ML20069K443: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 2: | Line 2: | ||
| number = ML20069K443 | | number = ML20069K443 | ||
| issue date = 09/24/1982 | | issue date = 09/24/1982 | ||
| title = Revised Annual Operating Rept,1981 | | title = Revised Annual Operating Rept,1981 | ||
| author name = Sandquist G | | author name = Sandquist G | ||
| author affiliation = UTAH, UNIV. OF, SALT LAKE CITY, UT | | author affiliation = UTAH, UNIV. OF, SALT LAKE CITY, UT | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:f - | ||
o REVISED | |||
/, . | |||
Annual Operating Report 1981 , | |||
AGN 201N Reactor No. 107 University of Utah License R-25 Docket #50- 72 A. Operations Strmnry - | |||
/ | |||
: 1. Changes in facility design: None | |||
: 2. Perfomance Characteristics: Operation Nominal | |||
: 3. Changes in Operating Procedure: None | |||
: 4. Results of Surveillance Tests: | |||
1/17/81 .62 watts - Ch#1 Exceeds range ' | |||
-0 Ch#2 8x10 amps. | |||
-8 Ch#3 1.5x10 amps. | |||
2/28/81 Control Rod p = $1.98 Control ans Safety #2 p : $3.67 Control Safeties #1&2 p = $6.71 Excess Reactivity Ap a $1.00 | |||
* Shutdown Margin p : $3.67 | |||
: 5. Sunmary of, Changes (50.59a): None | |||
: 6. Changes in Staff: | |||
Richard E. Turley was replaced by Harold R. Jacobs as Reactor Administrator Craig M. Jensen was replaced by Kevan C. Crawford as Senior Reactor Engineer Manbers of the Reactor Safety Ccmnittee include: H.R. Jacobs, G.M. Sandquist, K.C. Crawford, R. Lloyd, R.C. Pendleton, and J.M. Byrne B. The Reactor Operated for 3.6 Hours for .64 Watt Hours. | |||
C. Shutdavn 2/28/81 A.C. Power fluctuation caused scram. No scram indicated on instruments magnet poner still on. | |||
2/28/81 Another scram caused by pover fluctuation. | |||
3/3/81 Reactor manually scramed. Recorder failed. | |||
D. Maintenance 1/20/81 Radiation survey and general equipment inspection. | |||
1/27/81 Power calibration. | |||
1/26/81 Scram interlock checks and monthly checks. | |||
2/28/81 Rod drop calibrations and monthly checks. | |||
0260234 eptopp --- | |||
g ADOCK 05000072 PDR | |||
f | |||
(' . | |||
E. Changes, Tests, and Experiments (50.59): None F. Radioactive Effluent Release: None G. Radiological Survey: Measuranents perfonned raonthly show no increase over background. | |||
II. Radiation Exposure Over 100 mrem. None - | |||
Report Submitted by: | |||
M A' | |||
andq 1st- | |||
// ffIff a' or Supe g or i | |||
s}} |
Latest revision as of 02:58, 24 May 2020
ML20069K443 | |
Person / Time | |
---|---|
Site: | 05000072 |
Issue date: | 09/24/1982 |
From: | Sandquist G UTAH, UNIV. OF, SALT LAKE CITY, UT |
To: | |
Shared Package | |
ML20069K436 | List: |
References | |
NUDOCS 8210260234 | |
Download: ML20069K443 (2) | |
Text
f -
o REVISED
/, .
Annual Operating Report 1981 ,
AGN 201N Reactor No. 107 University of Utah License R-25 Docket #50- 72 A. Operations Strmnry -
/
- 1. Changes in facility design: None
- 2. Perfomance Characteristics: Operation Nominal
- 3. Changes in Operating Procedure: None
- 4. Results of Surveillance Tests:
1/17/81 .62 watts - Ch#1 Exceeds range '
-0 Ch#2 8x10 amps.
-8 Ch#3 1.5x10 amps.
2/28/81 Control Rod p = $1.98 Control ans Safety #2 p : $3.67 Control Safeties #1&2 p = $6.71 Excess Reactivity Ap a $1.00
- Shutdown Margin p : $3.67
- 5. Sunmary of, Changes (50.59a): None
- 6. Changes in Staff:
Richard E. Turley was replaced by Harold R. Jacobs as Reactor Administrator Craig M. Jensen was replaced by Kevan C. Crawford as Senior Reactor Engineer Manbers of the Reactor Safety Ccmnittee include: H.R. Jacobs, G.M. Sandquist, K.C. Crawford, R. Lloyd, R.C. Pendleton, and J.M. Byrne B. The Reactor Operated for 3.6 Hours for .64 Watt Hours.
C. Shutdavn 2/28/81 A.C. Power fluctuation caused scram. No scram indicated on instruments magnet poner still on.
2/28/81 Another scram caused by pover fluctuation.
3/3/81 Reactor manually scramed. Recorder failed.
D. Maintenance 1/20/81 Radiation survey and general equipment inspection.
1/27/81 Power calibration.
1/26/81 Scram interlock checks and monthly checks.
2/28/81 Rod drop calibrations and monthly checks.
0260234 eptopp ---
g ADOCK 05000072 PDR
f
(' .
E. Changes, Tests, and Experiments (50.59): None F. Radioactive Effluent Release: None G. Radiological Survey: Measuranents perfonned raonthly show no increase over background.
II. Radiation Exposure Over 100 mrem. None -
Report Submitted by:
M A'
andq 1st-
// ffIff a' or Supe g or i
s