05000455/FIN-2008002-04: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{finding
{{finding
| title = Unit 1 Train B Auxiliary Feedwater Pump Diesel Fire And Shutdown During Surveillance  
| title = Unit 1 Train B Auxiliary Feedwater Pump Diesel Fire and Shutdown During Surveillance  


| docket = 05000455
| docket = 05000455
Line 13: Line 13:
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 71153
| Inspection procedure = IP 71153
| Inspector = B Bartlett, C Acosta, C Thompson, C Zoia, D Jones, J Cassidy, J Jacobson, N Feliz,_Adorno R, Jickling R, Ng R, Russell R, Skokowski T, Bilik V, Meghanir Ng, C Thompson, B Bartlett, J Cassidy, R Skokowski, C Scott
| Inspector = B Bartlett, C Acosta, C Thompson, C Zoia, D Jones, J Cassidy, J Jacobson, N Feliz Adorno, R Jickling, R Ng, R Russell, R Skokowski, T Bilik, V Meghanir, Ngc Thompson, B Bartlett, J Cassidy, R Skokowski, C Scott
| CCA = N/A for ROP
| CCA = N/A for ROP
| INPO aspect =  
| INPO aspect =  

Revision as of 20:34, 20 February 2018

04
Site: Byron Constellation icon.png
Report IR 05000455/2008002 Section 4OA3
Date counted Mar 31, 2008 (2008Q1)
Type: URI:
cornerstone No Cornerstone
Identified by: NRC identified
Inspection Procedure: IP 71153
Inspectors (proximate) B Bartlett
C Acosta
C Thompson
C Zoia
D Jones
J Cassidy
J Jacobson
N Feliz Adorno
R Jickling
R Ng
R Russell
R Skokowski
T Bilik
V Meghanir
Ngc Thompson
B Bartlett
J Cassidy
R Skokowski
C Scott
INPO aspect
'