factor 40.1 % 92.5 % 76.6%
- 20. Unit Availability Factor 40.1 % 92.5 % 76.6 %
- 21. Unit Capacity Factor (Using MDC Net) 39.9% 92.2% 72.1 % i
- 22. Unit Capacity Factor (Using DER Net) 39.2 % 90.8 % 71.1 %
- 23. Unit Forced Outege Rate 0.0% 1.0% 8.0%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A ,
- 25. If Shut Down at End of Report Period, Estimated Date of Start-up: October 7,1998
- 26. Unit in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED I INITIAL CRITICALITY INITIAL ELECTRICITY l
COMMERCIAL OPERATION l
I-I-
i,
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 10/05/98 Contact W. R. Matthews Telephone: (540) 894-2101 MONTH: September,1998
{
Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) -
1 892 17 000 !
2 892 18 000 ;
i 3 893 19 000 4 893 20 000 5- 894 21 000 i l.
6 893 22 000 l
7' 893 23 000 8 894 24 000 -
9 895 25 000 !
10 '898 26 000 f
11 898 27 000 l 1
12 841 28 000 13 001 29 _
000 14 000 30 000 15 000 16 000 f
J INSTRUCTIONS =
On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.-
. . . . - ~ . . . . .~
)
' Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 10/05/98 Contact W. R. Matthews Telephone: (540)894-2101 I
NORTH ANNA POWER STATION UNIT NO.:_j, MONTH: September 1998 -
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 ,
l
. Usted below in chronological sequence is a summary of operating expenences for this month which required load -
reductions or resulted in significant non-load related incidents.
i Edf E!DS 988 i
September 01,1998 0000 Began month in Mode 1, at 100% power, 933 MWe. j September 12,1998 2015 Commenced ramping Unit 1 off-line for a refueling outage. I September 13,1998 0038 Opened G-12 breaker. Unit 1 is off-line.
September 21,1998 1745 Unit 1 is defueled.
September 28,1998 0214 Unit 1 core on-load is complete. l September 30,1998 2400 Ended the month in Mode 5.
l 1
l I
J
. . __ __ --_ _. _ ~.____ .m. . _ . _ . . . . . . . . . _ . _ _ . _ . . - . _ _ _ . _ _
l Docket No.: 50-338 l Unit Name: North Anna Unit 1 Date: 10/05/98
Contact:
W. R. Matthews
- Telephone
- (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To on GREATER THAN 20%)
REPORT MONTH: September,1998 (1) (2) (3) (4) (5)
Method Duration of LER No. System Component Cause & Corrective Action l Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Reactor 9-13-98 S 430 hrs. C 1 NA NA NA 1998 scheduled refueling utage.
40 min.
(1) (2) (3)
F: Forced REASON: METHOD:
S: Scheduled A- Equipment Failure (Explain) 1 - Manual B- Maintenance or Test 2- Manual Scram C- Refueling 3- Automatic Scram D- Regulatory Restriction 4- Other (Explain)
E- Operator Training & Licensing Examination F- Administrative G- Operational Error (Explain)
(4) (5)
Exhibit G Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161) f i
.. . ______,m .. . _ _ _ _ _ . _ . . _ _ . _ . ___ . . _ . . _ _ . . .. - . _ _ .__
= 1
}
OPERATING DATA REPORT ;
Docket No.: 50-339 Date: 10/05/98
Contact:
W. R. Matthews l Telephone: (540) 894-2101 '
1, Unit Name: .. . . . North Anna Unit 2
- 2. Reporting Period:. .. . . September,1998
- 3. Licensed Thermal Power (MWt): . 2,893
- 4. Nameplate Rating (Gross MWe): .. 979
- 5. Design Electrical Rating (Net MWe): . . 907
- 6. Maximum Dependable Capacity (Gross MWe): .. 944 1
- 7. Maximum Dependable Capacity (Net MWe): . 897
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted, if Any (Net MWe): N/A
- 10. Reasons For Restrictions, if Any: N/A This Month Year-To-Date Cumulative
- 11. Hours in Reporting Period 720.0 6,551.0 155,999.0
.12. Hours Reactor Was Critical 703.2 5,864.8 131,579.2
- 13. Reactor Reserve Shutdown Hours 16.4 57.3 7,241.5
- 14. Hours Generator On-Line 699.5 5,842.1 130,364.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 2,011,445.1 16,544,902.6 357,338,082.6
- 17. Gross Electrical Energy Generated (MWH) 648,867.0 5,372,031.0 118,874,545.0
- 18. Net Electrical Energy Generated (MWH) 616,337.0 5,103,782.0 111,631,750.0
- 19. Unit Service Factor 97.1 % 89.2 % 83.6 %
- 20. Unit Availability Factor 97.1 % 89.2 % 83.6 %
- 21. Unit Capacity Factor (Using MDC Net) 95.4 % 86.9 % 79.6%
- 22. Unrt Capacity Factor (Using DER Net) 94.4 % 85.9 % 78.9 %
- 23. Unrt Forced Outage Rate 2.9% 0.3% 4.9% ,
i
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None 25, if Shut Down at End of Report Period, Estimated Date of Start-up: N/A
- 26. Unit in Test Status (Prior to Commercial Operation):
1 FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ,
I n -
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 10/05/98
Contact:
W. R. Matthews Telephone: (540) 894-2101 l
month: September,1998
')
Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net)
'1 886 17 759 2 887 18 089 l 3 386 19 867 4 887 20 884 5 888 21 886 6 887 22 886 7 887 23 886 8 889 24 890 i 9 890 25 889 10 887 20 888 11 888 27 888 12 890 28 890 l 1
13 887 29. 890 14 887 30- 890 ,
l 15 886 16 -885 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
l l
Docket No.: 50-339 I Unit Name: North Anna Unit 2 I Date: 10/05/98
Contact:
W. R. Matthews Telephone: (540) 894-2101 NORTH ANNA POWER STATION UNIT NO.:.2 MONTH: Septeminr 1998
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1
' Listed below in chronolo;ical sequence is a summary of operating experiences for the month which required load reductions or resulted in significant non-load related incidents. I ggig - Time Qala September.1,1998 0000 Began the month in Mode 1,100% power,933 MWe. j September 17,1998 2032 Unit 2 reactor trip due to lightning strike. j September 18,1998 0000 Unit stable in Mode 3. Reactor trip recovery in progress. l l
1236 ' Commenced reactor startup. '
1321 Reactor critical.-
1404 Entered Mode 1.
1705 Unit 2 is on-line.
2127 Started 2-FW-P-1A. Commenced ramp to 100% power.
September 19,1998 0410 Unit 2 at 100% power,933 Mwe.
September 30,1998 2400 Ended the month in Mode 1,100% power, 935 MWe.
)
I i
1
- i l
Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 10/05/98
Contact:
W. R. Matthews Telephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EcuAL To oR GREATEN THAN 20%)
Report MONTH: September,1998 I (1) (2) (3) (4) (5) i Method Duration of LER No. System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Rx I
l 9-17 98 F 20 hrs. H 3 N2 Lightning strike caused 004-00 automatic reactor trip.
33 min.
i I
i.
l I
-(1) (2) (3)
- F: Forced REASON:. METHOD:
S: Scheduled A- Equipment Failure (Explain) 1 - Manual B- Maintenance or Test 2- Manual Scram
-C- Refueling 3- Automatic Scram D- Regulatory Restriction 4- Other (Explain) l- E- Operator Training & Licensing Examination F- Administrative G- Operational Error (Explain)
(4) .
(5)
. Exhibit G -Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161) l.
i ,'
._ . -- -