05000348/FIN-2009006-01: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| CCA = N/A for ROP
| CCA = N/A for ROP
| INPO aspect =  
| INPO aspect =  
| description = "The team identified a finding of very low safety significance involving a noncite
| description = \"The team identified a finding of very low safety significance involving a noncite
violation (NCV) of 10 CFR 50, Appendix B, Criterion III, Design Control
violation (NCV) of 10 CFR 50, Appendix B, Criterion III, Design Control
Specifically, the licensee failed to establish measures to verify the design capability o
Specifically, the licensee failed to establish measures to verify the design capability o
Line 36: Line 36:
finding because it does not reflect recent performance in that the original SW syste
finding because it does not reflect recent performance in that the original SW syste
analyses were performed in 1990 and 1999 and the inspectors indentified n
analyses were performed in 1990 and 1999 and the inspectors indentified n
subsequent opportunity for the licensee to identify this deficiency. (Sections 1R21.2.1)
subsequent opportunity for the licensee to identify this deficiency. (Sections 1R21.2.1)\


}}
}}

Latest revision as of 20:38, 20 February 2018

01
Site: Farley Southern Nuclear icon.png
Report IR 05000348/2009006 Section 1R21
Date counted Mar 31, 2009 (2009Q1)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.21
Inspectors (proximate) J Eargle
P Braxton
R Moore
D Jones
B Sherbin
S Kobylarz
C Peabody
C Even
R Patterson
B Desai
INPO aspect
'