ML20111B024
| ML20111B024 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 04/30/1996 |
| From: | Koudelka M, Maxfield G WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| PBL-96-0109, PBL-96-109, NUDOCS 9605140137 | |
| Download: ML20111B024 (10) | |
Text
!
l l
l Wisconsin 1 Electnc POWER COMPANY Point Beach Nucloor Plant 6610 Nuclear Rd., Two Rivers. VA 54241 (414) 755-2321 l
PBL %-0109 l
May 5,1996 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington,DC 20555 Gentlemen:
DOCKETS 50-266 AND 50-301 l
MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 l
Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of April 1996.
Sincerely, Jl/l G. L Maxfield PBNP Manager l
smb Attachments cc:
L. L. Smith, PSCW NRC Regional Administrator, Region Ill NRC Resident Inspector i
9605140137 960430 PDR ADOCK 05000266 R
PDR l
i l
l- I il.subsduy afIIluvauh theny {brp<n6m
F OPERATING DATA REPORT DOCKET NO. 50-266
~
DATE:
05/07/96 COMPLETED BY:
M. B.
Koudelka i
TELEPHONE: 414 755-6480 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES i
- 2. REPORTING PERIOD: April - 1996
- 3. LICENSED THERMAL POWER (MWT) :
1518.5 I
- 4. NAMEPLATE RATING (GROSS MWE):
523.8 l
- 5. DESIGN ELECTRICAL RATING (NET MWE) :
497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :
509.0.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) :
485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 2 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA t
- 10. REASONS FOR RESTRICTIONS, (IF ANY) :
NA THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719.0 2,903.0 223,391.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 197.7 2,338.5 186,992.9
- 13. REACTOR RESERVE SHUTDONN HOURS 0.0 0.0.
667.3
- 14. HOURS GENERATOR ON LINE 154.5 2,292.6 183,774.0
- 15. UNIT RESERVE SHUTDOWN HOURS j
0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 170031.0 3410754.0 260626903.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 56680.0 1161750.0 88068120.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 51251.0 1109759.0 83962843.5 i
- 19. UNIT SERVICE FACTOR 21.5%
79.0%
82.3%
- 20. UNIT AVAILABILITY FACTOR 21.5%
79.0%
82.6%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 14.7%
78.8%
77.2%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 14.3%
76.9%
75.6%
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
1.5%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
i NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
t POINT BEACH NUCLEAR PLANT DOCKET NO.
50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 1 MONTH APRIL -
1996 DATE 5/7/96 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
-3 11
-2 21
-12 2
-2 12
-2 22
-13 3
-2 13
-2 23
-15 4
-2 14
-2 24 30 5
-2 15
-2 25 163 6
-2 16
-2 26 275 7
-2 17
-2 27 326 8
-2 18
-2 28 437 9
-2 19
-3 29 498 10
-2 20
-11 30 498 1
x
POINT BEACH NifCLEAR PLANT Docket No.
50-266 Unit Name Point Beach. Unit i UNIT SHUTDOWNS AND POWER REDUCTIONS Date May 7.1996 Completed By M. B. Koudelka REPORT MONTH 6PRIL - 1996 Telephone No.
414n55-6480 Method of licensee Evem Duration Reactor Report No.
System Component Cause and Corrective Action No.
Date Type' (Hours)
Reason
- Shut Down' Code
- Code' To Prevem Recurrence 1
3/30/96 S
564.5 C
1 NA NA NA Scheduled refueling and ---
-e (UIR23). Major work items include replacing boric acid / reactor ninkeup water transminers; reactor head shield work; Phase 3D of emergency diesel generator tie-in work; replace IMS-2015/2016 aunospheric steam dump valves; replace HP turbine exhaust cmader piping; station service transformers anchorages; replace eight main steam condenser dump valves; and install containment isolauen valve for N2 supply lines to safety injection.
'F: Forced
' Reason:
' Method:
Txhibit G -Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenanc'e or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced load F - Administrative 6 - Other (explain)
Exhibit I-Same Source 8
G - Operational Ermr (explain)
H - Other (explain)
(
i I
PBF4328b (03-90)
i l
DOCKET NO.
50-266 UNIT NAME Point Beach Unit 1 l
DATE May 6, 1996 l
COMPLETED BY M.
B. Koudelka TELEPHONE 414/755-6480 l
l Unit 1 was in its twenty-third refueling outage and operated at an average of 71 MWe net for the report period.
I Safety-related maintenance included:
1.
1A06 4.16 kV bus switchgear de ground located and corrected.
2.
1CS-466 HX-1A steam generator feedwater regulator control valve cleaned, inspected and body-to-bonnet gasket replaced.
3.
1CV-289 P2B charging pump discharge valve repacked.
l 4.
DY-14 safe shutdown panel inverter capacitor, wiring and cooling fan replaced.
5.
G-01 and G-02 emergency diesel generator governor setpoint and no load speed adjusted.
6.
1MS-317 HX-1B steam generator sample to MS-2084 inlet valve repacked.
7.
1MS-2015 and 1MS-2016 HX-1A&B steam generator header atmospheric steam dump control valves replaced.
l 8.
1MS-2082 P29 auxiliary feedwater pump overspeed trip valve stem l
set screw inspected.
l l
9.
1N-32 nuclear instrumentation source range channel resistor, detector and pre-amp replaced.
l 10.
IP-2C charging pump varidrive replaced.
11.
1P-15A safety injection pump oil sightglass installed.
12.
IP-29-T turbine-driven auxiliary feedwater pump turbine inboard / outboard bearing oil' changed.
13.
P38A-M motor-driven auxiliary feedwater pump motor load tested and amptector setpoint verified.
14.
1RC-431A T1 pressurizer spray line pressure control valve cage spacer and body-to-bonnet gasket replaced.
l
~
f 15.
1SI-834C T34A&B safety injection accumulator nitrogen inlet isolation test connection and containment isolation valve installed.
t 16.
1SI-847A eductor A sodium hydroxide supply check valve replaced.
17.
ISW-2908-M HX-15A-D containment recirculation heat exchanger j
emergency flow control valve motor replaced.
18.
1W1C1 containment accident recirculation fan, shaft and l
spoolpiece balanced.
l 19.
1WL-1003A P18 reactor coolant drain tank pump suction switch selector operator replaced.
20.
Eight main steam condenser steam dump valves replaced.
l l
j
OPERATING DATA REPORT DOCKET NO. 50-301 DATE:
05/07/96 COMPLETED BY:
M.
B.
Koudelka TELEPHONE:
414 755-6480 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2
. NOTES
- 2. REPORTING PERIOD: April - 1996 3.
LICENSED THERMAL POWER (MWT):
1518.5 4.
NAMEPLATE RATING (GROSS MWE) :
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE) :
497.0 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :
509.0.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
Power 90%
- 10. REASONS FOR RESTRICTIONS, (IF ANY) :
Self-imposed restriction because of SG tube plugging, pending further evaluation.
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719.0 2,903.0 208,176.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,903.0 182,230.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
- 11. HOURS GENERATOR ON LINE 719.0 2,903.0 179,757.4
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 982621.0 3966034.0 258498187.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 336930.0 1360390.0 87863650.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 321180.0 1297686.0 83762335.5
- 19. UNIT SERVICE FACTOR 100.0%
100.0%
86.3%
- 20. UNIT AVAILABILITY FACTOR 100.0%
100.0%
86.5%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 92.1%
92.2%
82.4%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 89.9%
89.9%
81.0%
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
0.9%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF RACH) :
Refueling /SGRP, 10/05/96, 70 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
3 POINT BEACH NUCLEAR PLANT DOCKET NO.
50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 MONTH APRIL -
1996 DATE 5/7/96 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
447 11 448 21 445 2
447 12 464 22 446 3
446 13 430 23 446 4
447 14 447 24 450 5
447 15 448 25 442 6
447 16 448 26 447 7
428 17 448 27 442 l
8 447 18 449 28 450 9
448 19 447 29 446 10 447 20 445 30 445
~ - -
~ ~ -
POINT BEACH NUCLEAR PLANT Docket No.
50-266 Unit Name Point Beach. Unit 2 UNIT SHUTDOWNS AND POWER REDUCTIONS Date May 7.1996 Completed By M. B. Koudelka REPORT MONTH APRIL - 1996 Telephone No.
414 055-6480 Method of Duration Reactor Licensee Event System Component Cause and Corrective Action No.
Date Type' (Hours)
Reason
- Shut Down' Report No.
Code' Code' To Prevent Recunence NA NA NA NA NA NA NA NA NA NA
'F: Forced
' Reason:
' Method:
' Exhibit G -Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scrum LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Load F-Administranve 6 - Other (explain)
Exhibit I-Same Source 5
G - Operational Error (explain)
H - Other (explain) i PBF-0028b (03-90)
-=
-1 i
l l*
1 e
i l
1 1
1 i
i l
DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE May 6, 1996 COMPLETED BY M. B. Koudelka 1
I TELEPHONE 414/755-6480 1
Unit 2 operated at an average of 446 MWe net for the report i
period.
l l
l l
i l
I i
l l
l i
e