.w e Southem Califomia Edison Company 23 PAHKER ST HEET ARWNE. CALIFORNIA 97718 January 14, 1994 WALTE H C MAR SH TE L EPe*ONE i
MANAGk.H Or NUCL E.AH #4f OLM.A f OMY AF FAdMS (F14) 464-4403 i
U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washingten, D.C.
20555 Gentlemen:
Subject:
Docket Nos. 50-361 and 50-362 Monthly Operating Reports for December 1993 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 6.9.1.10 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires SCE to provide a Monthly Operating Report for each Unit, which includes: routine operating statistics and shutdown experience; all challenges to safety valves; any changes to the Offsite Dose Calculation Manual (00CM); and any major changes to the radioactive. waste treatment system.
All covered activities are reported monthly, except for ODCM changes, which are reported within 90 days from the. time the changes were made effective.
This letter transmits the December 1993 Monthly Operating Reports for Units 2 and 3,'respectively. There were no challenges to safety valves, and no major changes to the Units 2 and 3 radioactive-waste treatment systems during the reporting period.
I Revision 26 of the Unit 2/3 OCDM is provided as an enclosure.
If you require any additional information, please let me know.