ML042430669: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Page 1 of 2                                                                                  Crystal River 08/30/2004    14:17:49                                                                Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit                                                                                                          No. of Staff    Planned Dates          Inspection Number      Inspection Activity                                                    Title                        on Site        Start      End            Type EB1-TFP        - TRIENNIAL FIRE PROTECTION PRE-INSP VISIT                                                  7 3            IP 7111105T            Fire Protection                                                                      12/13/2004  12/17/2004 Baseline Inspections EB1-TFP        - TRIENNIAL FIRE PROTECTION                                                                  4 3            IP 7111105T            Fire Protection                                                                      01/10/2005  01/14/2005 Baseline Inspections 3            IP 7111105T            Fire Protection                                                                      01/24/2005  01/29/2005 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT                                                                      2 3            IP 7111121            Safety System Design and Performance Capability                                      03/28/2005  04/01/2005 Baseline Inspections OL EP          - EP INSPECTION                                                                              1 3            IP 7111402            Alert and Notification System Testing                                                04/25/2005  04/29/2005 Baseline Inspections 3            IP 7111403            Emergency Response Organization Augmentation Testing                                  04/25/2005  04/29/2005 Baseline Inspections 3            IP 7111404            Emergency Action Level and Emergency Plan Changes                                    04/25/2005  04/29/2005 Baseline Inspections 3            IP 7111405            Correction of Emergency Preparedness Weaknesses and Deficiencies                      04/25/2005  04/29/2005 Baseline Inspections 3            IP 71151              Performance Indicator Verification                                                    04/25/2005  04/29/2005 Baseline Inspections EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY                                                          5 3            IP 7111121            Safety System Design and Performance Capability                                      04/25/2005  04/29/2005 Baseline Inspections 3            IP 7111121            Safety System Design and Performance Capability                                      05/09/2005  05/13/2005 Baseline Inspections OL PREP        - INITIAL EXAM PREP                                                                          2 3              V23237              CRYSTAL RIVER/EXAMS AT POWER FACILITIES                                              08/08/2005  08/12/2005 Not Applicable EB2-MR        - MAINTENANCE EFFECTIVENESS                                                                  1 3            IP 7111112B            Maintenance Effectiveness                                                            08/15/2005  08/19/2005 Baseline Inspections OL EXAM        - INITIAL EXAM                                                                              3 3              V23237              CRYSTAL RIVER/EXAMS AT POWER FACILITIES                                              08/29/2005  09/02/2005 Not Applicable EB2-ISI        - INSERVICE INSPECTION                                                                      1 3            IP 7111108P            Inservice Inspection Activities - PWR                                                10/10/2005  10/14/2005 Baseline Inspections PS-RP          - RP OCCUPATIONAL BASELINE - WEEK 1                                                          2 3            IP 7112101            Access Control to Radiologically Significant Areas                                    10/17/2005  10/21/2005 Baseline Inspections 3            IP 7112102            ALARA Planning and Controls                                                          10/17/2005  10/21/2005 Baseline Inspections 3            IP 7112202            Radioactive Material Processing and Transportation                                    10/17/2005  10/21/2005 Baseline Inspections 3            IP 71151              Performance Indicator Verification                                                    10/17/2005  10/21/2005 Baseline Inspections EB2SGISI      - STEAM GENERATOR ISI                                                                        1 3            IP 7111108P            Inservice Inspection Activities - PWR                                                10/24/2005  10/28/2005 Baseline Inspections PS-RP          - RP OCCUPATIONAL BASELINE - WEEK 2                                                          2 3            IP 7112101            Access Control to Radiologically Significant Areas                                    10/31/2005  11/04/2005 Baseline Inspections 3            IP 7112102            ALARA Planning and Controls                                                          10/31/2005  11/04/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
ENCLOSURE
 
Page 2 of 2                                                                                Crystal River 08/30/2004    14:17:49                                                              Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit                                                                                                        No. of Staff    Planned Dates        Inspection Number      Inspection Activity                                                Title                          on Site        Start      End            Type PS-RP          - RP OCCUPATIONAL BASELINE - WEEK 2                                                        2 3            IP 7112202            Radioactive Material Processing and Transportation                                  10/31/2005  11/04/2005 Baseline Inspections 3            IP 71151              Performance Indicator Verification                                                  10/31/2005  11/04/2005 Baseline Inspections EB2-MODS - MODIFICATIONS/10CFR50.59                                                                      4 3            IP 7111102            Evaluation of Changes, Tests, or Experiments                                        11/14/2005  11/18/2005 Baseline Inspections 3            IP 7111117B            Permanent Plant Modifications                                                      11/14/2005  11/18/2005 Baseline Inspections EB2-HS        - HEAT SINK                                                                                1 3            IP 7111107B            Heat Sink Performance                                                              01/09/2006  01/13/2006 Baseline Inspections OL RQ          - REQUAL INSPECTION                                                                        2 3            IP 7111111B            Licensed Operator Requalification Program                                          01/30/2006  02/03/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}

Revision as of 12:14, 24 March 2020

Inspection/Activity Plan for 09/01/2004 - 03/31/2006
ML042430669
Person / Time
Site: Crystal River 
Issue date: 08/30/2004
From: Joel Munday
NRC/RGN-II/DRP/RPB3
To: Young D
Florida Power Corp
Shared Package
ML042430667 List:
References
Download: ML042430669 (2)


Text

Page 1 of 2 Crystal River 08/30/2004 14:17:49 Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-TFP - TRIENNIAL FIRE PROTECTION PRE-INSP VISIT 7 3 IP 7111105T Fire Protection 12/13/2004 12/17/2004 Baseline Inspections EB1-TFP - TRIENNIAL FIRE PROTECTION 4 3 IP 7111105T Fire Protection 01/10/2005 01/14/2005 Baseline Inspections 3 IP 7111105T Fire Protection 01/24/2005 01/29/2005 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT 2 3 IP 7111121 Safety System Design and Performance Capability 03/28/2005 04/01/2005 Baseline Inspections OL EP - EP INSPECTION 1 3 IP 7111402 Alert and Notification System Testing 04/25/2005 04/29/2005 Baseline Inspections 3 IP 7111403 Emergency Response Organization Augmentation Testing 04/25/2005 04/29/2005 Baseline Inspections 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/25/2005 04/29/2005 Baseline Inspections 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/25/2005 04/29/2005 Baseline Inspections 3 IP 71151 Performance Indicator Verification 04/25/2005 04/29/2005 Baseline Inspections EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY 5 3 IP 7111121 Safety System Design and Performance Capability 04/25/2005 04/29/2005 Baseline Inspections 3 IP 7111121 Safety System Design and Performance Capability 05/09/2005 05/13/2005 Baseline Inspections OL PREP - INITIAL EXAM PREP 2 3 V23237 CRYSTAL RIVER/EXAMS AT POWER FACILITIES 08/08/2005 08/12/2005 Not Applicable EB2-MR - MAINTENANCE EFFECTIVENESS 1 3 IP 7111112B Maintenance Effectiveness 08/15/2005 08/19/2005 Baseline Inspections OL EXAM - INITIAL EXAM 3 3 V23237 CRYSTAL RIVER/EXAMS AT POWER FACILITIES 08/29/2005 09/02/2005 Not Applicable EB2-ISI - INSERVICE INSPECTION 1 3 IP 7111108P Inservice Inspection Activities - PWR 10/10/2005 10/14/2005 Baseline Inspections PS-RP - RP OCCUPATIONAL BASELINE - WEEK 1 2 3 IP 7112101 Access Control to Radiologically Significant Areas 10/17/2005 10/21/2005 Baseline Inspections 3 IP 7112102 ALARA Planning and Controls 10/17/2005 10/21/2005 Baseline Inspections 3 IP 7112202 Radioactive Material Processing and Transportation 10/17/2005 10/21/2005 Baseline Inspections 3 IP 71151 Performance Indicator Verification 10/17/2005 10/21/2005 Baseline Inspections EB2SGISI - STEAM GENERATOR ISI 1 3 IP 7111108P Inservice Inspection Activities - PWR 10/24/2005 10/28/2005 Baseline Inspections PS-RP - RP OCCUPATIONAL BASELINE - WEEK 2 2 3 IP 7112101 Access Control to Radiologically Significant Areas 10/31/2005 11/04/2005 Baseline Inspections 3 IP 7112102 ALARA Planning and Controls 10/31/2005 11/04/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

ENCLOSURE

Page 2 of 2 Crystal River 08/30/2004 14:17:49 Inspection / Activity Plan Report 22 09/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS-RP - RP OCCUPATIONAL BASELINE - WEEK 2 2 3 IP 7112202 Radioactive Material Processing and Transportation 10/31/2005 11/04/2005 Baseline Inspections 3 IP 71151 Performance Indicator Verification 10/31/2005 11/04/2005 Baseline Inspections EB2-MODS - MODIFICATIONS/10CFR50.59 4 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 11/14/2005 11/18/2005 Baseline Inspections 3 IP 7111117B Permanent Plant Modifications 11/14/2005 11/18/2005 Baseline Inspections EB2-HS - HEAT SINK 1 3 IP 7111107B Heat Sink Performance 01/09/2006 01/13/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 2 3 IP 7111111B Licensed Operator Requalification Program 01/30/2006 02/03/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.