ML20111B024: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:! | ||
l , | |||
l l Wisconsin 1 | |||
! 1 Electnc POWER COMPANY Point Beach Nucloor Plant 6610 Nuclear Rd., Two Rivers. VA 54241 (414) 755-2321 l PBL %-0109 I l | |||
l May 5,1996 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington,DC 20555 l | |||
l Gentlemen: | |||
DOCKETS 50-266 AND 50-301 l MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 l Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of April 1996. | |||
Sincerely, Jl/l G. L Maxfield l | |||
PBNP Manager | |||
! smb Attachments cc: L. L. Smith, PSCW | |||
; NRC Regional Administrator, Region Ill NRC Resident Inspector i 9605140137 960430 PDR ADOCK 05000266 R PDR l | |||
i l l-'' I il .subsduy afIIluvauh theny {brp<n6m | |||
F OPERATING DATA REPORT ' | |||
~ | |||
DOCKET NO. 50-266 DATE: 05/07/96 | |||
* COMPLETED BY: M. B. Koudelka i | |||
TELEPHONE: 414 755-6480 OPERATING STATUS | |||
: 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 . NOTES * | |||
: 2. REPORTING PERIOD: April - 1996 . | |||
i | |||
: 3. LICENSED THERMAL POWER (MWT) : 1518.5 . | |||
. I | |||
: 4. NAMEPLATE RATING (GROSS MWE): 523.8 . | |||
l | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE) : 497.0 . | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : 509.0 . | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) : 485.0 . . . . . . . . . . . . . . . . . | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 2 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: | |||
NA | |||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA | |||
: 10. REASONS FOR RESTRICTIONS, (IF ANY) : t NA THIS MONTH YEAR TO DATE CUMULATIVE | |||
: 11. HOURS IN REPORTING PERIOD 719.0 2,903.0 223,391.0 | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 197.7 2,338.5 186,992.9 . | |||
: 13. REACTOR RESERVE SHUTDONN HOURS 0.0 0.0. 667.3 | |||
: 14. HOURS GENERATOR ON LINE 154.5 2,292.6 183,774.0 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS j 0.0 0.0 846.9 | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 170031.0 3410754.0 260626903.0 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED 56680.0 1161750.0 88068120.0 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 51251.0 1109759.0 83962843.5 i | |||
: 19. UNIT SERVICE FACTOR 21.5% 79.0% 82.3% | |||
: 20. UNIT AVAILABILITY FACTOR 21.5% 79.0% 82.6% | |||
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 14.7% 78.8% 77.2% | |||
: 22. UNIT CAPACITY FACTOR (USING DER NET) 14.3% 76.9% 75.6% | |||
: 23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 1.5% | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) : | |||
NONE i | |||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 | |||
t POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 1 MONTH APRIL - 1996 DATE 5/7/96 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY __ | |||
MWe NET 1 -3 11 -2 21 -12 2 -2 12 -2 22 -13 3 -2 13 -2 23 -15 4 -2 14 -2 24 30 5 -2 15 -2 25 163 6 -2 16 -2 26 275 7 -2 17 -2 27 326 8 -2 18 -2 28 437 9 -2 19 -3 29 498 10 -2 20 -11 30 498 1 | |||
_ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - . _ _ _ _ _ x _ _ _ _ | |||
POINT BEACH NifCLEAR PLANT Docket No. 50-266 . | |||
Unit Name Point Beach. Unit i UNIT SHUTDOWNS AND POWER REDUCTIONS Date May 7.1996 Completed By M. B. Koudelka - | |||
REPORT MONTH 6PRIL - 1996 Telephone No. 414n55-6480 - | |||
Method of licensee Evem Duration Reactor Report No. System Component Cause and Corrective Action No. Date Type' (Hours) Reason | |||
* Shut Down' Code | |||
* Code' To Prevem Recurrence 1 3/30/96 S 564.5 C 1 NA NA NA Scheduled refueling and --- -e (UIR23). Major work items include replacing boric acid / reactor ninkeup water transminers; reactor head shield work; Phase 3D of emergency diesel generator tie-in work; replace IMS-2015/2016 aunospheric steam dump valves; replace HP turbine exhaust cmader piping; station service transformers anchorages; replace eight main steam condenser dump valves; and install containment isolauen valve for N2 supply lines to safety injection. | |||
'F: Forced ' Reason: ' Method: Txhibit G -Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenanc'e or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161) | |||
D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced load F - Administrative 6 - Other (explain) 8 Exhibit I- Same Source G - Operational Ermr (explain) | |||
H - Other (explain) | |||
( | |||
i I | |||
PBF4328b (03-90) | |||
i l - | |||
DOCKET NO. 50-266 l UNIT NAME Point Beach Unit 1 l DATE May 6, 1996 l COMPLETED BY M. B. Koudelka TELEPHONE 414/755-6480 l l l l | |||
Unit 1 was in its twenty-third refueling outage and operated at an average of 71 MWe net for the report period. | |||
I Safety-related maintenance included: | |||
1 | |||
: 1. 1A06 4.16 kV bus switchgear de ground located and corrected. | |||
: 2. 1CS-466 HX-1A steam generator feedwater regulator control valve cleaned, inspected and body-to-bonnet gasket replaced. | |||
: 3. 1CV-289 P2B charging pump discharge valve repacked. | |||
l l 4. DY-14 safe shutdown panel inverter capacitor, wiring and cooling | |||
; fan replaced. | |||
: 5. G-01 and G-02 emergency diesel generator governor setpoint and no load speed adjusted. | |||
! 6. 1MS-317 HX-1B steam generator sample to MS-2084 inlet valve | |||
! repacked. | |||
: 7. 1MS-2015 and 1MS-2016 HX-1A&B steam generator header atmospheric steam dump control valves replaced. | |||
l 8. 1MS-2082 P29 auxiliary feedwater pump overspeed trip valve stem l set screw inspected. | |||
l l 9. 1N-32 nuclear instrumentation source range channel resistor, detector and pre-amp replaced. | |||
l 10. IP-2C charging pump varidrive replaced. | |||
: 11. 1P-15A safety injection pump oil sightglass installed. | |||
: 12. IP-29-T turbine-driven auxiliary feedwater pump turbine inboard / outboard bearing oil' changed. | |||
: 13. P38A-M motor-driven auxiliary feedwater pump motor load tested and amptector setpoint verified. | |||
: 14. 1RC-431A T1 pressurizer spray line pressure control valve cage spacer and body-to-bonnet gasket replaced. | |||
l | |||
~ | |||
f | |||
: 15. 1SI-834C T34A&B safety injection accumulator nitrogen inlet isolation test connection and containment isolation valve installed. | |||
t | |||
: 16. 1SI-847A eductor A sodium hydroxide supply check valve replaced. | |||
j 17. ISW-2908-M HX-15A-D containment recirculation heat exchanger emergency flow control valve motor replaced. | |||
: 18. 1W1C1 containment accident recirculation fan, shaft and l spoolpiece balanced. | |||
l | |||
: 19. 1WL-1003A P18 reactor coolant drain tank pump suction switch selector operator replaced. | |||
: 20. Eight main steam condenser steam dump valves replaced. | |||
l l | |||
j | |||
OPERATING DATA REPORT DOCKET NO. 50-301 DATE: 05/07/96 . | |||
COMPLETED BY: M. B. Koudelka TELEPHONE: 414 755-6480 OPERATING STATUS | |||
: 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 . NOTES . | |||
: 2. REPORTING PERIOD: April - 1996 . | |||
: 3. LICENSED THERMAL POWER (MWT): 1518.5 . | |||
: 4. NAMEPLATE RATING (GROSS MWE) : 523.8 . | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE) : 497.0 . | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : 509.0 . . | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . . . . . . . . . . . . . . . . . . | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: | |||
NA | |||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): Power 90% | |||
: 10. REASONS FOR RESTRICTIONS, (IF ANY) : | |||
Self-imposed restriction because of SG tube plugging, pending further evaluation. | |||
THIS MONTH YEAR TO DATE CUMULATIVE | |||
: 11. HOURS IN REPORTING PERIOD 719.0 2,903.0 208,176.0 | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,903.0 182,230.1 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9 | |||
: 11. HOURS GENERATOR ON LINE 719.0 2,903.0 179,757.4 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2 | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 982621.0 3966034.0 258498187.0 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED 336930.0 1360390.0 87863650.0 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 321180.0 1297686.0 83762335.5 | |||
: 19. UNIT SERVICE FACTOR 100.0% 100.0% 86.3% | |||
: 20. UNIT AVAILABILITY FACTOR 100.0% 100.0% 86.5% | |||
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 92.1% 92.2% 82.4% | |||
: 22. UNIT CAPACITY FACTOR (USING DER NET) 89.9% 89.9% 81.0% | |||
: 23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 0.9% | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF RACH) : | |||
Refueling /SGRP, 10/05/96, 70 days | |||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 | |||
_ _ _ - - , - - , - , - - - - - , 3 POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301 , | |||
AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 MONTH APRIL - 1996 DATE 5/7/96 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 447 11 448 21 445 2 447 12 464 22 446 3 446 13 430 23 446 4 447 14 447 24 450 5 447 15 448 25 442 6 447 16 448 26 447 7 428 17 448 27 442 8 447 18 449 28 450 9 448 19 447 29 446 10 447 20 445 30 445 | |||
~ - - ~ ~ - ' | |||
POINT BEACH NUCLEAR PLANT Docket No. 50-266 . | |||
Unit Name Point Beach. Unit 2 UNIT SHUTDOWNS AND POWER REDUCTIONS Date May 7.1996 Completed By M. B. Koudelka ' | |||
REPORT MONTH APRIL - 1996 Telephone No. 414 055-6480 | |||
* Method of Duration Reactor Licensee Event System Component Cause and Corrective Action No. Date Type' (Hours) Reason | |||
* Shut Down' Report No. Code' Code' To Prevent Recunence NA NA NA NA NA NA NA NA NA NA | |||
'F: Forced ' Reason: ' Method: ' Exhibit G -Instructions | |||
, S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scrum LER file (NUREG-0161) | |||
D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load F- Administranve 6 - Other (explain) 5 Exhibit I- Same Source G - Operational Error (explain) | |||
H - Other (explain) i PBF-0028b (03-90) | |||
-= ._ - - - - - - - - | |||
-1 i | |||
l l* . | |||
1 e i | |||
1 l | |||
1 1 1 i | |||
i l DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 DATE May 6, 1996 COMPLETED BY M. B. Koudelka 1 I TELEPHONE 414/755-6480 l 1 | |||
, Unit 2 operated at an average of 446 MWe net for the report i period. I l | |||
l l | |||
l i | |||
l I | |||
i ; | |||
l l | |||
l i}} | |||
Revision as of 19:01, 13 July 2020
| ML20111B024 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 04/30/1996 |
| From: | Koudelka M, Maxfield G WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| PBL-96-0109, PBL-96-109, NUDOCS 9605140137 | |
| Download: ML20111B024 (10) | |
Text
!
l ,
l l Wisconsin 1
! 1 Electnc POWER COMPANY Point Beach Nucloor Plant 6610 Nuclear Rd., Two Rivers. VA 54241 (414) 755-2321 l PBL %-0109 I l
l May 5,1996 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington,DC 20555 l
l Gentlemen:
DOCKETS 50-266 AND 50-301 l MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 l Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of April 1996.
Sincerely, Jl/l G. L Maxfield l
PBNP Manager
! smb Attachments cc: L. L. Smith, PSCW
- NRC Regional Administrator, Region Ill NRC Resident Inspector i 9605140137 960430 PDR ADOCK 05000266 R PDR l
i l l- I il .subsduy afIIluvauh theny {brp<n6m
F OPERATING DATA REPORT '
~
DOCKET NO. 50-266 DATE: 05/07/96
- COMPLETED BY: M. B. Koudelka i
TELEPHONE: 414 755-6480 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 . NOTES *
- 2. REPORTING PERIOD: April - 1996 .
i
- 3. LICENSED THERMAL POWER (MWT) : 1518.5 .
. I
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 .
l
- 5. DESIGN ELECTRICAL RATING (NET MWE) : 497.0 .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : 509.0 .
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) : 485.0 . . . . . . . . . . . . . . . . .
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 2 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY) : t NA THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719.0 2,903.0 223,391.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 197.7 2,338.5 186,992.9 .
- 13. REACTOR RESERVE SHUTDONN HOURS 0.0 0.0. 667.3
- 14. HOURS GENERATOR ON LINE 154.5 2,292.6 183,774.0
- 15. UNIT RESERVE SHUTDOWN HOURS j 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 170031.0 3410754.0 260626903.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 56680.0 1161750.0 88068120.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 51251.0 1109759.0 83962843.5 i
- 19. UNIT SERVICE FACTOR 21.5% 79.0% 82.3%
- 20. UNIT AVAILABILITY FACTOR 21.5% 79.0% 82.6%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 14.7% 78.8% 77.2%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 14.3% 76.9% 75.6%
- 23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 1.5%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
NONE i
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
t POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 1 MONTH APRIL - 1996 DATE 5/7/96 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY __
MWe NET 1 -3 11 -2 21 -12 2 -2 12 -2 22 -13 3 -2 13 -2 23 -15 4 -2 14 -2 24 30 5 -2 15 -2 25 163 6 -2 16 -2 26 275 7 -2 17 -2 27 326 8 -2 18 -2 28 437 9 -2 19 -3 29 498 10 -2 20 -11 30 498 1
_ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - . _ _ _ _ _ x _ _ _ _
POINT BEACH NifCLEAR PLANT Docket No. 50-266 .
Unit Name Point Beach. Unit i UNIT SHUTDOWNS AND POWER REDUCTIONS Date May 7.1996 Completed By M. B. Koudelka -
REPORT MONTH 6PRIL - 1996 Telephone No. 414n55-6480 -
Method of licensee Evem Duration Reactor Report No. System Component Cause and Corrective Action No. Date Type' (Hours) Reason
- Shut Down' Code
- Code' To Prevem Recurrence 1 3/30/96 S 564.5 C 1 NA NA NA Scheduled refueling and --- -e (UIR23). Major work items include replacing boric acid / reactor ninkeup water transminers; reactor head shield work; Phase 3D of emergency diesel generator tie-in work; replace IMS-2015/2016 aunospheric steam dump valves; replace HP turbine exhaust cmader piping; station service transformers anchorages; replace eight main steam condenser dump valves; and install containment isolauen valve for N2 supply lines to safety injection.
'F: Forced ' Reason: ' Method: Txhibit G -Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenanc'e or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced load F - Administrative 6 - Other (explain) 8 Exhibit I- Same Source G - Operational Ermr (explain)
H - Other (explain)
(
i I
PBF4328b (03-90)
i l -
DOCKET NO. 50-266 l UNIT NAME Point Beach Unit 1 l DATE May 6, 1996 l COMPLETED BY M. B. Koudelka TELEPHONE 414/755-6480 l l l l
Unit 1 was in its twenty-third refueling outage and operated at an average of 71 MWe net for the report period.
I Safety-related maintenance included:
1
- 1. 1A06 4.16 kV bus switchgear de ground located and corrected.
- 2. 1CS-466 HX-1A steam generator feedwater regulator control valve cleaned, inspected and body-to-bonnet gasket replaced.
- 3. 1CV-289 P2B charging pump discharge valve repacked.
l l 4. DY-14 safe shutdown panel inverter capacitor, wiring and cooling
- fan replaced.
- 5. G-01 and G-02 emergency diesel generator governor setpoint and no load speed adjusted.
! 6. 1MS-317 HX-1B steam generator sample to MS-2084 inlet valve
! repacked.
- 7. 1MS-2015 and 1MS-2016 HX-1A&B steam generator header atmospheric steam dump control valves replaced.
l 8. 1MS-2082 P29 auxiliary feedwater pump overspeed trip valve stem l set screw inspected.
l l 9. 1N-32 nuclear instrumentation source range channel resistor, detector and pre-amp replaced.
l 10. IP-2C charging pump varidrive replaced.
- 11. 1P-15A safety injection pump oil sightglass installed.
- 12. IP-29-T turbine-driven auxiliary feedwater pump turbine inboard / outboard bearing oil' changed.
- 13. P38A-M motor-driven auxiliary feedwater pump motor load tested and amptector setpoint verified.
- 14. 1RC-431A T1 pressurizer spray line pressure control valve cage spacer and body-to-bonnet gasket replaced.
l
~
f
- 15. 1SI-834C T34A&B safety injection accumulator nitrogen inlet isolation test connection and containment isolation valve installed.
t
- 16. 1SI-847A eductor A sodium hydroxide supply check valve replaced.
j 17. ISW-2908-M HX-15A-D containment recirculation heat exchanger emergency flow control valve motor replaced.
- 18. 1W1C1 containment accident recirculation fan, shaft and l spoolpiece balanced.
l
- 19. 1WL-1003A P18 reactor coolant drain tank pump suction switch selector operator replaced.
- 20. Eight main steam condenser steam dump valves replaced.
l l
j
OPERATING DATA REPORT DOCKET NO. 50-301 DATE: 05/07/96 .
COMPLETED BY: M. B. Koudelka TELEPHONE: 414 755-6480 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 . NOTES .
- 2. REPORTING PERIOD: April - 1996 .
- 3. LICENSED THERMAL POWER (MWT): 1518.5 .
- 4. NAMEPLATE RATING (GROSS MWE) : 523.8 .
- 5. DESIGN ELECTRICAL RATING (NET MWE) : 497.0 .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : 509.0 . .
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . . . . . . . . . . . . . . . . . .
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): Power 90%
- 10. REASONS FOR RESTRICTIONS, (IF ANY) :
Self-imposed restriction because of SG tube plugging, pending further evaluation.
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719.0 2,903.0 208,176.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,903.0 182,230.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
- 11. HOURS GENERATOR ON LINE 719.0 2,903.0 179,757.4
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 982621.0 3966034.0 258498187.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 336930.0 1360390.0 87863650.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 321180.0 1297686.0 83762335.5
- 19. UNIT SERVICE FACTOR 100.0% 100.0% 86.3%
- 20. UNIT AVAILABILITY FACTOR 100.0% 100.0% 86.5%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 92.1% 92.2% 82.4%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 89.9% 89.9% 81.0%
- 23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 0.9%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF RACH) :
Refueling /SGRP, 10/05/96, 70 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
_ _ _ - - , - - , - , - - - - - , 3 POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301 ,
AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 MONTH APRIL - 1996 DATE 5/7/96 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 447 11 448 21 445 2 447 12 464 22 446 3 446 13 430 23 446 4 447 14 447 24 450 5 447 15 448 25 442 6 447 16 448 26 447 7 428 17 448 27 442 8 447 18 449 28 450 9 448 19 447 29 446 10 447 20 445 30 445
~ - - ~ ~ - '
POINT BEACH NUCLEAR PLANT Docket No. 50-266 .
Unit Name Point Beach. Unit 2 UNIT SHUTDOWNS AND POWER REDUCTIONS Date May 7.1996 Completed By M. B. Koudelka '
REPORT MONTH APRIL - 1996 Telephone No. 414 055-6480
- Method of Duration Reactor Licensee Event System Component Cause and Corrective Action No. Date Type' (Hours) Reason
- Shut Down' Report No. Code' Code' To Prevent Recunence NA NA NA NA NA NA NA NA NA NA
'F: Forced ' Reason: ' Method: ' Exhibit G -Instructions
, S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scrum LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load F- Administranve 6 - Other (explain) 5 Exhibit I- Same Source G - Operational Error (explain)
H - Other (explain) i PBF-0028b (03-90)
-= ._ - - - - - - - -
-1 i
l l* .
1 e i
1 l
1 1 1 i
i l DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 DATE May 6, 1996 COMPLETED BY M. B. Koudelka 1 I TELEPHONE 414/755-6480 l 1
, Unit 2 operated at an average of 446 MWe net for the report i period. I l
l l
l i
l I
i ;
l l
l i