                                                  APR 0 71986
  .
    Docket No.      50-423                                            NRC Construction
                                                                      Permit No. CPPR-113
    Northeast Nuclear Energy Company
    ATTN: Mr. J. F. Opeka
            Senior Vice President - Nuclear
            Engineering and Operations Group
    P. O. Box 270
    Hartford, Connecticut 06141-0270
    Gentlemen:
    Subject:      Inspection No. 50-423/85-64
    This refers to the Preoperational Security Program Review conducted by
    Mr. William Madden of this office on November 4-8, 1985, at Millstone Unit 3,
    Waterford, Connecticut, of activities authorized by NRC Construction Permit
    No. CPPR-113 and to the discussions of our findings held by Mr. Madden with
    Mr. R. Vogel and other members of your staff at the conclusion of the
    inspection.
    The review was conducted to determine whether the Unit No. 3 Physical Protec-
    tion Program, including personnel, equipment, systems and facilities, was being
    effectively integrated into the proposed combined security program for the
    Millstone site. The review also included a special evaluation of the security
    force training program to determine the ability of security force personnel to
    carry out their duties and responsibilities by observing licensee administered
    examinations of a statistically selected sample of security force personnel, in
    the tasks in which they were qualified, to ootain results at a confidence level
    of 95%. Additionally, the review included interviews of key members of the
    security organization and project engineering staff responsible for the instal-
    lation and testing of security systems and equipment. The review indicated
    that the Unit 3 security program conformed to NRC requirements in the areas
    examined and was being effectively integrated into the Millstone site program.
    In accordance with 10 CFR 2.790(a), this letter and the enclosure will be
    placed in the Public Document Room.
    No reply to this letter is required. Your cooperation with us is appreciated.
                                                  Sincerely,
                                                    Original Signed by:
                                  *'                Jern3 L J0YCSf
      deue19UMU6 860407
      PDR  ADOCK 05000423
      O                    PDR                  Thomas T. Martin, L'irector
                                                  Division of Radiation Safety
                                                    and Safeguards
    Enclosure: NP' Region I Inspection Report No. 50-423/85-64
                                  0FFICIAL RECORD COPY        IR MILL 3 85-64 - 0001.0.0
;                                                            03/27/86
l
,
L
                                                                                'TEi4      &
                                                                                              I  .
                                                                                                  j
 
                                                                              , - , - - - - - - - , - - - - - - - - - - -
    0
      Northeast Nuclear Energy Company          2  APR 0 71986
    .
'
      cc w/ enc 1:
      V. Papadopoli, Construction Quality Assurance Supervisor
      E. R. Foster, Director of G3neration Construction
      E. J. Mroczka, Vice President, Nuclear Operations
      D. O. Nordquist, Manager of Quality Assurance
      R.~ T. Laudenat, Manager, Generation Facilities Licensing
      W. D. Romberg, Station Superintendent
      Public Document Room (PDR)
      local Public Document Room (LPDR)
      Nuclear Safety Information Center (NSIC)
      NRC Senior Resident Inspector
      State of Connecticut
      bcc W/ encl:
      Region I Docket Room (with concurrences)
      Management Assistant, DRMA (w/o encl)
      DRP Section Chief
      G. Walton, SRI, BV-2
      T. Shediosky, SRI, Millstone 1&2
      B. Doolittle, LPM, NRR
      C. Gaskins, NMSS
                                                                                                                          ,
      RI:DRSS              RI: SS          R            R -D    S
      Madden /djh/ms        Ke ig            yn r        Ma  in
                          f //86              7/86              6
                                0FFICIAL RECORD COPY      IR MILL 3 85-64 - 0002.0.0
                                                          03/27/86
                                                                                                                          l
                                                                                                                          l
  _
                                                                                                                          1
}}
}}

Revision as of 18:04, 1 January 2021

Forwards Preoperational Security Program Review Rept 50-423/85-64 on 851104-08.Security Program Conformed to NRC Requirements in Areas Examined & Effectively Integrated Into Site Program
ML20202G140
Person / Time
Site: Millstone 
Issue date: 04/07/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20202G145 List:
References
NUDOCS 8604140286
Download: ML20202G140 (2)


See also: IR 05000423/1985064

Text

. . __ _

.

APR 0 71986

.

Docket No. 50-423 NRC Construction

Permit No. CPPR-113

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Inspection No. 50-423/85-64

This refers to the Preoperational Security Program Review conducted by

Mr. William Madden of this office on November 4-8, 1985, at Millstone Unit 3,

Waterford, Connecticut, of activities authorized by NRC Construction Permit

No. CPPR-113 and to the discussions of our findings held by Mr. Madden with

Mr. R. Vogel and other members of your staff at the conclusion of the

inspection.

The review was conducted to determine whether the Unit No. 3 Physical Protec-

tion Program, including personnel, equipment, systems and facilities, was being

effectively integrated into the proposed combined security program for the

Millstone site. The review also included a special evaluation of the security

force training program to determine the ability of security force personnel to

carry out their duties and responsibilities by observing licensee administered

examinations of a statistically selected sample of security force personnel, in

the tasks in which they were qualified, to ootain results at a confidence level

of 95%. Additionally, the review included interviews of key members of the

security organization and project engineering staff responsible for the instal-

lation and testing of security systems and equipment. The review indicated

that the Unit 3 security program conformed to NRC requirements in the areas

examined and was being effectively integrated into the Millstone site program.

In accordance with 10 CFR 2.790(a), this letter and the enclosure will be

placed in the Public Document Room.

No reply to this letter is required. Your cooperation with us is appreciated.

Sincerely,

Original Signed by:

  • ' Jern3 L J0YCSf

deue19UMU6 860407

PDR ADOCK 05000423

O PDR Thomas T. Martin, L'irector

Division of Radiation Safety

and Safeguards

Enclosure: NP' Region I Inspection Report No. 50-423/85-64

0FFICIAL RECORD COPY IR MILL 3 85-64 - 0001.0.0

03/27/86

l

,

L

'TEi4 &

I .

j

, - , - - - - - - - , - - - - - - - - - - -

0

Northeast Nuclear Energy Company 2 APR 0 71986

.

'

cc w/ enc 1:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. Foster, Director of G3neration Construction

E. J. Mroczka, Vice President, Nuclear Operations

D. O. Nordquist, Manager of Quality Assurance

R.~ T. Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg, Station Superintendent

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bcc W/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

G. Walton, SRI, BV-2

T. Shediosky, SRI, Millstone 1&2

B. Doolittle, LPM, NRR

C. Gaskins, NMSS

,

RI:DRSS RI: SS R R -D S

Madden /djh/ms Ke ig yn r Ma in

f //86 7/86 6

0FFICIAL RECORD COPY IR MILL 3 85-64 - 0002.0.0

03/27/86