ENS 54721: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 1: | Line 1: | ||
{{ENS notification | {{ENS notification | ||
| event number = 54721 | | event number = 54721 | ||
| facility = | | facility = | ||
| Organization = Diablo Canyon | | Organization = Diablo Canyon | ||
| license number = | | license number = | ||
Line 10: | Line 10: | ||
| utype = | | utype = | ||
| cfr = 10 CFR 21.21(d)(3)(i) | | cfr = 10 CFR 21.21(d)(3)(i) | ||
| emergency class = | | emergency class = Non Emergency | ||
| notification date = 05/20/2020 14:07 | | notification date = 05/20/2020 14:07 | ||
| notification by = Ken Cortese | | notification by = Ken Cortese | ||
Line 18: | Line 18: | ||
| title = Part 21 Report - Inadequate Dedication of Replacement Thermocouples | | title = Part 21 Report - Inadequate Dedication of Replacement Thermocouples | ||
| event text = The following is a summary from the Diablo Canyon Part 21 Report submitted: | | event text = The following is a summary from the Diablo Canyon Part 21 Report submitted: | ||
On May 18, 2020, Pacific Gas and Electric (PG&E) completed its evaluation of a deviation concerning commercial-grade thermocouples dedicated at Diablo Canyon Power Plant. | On May 18, 2020, Pacific Gas and Electric (PG&E) completed its evaluation of a deviation concerning commercial-grade thermocouples dedicated at Diablo Canyon Power Plant. The original defect was discovered on April 10, 2020 during bench testing where two separate thermocouples exhibited leakage during static pressure testing. The two thermocouples were tested as part of a spare safety-related pump motor refurbishment. Upon subsequent review, it was identified that a pressure boundary test had not been required as part of the dedication process, but should have for its safety-related application. These components were not installed in the plant and there was no risk to the health and safety of the public. Thermocouples from the same batch have been quarantined to prevent installation, and it has been confirmed that none of the suspect batch of thermocouples have been installed in the plant. The thermocouple replacement part evaluation has been revised to include a pressure boundary test as part of the commercial-grade dedication prior to acceptance. | ||
Thermocouple Make and Model: March Bellofram 3060-2-JJ-2-13.00-0-1-000 | Thermocouple Make and Model: March Bellofram 3060-2-JJ-2-13.00-0-1-000 | ||
The NRC Resident Inspectors have been notified. | The NRC Resident Inspectors have been notified. | ||
This report only affects Diablo Canyon Power Plant. | This report only affects Diablo Canyon Power Plant. | ||
The person informing the Nuclear Regulatory Commission: | The person informing the Nuclear Regulatory Commission: |
Latest revision as of 12:37, 15 January 2021
Where | |
---|---|
Diablo Canyon California (NRC Region 4) | |
Organization: | Diablo Canyon |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+43.17 h1.799 days <br />0.257 weeks <br />0.0591 months <br />) | |
Opened: | Ken Cortese 14:07 May 20, 2020 |
NRC Officer: | Brian P. Smith |
Last Updated: | May 20, 2020 |