ML20066K330
| ML20066K330 | |
| Person / Time | |
|---|---|
| Site: | 05000072 |
| Issue date: | 12/31/1990 |
| From: | Gehmlich D, Sandquist G UTAH, UNIV. OF, SALT LAKE CITY, UT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9102270151 | |
| Download: ML20066K330 (3) | |
Text
. -
'Y U
q E
I h.'
+ x-i " '
+
.. i _l
{f;i
+
n, '
7'
- .ts c r.
^
THE
- UNIVERSIT'T xw
[
.OFUTAH 7-g f
j.
a
+
- i;
-[.
W l
February 21,1991 r
t
.U.S. Nuclear Regulatory Com. mission.
- Document Cdntrol Center.
> e 4
Washington, D.C. 120555
@g 4
Dear Sir / Madam:
s u-
- y f'~u
, Enclosed you will find a copy of the Annual Operating Report for the University of Utah'-
L m'
l
. AGN 20lM Reactor, License R-2.5 Docket 50-77, for the period 1 January 1990 through 31 m
- 7%
. December 1990.lThis report fulfills AGN Technical Specification 6,9.1.
w e$k7 lf you have aniquestions concerning the report please contact the staff at ; e facilitp.
f o
3 yb t
t
-b
,[
e..g
-m s i:._
+
.i s
ii,
Sincerely, -
,w -
a
+
/
h_ k {p. '.Q,l W
}f t x
-)
~
y I t W.M; 9
p p ', y,9
?Dietrich K. Gehmlich <
ibe 4 1
Reactor Administrator ~
4 h-in m
,s W M (0--
m s '
(M lr) s
' ' '*; }g. > -, ' !,?
+
1 4 --
__.__ < =
t
,(.
r yg A
E
?\\i;,0 $kY ^
- l w
g a
1 g;- Ha [Sn
- o. M- -'
e& '
ls
+py:,
..p j 19 r
d I jj. N A}.
,~-
4
!') E _ v v' 2:.
l -
.f 3
~
1 8_ 80 673,i< L M$Q@1J91o2270151 901231
'MEB M09'.
O J/
,m.m.
- =-
a f,
f. Apartment of Mechanleal Engineering C
?
y
. Salt Lake Oty, Utah 84112
~
M..i i.PDR oADOCK'05000072
_lgp
> f,Ax F8015818692 o,
g poliss m44:
Rt POR-z o
b-Q. -.-d9f< -[.p[ ff.
t r V.
3 m
f 4
n' u'
f g-Ng, a ?
[
The University of Utah -
4
= AGN 20lM Reactor No.14
- License R 25, Docket No. ! J 72 1 Annual Operating Report f er 1990-A. Facility Modifications:
l None.
r Me.
y
'B.
Results of Tests and Inspections:
_i
~
Surveillance of the reactor has continued despite preliminary decommissioning; j
activities. Inspections included monthly visual inspections and monitoring'of radiation 1
levels in the vicinity of the reactor and the periodic sampling and analysis of shieldingf 1
(g, water to determine the presence of any radioactive materials..~ These inspections showed no' evidence?of water leakage, excessive corrosion,' release!of fission-s aroducts', or unusual radiation levels. Fuel has been removed from the reactor and is -
q E
Ming stored under lock and key in approved fuel storage pits pending transfer to the 1
--Department of Energy. Periodic inventory and surveillance of the fuel is being
' performed.E Because the AGN restor has not been operated since February.-1985,
_ and since we are pres:ntly awaiting approval to decommission the reactor, none of the
'j 1 operational surveillance activities enumeraied'in Section 4 of the AGN Technical 1
Specifications are required as provided in Section 4.0. However, surveillance for -
retention of radioactive materials is being per'ormed.-
- 3 m'
y i
i g [,
Cdtrective Maintenance:
C m
C None.
W 7
%y-LDi Energy Produced:-
1 s
7 i Since February:1985 - zero.1 x.
..,.g i,
- EL UhselEduled Shutdowns:
(-
- 'o,ne,j N-1 o
u
.o LF! ; Reactor Safety Committee Action: -
I 4.,
_1l, The RSC is current $homprised'of the following' members:
j!
y W'
1 Dietrich K Gehmlich - Reactor Administrator?
h.Ylh '
- Gary M. Sandquist - Director, UUNEL and AGN Reactor Supervisor 1
Ej Keith J.- Schiager - Radistion %fety Officer Kevan C. Crawford -
j M
_ Jame' ' M.'Byrne -
s M
Nern C_. Rogers y
" John S.:Bennion.
j
'2. Personnel ~ radiation exposures andLradiation su.veys have been reviewed and R
approved. ' All exposures and st.rveys have been v ithin nominal background levels.
I m
~p g
a-a
l L
[
Oniversity of Utah AGN 20lM Reactor 1990 Antiual Operating Repon page 2
.3. The RSC reviewed and audited all documentation of preliminary decommissioning act!vities completed to date. These activities were associated with defueling the reactor and preparing it for safe storage until approval is granted by NRC to proceed with final decommissioning procedures.
~ 4J The RSC reviewed and approved the Decommissioning Plan (DP) for the AGN reactor. The DP was submitted to NRC for review on 17 July 1990.
G. Summary of Changes Reportable under 10 CFR 50.59:
3 As provided by AGN Technical Specification 4.0, certain surveillance activities have been discontinued since the reactor is not werable. Fuel has been removed from the reactor and is being stored under lock and key in approved fuel storage pits pending transfer to DOE. Periodic inventory and surveillance of the fuel is being performed.
.The DOE has authorized the request for shipment of the fuel to the DOE facility at Oak Ridge, Tennessee. Arrangements for the shipment have been made with the assistance i
of the DOE Idaho Operations Office. It is anticipated that the fuel will be shipped
~ off site in early February 1991.
H.. Reponable Occurrences:
None.
Report submitted by:
dA 4
e Gay. S p ist, Reacto Supe sor