ML20059G671: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:e                                                                                                              ,
d        .
                                                            .w e a'"dC$?
Southem Califomia Edison Company                              -
23 PAHKER ST HEET ARWNE. CALIFORNIA 97718 January 14, 1994 WALTE H C MAR SH                                                                    TE L EPe*ONE  i MANAGk.H Or NUCL E.AH #4f OLM.A f OMY AF FAdMS                                              (F14) 464-4403  i U. S. Nuclear Regulatory Commission                                                                !
Attention: Document Control Desk Washingten, D.C. 20555 Gentlemen:
 
==Subject:==
Docket Nos. 50-361 and 50-362                                            .
Monthly Operating Reports for December 1993 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 6.9.1.10 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3,                              .
respectively, requires SCE to provide a Monthly Operating Report for each Unit, which includes: routine operating statistics and shutdown experience; all challenges to safety valves; any changes to the Offsite Dose Calculation Manual (00CM); and any major changes to the radioactive. waste treatment system. All covered activities are reported monthly, except for                        !
ODCM changes, which are reported within 90 days from the. time the changes were made effective.                                                                              .
This letter transmits the December 1993 Monthly Operating Reports for Units 2 and 3,'respectively. There were no challenges to safety valves, and no major changes to the Units 2 and 3 radioactive-waste treatment systems                            ,
during the reporting period.
Revision 26 of the Unit 2/3 OCDM is provided as an enclosure.                                  I If you require any additional information, please let me know.                                  3 Sincerely, f(
Ofw Enclosures                                                        ,
i cc:        K. E. Perkins, Jr., Acting Regional Administrator, NRC Region V M. B. Fields, NRC Project Manager, Units 2 and 3 J. A. Sloan, Senior NRC Resident Inspector, San Onofre Units 1, 2_& 3                ;
f D Ll.        l R. _          _
tic    t}}

Revision as of 20:50, 6 January 2021

Forwards Monthly Operating Rept for Dec 1993 for SONGS Units 2 & 3.No Challenges to Safety Valves & No Major Changes to Radwaste Treatment Sys Occurred During Reporting Period
ML20059G671
Person / Time
Site: San Onofre  
Issue date: 01/14/1994
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20059G674 List:
References
NUDOCS 9401250058
Download: ML20059G671 (1)


Text

e ,

d .

.w e a'"dC$?

Southem Califomia Edison Company -

23 PAHKER ST HEET ARWNE. CALIFORNIA 97718 January 14, 1994 WALTE H C MAR SH TE L EPe*ONE i MANAGk.H Or NUCL E.AH #4f OLM.A f OMY AF FAdMS (F14) 464-4403 i U. S. Nuclear Regulatory Commission  !

Attention: Document Control Desk Washingten, D.C. 20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 .

Monthly Operating Reports for December 1993 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 6.9.1.10 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, .

respectively, requires SCE to provide a Monthly Operating Report for each Unit, which includes: routine operating statistics and shutdown experience; all challenges to safety valves; any changes to the Offsite Dose Calculation Manual (00CM); and any major changes to the radioactive. waste treatment system. All covered activities are reported monthly, except for  !

ODCM changes, which are reported within 90 days from the. time the changes were made effective. .

This letter transmits the December 1993 Monthly Operating Reports for Units 2 and 3,'respectively. There were no challenges to safety valves, and no major changes to the Units 2 and 3 radioactive-waste treatment systems ,

during the reporting period.

Revision 26 of the Unit 2/3 OCDM is provided as an enclosure. I If you require any additional information, please let me know. 3 Sincerely, f(

Ofw Enclosures ,

i cc: K. E. Perkins, Jr., Acting Regional Administrator, NRC Region V M. B. Fields, NRC Project Manager, Units 2 and 3 J. A. Sloan, Senior NRC Resident Inspector, San Onofre Units 1, 2_& 3  ;

f D Ll. l R. _ _

tic t