NOC-AE-06002013, License Amendment Request - Proposed Amendment to Technical Specifications: Revision of the Spent Fuel Pool and In-Containment Storage Area Criticality Analysis: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 422: Line 422:
DESIGN FEATURES TABLE 5.6-2 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 2 FUEL Limiting Burnup S~~~~~~(MWD/MTU____                                      ____          ____
DESIGN FEATURES TABLE 5.6-2 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 2 FUEL Limiting Burnup S~~~~~~(MWD/MTU____                                      ____          ____
Initial Enrichment        0Oyr          5 yr          10 yr        15 yr        20Oyr        25 yr          30 yr (W/o MU)        decay        decay          decay        decay          decay      decay          decay 1.169                0                0            0            0            0            0              0 3.000      34,181.37 31,739.93            30,016.00    28,707.44 27,899.89      27,201.13      26,828.89 4.000      49,896.73 46,448.45            43,861.01    42,370.86, 40,980.96      40,274.66      39,689.32 5.000"    65,006.18 60,688.97            57,628.51    55,503.59 154,010.68      53,081.69      52,120.75J Note that the required assembly burnups as a function of initial enrichment (e)for each decay period is described by the following polynomials:
Initial Enrichment        0Oyr          5 yr          10 yr        15 yr        20Oyr        25 yr          30 yr (W/o MU)        decay        decay          decay        decay          decay      decay          decay 1.169                0                0            0            0            0            0              0 3.000      34,181.37 31,739.93            30,016.00    28,707.44 27,899.89      27,201.13      26,828.89 4.000      49,896.73 46,448.45            43,861.01    42,370.86, 40,980.96      40,274.66      39,689.32 5.000"    65,006.18 60,688.97            57,628.51    55,503.59 154,010.68      53,081.69      52,120.75J Note that the required assembly burnups as a function of initial enrichment (e)for each decay period is described by the following polynomials:
Required Assembly    Burnup  (@0 yr decay) = 193.82e3 -2628.80e 2 +26945.60e -28229.39 Required Assembly    Burnup  (@5 yr decay) = 181 .66e3 - 2413.97e2 + 24884.71 e - 26093.42 Required Assembly    Burnup  (@10 yr decay) = 225.41e3 - 2743.71 e2 + 24710.68e - 25508.80 Required Assembly    Burnup  (@15 yr decay) = 11 7.06e3 -_1670.1 1e2 + 21022.85e - 22490.81 Required Assembly    Burnup  (@20 yr decay) = 192.66e 3 - 2337.54e2 + 2231 5.60e - 23210.74 Required Assembly    Burnup  (@25 yr decay) = 130.06e3 1693.93e2 + 201 18.91 e - 21421.79
Required Assembly    Burnup  (@0 yr decay) = 193.82e3 -2628.80e 2 +26945.60e -28229.39 Required Assembly    Burnup  (@5 yr decay) = 181 .66e3 - 2413.97e2 + 24884.71 e - 26093.42 Required Assembly    Burnup  (@10 yr decay) = 225.41e3 - 2743.71 e2 + 24710.68e - 25508.80 Required Assembly    Burnup  (@15 yr decay) = 11 7.06e3 -_1670.1 1e2 + 21022.85e - 22490.81 Required Assembly    Burnup  (@20 yr decay) = 192.66e 3 - 2337.54e2 + 2231 5.60e - 23210.74 Required Assembly    Burnup  (@25 yr decay) = 130.06e3 1693.93e2 + 201 18.91 e - 21421.79 Required Assembly    Burnup  (@30 yr decay) = 109.74e3 1531.41 e2 + 19519.81 e - 20910.89 This data represents the curves in Figure 5.6-18.
                                                                -
Required Assembly    Burnup  (@30 yr decay) = 109.74e3 1531.41 e2 + 19519.81 e - 20910.89
                                                                -
This data represents the curves in Figure 5.6-18.
SOUTH TEXAS      -  UNITS 1 & 2                    5-15            Unit 1 - Amendment No. 43,1-O4, Unit 2 - Amendment No. 32-,94-,
SOUTH TEXAS      -  UNITS 1 & 2                    5-15            Unit 1 - Amendment No. 43,1-O4, Unit 2 - Amendment No. 32-,94-,


Line 439: Line 435:
DESIGN FEATURES TABLE 5.6-5 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 4 FUEL Limiting Burnup
DESIGN FEATURES TABLE 5.6-5 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 4 FUEL Limiting Burnup
______(NMWD/MTU Initial Enrichment        0Qyr      5 yr              10 yr          15 yr        20Oyr      25 yr        30Oyr (W/o MU)        decay      decay            decay          decay          decay    decay        decay 1.240              0            0                0              0            0          0            0, 3.000    31,005.51 28,911.05          27,181.32        26,214.57      25,577.34  24,902.21    24,411.30 4.000    45,943.04 42,781.39          40,567.87        39,204.86      38,151.31  37,284.43    36,815.21 5.000    60,361.64 56,489.33          53,864.06        51,947.13      50,680.02  49,485.61    48,865.60 Note that the required assembly burnups as a function of initial enrichment (e) for each decay period is described by the following polynomials:
______(NMWD/MTU Initial Enrichment        0Qyr      5 yr              10 yr          15 yr        20Oyr      25 yr        30Oyr (W/o MU)        decay      decay            decay          decay          decay    decay        decay 1.240              0            0                0              0            0          0            0, 3.000    31,005.51 28,911.05          27,181.32        26,214.57      25,577.34  24,902.21    24,411.30 4.000    45,943.04 42,781.39          40,567.87        39,204.86      38,151.31  37,284.43    36,815.21 5.000    60,361.64 56,489.33          53,864.06        51,947.13      50,680.02  49,485.61    48,865.60 Note that the required assembly burnups as a function of initial enrichment (e) for each decay period is described by the following polynomials:
Required Assembly    Burnup (@0 yr decay) =          189.37e 3 - 2531 .89e2 + 25654.1 4e - 28282.82 Required Assembly    Burnup (@5 yr decay) =          224.93e 3 - 2780.39e 2 + 25010.58e - 27170.32 Required Assembly    Burnup (@10 yr decay) =        186.41 e3 - 2282.12e 2 + 22464.17e - 24705.21 Required Assembly    Burnup (@15 yr decay) =        150.69e3 _ 1932.33e2 + 20940.94e - 23285.99 Required Assembly    Burnup (@20 yr decay) =        182.88e3 - 221 7.24e 2 + 21 327.90e - 23389.09 Required Assembly    Burnup (@25 yr decay) =        146.33e3 1846.50e2 + 19893.47e - 22110.62
Required Assembly    Burnup (@0 yr decay) =          189.37e 3 - 2531 .89e2 + 25654.1 4e - 28282.82 Required Assembly    Burnup (@5 yr decay) =          224.93e 3 - 2780.39e 2 + 25010.58e - 27170.32 Required Assembly    Burnup (@10 yr decay) =        186.41 e3 - 2282.12e 2 + 22464.17e - 24705.21 Required Assembly    Burnup (@15 yr decay) =        150.69e3 _ 1932.33e2 + 20940.94e - 23285.99 Required Assembly    Burnup (@20 yr decay) =        182.88e3 - 221 7.24e 2 + 21 327.90e - 23389.09 Required Assembly    Burnup (@25 yr decay) =        146.33e3 1846.50e2 + 19893.47e - 22110.62 Required Assembly    Burnup (@30 yr decay) =          94.42e3 _ 1,309.83e2 + 18079.07e - 20586.85 This data represents the curves in Figure 5.6-21.
                                                                  -
Required Assembly    Burnup (@30 yr decay) =          94.42e3 _ 1,309.83e2 + 18079.07e - 20586.85 This data represents the curves in Figure 5.6-21.
TABLE 5.6-6 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 5 FUEL Initial Enrichment          Limiting Burnup U) 23/o        (MWD/MTU) 1.695                            0 3.000                    17,449.52 4.000                  27,331.22 5.000                  37,696.661 Note that the required assembly burnup as a function of initial enrichment (e) is described by the following polynomial:
TABLE 5.6-6 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 5 FUEL Initial Enrichment          Limiting Burnup U) 23/o        (MWD/MTU) 1.695                            0 3.000                    17,449.52 4.000                  27,331.22 5.000                  37,696.661 Note that the required assembly burnup as a function of initial enrichment (e) is described by the following polynomial:
Required Assembly Burnup = 531 .223e3 - 6132.815Se 2 + 33156.1 50e - 41166.623 This data represents the curves in Figure 5.6-22.
Required Assembly Burnup = 531 .223e3 - 6132.815Se 2 + 33156.1 50e - 41166.623 This data represents the curves in Figure 5.6-22.
Line 481: Line 475:


DESIGN FEATURES TABLE 5.6-12 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 14 AND 16 FUEL Limiting Burnup Initial Enrichment        0Oyr        5 yr        10 yr          15 yr        20Oyr      25 yr      30Oyr (w/o  23U)      decay      decay        decay          decay        decay    decay      decay 1.379          0          0            0              0            0        0          0 3.000      26,324.70 24,510.31      23,293.43      22,355.96      21,841.95 21,318.38  21,045.43 4.000      40,552.13 37,872.29      35,977.77      34,847.67      33,978.83 33,197.02  32,857.48 5.000      54,120.03 51,210.59      48,740.61      47,176.78      45,874.18 45,225.90  44,385.90 Note that the required assembly' burnups as a function of initial enrichment (e)for each decay period is described by the following polynomials:
DESIGN FEATURES TABLE 5.6-12 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 14 AND 16 FUEL Limiting Burnup Initial Enrichment        0Oyr        5 yr        10 yr          15 yr        20Oyr      25 yr      30Oyr (w/o  23U)      decay      decay        decay          decay        decay    decay      decay 1.379          0          0            0              0            0        0          0 3.000      26,324.70 24,510.31      23,293.43      22,355.96      21,841.95 21,318.38  21,045.43 4.000      40,552.13 37,872.29      35,977.77      34,847.67      33,978.83 33,197.02  32,857.48 5.000      54,120.03 51,210.59      48,740.61      47,176.78      45,874.18 45,225.90  44,385.90 Note that the required assembly' burnups as a function of initial enrichment (e)for each decay period is described by the following polynomials:
Required Assembly    Burnup  (@0 yr decay)  =  121 .12e3 -1783.27e 2 + 22228.68e - 27582.31 Required Assembly    Burnup  (@5 yr decay)  =  182.17e3 - 2197.86e2 + 22006.79e - 26647.85 Required Assembly    Burnup  (@10 yr decay)  =  188.58e3 - 2223.67e2 + 21272.66e - 25603.11 Required Assembly    Burnup  (@15 yr decay)  =  11 4.63e 3 _ 1456.89e 2 + 18448.52e - 22972.71 Required Assembly    Burnup  (@20 yr decay)  =  107.71 e3 - 1413.26e2 + 18044.48e - 22480.30 Required Assembly    Burnup  (@25 yr decay)  =  154.98e3 1784.63e2 + 18636.83e - 22714.86
Required Assembly    Burnup  (@0 yr decay)  =  121 .12e3 -1783.27e 2 + 22228.68e - 27582.31 Required Assembly    Burnup  (@5 yr decay)  =  182.17e3 - 2197.86e2 + 22006.79e - 26647.85 Required Assembly    Burnup  (@10 yr decay)  =  188.58e3 - 2223.67e2 + 21272.66e - 25603.11 Required Assembly    Burnup  (@15 yr decay)  =  11 4.63e 3 _ 1456.89e 2 + 18448.52e - 22972.71 Required Assembly    Burnup  (@20 yr decay)  =  107.71 e3 - 1413.26e2 + 18044.48e - 22480.30 Required Assembly    Burnup  (@25 yr decay)  =  154.98e3 1784.63e2 + 18636.83e - 22714.86 Required Assembly    Burnup  (@30 yr decay)  =    84.34e 3 11 53.89e2 + 16768.69e - 21152.84 This data represents the curves in Figure 5.6-28.
                                                          -
Required Assembly    Burnup  (@30 yr decay)  =    84.34e 3 11 53.89e2 + 16768.69e - 21152.84
                                                          -
This data represents the curves in Figure 5.6-28.
SOUTH TEXAS - UNITS 1 & 2                      5-21            Unit 1 - Amendment No. 1-04, Unit 2 - Amendment No. 041,
SOUTH TEXAS - UNITS 1 & 2                      5-21            Unit 1 - Amendment No. 1-04, Unit 2 - Amendment No. 041,



Latest revision as of 04:08, 23 March 2020

License Amendment Request - Proposed Amendment to Technical Specifications: Revision of the Spent Fuel Pool and In-Containment Storage Area Criticality Analysis
ML061650071
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/07/2006
From: Rencurrel D
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
D43.02, NOC-AE-06002013, STI: 32006066, FOIA/PA-2009-0260
Download: ML061650071 (76)


Text

Attachment 4 should be withheld from public disclosure under 10 CFR 2.390.

Nuclear Operating Company South Teias Pxqfet Electri Genertng StAtion PO &ox289 M~dsm'vid Texa77483 -AAA June 7, 2006 NOC-AE-0600201 3 10 CFR 50.90 10 CER 2.390 D43.02 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, NMD 20852-273 8 South Texas Project Units 1 and 2 Docket No. STN 50-498 and STN 50-499 License Amendment Request -

Proposed Amendment to Technical Specifications:

Revision of the Spent Fuel Pool and In-Containment Storage Area Criticality Analysis Pursuant to 10 CER 50.90, STP Nuclear Operating Company (STPNOC) proposes to amend South Texas Project Operating Licenses NPF-76 and NPF-80 by incorporating the attached changes into the Technical Specifications (TS). The proposed changes reflect a revision of the criticality analysis and the rack utilization schemes for the spent fuel racks as described in Section 5.6 of the TS. STPNOC has determined that a finding of "no significant hazards consideration" is justified.

This proposed change is necessary to implement an updated criticality analysis for irradiated fuel storage in the spent fuel pool racks and the In-Containment Storage Area racks. The existing criticality analysis is based on the Westinghouse two-dimensional KENO methodology with an axial bumup shape reactivity bias. The revised analysis is based on a three-dimensional KENO model. The new methodology has been approved previously by the NRC for use at other nuclear power plants. provides the No Significant Hazards Determination and Attachment 2 provides the TS pages with the proposed revisions incorporated. Attachment 4 (proprietary) provides the revised criticality analysis. Classification of this information as proprietary to the Westinghouse Electric Company LLC is supported by the affidavit in Attachment 3 signed by Westinghouse, the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the NRC and Addresses with specificity the considerations in 10 CER 2.390(b)(4). Accordingly, STPNOC requests that Attachment 4 be withheld in its entirety from public disclosure. A non-proprietary version does not exist.

STI: 32006066

NOC-AE-0600201 3 Page 2 of 3 The Plant Operations Review Committee has recommended approval of the proposed change.

STPNOC has notified the State of Texas in accordance with 10 CER 50.9 1(b).

STPNOC requests approval of the proposed amendment by May 15, 2007. Once approved, the amendment shall be implemented within 120 days.

Correspondence with respect to the proprietary aspects of the revised criticality analysis or the supporting Westinghouse affidavit should reference CAW-06-2136 and should be addressed to B. F. Maurer, Acting Manager, Regulatory Compliance and Plant Licensing, Westinghouse Electric Company LLC, P.O. Box 355, Pittsburgh, Pennsylvania 15230-0355.

If there are any questions regarding this license amendment request, please contact John Conly at (361) 972-7336 or me at (361) 972-7867.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on Jal44 7j )-0 j idd Renn~currel Vice President, Engineering jtc Attachments:

1. Licensee Evaluation
2. Proposed Changes to the Technical Specifications
3. Westinghouse Affidavit
4. South Texas Project Spent Fuel Pool and In-Containment Storage Rack Criticality Analysis, WCAP-165 13-P. Rev. 1 (Proprietary)
5. Table of Commitments

NOC-AE-0600201 3 Page 3 of 3 cc:

(paper copy w/6 Att. 4) (electronic copy w/o Att. 4)

Regional Administrator, Region IV A. H. Gutterman, Esquire U. S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mohan C. Thadani U. S. Nuclear Regulatory Commission Richard A. Ratliff Steve Winn Bureau of Radiation Control Christine Jacobs Texas Department of State Health Services Eddy Daniels 1100 West 49th Street NRG South Texas LP Austin, TX 78756-3 189 Senior Resident Inspector C. Kirksey U. S. Nuclear Regulatory Commission City of Austin P. 0. Box 289, Mail Code: MiNI 16 Wadsworth, TX 77483 Jon C. Wood Cox Smith Matthews C. M. Canady J. J. Nesrsta City of Austin R. K. Temple Electric Utility Department E. Alarcon 721 Barton Springs Road City Public Service Austin, TX 78704

NOC-AE-0600201 3 Attachment I Licensee Evaluation

NOC-AE-06002013 Attachment 1 Page 1 of 16 Licensee Evaluation

1.0 DESCRIPTION

This evaluation addresses a request to amend South Texas Project (STP) Operating Licenses NPF-76 and NPF-80 by incorporating the attached changes into the Technical Specifications (TS). The proposed changes reflect revision of the criticality analysis and the rack utilization schemes for Regions 1 and 2 of the spent fuel racks.

In 2000, Westinghouse issued a Nuclear Safety Advisory Letter (Ref. 1) advising clients that the two-dimensional-to-three-dimensional (2D)-to-3D3) axial bumup biases presented in WCAP-14416-P-A were non-conservative. The 2D KENO analyses did not adequately address the axial reactivity distribution in an irradiated fuel assembly. Subsequently, the NRC decided that future subnmittals from licensees would no longer be able to reference the methodology in WCAP-14416-P-A (Ref. 2).

Westinghouse re-evaluated the criticality analysis for the spent fuel pool (SFP) racks and the In-Containment Storage Area (ICSA) racks at the request of STP Nuclear Operating Company (STPNOC). The revised analysis is based on the methodology presented in WCAP-14416-P-A, but the 2D-to-3D axial bumup biasing methodology is not used. Instead, the 3D axial bumup distribution effects are explicitly modeled. This 3D axial bumup distribution methodology was previously approved by the NRC for Ginna (Ref. 3). The proposed changes in this license amendment request implement the results of the revised analysis into the TS.

The axial bumnup shape bias is not applicable to the new fuel racks because it is analyzed for fresh assemblies only. Therefore, the current analyses for the new fuel racks remain valid and the TS sections addressing the new fuel racks are not modified.

2.0 PROPOSED CHANGE

S The changes to the TS proposed in this license amendment request are summarized in the following table:

-Section Proposed Change Reason for Change 5.6.1 Add sentence. The sentence provides control over

___________implementation of the change.

5.61.1Add paragraph e. The proposed change provides for the use of rack

_____________________________cell inserts in Region 2 racks.

5.6.1.2 Change the reactivity The proposed changes redefine the reactivity category definitions, category designations. Also, the use of numerical

_____________________________fits to the analytical data is proposed to be allowed.

NOC-AE-0600201 3 Attachment 1 Page 2of 16 Section Proposed Change Reason for Change 5.6.1.3 Change the reactivity The proposed changes redefine the reactivity categories allowed to be category designations.

____________stored in Region 1 racks. _______________________

5.6.1.4 Change the reactivity The proposed changes redefine the reactivity categories allowed to be category designations.

stored in Region 2 racks.

5.6.1.5 Revise the interface The proposed changes revise the interface requirements for storage requirements for storage configurations.

___________configurations.

5.6.1.8 Revise the maximum The proposed change increases the maximum fuel enrichment of fuel enrichment from 4.5 w/o to 5.0 w/o.

assemblies stored in the ICSA.

5.6.1.8 Delete requirements for The proposed change eliminates the need for LFBA LEBA pins in fuel pins in assemblies stored in the ICSA.

assemblies to be stored in the ICSA.

Tables 5.6-1 Add Tables. The proposed changes redefine the reactivity through category designations, the allowable storage 5.6-18 ____________ configurations, and the interface requirements.

Figures 5.6-1 Revise Figures 5.6-1 The proposed changes redefine the reactivity to 5.6-20 through 5.6-20. Add category designations, the allowable storage Figures 5.6-21 through configurations, and the interface requirements.

__ ____ _ 1_5.6-33.1 In addition, the following editorial changes are proposed in this license amendment request:

" Change "center to center distance" to read "center-to-center distance" at three locations in Section 5.6.1.

" Change "provided that: the cells are not face-adjacent to a cell storing a fuel assembly, or an evaluation has been performed..." to read "provided that the cells are not face-adjacent to a cell storing a fuel assembly or an evaluation has been performed..." in Section 5.6.1.3.

" Change "A Kff equivalent to..." to read "kff equivalent to..." in Sections 5.6.1.7a and 5.6.1.8a.

" Change "In-containment fuel storage racks" to read "in-containment storage area (ICSA) racks" in Section 5.6.1.8.

NOC-AE-06002013 Attachment 1 Page 3of 16

3.0 BACKGROUND

Each unit at STP has its own separate SFP. The spent fuel storage facility provides storage capacity for 1,969 fuel assemblies in each unit. Two storage regions are provided in each SFP.

The Region 1 racks have 10.95-in, nominal center-to-center spacing between the cells. Region 1 storage cells are each bounded on four sides by a water box except on the periphery of the pool.

The Region 2 racks have a 9.15-in, nominal center-to-center spacing. A sheet of neutron absorber material (Boraflex) is captured between the side walls of all adjacent boxes. The criticality analysis does not take credit for the presence of the fixed absorber material.

The current STP criticality analysis for storage of irradiated fuel in the SFP racks and in the ICSA racks (Refs. 4 and 5) are based on the Westinghouse methodology described in WCAP-14416-P-A. The analyses are based on 2D KENO analyses using an axial bumup shape reactivity bias and reactivity equivalencing techniques to obtain credit for burnup, Westinghouse Integral Fuel Burnable Absorber (IEBA) pins, and control rod content. The results of the current analysis are presented in TS Section 5.6.

For storage in the SFP racks, each fuel assembly may be designated as one or more of eleven

.reactivity categories based on initial nominal enrichment, burnup, decay, or number of IFBA

ýpins contained in the assembly. Whether the assembly has a control rod inserted is also a factor in characterization. The TS currently defines three allowable storage configurations in Region 1 racks and five configurations in Region 2 racks. There are twelve figures depicting bumup and/or LFBA requirements. Allowable interfaces between storage configurations are defined.

Storage in the ICSA is governed by the initial enrichment and LIFBA content of a fuel assembly.

4.0 TECHNICAL ANALYSIS

The revised analysis is based on the WCAP-14416-P-A methodology with an explicit treatment of the axial burnup distribution for non-blanketed irradiated assemblies. This 3D methodology was previously approved by the NRC staff (Ref., 6). STPNOC also uses fuel with axial blankets.

The 3D axial burnup distribution for blanketed fuel is considered and the modeling methodology is described in the revised criticality analysis (Attachment 4 to this license amendment request).

The new analysis does not use reactivity biasing, thus avoiding the pitfalls associated with that methodology.

4.1 Methodology Overview The reactivity analysis of the spent fuel racks is provided in Attachment 4. The methodology.

employed in the revised analysis for soluble boron credit is analogous to that of Ginna (Ref. 3) and employs analysis criteria consistent with those cited in the WCAP-14416-P-A safety evaluation (Ref. 6). The methodology employed in the revised STP analysis and by Ginna employs axially distributed burnups to represent discharged fuel assemblies.

NOC-AE-06002013 Attachment 1 Page 4of 16 Credit is taken for the soluble boron present in SEP Region 1 and 2 to provide safety margin in the criticality analysis of the spent fuel racks. This parameter provides significant negative reactivity in the criticality analysis of the spent fuel rack and is used here in conjunction with administrative controls to offset the reactivity increase when ignoring the presence of the spent fuel rack Boraflex poison panels. Soluble boron credit provides sufficient relaxation in the enrichment limits of the spent fuel racks. Reference 7 shows that there is no credible event at STP which would result in a SEP dilution from the required soluble boron concentration (2500 ppm) to the minimum soluble boron concentration that assures kef < 0.95 (700 ppm). This dilution analysis was previously submitted (Ref. 4) and approved by the NRC (Ref. 5). The changes proposed by this license amendment request do not impact the assumptions, analyses, or conclusions of the previous dilution analysis.

The design criteria are consistent with General Design Criterion (GDC) 62 and NRC guidance given regarding criticality analysis (Ref. 8). The revised STP criticality analysis describes the analysis methods including a description of the computer codes used to perform the criticality safety analysis. The design basis for preventing criticality in the SEP is:

1. the effective neutron multiplication factor, keff, of the fuel rack array will be < 1.00 in pure, unborated water, with a 95% probability at a 95% confidence level, including uncertainties (The actual NRC kef limit for this condition is unity; therefore, an additional margin equal to 0.005 Akeff units is included in the analysis results.); and
2. keff of the fuel rack array will be < 0.95 in the pool containing borated water, with a 95%

probability at a 95% confidence level, including uncertainties.

With the simplifying assumptions employed in this analysis (no grids, sleeves, etc.), the various types of 17x17 XL fuel do not contribute to any increase in the basic assembly reactivity. This includes small changes in guide tube and instrumentation tube dimensions. Therefore, future fuel assembly upgrades do not require a criticality analysis if the fuel diameter is the same 0.374 inches.

The most reactive SFP temperature will be employed for each fuel assembly storage configuration such that the analysis results are valid over the nominal spent fuel temperature range of 50'F to 160TF.

The steps in the analysis are:

1. Determnine the fresh and spent fuel storage configurations using no soluble boron conditions such that the 95/95 upper tolerance limit value of kef, including applicable biases and uncertainties, is < 0.995. This is accomplished with infinite arrays of either fresh or spent fuel assembly configurations. Note that actual keff limit for this condition is unity. Therefore, an additional margin equal to 0.005 Akff units is included in the analysis results.
2. Determine the amount of soluble boron (ppm) necessary to reduce the kef value of all storage configurations by at least 0.05 Ak~ff units. This is accomplished by constructing a KENO model for the entire SEP which includes the storage configurations that are least sensitive to changes in soluble boron concentration. As an example, storage

NOC-AE-06002013 Attachment 1 Page 5of 16 configurations that contain depleted fuel assemblies (and represented by depleted isotopics) are less reactivity-sensitive to changes in soluble boron concentration than an assembly represented by zero bumup and relatively low initial fuel enrichment.

3. Determine the amount of soluble boron necessary to compensate for 5% of the maximum burnup credited in any storage configuration. In addition, determine the amount of soluble boron necessary to account for a reactivity depletion uncertainty equal to 1.0%

AIeif per 30,000 MWD/IMTU of credited assembly bumup. This is accomplished by multiplying this derivative by the maximum burnup credited in any storage configuration and converting to soluble boron using the data generated in Step 2.

4. Determine the largest increase in reactivity caused by postulated accidents and the corresponding amount of soluble boron needed to offset this reactivity increase.

An alternative form of expressing the soluble boron requirements is given in Reference 6. The final soluble boron requirement (ppm) is determined from the following summation:

SBCTOTAL = SBC 95195 +SBCft + SBCPA where:

SBCTOTPJL = total soluble boron credit requirement SBC 95195 = soluble boron requirement for 95/95 kef < 0.95 SBCRE = soluble boron required to account for burnup and reactivity uncertainties

,SBCPA = soluble boron required to maintain keff < 0.95 under accident conditions For purposes of the analysis, minimum. burnup limits established for fuel assemblies to be stored in the storage configuration racks include bumup credit established in a manner that takes into account approximations to the operating history of the fuel assemblies. Variables such as axial bumnup profile and axial profile of moderator and fuel temperatures have been factored into the analysis. The axial reactivity effects associated with the "cut-back" of the EFBA at both ends of the fuel assembly and reduced LFBA poison loadings were directly included in this analysis.

The reactivity characteristics of the storage racks were evaluated using infinite lattice analyses.

This environment was employed in the evaluation of the bumup limits versus initial enrichment as well as the evaluation of physical tolerances and uncertainties. A full SFP model was also employed to evaluate soluble boron worth, the reactivity worth of postulated accidents, and the multiplication factor for the zero soluble boron condition. Furthermore, a full ICSA was employed to analyze the criticality of a fresh 5.0 w/o (weight %) U2 "5 fuel assembly array.

The analysis metho6dology employs SCALE-PC, a personal computer version of the SCALE-4.4 code system (Ref. 9) with the updated SCALE-4.4 version of the 44 group ENDF/B-V neutron cross section library, and the two-dimensional integral transport code DEC (Ref. 10), with an ENDF/B-VI neutron cross section library.

NOC-AE-06002013 Attachment 1 Page 6 of 16 SCALE-PC was used for calculations involving infinite arrays for all the storage configurations in SFP Regions 1 and 2. In addition, it was employed in a full-pool and ICSA representation of the storage racks to evaluate soluble boron worth and postulated accidents. SCALE-PC, used in both the benchmnarking and the fuel assembly storage configurations, includes the control module CSAS25 and functional modules BONAMI, NITAWL-ll, and KENO V.a.

The DIT code is used for simulation of in-reactor fuel assembly depletion.

The fuel rod, guide tube, and instrumentation tube claddings are modeled with zircaloy in this analysis. This is conservative with respect to the Westinghouse ZIRLO product, which is a zirconium alloy containing additional elements including niobium. Niobium has a small absorption cross section, which causes more neutron capture in the cladding regions resulting in a lower reactivity. Therefore, this'analysis is conservative with respect to fuel assemblies containing ZIRLO cladding in fuel rods, guide tubes, and the instrumentation tube.

Empty water cells may be substituted for fresh or burned fuel assemblies at any location. Any positive reactivity effect due to the additional water in the 2x2 analytical cell is offset by the absence of uranium.

'This analysis also includes provision for the use of rack cell inserts (referred to as "poison inserts" in the attached criticality analysis) to close-pack the Region 2 racks to maximize storage.

One storage configuration ("All-Cell" with Cell Inserts) is modeled to take advantage of rack cell inserts that are on the market. In this configuration, an L-shaped insert is assumed to be placed in each cell. The dimensions, materials, and manufacturing tolerances of the insert are specified in the analysis. These values will be used as purchase specifications for such inserts in the future.

The licensing basis for the racks is met by the combination of the physical design and center-to-center spacing of the storage cells, the required presence of soluble boron, and the use of administrative procedures to guide the placement of fuel assemblies, cell inserts, Pyrex Burnable Poison Absorber Rods (BPRAs), and rod cluster control assemblies (RCCAs).

When storing fuel with an initial nominal enrichment greater than the maximum all-cell enrichment for the respective rack region, a rack kef of < 0.95 is ensured by maintaining a minimum amount of soluble boron and using administrative procedures to control the placement of burned fuel, fresh fuel, cell inserts, BPRAs, and RCCAs. A rack kef of < 0.995 in pure, unborated water is ensured by using administrative procedures to control the placement of burned fuel, fresh fuel, cell inserts, BPRAs, and RCCAs.

The boron concentration of the water in the SEP is maintained at or above the minimum value needed to ensure that the rack kffi is < 0.95 in the event of a single misplaced assembly.

NOC-AE-0600201 3 Attachment 1 Page 7of 16 4.2 Basis for Determining Analyzed Storage Configurations Because the number of possible storage configurations of existing and expected fuel assemblies would be overwhelming, a strategy was developed to determine those combinations that would have the best possibility of maximizing the pool utilization. Sixteen 2x2 storage configurations were predefined for analysis in the SEP racks. Three configurations were chosen for the Region 1 racks and thirteen for the Region 2 racks.

In preparation for a refueling outage, fresh feed fuel may be pre-staged in the Region 1 racks prior to loading in the core. The core is routinely discharged into the Region 1 racks during the outage. Decay credit in the Region 1 racks is not needed because discharged fuel is routinely allowed to decay in the Region 1 racks and then is moved to the Region 2 racks. These considerations govern the choices of storage configurations. For Region 1, the configurations are:

  • "All-Cell" or close-packed storage

" Checkerboard #1 - storage of burned fuel or burned fuel with fresh feed fuel

  • Checkerboard #2 - storage of burned fuel with fresh feed fuel All of the configurations allow burnup credit. Checkerboard #1 allows credit for the number of Westinghouse LFBA pins.

The Region 2 racks are used for long-term storage of fuel assemblies. Burnup credit and decay time credit are used extensively in the Region 2 configurations. However, as for Region 1, the Region 2 racks may also be used to pre-stage fresh fuel assemblies in preparation for a refueling outage. Also, accommodations are needed to store once-burned assemblies, and those with minimal burnup, in case they cannot be reused in the core. These considerations, and the desire to maximize the use of storage locations for existing fuel and for planned discharge batches, govern the choices of storage configurations.

Most of the existing discharged fuel assemblies do not have axial blankets. However, recent fuel cycles and future planned cycles utilize assemblies with top and bottom axial blankets with reduced enrichment (2.6 W/o U2 35) and/or annular pellets. The criticality analysis makes use of this axial feature to lower the reactivity of the top and bottom regions of the assemblies.

For Region 2, the configurations are:

" "All-Cell," non-blanketed

" 4-out-of-4 withWestinghouse BPRA insert, non-blanketed

" 1-out-of-4 blanketed

  • 2-out-of-4 blanketed

" 1-out-of-4 with RCCA

  • 2-out-of-4 with RCCA
  • 3-out-of-4 Checkerboard

NOC-AE-06002013 Attachment I Page 8of 16

  • 4-out-of-4 blanketed

" 4-out-of-4 blanketed, 1 RCCA and decay credit The following configurations are for pre-staging fresh feed fuel in Region 2 racks:

  • 2-out-of-4 5.0 w/o, sixteen 1.5x IFBA (where "1.5x" designates the B10 loading on the fuel pellet. "1.0x" corresponds to a loading of 1.57 mg/in, of B10 .)
  • 1-out-of-4 5.0 w/o with no LFBA (This configuration provides storage for last-minute replacement assemblies of any enrichment and minimal LFBA content.)

" 2-out-of-4 4.768 w/o with no LFBA (This configuration provides more efficient storage for last-minute replacement assemblies of most enrichments and minimal L]FBA content.)

In the future, STPNOC will probably use RCCAs and some type of rack cell inserts to close-pack the Region 2 racks to maximize storage capacity. Use of RCCAs is included in the configurations above. One final configuration ("All-Cell" with Cell Inserts ) is modeled to take advantage of rack cell inserts that are on the market. In this configuration, an L-shaped insert is assumed to be placed in each cell. The dimensions, materials, and manufacturing tolerances of the insert are specified in the analysis. These values will be used as purchase specifications for such inserts in the fuiture.

Actual implementation and usage of rack inserts will be evaluated in accordance with 10 CER 50.59. This proposed change will provide the criticality basis and fuel storage guidance for the use of cell inserts.

4.3 Results The detailed results of the analysis are presented in Attachment 4. Only a brief overview of the analysis results is presented in this evaluation.

Twenty-four reactivity categories were defined from the definitions of the storage configurations.

Six odd-numbered categories are used in Region 1 configurations. Eighteen even-numbered categories are used in Region 2 racks. The fuel assembly characteristics of the categories are given in Attachment 4.

As discussed in Section 4.1 above, soluble boron in the SEP coolant is used in this analysis to offset the reactivity allowances for calculational uncertainties in modeling, storage rack fabrication tolerances, fuel assembly design tolerances, and postulated accidents. The total soluble boron requirement is defined above.

The magnitude of each soluble boron requirement is as follows with the individual terms as defined in Section 4. 1, above:

NOC-AE-0600201 3 Attachment I Page 9of 16 SBC95195 373.1 ppmn SBCR = 293.1 ppmn SB CPA = 789.3 ppm SBCToTAL = 1455.5 ppm Therefore, a total of 1455.5 ppm of soluble boron (with 19.9% B"0 abundance) is required to maintain keff< to 0.95 (including all biases and uncertainties) assumiing the most limiting single accident.

The existing boron dilution analysis (Ref. 7) is based on the current criticality analysis finding that a soluble boron concentration of 700 ppm is needed to account for the 95/95 confidence level and burnup and reactivity uncertainties. Per the revised analysis (Section 3.6.4 of Attachment 4), only 666 ppm boron is needed (373 ppm for 95/95 confidence + 293 ppm. for uncertainties). Therefore, the current dilution analysis described in Reference 7 remains bounding.

To aid in the practical application of the required minimum bumnup as a function of initial nominal enrichment, decay time, and LFBA content, n-degree polynomials were developed as curve fits on most of the result sets for the reactivity categories in the analyzed storage

,configurations. Interpolations between analyzed decay times to determine the required bumnup as a function of initial nominal enrichment may be performed using at least a second degree polynomial. Extrapolation beyond the 30-year time limit is not allowed.

A surface fit polynomial may also be developed to directly determine the required minimum bumup as a function of initial enrichment and decay time for a particular category. Since the analysis was performed using four enrichment values and seven time points, a polynomial of third degree in x (enrichment) and sixth degree in y (time), will fit the analytical data. Such a surface fit will match the analytical results "exactly" at the data point. However, before implementation, interior points at intermediate enrichment and time values will be analyzed to ensure the polynomials chosen for the surface fit yield results within 1%of the results obtained by interpolation between the 2D polynomial fits generated in the criticality analysis.

Interface requirements between storage configurations within a rack region and between configurations in Region 1 adjacent to configurations in Region 2 have been analyzed and are defined in Attachment 4.

4.4 Relevant NRC Guidance Documents

  • NRC Information Notice 91-26, "Potential Nonconservative Errors in the Working Format Hansen-Roach Cross-Section Set Provided with the KENO and SCALE Codes" The revised analysis uses the newer version of SCALE package (Version 4.4a as opposed to Version 3, to which this error pertains) and the 44-group library rather than the 16-group Hansen-Roach library.

NOC-AE-06002013 Attachment 1 Page 10 of 16

The modeling problems cited by this Notice concerned methodologies with flaws that were not detected due to the lack of analytical benchmark data sets containing strong neutron absorbers such as Boraflex. However, no credit is taken in the revised analysis for Boraflex. Therefore, the problem of selecting representative benchmarks does not arise.

  • NRC Information Notice 95-38, "Degradation of Boraflex Neutron Absorber in Spent Fuel Storage Racks" The spent fuel racks at STP were originally designed with Boraflex. However, the Boraflex was removed from the Region 1 racks in 2000. Because of the construction of the Region 2 racks, it is not practical to remove the Boraflex from those racks. Neither the current nor the revised analysis credits Boraflex as a neutron absorber.
  • NRC Regulatory Issue Summary 2001-12, "Nonconservatism in Pressurized Water Reactor Spent Fuel Storage Pool Reactivity Equivalencing Calculations" The revised analysis does not use reactivity equivalencing, so the nonconservatisms identified in this Summary have been avoided.

" NRC Informnation Notice 2005-13, "Potential Non-Conservative Error in Modeling Geometric Regions in the KENO-V.A Criticality Code" None of the input models involve cylindrical holes with shared boundaries in the STP analysis, so the revised analysis is not affected by this error.

5.0 REGULATORY ANALYSIS

5.1 No Signifficant Hazards Determination STPNOC has evaluated whether a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92:

1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No There is no increase in the probability of an accident. The proposed change does allow a greater number of fuel storage configurations in the SFP. While this could increase the probability of a fuel misloading, the presence of sufficient soluble boron in the SFP precludes criticality as a result of the misloading. Fuel assembly placement will

NOC-AE-06002013 Attachment 1 Page 11of 16 continue to be controlled pursuant to approved fuel handling procedures and will be in accordance with the TS and the spent fuel rack storage configuration limitations of UFSAR Chapter 9.1.2.

Reactivity changes due to SFP temperature changes have been evaluated. The base case criticality analysis covers a "normal" SFP temperature range of 50*F to 160'F.

Spent fuel pool temperature accidents are considered outside the normal temperature range extending from 50'F to 240'F. In all SFP temperature accident cases, sufficient reactivity margin is available to the 0.95 kef limit without requiring additional soluble boron above the base case level. Because adequate soluble boron will be maintained in the SEP water to maintain kff < 0.95, the consequences of a loss of normal cooling to the SEP will not be increased.

There is no increase in the consequences of the accidental misloading of spent fuel assemblies into the SEP racks. The criticality analysis demonstrates that the pool kf will remain <c0.95 following an accidental misloading due to the boron concentration of the pool. The current TS limitation will ensure that an adequate SEP boron concentration is maintained.

The criticality analysis shows the consequences of a fuel assembly drop accident in the SEP are not affected when considering the presence of soluble boron. The rack kff remains < 0.95.

The editorial changes proposed in this license amendment request do not impact the probability or consequences of an accident.

Therefore, based on the conclusions of the above evaluation, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No Spent fuel handling accidents are not new or different types of accidents; they have been analyzed in Section 15.7.4 of the UFSAR.

Criticality accidents in the SEP are not new or different types of accidents. They have been analyzed in the UFSAR and in Criticality Analysis Reports associated with specific licensing amendments for fuel enrichments that are assumed for the proposed change. Because the proposed SEP storage configuration limitations will be similar to the current ones, the new limitations will not have any significant effect on normal SEP operations and maintenance, and will not create any possibility of a new or different

NOC-AE-0600201 3 Attachment 1 Page 12 of 16 kind of accident. Verifications will continue to be performed to ensure that the SEP loading configuration meets specified requirements.

The misloading of a fuel assembly in the required storage configuration has been evaluated. In all cases, the rack kef remains < 0.95. Removal of an RCCA from a checkerboard storage configuration has been analyzed and found to be bounded by the misloading of a fuel assembly.

As discussed above, the proposed changes will not create the possibility of a new or different kind of accident. There is no significant change in plant configuration, equipment design, or equipment.

The editorial changes proposed in this license amendment request do not impact the design basis accidents of STP.

Under the proposed amendment, no changes are being made to the racks themselves, to any other systems, or to the physical structures of the Fuel Handling Building.

Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.

3. Does the proposed change involve a significant reduction in a margin of safety?

Response: No The proposed TS changes and the resulting spent fuel storage operation limits will provide adequate safety margin to ensure that the stored fuel assembly array always remains subcritical. Those limits are based on a plant-specific criticality analysis performed in accordance with Westinghouse spent fuel rack criticality analysis methodology.

While the criticality analysis utilized credit for soluble boron, storage configurations have been defined using 95/95 kff calculations to ensure that the spent fuel rack kef is < 1.0 with no soluble boron. Soluble boron credit is used to offset uncertainties, tolerances, and off-normal conditions, and to provide subcritical margin such that the SEP kef is maintained < 0.95.

The loss of substantial amounts of soluble boron from the SEP that could lead to k'f exceeding 0.95 has been previously evaluated and approved (Ref. 4 and 5) and shown to be not credible. A safety evaluation has been performed which shows that dilution of the SEP boron concentration from 2500 ppm to 700 ppm is not credible. Also, the spent fuel rack kef will remain < 1.0 (with a 95/95 confidence level) with the SEP flooded with unborated water. These safety analyses demonstrate a level of safety comparable to the conservative criticality analysis methodology required by Westinghouse WCAP- 14416-P-A.

NOC-AE-06002013 Attachment 1 Page 13 of 16 The editorial changes proposed in this license amendment request do not affect the margin of safety.

Therefore, the proposed changes do not involve a significant reduction in a margin of safety.

Based on the above, STPNOC concludes that the proposed amendment involves no significant hazards consideration under the standards set forth in 10CFR5O.92 and a finding of "no significant hazards consideration" is justified.

5.2 AR12licable Regulatory Requirements/Criteria 10 CFR 50, Appendix A, GDC 62 states; Criticality in the fuel storage and handling system shall be prevented by physical systems or processes, preferably by use of geometrically safe configurations.

Implementation of the proposed changes in the required fuel storage configurations and the associated assembly reactivity requirements will continue to satisfy the requirements of GDC 62.

Specifically, the design basis for preventing criticality in the SFP and the ICSA is:

1. the kef of the fuel rack array shall be < 1.00 in pure, unborated water, with a 95%

probability at a 95% confidence level, including uncertainties; and

2. the keff of the fuel rack array shall be < 0.95 in the pool containing borated water, with a 95% probability at a 95% confidence level, including uncertainties.

In conclusion, based on the considerations discussed above, (1) there is a reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

6.0 ENVIRONMENTAL CONSIDERATION

STPNOC has evaluated the proposed changes and determined that (i) the proposed amendment involves no significant hazards considerations, (ii) there is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite, and (iii) there is no significant increase 'in the individual or cumulative occupational exposure. Accordingly, the proposed changes meet the eligibility criteria for categorical exclusion set forth in 10 CER 51 .22(c)(9), and an environmental assessment of the proposed changes is not required.

NOC-AE-0600201 3 Attachment 1 Page 14 of 16 7.0 IMIPLEMENTATION The proposed TS changes do not modify the basic design objectives in TS 5.6. 1.1 concerning the SEP rack storage criticality. However, the proposed changes to the allowed storage configurations and associated fuel assembly characteristics (e.g., required fuel assembly burnup, decay time, etc.) are generally more restrictive than the current TS. Therefore, it is very probable that storage configurations allowed by the current TS are not allowed by the proposed TS.

STPNOC proposes to perform the following to allow for an implementation period for fuel stored in the SFP:

" Move the current requirements in TS 5.6 to Technical Requirements Manual (TRM)

Section 5.6.1.

" Add the following paragraph to TRM Section 5.6. 1:

"Fuel shall be stored in compliance with the requirements below OR in accordance with the requirements of Technical Specification 5.6.1 during the implementation period of May 15, 2007 to September 15, 2007. After September 15, 2007, fuel shall be stored in compliance with the requirements of Technical Specification 5.6.1 only."

" Add the following paragraph to TS Section 5.6.1:

"Fuel shall be stored in compliance with the requirements below or in accordance with the requirements of Technical Requirements Manual (TRM) 5.6.1 during the implementation period as specified in TRM 5.6.1."

  • Update the TS with the proposed storage configurations and fuel assembly requirements After the implementation period, all configuration requirements in TRM 5.6.1 wll be removed and replaced by the statement:

"Fuel shall be stored in compliance with the requirements of Technical Specification 5.6.1L" This ensures that all fuel is stored in an analyzed configuration during the implementation period, either in the currently approved configuration moved to the TRM or in the configuration approved by the NRC as the new TS section. After the implementation period, all fuel will be stored in accordance with the proposed TS.

Because fuel is not normally stored in the ICSA, changes in the fuel storage requirements for the ICSA will be implemented in the normal manner.

NOC-AE-0600201 3 Attachment 1 Page 15 of 16

8.0 REFERENCES

AND PRECEDENTS 8.1 References

1. Westinghouse Nuclear Safety Advisory Letter, "Axial Bumnup Shape Reactivity Bias," NSAL-00-015, November 2, 2000
2. Letter, S. Dembek to H.A. Sepp, "Non-conservatisms in Axial Bumnup Biases for Spent Fuel Rack Criticality Analysis Methodology," July 27, 2001 (MIL012080337)
3. Letter, G. S. Vissing to R. C. Mecredy, "R. E. Ginna Nuclear Plant - Amendment re:

Revision to the Storage Configuration Requirements within the Existing Storage Racking and Taking Credit for a Limited Amount of Soluble Boron (TAG No.

MA8443)," December 7, 2000 (MIL00376 1578)

4. Letter, T.H. Cloninger to Document Control Desk, "Proposed Amendment to Technical Specifications for Spent Fuel Storage Pool Rack Criticality Analysis with Soluble Boron Credit," July 7, 1998 (NOC-AE-000178) (TAG Nos. MA2296 and MA2297)
5. Letter, T. W. Alexion to W. T. Cottle, "South Texas Project Units 1 and 2 -

Amendment Nos. 104 and 91 to Facility Operating License Nos. NPF-76 and NPF-80 (TAG Nos. MA2296 and MA2297)," March 3, 1999

6. Letter, T. E. Collins to T. Greene, "Acceptance for Referencing of Licensing Topical Report WCAP-14416-P, 'Westinghouse Spent Fuel Rack Methodology' (TAG No.

M93254)," October 25, 1996

7. Corpora, G. J., "South Texas Units 1 and 2 Spent Fuel Pool Dilution Analysis,"

Westinghouse Electric Co., February 25, 1998 (submitted as an attachment to Ref. 4 above)

8. L. Kopp, "Guidance on the Regulatory Requirements for Criticality Analysis of Fuel Storage at Light-Water Reactor Power Plants," February 1998
9. "SCALE 4.4a - Modular Code System for Performing Standardized Computer Analyses for Licensing Evaluation for Workstations and Personal Computers,"

RSICC Code Package CCC-545, Oak Ridge National Laboratory, 2000

10. "DIT: Discrete Integral Transport Assembly Design Code," CE-CES-1 1, Revision 4-P, April 1994

NOC-AE-06002013 Attachment 1 Page 16 of 16 8.2 Precedents Three-Dimensional Methodology Letter, T. E. Collins to T. Greene, "Acceptance for Referencing of Licensing Topical Report WCAP-14416-P, Westinghouse Spent Fuel Rack Methodology (TAC No.

M93254)," October 25, 1996 Letter, B. Benney to G. M. Rueger, "Diablo Canyon Nuclear Power Plant, Unit Nos. 1 and 2 - Issuance of Amendment re: Credit for Soluble Boron in the Spent Fuel Pool Criticality Analysis (TAG Nos. MB2982 and MB2984)," September 25, 2002 (ML022610080)

Letter, R. B. Ennis to J. A. Price, "Millstone Power Station, Unit 2 - Issuance of Amendment re: Spent Fuel Pool Requirements (TAG No. MB3386)," April 1, 2003 (ML030910485)

Letter, R. E. Martin to L. M. Stinson, "Joseph M. Farley Nuclear Plant, Units 1 and 2 re:

Issuance of Amendments (TAG Nos. MC6987 and MC698 8)," June 28, 2005 (ML051860200)

Specific Application at Ginna Letter, G. S. Vissing to R. C. Mecredy, "R. E. Ginna Nuclear Plant - Amendment re:

Revision to the Storage Configuration Requirements within the Existing Storage Racking and Taking Credit for a Limited Amount of Soluble Boron (TAG No.

MA8443)," December 7, 2000 (ML003761578)

NOC-AE-0600201 3 Attachment 2 Proposed Changes to the Technical Specifications

DESIGN FEATURES SECTION PAGE 5.1 SITE 5.1.1 EXCLUSION AREA ............. ........... 51 5.1.2 LOW POPULATION ZONE....................................................... 5-1 5.1.3 MAP DEFINING UNRESTRICTED AREAS AND SITE BOUNDARY FOR RADIOACTIVE GASEOUS AND LIQUID EFFLUENTS....................... 5-1 5.2 CONTAINMENT 5.2.1 CONFIGURATION ................................................................... 5-1 5.2.2 DESIGN PRESSURE AND TEMPERATURE ..................................... 5-1 FIGURE 5.1 -1 EXCLUSION AREA .................................................... 5-2 FIGURE 5.1-2 LOW POPULATION ZONE............................................ 5-3 FIGURE 5.1-3 UNRESTRICTED AREA AND SITE BOUNDARY FOR RADIOACTIVE GASEOUS EFFLUENTS ........................... 5-4 FIGURE 5.1-4 UNRESTRICTED AREA AND SITE BOUNDARY FOR RADIOACTIVE LIQUID EFFLUENTS ................................ 5-5 5.3 'REACTOR CORE 5.3.1 FUEL ASSEMBLIES ................................................................ 5-6 5.3.2 'CONTROL ROD ASSEMBLIES ................................................... 5-6 5.4 (NOT USED) 5.5 METEOROLOGICAL TOWER LOCATION ........................................ 5-6 5.6 FUEL STORAGE 5.6.1 CRITICALITY ....................................................................... 5-6 5.6.2 DRAINAGE ........................................................................ 5-13 5.6.3 CAPACITY ....................................................................... 5-13 TABLE 5.6-1 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 1 FUEL..5-14 TABLE 5.6-2 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 2 FUEL..5-15 TABLE 5.6-3 ,BURNUP CREDIT REQUIREMENTS FOR CATEGORY 3 FUEL .5-16 TABLE 5.6-4 IFBA CREDIT REQUIREMENTS FOR CATEGORY 3 FUEL......5-16 TABLE 5.6-5 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 4 FUEL. .1-17 TABLE 5.6-6 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 5 FUEL .5-17 TABLE 5.6-7 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 6 AND 8 FUEL..........I................................. 5-18 TABLE 5.6-8 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 7 FUEL .5-18 TABLE 5.6-9 IFBA CREDIT REQUIREMENTS FOR CATEGORY 7 FUEL......5-19 SOUTH TEXAS - UNITS 1 & 2 xvii Unit 1 - Amendment No. 4,43,46,61,65,08, 101 Unit 2 - Amendment No. 32,35,60,85,441

DESIGN FEATURES SECTION PAGE TABLE 5.6-10 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 9 FUEL .5-19 TABLE 5.6-11 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 10 AND 12 FUEL ........................................ 5-20 TABLE 5.6-12 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 14 AND 16 FUEL ........................................ 5-21 TABLE 5.6-13 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 18 AND 20 FUEL ........................................ 5-22 TABLE 5.6-14 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 22 FUELS-23 TABLE 5.6-15 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 24 FUEL5-24 TABLE 5.6-16 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 26 AND 28 FUEL ........................................ 5-25 TABLE 5.6-17 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 36 FUEL. 5-26 TABLE 5.6-18 ASSEMBLY LOADING REQUIREMENTS AT THE INTERFACE BETWEEN DIFFERENT STORAGE CONFIGURATIONS .......... 5-27 FIGURE 5.6-1 REGION 1: ALL-CELL STORAGE ..................................... 5-28 FIGURE 5.6-2 REGION 1: CHECKERBOARD #1..................................... 5-28 FIGURE 5.6-3 REGION 1: CHECKERBOARD #2..................................... 5-28 FIGURE 5.6-4 REGION 2: ALL-CELL, NON-BLANKETED ............................. 5-28 FIGURE 5.6-5 REGION 2: 4-OUT-OF-4 BPRA, NON-BLANKETED .................. 5-28 FIGURE 5.6-6 REGION 2: 1-OUT-OF-4 BLANKETED................................... 5-28 FIGURE 5.6-7 REGION 2: 2-OUT-OF-4 BLANKETED................................... 5-28 FIGURE 5.6-8 REGION 2: 1-OUT-OF-4 WITH RCCA ................................... 5-28 FIGURE 5.6-9 REGION 2: 2-OUT-OF-4 WITH RCCA ................................... 5-29 FIGURE 5.6-10 REGION 2: 3-OUT-OF-4 CHECKERBOARD ........................... 5-29 FIGURE 5.6-11 REGION 2: 4-OUT-OF-4 BLANKETED................................... 5-29 FIGURE 5.6-12 REGION 2: 4-OUT-OF-4 BLANKETED, 1 RCCA AND DECAY CREDIT ............................................................. 5-29 FIGURE 5.6-13 REGION 2: 2-OUT-OF-4 5.0 wlo,16 1.5x IFBA....................... 5-29 FIGURE 5.6-14 REGION 2: 1-OUT-OF-4 5.0 wloWITH NO IFBA .................... 5-29 FIGURE 5.6-15 REGION 2: 2-OUT-OF-4 4.768 w/o WITH NO IFBA ................. 5-29 FIGURE 5.6-16 REGION 2: ALL-CELL WITH CELL INSERTS.......................... 5-29 FIGURE 5.6-17 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 1 FUEL ...5-30 SOUTH TEXAS -UNITS 1 & 2 xviia Unit 1 - Amendment No. 4-04, Unit 2 - Amendment No. 0-1,

DESIGN FEATURES PAGE SECTION PAGE FIGURE 5.6-18 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 2 FUEL..5-31 FIGURE 5.6-19 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 3 FUEL .5-32 FIGURE 5.6-20 IFBA REQUIREMENTS FOR CATEGORY 3 FUEL................. 5-33 FIGURE 5.6-21 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 4 FUEL .5-34 FIGURE 5.6-22 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 5 FUEL .5-35 FIGURE 5.6-23 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 6 AND 8 FUEL........................................... 5-36 FIGURE 5.6-24 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 7 FUEL .5-37 FIGURE 5.6-25 IFBA CREDIT REQUIREMENTS FOR CATEGORY 7 FUEL......5-38 FIGURE 5.6-26 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 9 FUEL .5-39 FIGURE 5.6-27 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 10 AND 12 FUEL ........................................ 5-40 FIGURE 5.6-28 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 14 AND 16 FUEL ........................................ 5-41 FIGURE 5.6-29 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 18 AND 20 FUEL ........................................ 5-42 FIGURE 5.6-30 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 22 FUEL.5-43 FIGURE 5.6-31 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 24 FUEL.5-44 FIGURE 5.6-32 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 26 AND 28 FUEL ........................................ 5-45 FIGURE 5.6-33 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 36 FUEL.5-46 FIGURE 5.6-34 BOUNDARY BETW~EEN THREE STORAGE CONFIGURATIONS. 5-47 FIGURE 5.6-35 BOUNDARY BETWEEN FOUR STORAGE CONFIGURATIONS ...5-48 5.7 COMPONENT CYCLIC OR TRANSIENT LIMIT ................................ 5-48 SOUTH TEXAS - UNITS 1 & 2 xviib Unit 1 - Amendment No.

Unit 2 - Amendment No.

DESIGN FEATURES 5.3 REACTOR CORE FUEL ASSEMBLIES 5.3.1 The reactor core shall contain 193 fuel assemblies. Each fuel assembly shall consist of a matrix of zircaloy or ZIRLO clad fuel rods with an initial composition of natural or slightly enriched uranium dioxide as fuel material. Limited substitutions of zirconium alloy, ZIRLO or stainless steel filler rods for fuel rods, in accordance with NRIC-approved applications of fuel rod configurations, may be used. Fuel assemblies shall be limited to those fuel designs that have been analyzed with applicable NRC staff-approved codes and methods, and shown by tests or analyses to comply with all fuel safety design bases. A limited number of lead test assemblies that have not completed representative testing may be placed in non-limiting core regions.

CONTROL ROD ASSEMBLIES 5.3.2 The core shall contain 57 full-length control rod assemblies. The full-length control rod assemblies shall contain a nominal 158.9 inches of absorber material. The absorber material within each assembly shall be silver-indium-cadmium or hafnium. Mixtures of hafnium and silver-indium-cadmium are not permitted within a bank. All control rods shall be clad with stainless steel tubing.

5.4 (NOT USED)

'5.5 METEOROLOGICAL TOWER LOCATION 5.5.1 The meteorological towers shall be located as shown on Figure 5.1 -1.

5.6 FUEL STORAGE 5.6.1 CRITICALITY Fuel shall be stored in compliance with the requirements below or in accordance with the requirements of Technical Requirements Manual (TRM) 5.6.1 during the implementation period as specified in TRM 5.6.1.

5.6.1.1 The spent fuel storage racks are designed and shall be maintained with:

a. keff less than 1.0 when flooded with unborated water, which includes an allowance for uncertainties as described in WCAP-1 4416-NP-A.
b. kff less than or equal to 0.95 when flooded with water borated to 700 ppm, which includes an allowance for uncertainties as described in WCAP-14416-NP-A.
c. These requirements (a and b above) shall be met by storing fuel in the spent fuel storage racks according to Specifications 5.6.1.3, 5.6.1.4, and 5.6.1.5. Additionally, credit may be taken for the presence of soluble boron in the spent fuel pool water, per Specification 3.9.13, to mitigate the misloading of one or more fuel assemblies, as described in Specification 5.6.1.6.

SOUTH TEXAS - UNITS 1 & 2 5-6 Unit 1 - Amendment No. 2,Q~10,6,4, 61,65,89,92,08,104, Unit 2 - Amendment No. 2,632,50 64,76,70,857,01

DESIGN FEATURES

d. A nominal 10.95 inches center-to-center distance between fuel assemblies in Region 1 of the storage racks and a nominal 9.15 inches center-to-center distance between fuel assemblies in Region 2 of the storage racks.
e. Rack cell inserts of appropriate material may be used to provide reactivity hoiddown in all or portions of the Region 2 racks.

5.6.1.2 Prior to insertion into the spent fuel storage racks, each fuel assembly shall be categorized by reactivity, as discussed below, or be designated as a Category 11 (for storage in Region 1) or Category 32 (for storage in Region 2) fuel assembly. All fuel enrichment values are initial nominal U23 enrichments. The reactivity categories are:

CATEGORY 1:

Fuel in Category 1 shall meet at least one of the following criteria:

1) an initial enrichment of less than or equal to 2.452 w/o; OR
2) a minimum burnup requirement as a function of initial enrichment as presented in Table 5.6-1 and Figure 5.6-17.

CATEGORY 2:

Fuel in Category 2 shall meet at least one of the following criteria:

1) an initial nominal enrichment of less than or equal to 1.169 w/o; OR
2) a minimum burnup as a function of initial enrichment and decay time as presented in Table 5.6-2 and Figure 5.6-18.

CATEGORY 3:

Fuel in Category 3 shall meet at least one of the following criteria:

1) an initial nominal enrichment of less than or equal to 2.961 w/o; OR
2) a minimum burnup as a function of initial enrichment as presented in Table 5.6-3 and Figure 5.6-19; OR
3) a minimum number of 140-inch Integral Fuel Burnable Absorber (IFBA) pins, as a function of IFBA B3 10 loading and initial enrichment as presented in Table 5.6-4 and Figure 5.6-20.

Coefficients for the polynomial fits for the IFBA requirements as a function of enrichment are given in Table 5.6-4.

CATEGORY 4:

Fuel in Category 4 shall meet the following criteria:

1) a Burnable Poison Rod Assembly (BPRA of the Pyrex design) insert with at least 20 rodlets; AND EITHER
2) an initial enrichment of less than or equal to 1.240 w/o; OR
3) a minimum burnup as a function of initial enrichment and decay time as presented in Table 5.6-5 and Figure 5.6-21.

SOUTH TEXAS - UNITS 1 & 2 5-7 Unit 1 - Amendment No. 2,436-1,1-O4, Unit 2 - Amendment No. 32,50,91,

DESIGN FEATURES CATEGORY 5:

Fuel in Category 5 shall meet at least one of the following criteria:

1) an initial nominal enrichment of less than or equal to 1.695 wlo; OR
2) a minimum burnup as a function of initial enrichment as presented in Table 5.6-6 and Figure 5.6-22.

CATEGORY 6:

Fuel in Category 6 shall meet the following criteria:

1) a 7-inch axial blanket on each end of the fuel assembly with an enrichment less than or equal to 2.60 w/o Um;h AND EITHER
2) an initial enrichment of less than or equal to 1.172 w/oUU3;O 2 ;O
3) a minimum burnup as a function of initial enrichment as presented in Table 5.6-7 and Figure 5.6-23.

Decay time credit may not be taken for Category 6 fuel (i.e., only the "0yr decay" curve on Figure 5.6-23 may be used).

CATEGORY 7:

'Fuel in Category 7 shall meet at least one of the following criteria:

1) an initial nominal enrichment of less than or equal to 3.860 w/o; OR
2) a minimum burnup as a function of initial enrichment as presented in Table 5.6-8 and Figure 5.6-24; OR
3) a minimum number of 140-inch IFBA pins as a function of IFBA B10 loading and initial enrichment as determined in Table 5.6-9 and Figure 5.6-25. Coefficients for the polynomial fits for the IFBA requirements as a function of enrichment are presented in Table 5.6-9.

CATEGORY 8:

A fuel assembly that does not meet the Blanketed criteria for Category 6 may be considered to be in Category 8. Specifically, fuel in Category 8 is a non-blanketed fuel assembly meeting the following criteria:

1) an initial enrichment of less than or equal to 1.172 w/o; OR
2) a burnup greater than the minimum burnup as a function of initial enrichment and decay time as presented in Table 5.6-7 and Figure 5.6-23.

CATEGORY 9:

Fuel in Category 9 shall meet at least one of the following criteria:

1) an initial nominal enrichment of less than or equal to 1.606 w/o; OR
2) a minimum burnup as a function of initial enrichment as presented in Table 5.6-10 and Figure 5.6-26.

SOUTH TEXAS - UNITS 1 & 2 5-8 Unit 1 - Amendment No. 43,-104, Unit 2 - Amendment No. 32-,94-,

DESIGN FEATURES CATEGORY 10:

Fuel in Category 10 shall meet the following criteria:

1) a 7-inch axial blanket on each end of the fuel assembly with an enrichment less than or equal to 2.60 w/o U23; AND EITHER
2) an initial enrichment of less than or equal to 1.159 w/o; OR
3) a minimum burnup as a function of initial enrichment as presented in Table 5.6-11 and Figure 5.6-27.

Decay time credit may not be taken for Category 10 fuel (i.e., only the "0yr decay" curve on Figure 5.6-27 may be used).

CATEGORY 11:

Fuel in Category 11 shall have an initial enrichment of less than or equal to 5.0 w/o.

CATEGORY 12 A fuel assembly that does not meet the Blanketed criteria for Category 10 may be considered to be in Category 12. Specifically, fuel in Category 12 is a non-blanketed fuel assembly that shall meet the following criteria:

1) an initial enrichment of less than or equal to 1.159 w/o; OR,
2) a minimum burnup as a function of initial enrichment and decay time as presented in Table 5.6-11 and Figure 5.6-27.

CATEGORY 14 Fuel in Category 14 shall meet the following criteria:

1) a rod cluster control assembly (RCCA) insert; AND EITHER
2) an initial enrichment of less than or equal to 1.379 w/o; OR
3) a minimum burnup as a function of initial enrichment and decay time as presented in Table 5.6-12 and Figure 5.6-28.

CATEGORY 16 Fuel in Category 16 shall meet the following criteria:

1) an initial enrichment of less than or equal to 1.379 w/o; OR
2) a minimum burnup as a function of initial enrichment and decay time as presented in Table 5.6-12 and Figure 5.6-28.

SOUTH TEXAS - UNITS 1 & 2 5-9 Unit 1 - Amendment No. 43,64,104, Unit 2 - Amendment No. 32,50,91-,

DESIGN FEATURES CATEGORY 18 Fuel in Category 18 shall meet the following criteria:

1) an RCCA insert; AND EITHER
2) an initial enrichment of less than or equal to 1.665 w/o; OR
3) a minimum burnup as a function of initial enrichment and decay time as presented in Table 5.6-13 and Figure 5.6-29.

CATEGORY 20 Fuel in Category 20 shall meet the following criteria:

1) an initial enrichment of less than or equal to 1.665 w/o; OR
2) a minimum burnup as a function of initial enrichment and decay time as presented in Table 5.6-13 and Figure 5.6-29.

CATEGORY 22 Fuel in Category 22 shall meet the following criteria:

1) an initial enrichment of less than or equal to 1.696 w/o; OR
2) a minimum burnup as a function of initial enrichment and decay time as presented in Table 5.6-14 and Figure 5.6-30.

CATEGORY 24 Fuel in Category 24 shall meet the following criteria:

1) a 7-inch axial blanket on each end of the fuel assembly with an enrichment less than or equal to 2.60 w/o; AND EITHER
2) an initial enrichment of less than or equal to 1.153 W/o; OR
3) a minimum burnup as a function of initial enrichment and decay time as presented in Table 5.6-15 and Figure 5.6-31.-

CATEGORY 26 Fuel in Category 26 shall meet the following criteria:

1) a 7-inch axial blanket on each end of the fuel assembly with an enrichment less than or equal to 2.60 w/o; AND
2) an RCCA insert; AND EITHER
3) an initial enrichment of less than or equal to 1.369 w/o; OR
4) a minimum burnup as a function of initial enrichment and decay time as presented in Table 5.6-16 and Figure 5.6-32.

SOUTH TEXAS - UNITS 1 & 2 5-10 Unit 1 - Amendment No. 43,494, Unit 2 - Amendment No. &'-,94-,

DESIGN FEATURES CATEGORY 28 Fuel in Category 28 shall meet the following criteria:

1) a 7-inch axial blanket on each end of the fuel assembly with an enrichment less than or equal to 2.60 w/o; AND EITHER
2) an initial enrichment of less than or equal to 1.369 w/o; OR
3) a minimum burnup as a function of initial enrichment and decay time as presented in Table 5.6-16 and Figure 5.6-32.

CATEGORY 30 Fuel in Category 30 shall meet the following criteria:

1) an initial enrichment of less than or equal to 5.0 w/o; AND
2) at least 16, 140-inch IFBA pins with a ' 013 loading greater than or equal to 2.355 mg/in (1.5X).

CATEGORY 32 Fuel in Category 32 shall have an initial enrichment of less than or equal to 5.0 w/o.

'CATEGORY 34 Fuel in Category 34 shall have an initial enrichment of less than or equal to 4.768 w/o.

'CATEGORY 36 Fuel in Category 36 shall meet at least one of the following criteria:

1) an initial enrichment of less than or equal to 2.049 w/o; OR
2) a minimum burnup as a function of initial enrichment and decay time as presented in Table 5.6-17 and Figure 5.6-33.

The cell in which a Category 36 fuel assembly is placed SHALL contain a rack insert.

SOUTH TEXAS - UNITS 1 & 2 5-11 Unit 1 - Amendment No. 43,194, Unit 2 - Amendment No. 32-,94-,

DESIGN FEATURES Data points for the curves presented in Figures 5.6-17 through 5.6-33 are presented in Tables 5.6-1 through 5.6-17. The tables also provide polynomial curve fits which may be used in lieu of the figures. Interpolations between analyzed decay times to determine the required burnup as a function of initial nominal enrichment may be performed using at least a second-degree polynomial. Extrapolation beyond the 30 year time limits is not allowed.

A surface fit polynomial may be used to directly determine the required minimum burnup as a function of initial enrichment and decay time for a particular category.

5.6.1.3 Region 1 racks may be used to store odd-numbered Category fuel. The fuel in Region 1 shall be stored in accordance with Figures 5.6-1 through 5.6-3.

Empty water cells may be substituted for fuel assemblies in all cases.

Empty water cells may be used to store non-f issile items provided that the cells are not face-adjacent to a cell storing a fuel assembly or an evaluation has been performed that supports storage of the non-f issile item.

5.6.1.4 Region 2 racks may be used to store even-numbered Category fuel. The fuel in Region 2 shall be stored in accordance with Figures 5.6-4 through 5.6-16.

,Empty water cells may be substituted for fuel assemblies in all cases. Non-f issile items may be stored in empty water cells per the provisions of Specification 5.6.1.3.

Fuel Rod Storage Canisters (or Racks) filled with fuel pins with a maximum enrichment of 5.0 W/o U235 with no burnable absorbers may be stored inthe Region 2 "All-Cell" storage configuration (Figure 5.6-4).

5.6.1.5 Storage Configuration Interface Requirements.. Fuel storage configurations used within each region and at the interface between Region 1 and Region 2 racks shall comply with the assembly loading requirements at the interface provided in Table 5.6-18. The interface boundaries of three or four different storage configurations are acceptable only if the storage cells on the boundary between the groups satisfy the interface requirements of the corresponding storage configurations as shown in Figures 5.6-34 and 5.6-35 and the assembly configurations along the border satisfy Table 5.6-18.

5.6.1.6 The minimum boron concentration of 2500 ppmn specified by Specification 3.9.13, TMSpent Fuel Pool Minimum Boron Concentration' bounds the boron concentration of 1456 ppmn required for the most limiting fuel misloading and also assures that the rack kef limit in Specification 5.6.1. la will not be violated.

SOUTH TEXAS - UNITS 1 & 2 5-12 Unit 1 - Amendment No. 43,404, Unit 2 - Amendment No. 32-,94-,

DESIGN FEATURES 5.6.1.7 The new fuel storage racks are designed and shall be maintained with:

a. kff equivalent to less than or equal to 0.95 when flooded with unborated water and I less than or equal to 0.98 when filled with aqueous foam moderation (low density water). This requirement shall be met by limiting the fuel assembly nominal enrichments to 5.0 w/o or less.
b. A nominal 21 inches center-to-center distance between fuel assemblies.

5.6.1.8 The in-containment fuel storage area (ICSA) racks are designed and shall be maintained with:

a. kef equivalent to less than or equal to 0.95 when flooded with unborated water. This requirement shall be met by limiting the fuel assembly nominal enrichments to 5.0 w/o or less.
b. A nominal 16 inches center-to-center distance between fuel assemblies.

In the lOSA, empty water cells may be substituted for fuel assemblies in all cases.'

Empty water cells may be used to store non-f issile items provided that the cells are not face-adjacent to a cell storing a fuel assembly or an evaluation has been performed that supports storage of the non-fissile item.

DRAINAGE 5.6.2 The spent fuel storage pool is designed and shall be maintained to prevent inadvertent draining of the pool below elevation 62 feet-6 inches.

CAPACITY 5.6.3 The spent fuel storage pool is designed and shall be maintained with a storage capacity limited to no more than 1969 fuel assemblies.

SOUTH TEXAS -UNITS 1 & 2 5-13 Unit 1 - Amendment No. 43,10O4, Unit 2 - Amendment No. 3 2 -,9 4-,

DESIGN FEATURES TABLE 5.6-1 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 1 FUEL Initial Limiting Enrichment Burnup w~235u)

(MWD/MTU) 2.452 0 3.000 4,466.43 4.000 13,056.25 5.000 20,787.51 Note that the required assembly burnup as a function of initial enrichment (e) is described by the following polynomial:

Required Assembly Burnup = -281.1 56e3 + 2944.097e2 - 161 6.095e - 9590.945 This data represents the curves in Figure 5.6-17.

SOUTH TEXAS - UNITS 1 & 2 5-14 Unit 1 - Amendment No. 43,104, Unit 2 - Amendment No. 32-,94-,

DESIGN FEATURES TABLE 5.6-2 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 2 FUEL Limiting Burnup S~~~~~~(MWD/MTU____ ____ ____

Initial Enrichment 0Oyr 5 yr 10 yr 15 yr 20Oyr 25 yr 30 yr (W/o MU) decay decay decay decay decay decay decay 1.169 0 0 0 0 0 0 0 3.000 34,181.37 31,739.93 30,016.00 28,707.44 27,899.89 27,201.13 26,828.89 4.000 49,896.73 46,448.45 43,861.01 42,370.86, 40,980.96 40,274.66 39,689.32 5.000" 65,006.18 60,688.97 57,628.51 55,503.59 154,010.68 53,081.69 52,120.75J Note that the required assembly burnups as a function of initial enrichment (e)for each decay period is described by the following polynomials:

Required Assembly Burnup (@0 yr decay) = 193.82e3 -2628.80e 2 +26945.60e -28229.39 Required Assembly Burnup (@5 yr decay) = 181 .66e3 - 2413.97e2 + 24884.71 e - 26093.42 Required Assembly Burnup (@10 yr decay) = 225.41e3 - 2743.71 e2 + 24710.68e - 25508.80 Required Assembly Burnup (@15 yr decay) = 11 7.06e3 -_1670.1 1e2 + 21022.85e - 22490.81 Required Assembly Burnup (@20 yr decay) = 192.66e 3 - 2337.54e2 + 2231 5.60e - 23210.74 Required Assembly Burnup (@25 yr decay) = 130.06e3 1693.93e2 + 201 18.91 e - 21421.79 Required Assembly Burnup (@30 yr decay) = 109.74e3 1531.41 e2 + 19519.81 e - 20910.89 This data represents the curves in Figure 5.6-18.

SOUTH TEXAS - UNITS 1 & 2 5-15 Unit 1 - Amendment No. 43,1-O4, Unit 2 - Amendment No. 32-,94-,

DESIGN FEATURES TABLE 5.6-3 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 3 FUEL Initial Limiting Enrichment Burnup (w/o 25U) (MWD/MTU) 2.961 0 4.000 7,23311."97 5.000 14,519.631 Note that the required assembly burnup as a function of initial enrichment (e) is described by the following polynomial:

Required Assembly Burnup = 158.729e 2 + 5857.1lOle - 18734.103 These data represent the curves in Figure 5.6-19.

TABLE 5.6-4 IFBA CREDIT REQUIREMENTS FOR CATEGORY 3 FUEL I FBA Loading Initial Enrichment Number (mg 10B3 per inch) (w/o 2 35u) of IFBAs N/A 2.961 0 1.Ox* 4.000 46.16 1.Ox 5.000 96.02 1.5x 4.000 30.70 1.5x 5.000 68.34 2.Ox 4.000 27.12 2.Ox 5.000 53.33

  • "1 .Ox" corresponds to an IFBA B3 10 loading of 1.57 mg/in. Accordingly, "1.5xe and "2.0x)e corresponds to 1.5x and 2x an IFBA B10 loading of 1.57 mg/in.

Note that the required number of IEBA as a function of initial enrichment (e) is described by the following polynomials:

Required Number of 1.Ox IFBA = 2.662e2 + 25.895e- 100.014 Required Number of 1.5x IFBA = 3.964e2 + 1.958e - 40.548 Required Number of 2.Ox IFBA = 0.052e2 + 25.744e- 76.680 This data represents the curves in Figure 5.6-20.

SOUTH TEXAS - UNITS 1 & 2 5-16 Unit 1 - Amendment No. 43,1-O4, Unit 2 - Amendment No. 321-,"

DESIGN FEATURES TABLE 5.6-5 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 4 FUEL Limiting Burnup

______(NMWD/MTU Initial Enrichment 0Qyr 5 yr 10 yr 15 yr 20Oyr 25 yr 30Oyr (W/o MU) decay decay decay decay decay decay decay 1.240 0 0 0 0 0 0 0, 3.000 31,005.51 28,911.05 27,181.32 26,214.57 25,577.34 24,902.21 24,411.30 4.000 45,943.04 42,781.39 40,567.87 39,204.86 38,151.31 37,284.43 36,815.21 5.000 60,361.64 56,489.33 53,864.06 51,947.13 50,680.02 49,485.61 48,865.60 Note that the required assembly burnups as a function of initial enrichment (e) for each decay period is described by the following polynomials:

Required Assembly Burnup (@0 yr decay) = 189.37e 3 - 2531 .89e2 + 25654.1 4e - 28282.82 Required Assembly Burnup (@5 yr decay) = 224.93e 3 - 2780.39e 2 + 25010.58e - 27170.32 Required Assembly Burnup (@10 yr decay) = 186.41 e3 - 2282.12e 2 + 22464.17e - 24705.21 Required Assembly Burnup (@15 yr decay) = 150.69e3 _ 1932.33e2 + 20940.94e - 23285.99 Required Assembly Burnup (@20 yr decay) = 182.88e3 - 221 7.24e 2 + 21 327.90e - 23389.09 Required Assembly Burnup (@25 yr decay) = 146.33e3 1846.50e2 + 19893.47e - 22110.62 Required Assembly Burnup (@30 yr decay) = 94.42e3 _ 1,309.83e2 + 18079.07e - 20586.85 This data represents the curves in Figure 5.6-21.

TABLE 5.6-6 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 5 FUEL Initial Enrichment Limiting Burnup U) 23/o (MWD/MTU) 1.695 0 3.000 17,449.52 4.000 27,331.22 5.000 37,696.661 Note that the required assembly burnup as a function of initial enrichment (e) is described by the following polynomial:

Required Assembly Burnup = 531 .223e3 - 6132.815Se 2 + 33156.1 50e - 41166.623 This data represents the curves in Figure 5.6-22.

SOUTH TEXAS - UNITS 1 & 2 5-17 Unit 1 - Amendment No. 6-1,404, Unit 2 - Amendment No. 50,941,

DESIGN FEATURES TABLE 5.6-7 BURNUP CREDIT REQUIREMENTS FOR THE CATEGORY 6 AND 8 FUEL Limiting Burnup Initial Enrichment 0Qyr 5 yr 10 yr 15 yr 20Oyr 25 yr 30Oyr (W/o 2-1U) decay decay decay decay decay decay decay 1.172 0 0 0 0 0 0 0.

3.000 31,962.27 30,134.91 28,763.65 27,930.20 27,344.72 26,914.24 26,612.28 4.000 45,626.99 43,422.99 41,479.85 40,504.05 39,735.24 38,786.33 38,460.32 5.000 158,634.68 55,880.90 53,972.48 52,665.53 51,286.08 50,659.00 50,147.32-Note that the required assembly burnups as a function of initial enrichment (e) for each decay period is described by the following polynomials:

Required Assembly Burnup (@0 yr decay) = 266.80e3 - 3530.16e2 + 28504.12e - 28982.31 Required Assembly Burnup (@5 yr decay) = 186.66e 3 -2654.99e 2 +24966.68e -25909.96*

Required Assembly Burnup (@10 yr decay) = 249.43e 3 - 31 04.96e2 + 25221 .98e - 25692.29*

Required Assembly Burnup (@15 yr decay) = 195.82e3 - 2555.99e 2 + 23220.53e - 24014.56*

Required Assembly Burnup (@20 yr decay) = 127.36e 3 _ 1948.18e2 + 21 31 5.40e - 22506.60*

Required Assembly Burnup (@25 yr decay) = 263.24e 3 - 3158.60e 2 + 24242.37e - 24492.99*

Required Assembly Burnup (@30 yr decay) = 229.1Oe 3 - 2829.72e 2 + 231 79.35e - 23644.02*

  • Decay time credit may not be taken for Category 6 fuel (i.e., only the "0yr decay" column may be used).

This data represents the curves in Figure 5.6-23.

TABLE 5.6-8 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 7 FUEL Initial Enrichment Limiting Burnup (w/o MU) .(MWD/MTU) 3.860 0 1 5.000 14,366.45 Note that the required assembly burnup as a function of initial enrichment (e) is described by the following polynomial:

Requi red Assembly Burnup = 3829.871 e - 14782.907 This data represents the curves in Figure 5.6-24.

SOUTH TEXAS - UNITS 1 & 2 5-18 Unit 1 - Amendment No. 4-04, Unit 2 - Amendment No. 9.1,

DESIGN FEATURES TABLE 5.6-9 IEBA CREDIT REQUIREMENTS FOR CATEGORY 7 FUEL IFBA Loading Initial Enrichment Number (mg 10B3 per inch) (w/o 2WU) of IFBAs N/A 3.860 0 1.Ox *5.000 42.97 1.5x 5.000 30.19 2.Ox 5.000 25.04

  • "11.0OxC corresponds to an IEBA B'1 0 loading of 1.57 mg/in. Accordingly, "1.5x and "2.Oxe' corresponds to 1.5x and 2x an IEBA B10 loading of 1.57 mg/in.

Note that the required number of IFBA as a function of initial enrichment (e)is described by the following polynomials:

Required Number of 1.Ox IFBA = 37.691 e - 145.483 Required Number of 1.5x IFBA = 26.477e - 102.198 Required Number of 2.Ox IFBA = 21 .692e - 84.770 This data represents the curves in Figure 5.6-25 TABLE 5.6-10 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 9 FUEL Initial Enrichment Limiting Burnup (w235u) (MWD/MTU) 1.606 0 3.000 19,884.59 4.000 30,202.66 5.000 40,475.25 Note that the required assembly burnup as a function of initial enrichment (e) is described by the following polynomial:

Required Assembly Burnup = 478.565e3 _ 5765.51 6e2 + 32969.784e - 400956.362 This data represents the curve in Figure 5.6-26.

SOUTH TEXAS - UNITS 1 & 2 5-19 Unit 1 - Amendment No. 4-04, Unit 2 - Amendment No. 941,

DESIGN FEATURES TABLE 5.6-11 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 10 AND 12 FUEL Limiting Burnup (MW/MU Initial Enrichment 0Oyr 5Syr 10 yr 15 yr 20Oyr 25 yr 30Oyr

-(W/o 23U) decay decay decay decay decay decay decay 1.159 0 0 0 0 0 0 0

-3.000 31,521.17 30,182.28 29,181.14 28,564.51 28,131.83 27,780.08 27,480.99 4.000 43,590.11 41,980.08 41,050.96 40,020.70 39,623.29 39,071.36 38,768.59 5.000 55,371.82 53,783.15 52,247.98 51,474.09 50,582.97 50,246.64 49,941.13 Note that the required assembly burnups as a function of initial enrichment (e) for each decay period is described by the following polynomials:

Required Assembly Burnup (@0 yr decay) = 425.49e3 - 5249.45e2 + 33072.07e - 31938.15 Required Assembly Burnup (@5 yr decay) = 421 .77e3 - 5058.57e2 + 31602.46e - 30485.63*

Required Assembly Burnup (@10 yr decay) = 277.08e 3 - 3661 .38e2 + 27247.46e - 27090.00*

Required Assembly Burnup (@15 yr decay) = 371.51 e3 - 4459.49e 2 + 28926.85e - 28111.30*

Required Assembly Burnup (@20 yr decay) = 277.88e 3 - 3600.49e 2 + 2641 3.23'e - 26206.27*

Required Assembly Burnup (@25 yr decay) = 332.84e 3 - 4052.111e2 + 27340.89e - 26760.32*

Required Assembly Burnup (@30 yr decay) = 31 8.42e 3 - 3878.55e 2 + 26655.95e - 26177.21 *

  • Decay time credit may not be taken for Category 10 fuel (i.e., only the "0 yr decay" column may be used).

This data represents the curves in Figure 5.6-27.

SOUTH TEXAS - UNITS 1 & 2 5-20 Unit 1 - Amendment No. 4-04, Unit 2 - Amendment No. 9-1,

DESIGN FEATURES TABLE 5.6-12 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 14 AND 16 FUEL Limiting Burnup Initial Enrichment 0Oyr 5 yr 10 yr 15 yr 20Oyr 25 yr 30Oyr (w/o 23U) decay decay decay decay decay decay decay 1.379 0 0 0 0 0 0 0 3.000 26,324.70 24,510.31 23,293.43 22,355.96 21,841.95 21,318.38 21,045.43 4.000 40,552.13 37,872.29 35,977.77 34,847.67 33,978.83 33,197.02 32,857.48 5.000 54,120.03 51,210.59 48,740.61 47,176.78 45,874.18 45,225.90 44,385.90 Note that the required assembly' burnups as a function of initial enrichment (e)for each decay period is described by the following polynomials:

Required Assembly Burnup (@0 yr decay) = 121 .12e3 -1783.27e 2 + 22228.68e - 27582.31 Required Assembly Burnup (@5 yr decay) = 182.17e3 - 2197.86e2 + 22006.79e - 26647.85 Required Assembly Burnup (@10 yr decay) = 188.58e3 - 2223.67e2 + 21272.66e - 25603.11 Required Assembly Burnup (@15 yr decay) = 11 4.63e 3 _ 1456.89e 2 + 18448.52e - 22972.71 Required Assembly Burnup (@20 yr decay) = 107.71 e3 - 1413.26e2 + 18044.48e - 22480.30 Required Assembly Burnup (@25 yr decay) = 154.98e3 1784.63e2 + 18636.83e - 22714.86 Required Assembly Burnup (@30 yr decay) = 84.34e 3 11 53.89e2 + 16768.69e - 21152.84 This data represents the curves in Figure 5.6-28.

SOUTH TEXAS - UNITS 1 & 2 5-21 Unit 1 - Amendment No. 1-04, Unit 2 - Amendment No. 041,

DESIGN FEATURES TABLE 5.6-13 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 18 AND 20 FUEL Limiting Burnup

_______ _______(MWD/MTU ___

Initial Enrichment 0Oyr 5 yr 10 yr 15 yr 20Oyr 25 yr 30Oyr (W16 235 u) decay decay decay decay decay decay decay 1.665 0 0 0 0 0 0 0 3.000 19,854.57 18,768.74 17,956.96 17,428.60 17,023.73 16,655.44 16,368.60 4.000 31,877.43 30,055.14 28,752.30 27,947.64 27,254.34 26,851.19 26,497.38 5.000 42,753.09 40,507.61 39,097.96 37,839.29 37,230.89 36,462.46 36,152.70 Note that the required assembly burnups as a function of initial enrichment (e) for each decay period is described by the following polynomials:

Required Assembly Burnup (@0 yr decay) = 193.48e3 - 2895.33e 2 + 25131.51 e - 34705.87 Required Assembly Burnup (@5 yr decay) = 230.59e3 - 31 84.01 e2 + 25042.79e - 33929.34 Required Assembly Burnup (@10 yr decay) = 273.18Be 3 - 3503.04e2 + 25208.86e - 33518.20 Required Assembly Burnup (@15 yr decay) = 231 .22e3 - 3088.28e2 + 23582.01le - 31765.77 Required Assembly Burnup (@20 yr decay) = 285.28e3 - 3550.43e2 + 24528.14e - 32309.48 Required Assembly Burnup (@25 yr decay) = 204.81 e3 - 2750.00e2 + 21867.68e - 29727.52 Required Assembly Burnup (@30 yr decay) = 202.48e3 - 2666.43e2 + 21302.33e - 29007.01 This data represents the curves in Figure 5.6-29.

SOUTH TEXAS - UNITS 1 & 2 5-22 Unit 1 - Amendment No. 404, Unit 2 - Amendment No. 9-1,

DESIGN FEATURES TABLE 5.6-14 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 22 FUEL Limiting Burnup

_ MWD/M Initial Enrichment 0Oyr 5 yr 10 yr 15 yr 20 yr 25 yr 30 yr (w/o 2 35u) decay decay decay decay decay decay decay 1.696 0 0 0 0 0 0 0 3.000 15,443.94 14,682.92 14,147.18 13,784.66 13,374.76 13,092.76 12,948.70 4.000 26,269.52 24,965.41 23,860.31 23,340.38, 22,882.39 ,22,469.93 22,348.49 5.000 136,948.53 34,752.92 33,568.91 _32,651.58 132,037.581 31,531.37 31,175.27 Note that the required assembly burnups as a function of initial enrichment (e) for each decay period is described by the following polynomials:

Required Assembly Burnup (@0 yr decay) = 11 1.07e3 _ 1406.1332 + 16558.88e - 24576.43 Required Assembly Burnup (@5 yr decay) = 53.05e 3 - 884. 09e2 + 14508.27e - 22317.44 Required Assembly Burnup (@10 yr decay) = 148.1Oe 3 2

_ 1779.46e + 16689.63e - 23905.27 Required Assembly Burnup (@15 yr decay) = 95.96e 3 - 1273.72e 2 + 14921 .44e - 22106.93 Required Assembly Burnup (@20 yr decay) = 44.67e3 - 712.27e2 + 12840.68e - 19942.99 Required Assembly Burnup (@25 yr decay) = 38.96e 3 - 625.41 e2 + 12313.46e - 19270.92 Required Assembly Burnup (@30 yr decay) = -17.44e 3 - 77.24e 2 + 10585.68e - 17642.36 This data represents the curves in Figure 5.6-30.

SOUTH TEXAS - UNITS 1 & 2 5-23 Unit 1 - Amendment No. 4-04, Unit 2 - Amendment No. 94,

DESIGN FEATURES TABLE 5.6-15 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 24 FUEL Limiting Burnup S_______ (MWD/MTU____

Initial Enrichment 0Oyr 5 yr 10 yr 15 yr 20Oyr 25 yr 30Oyr U)

Mwo decay decay decay decay decay decay decay 1.153 0 0 0 0 0 0 0, 3.000 32,196.93 29,606.82 27,947.14 26,663.96 25,932.39 25,259.09 24,884.07 4.000 44,231.10 40,927.90 38,757.70 37,326.28 36,223.83 35,511.98 34,891.94 5.000 55,546.33 51,810.19 49,187.88 47,443.64t 46,091.89 45,123.86 44,426.31 Note that the required assembly burnups as a function of initial enrichment (e) for each decay period is described by the following polynomials:

Required Assembly Burnup (@0 yr decay) = 399.01e 3 - 5147.63e 2 + 33304.09e - 32160.03 Required Assembly Burnup (@5 yr decay) = 372.53e 3 - 4689.72e2 + 30365.62e - 29340.81 Required Assembly Burnup (@10 yr decay) = 344.71 e3 - 4326.72e 2 + 28343.29e - 27449.44 Required Assembly Burnup (@15 yr decay) = 273.45e 3 - 3553.83e2 + 25421 .62e - 24999.51 Required Assembly Burnup (@20 yr decay) = 286.95e 3 - 3655.1Oe 2 + 25259.98e - 24699.31 Required Assembly Burnup (@25 yr decay) = 228.92e 3 - 3067.53e2 + 23255.60e - 23080.73 Required Assembly Burnup (@30 yr decay) = 254.52e3 - 3291 .02e2 + 23627.67e - 23251.88 This data represents the curves in Figure 5.6-31.

SOUTH TEXAS - UNITS 1 & 2 5-24 Unit 1 - Amendment No. 4-04, Unit 2 - Amendment No. 9-1,

DESIGN FEATURES TABLE 5.6-16 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 26 AND 28 FUEL Limiting Burnup (MWD/MTU Initial Enrichment 0Oyr 5 yr 10 yr 15 yr 20Oyr 25 yr 30 yr 5

23o u) decay decay decay decay -decay decay decay 1.369 0 0 0 0 0 0 0 3.000 25,928.30 24,078.04 22,788.97 21,931.60 21,398.03 20,834.48 20,440.03 4.000 .37,542.07 35,109.98 33,443.17 32,163.04 31,311.84 30,617.11 30,180.08 5.000 148,372.80 45,418.12 43,304.49 41,861.29 40,661.75 39,838.23 39,312.95j Note that the required assembly burnups as a function of initial enrichment (e) for each decay period is described by the following polynomials:

Required Assembly Burnup (@0 yr decay) =340.06e 3 - 4472.21 e2 + 30337.12e - 34014.74 Required Assembly Burnup (@5 yr decay) = 290.41e 3 -3846.85e 2 + 27214.65e - 30785.36 Required Assembly Burnup (@10 yr decay) = 237.74e 3 - 3249.32e 2 + 24603.07e - 28195.32 Required Assembly Burnup (@15 yr decay) = 262.74e 3 - 341 9.44e2 + 24446.28e - 27726.17 Required Assembly Burnup (@20 yr decay) = 257.52e 3 - 3372.24e 2 + 239911.1lOe - 27178.24 Required Assembly Burnup'(@25 yr decay) = 235.43e 3 - 3105.92e 2 + 2281 3.12e - 26008.26 Required Assembly Burnup (@30 yr decay) = 208.29e 3 - 2803.09e 2 + 21654.92e - 24920.78 This data represents the curves in Figure 5.6-32.

SOUTH TEXAS - UNITS 1 & 2 5-25 Unit 1 - Amendment No. 4-04, Unit 2 - Amendment No. 941,

DESIGN FEATURES TABLE 5.6-17 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 36 FUEL Limiting Burnup Initial Enrichment 0Oyr 5 yr 10 yr 15 yr 20 yr 25 yr 30Oyr U) 235o decay decay dcyr decay decay decay decay 2.049 0 0n 0 0 0 0 3.000 10,489.63 9,924.78 9,500.65 9,480.05 9,127.01 9,025.86 8,933.94 4.000 20,728.17 19,881.06 19,180.16 18,677.80 18,167.33 18,116.47 18,034.301 5.000 30,841.66 29,420.10 128,380.30 27,501.48 27,042.47 26,541.63 26,296.651 Note that the required assembly burnups as a function of initial enrichment (e)for each decay period is described by the following polynomials:

Required Assembly Burnup (@0 yr decay) = 116.95e - 1465.93e 2 + 161 72.89e - 27993.31 Required Assembly Burnup (@5 yr decay) = 13.25e3 - 367.64e 2 + 12039.45e - 23242.60 Required Assembly Burnup (@10 yr decay) = - 26.70e 3 + 80.68e2 + 101 02.53e - 20812.24 Required Assembly Burnup (@15 yr decay) = 71 .08e3 - 1039.95e2 + 13847.60e - 24622.23 Required Assembly Burnup (@20 yr decay) = 69.31ee3 _ 91 4.32e 2 + 12876.05e - 23143.65 Required Assembly Burnup (@25 yr decay) = - 42.69e3 + 179.50e 2 + 9413.49e - 19677.57 Required Assembly Burnup (@30 yr decay) = - 90.41e 3 + 665.96e 2 + 7783.94e - 17970.33 This data represents the curves in Figure 5.6-33.

SOUTH TEXAS - UNITS 1 & 2 5-26 Unit 1 - Amendment No. 404, Unit 2 - Amendment No. 94,

DESIGN FEATURES TABLE 5.6-18 ASSEMBLY LOADING REQUIREMENTS AT THE INTERFACE BETWEEN DIFFERENT STORAGE CONFIGURATIONS' Assembly that Must be Loaded at the Configuration I Interface with Another Configuration 2 Region 1 All-Cell ]Any Checkerboard #1 JOnly Category 3 and Category 5 Checkerboard #2 JOnly Category 9 Region 2 All-Cell Any 4-out-of-4 BPRA Any 1-out-of-4 Blanketed Category 6 2-out-of-4 Blanketed Any 1-out-of-4 RCCA Category 14 2-out-of-4 RCCA Any 3-out-of-4 Checkerboard Leave empty location at interface out-of-4 Blanketed Any 4-out-of -4 Blanketed with 1 RCCA Category 26 2-out-of -4 5.0 w/o with 16 1.5x IFBA See footnote' 1-out-of-4 5.0 w/o Fresh, No IFBA See footnote'

.2-out-of -4 4.768 w/o Fresh No IFBA See footnote' All-Cell with Poison Inserts 1Any Instructions:

1. Identify which storage configurations will be interfaced.
2. Look up the assembly loading requirements for both storage configurations.

These interface requirements apply within Region 1and Region 2 and at the Interface between Region 1 and 2 Region 2.

3An empty storage location is always permitted.

SA fresh fuel assembly from these configurations must be surrounded by empty locations on all four sides of the assembly.

SOUTH TEXAS - UNITS 1 & 2 5-27 Unit 1 - Amendment No. 1-04, Unit 2 - Amendment No. 941,

DESIGN FEATURES FIGURE 5.6-1 FIGURE 5.6-2 REGION 1: ALL-CELL STORAGE REGION 1: CHECKERBOARD #1

4. 1= ] F ]

Position 1: Position 2: Position 1: Position 2:

CATEGORY 1 CATEGORY 1 CATEGORY 3 CATEGORY 5 Position 3: Position 4: Position 3: Position 4:

CATEGORY 1 CATEGORY 1 CATEGORY 5 CATEGORY 7 FIGURE 5.6-4 FIGURE 5.6-3 REGION 2: ALL-CELL, NON-REGION 1: CHECKERBOARD #2 BLANKETED F ] F + I Position 1: Position 2: Position 1: Position 2:

CATEGORY 9 CATEGORY 9 CATEGORY 2 CATEGORY 2 Position 3: Position 4: Position 3: Position 4:

CATEGORY 11 CATEGORY 9 CATEGORY 2 CATEGORY 2 FIGURE 5.6-5 FIGURE 5.6-6 REGION 2: 4-OUT-OF-4 BPRA, NON- REGION 2: 1-OUT-OF-4 BLANKETED BLANKETED F I Position 1: Position 2: Position 1: Position 2:

CATEGORY 4 CATEGORY 4 CATEGORY 8 CATEGORY 6 Position 3: Position 4: Position 3: Position 4:

CATEGORY 4 CATEGORY 4 CATEGORY 8 CATEGORY 8 FIGURE 5.6-7 FIGURE 5.6-8 REGION 2: 2-OUT-OF-4 BLANKETED REGION 2: 1-OUT-OF-4 WITH RCCA I F I Position 1: Position 2: Position 1: Position 2:

CATEGORY 10 CATEGORY 12 CATEGORY 16 CATEGORY 14 Position 3: Position 4: Position 3: Position 4:

CATEGORY 12 CATEGORY 10 CATEGORY 16 CATEGORY 16 SOUTH TEXAS -UNITS 1 & 2 5-28 Unit 1 - Amendment No. 404, Unit 2 - Amendment No. 9-1,

DESIGN FEATURES FIGURE 5.6-9 FIGURE 5.6-10 REGION 2: 2-OUT-OF-4 WITH RCCA REGION 2: 3-OUT-OF-4 CHECKERBOARD F + ] +

Position 1: Position 2: Position 1: Position 2:

CATEGORY 18 CATEGORY 20 CATEGORY 22 CATEGORY 22 Position 3: Position 4: Position 3: Position 4:

CATEGORY 20 CATEGORY 18 CATEGORY 22 WATER FIGURE 5.6-12 FIGURE 5.6-11 REGION 2: 4-OUT-OF-4 REGION 2: 4-OUT-OF-4 BLANKETED BLANKETED, 1 RCCA AND DECAY CREDIT F + I I Position 1: Position 2: Position 1: Position 2:

CATEGORY 24 CATEGORY 24 CATEGOI RY 28 CATEGORY 26 Position 3: Position 4: Position 3: Position 4:

CATEGORY 24 CATEGORY 24 CATEGO! RY 28 CATEGORY 28 FIGURE 5.6-13 FIGURE 5.6-14 REGION 2: 2-OUT-OF-4, 5.0 W/O, REGION 2: 1-OUT-OF-4, 5.0 W/O 16 1.5X I FBA WITH NO IFBA FIGURE 5.6-15 FIGURE 5.6-16 REGION 2: 2-OUT-OF-4 4.768 W/O REGION 2: ALL-CELL WITH CELL WITH NO IFBA INSERTS F I Position 1: Position 2:

ICATEGORY 36 CATEGORY 36 Position 3: Position 4:

CATEGORY 36 CATEGORY 36 SOUTH TEXAS - UNITS 1 & 2 5-29 Unit 1 - Amendment No. 404, Unit 2 - Amendment No. 041,

DESIGN FEATURES FIGURE 5.6-17 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 1 FUEL 25,000.00 - -- ------

20,000.00 - --.- -----

15,00000~-ACCEPT-ABLE~

E 10,000.00* ...--

a)

(Io 5,000.00------ ---

- - - UNACCEPTABLE-[

0.00 - 15 .0 25 1.0 15 2.0 25 3.00 3.50 4.00 4.50 5.00 Initial U-235 Enrichment (nominal w/o)

The data for this curve is given in Table 5.6-1.

SOUTH TEXAS - UNITS 1 & 2 5-30 Unit 1 - Amendment No. 6-1,404, Unit 2 - Amendment No. 60 ,9 4-,

DESIGN FEATURES FIGURE 5.6-18 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 2 FUEL 70,000-60,000-- I 5 50,000-40,000 -- ACCEPTABLE M 30,000 10,000--UACPTBE--

1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 Initial U-235 Enrichment (nominal w/o)

The data for these curves is given in Table 5.6-2.

SOUTH TEXAS - UNITS 1 & 2 5-31 Unit 1 - Amendment No. 43,46,6-1,14, Unit 2 - Amendment No. 32,35,.5O,91,

DESIGN FEATURES FIGURE 5.6-19 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 3 FUEL 16,000.00 H ill 1 1 1 1 1 1 1 1 1 11 1 1 11 1 11 111 1 1 11 H il l II I I I H i ll 14,000.00 12,000.00 D. 10,000.00 I

ACCEPTABLE+

E 8,000.00 E

6,000.00 u-4,000.00 UNACCEPTABLE 2,000.00 Ij 0.00 1LFFI 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 Initial U-235 Enrichment (nominal w/o)

The data for this curve is given in Table 5.6-3.

SOUTH TEXAS - UNITS 1 & 2 5-32 Unit 1 - Amendment No.

Unit 2 - Amendment No.

DESIGN FEATURES FIGURE 5.6-20 IEBA CREDIT REQUIREMENTS FOR CATEGORY 3 FUEL 120 100 80 CL

  • 6-0 60

.0 z

40 20 0

2.50 3.00 3.50 4.00 4.50 5.00 Initial U-235 Enrichment (nominal w/o)

The data for these curves is given in Table 5.6-4.

SOUTH TEXAS - UNITS 1 & 2 5-33 Unit 1 - Amendment No.

Unit 2 - Amendment No.

DESIGN FEATURES FIGURE 5.6-21 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 4 FUEL 70,000 60,000 S50,000 Hz~z~~fiifrJEE~l EEE:::: 0

~-40,000 CL A hi ' ,CEPTABLE ,I_ - , , I

./

I

-1 I)

E fl30,000 E

,1 O0yrdecay

- 5 yr decay u.20,000 -35 yr decay 10,000 * ----------- -JUNACCEPTABLE-------

.0 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 Initial U-235 Enrichment (nominal w/o)

The data for these curves is given in Table 5.6-5.

SOUTH TEXAS - UNITS 1 & 2 5-34 Unit 1 - Amendment No.

Unit 2 - Amendment No.

DESIGN FEATURES FIGURE 5.6-22 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 5 FUEL 40,000.00 35,000.00 30,000.00 IACCEPTAIIBLEI IIA II 25,000.00 0~

E 20,000.00 CD

.0 E

0)

U) 15,000.00 U) UNACCEPTABL 0)

IL 10,000.00 5,000.00 0.00 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 Initial U-235 Enrichment (nominal w/o)

The data for this curve is given in Table 5.6-6.

SOUTH TEXAS -UNITS 1 & 2 5-35 Unit 1 - Amendment No.

Unit 2 - Amendment No.

DESIGN FEATURES FIGURE 5.6-23 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 6 AND 8 FUEL 60,000 50,000 4,

S40,000 V 1 I I I II I I X 4, I I I ACCEPTABLE 4w

= 30,000 E 0 0 yr decay 0) 5 yr decay

<20,000 10yrdecay 15 yrdecay LL --- ---20 yr decay

- - - 25 yr decay OV 30 yrdecay

/10 Jý4 10,000 UNACCEPTABLE 0

1.00 1.50' 2.00 2.50 3.00 3.50 4.00 4.50 5.00 Initial U-235 Enrichment (nominal w/o)

Category 6 fuel may ONLY use the uOyr decay" curve.

The data for these curves is given in Table 5.6-7.

SOUTH TEXAS - UNITS 1 & 2 5-36 Unit 1 - Amendment No.

Unit 2 - Amendment No.

DESIGN FEATURES FIGURE 5.6-24 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 7 FUEL 5,000.00 4,500.00 4,000.00 S3,500.00 S3,000.00 ACCEPTABLE]-

C-CL p 2,500.00 2,000.00 S1,500.00 L-1,000.00 III{ U-NACC EPTAB LE:: -

500.00 0.00 3.00 03.50.. 4.00 4.50 5.00 Initial U-235 Enrichment (nominal w/o)

The data for this curve is given in Table 5.6-8.

SOUTH TEXAS - UNITS 1 & 2 5-37 Unit 1 - Amendment No.

Unit 2 - Amendment No.

DESIGN FEATURES FIGURE 5.6-25 IFBA CREDIT REQUIREMENTS FOR CATEGORY 7 FUEL 50 1.Ox IFBA __

45 -- ----- - - - - ---- - 1.6x IFBA - - -- -

--- 2.Ox IFBA ---- - -

40 35 0'

C 30

-ACCEPTABLE ___

u-25 E 20 z

- - - - - -- -- ~- - - - - - - - - - -

15 UNACCPTABL----------

10 5

0 3.50 3.70 3.90 4.10 4.30 4.50 4.70 4.90 Initial U-235 Enrichment (nominal w/o)

The data for these curves is given in Table 5.6-9.

SOUTH TEXAS - UNITS 1 & 2 5-38 Unit 1 - Amendment No.

Unit 2 - Amendment No.

DESIGN FEATURES FIGURE 5.6-26 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 9 FUEL 45,000~-----------------------------

40,000 --

3.5,000

'00 E

)

1%0,000~-----------------------

15,000---------- 1 .-----

00 1.0 15 .0 25 .0 .0 40 .0 50 IntilU-3 Erchet nmia wo The ataforthi cuve sUNveninEablA5.-10 SOUTH TEXAS - UNITS 1 & 2 5-39 Unit 1 - Amendment No.

Unit 2 - Amendment No.

DESIGN FEATURES FIGURE 5.6-27 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 10 AND 12 FUEL 60,000 50,000 40,000

330,000 E

10 yr decay 20,000 OF 2 r ea 30 yr decay LL UNCEPAL - -- - -20ydea 10,000 0

1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 Initial U-235 Enrichment (nominal w/o)

Category 10 fuel may ONLY use the "Oyr decay" curve.

The data for these curves is given in Table 5.6-11.

SOUTH TEXAS - UNITS 1 & 2 5-40 Unit 1 - Amendment No.

Unit 2 - Amendment No.

DESIGN FEATURES FIGURE 5.6-28 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 14 AND 16 FUEL 60,000 50,000 40,000 ACCEPTABLEIA.

N 30,000 E

10 yr decay 20,000

__ __ __ __ __ __ _ __ __ 0____1- _ _ 1 - 5 yr decay 10 yr decay 10,000


UNACCEPTABLE -

0 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 Initial U-235 Enrichment (nominal w/o)

The data for these curves is given in Table 5.6-12.

SOUTH TEXAS - UNITS 1 & 2 5-41 Unit 1 - Amendment No.

Unit 2 - Amendment No.

DESIGN FEATURES FIGURE 5.6-29 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 18 AND 20 FUEL 45,000 40,000

  • Jo 35,000 D

30,000 ACCEPTABLE -- -;, -

a.-25,000 E

Ž20,000 E yr decay 0+-

decay 5--lyr

<15,000 U-

- - - 25 yr decay 10,000 UNACEPABILE --

5,000 0

1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 Initial U-235 Enrichment (nominal w/o)

The data for these curves is given in Table 5.6-13.

SOUTH TEXAS -UNITS 1 & 2 5-42 Unit 1 - Amendment No.

Unit 2 - Amendment No.

DESIGN FEATURES FIGURE 5.6-30 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 22 FUEL 40,000 35,000 30,000 25,000 ACCEPTABLE 20,000 E

15,000


- 5yr decay LIL 10,000 UNAC0EPTAdLcay 5,000 0

1.00 1.50 2.00 2.50, 3.00 3.50 4.00 4.50 5.00 Initial U-235 Enrichment (nominal w/o)

The data for these curves is given in Table 5.6-14.

SOUTH TEXAS - UNITS 1 & 2 5-43 Unit 1 - Amendment No.

Unit 2 - Amendment No.

DESIGN FEATURES FIGURE 5.6-31 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 24 FUEL 60,000 50,000 S40,000 ACCEPTABLE -_--

30,000 E

20,000

- 5 yr decay u_

-30 yr decay 10,000

, P -- 1UNACCEPTABLEfTl I 0

1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 Initial U-235 Enrichment (nominal w/o)

The data for these curves is given in Table 5.6-15.

SOUTH TEXAS - UNITS 1 & 2 5-44 Unit 1 - Amendment No.

Unit 2 - Amendment No.

DESIGN FEATURES FIGURE 5.6-32 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 26 AND 28 FUEL 50,000 45,000 40,000 D 35,000 f,0 X 1',:4 30,000 ACCEPTABLE 00F A.-

oo' L oooO' I I I 325,000 Ad 20,000 A:

0 o yr decay co, 000, z.r"/ -E - 5 yr decay I1-1A - - - 10 yr decay 15 yr decay S15,000 z u- - - - - - - -20 yr decay I YJ V

- - - yrdecay 30 yrr d cay 10,000 0',

-- - - --- UNACCEPTABLE 5,000 0

1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 Initial U-235 Enrichment (nominal w/o)

The data for these curves is given in Table 5.6-16.

SOUTH TEXAS - UNITS 1 & 2 5-45 Unit 1 - Amendment No.

Unit 2 - Amendment No.

DESIGN FEATURES FIGURE 5.6-33 BURNUP CREDIT REQUIREMENTS FOR CATEGORY 36 FUEL 30,000 25,000 D

S20,000 S15,000 E

u-5,000 0 4v 2.00 2.50 3.00 3.0 4.00 4.50 5.00 Initial U-235 Enrichment (nominal w/o)

The data for these curves is given in Table 5.6-17.

SOUTH TEXAS -UNITS 1 & 2 5-46 Unit 1 - Amendment No.

Unit 2 - Amendment No.

DESIGN FEATURES FIGURE 5.6-34 BOUNDARY BETWEEN THREE STORAGE CONFIGURATIONS Gi GI Gi GI Gi Gi Gi GI Gi Gi Gi Gi Gi Gi GI Gi Gi Gi G1 Gi GI Gi Gi Gi Gi GI GI GI Gi Gi Gi GI G2 G2 G2 G2 G3 G3 G3 G3 G2 G2 G2 G2 G3 G3 G3 G3 G2 G2 G2 G2 G3 G3 G3 G3_

" Gi, G2, and G3 represent groups of storage configurations.

  • The interface between Gl and G2, Gl and G3, and G2 and G3 must satisfy the requirements of Table 5.6-18.

SOUTH TEXAS - UNITS 1 & 2 5-47 Unit 1 - Amendment No.

Unit 2 - Amendment No.

DESIGN FEATURES FIGURE 5.6-35 BOUNDARY BETWEEN FOUR STORAGE CONFIGURATIONS G1 G1 G1 G1 G2 G2 G2 G2 G1 G1 G1 GI G2 G2 G2 G2 G1 GI GI GI G2 G2 G2 G2 G1 G1 G1 G1 G2 G2 G2 G2 G3 G3 G3 G3 G4 G4 G4 G4 G3 G3 G3 G3 G4 G4 G4 G4 G3 G3 G3 G3 G4 G4 G4 G4 G3 G3 G3 G3 G4 G4 G4 G4

" G1, G2, G3, and G4 represent groups of storage configurations.

" The interface between G1 and G2, G1 and G3, and G2 and G4, G3 and G4 must satisfy the requirements of Table 5.6-18.

5.7 COMPONENT CYCLIC OR TRANSIENT LIMIT 5.7.1 The components of the reactor coolant system are designed and shall be maintained within limits addressed in the Component Cyclic and Transient Limit Program as required by specification 6.8.3f.

SOUTH TEXAS - UNITS 1 & 2 5-48 Unit 1 - Amendment No.

Unit 2 - Amendment No.

NOC-AE-0600201 3 Attachment 3 Westinghouse Affidavit

S Wesfinghouse Westinghouse Electric Company Nudlear Services P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 USA U.S. Nuclear Regulatory Commission Direct tel: (412) 374-4419 Document Control Desk Direct fax: (412) 374-4011 Washington, DC 20555-000 1 e-mail: maurerbf@westinghouse.com Our ref. CAW-06-2 136 May 2, 2006 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE

Subject:

WCAP-165 13-P Revision 1 "South Texas Project Spent Fuel Pool and In-Containment Storage Racks Criticality Analysis," January 2006 (Proprietary)

The proprietary information for which withholding is being requested in the above-referenced report is further identified in Affidavit CAW-06-2 136 signed by the owner of the proprietary information, Westinghouse Electric Company LLC. The affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (bX4) of 10 CFR Section 2.390 of the Commission's regulations.

Accordingly, this letter authorizes the utilization of the accompanying affidavit by South Texas Project Nuclear Operating Company.

Correspondence with respect to the proprietary aspects of the application for withholding or the Westinghouse affidavit should reference this letter, CAW-06-2 136 and should be addressed to B. F. Maurer, Acting Manager, Regulatory Compliance and Plant Licensing, Westinghouse Electric Company LLC, P.O. Box 355, Pittsburgh, Pennsylvania 15230-0355.

B. F. aueActing Manager Regulatory Compliance and Plant Licensing Enclosures cc: D. H. Jaffe/NRR F. M. AkstulewiczlNRR G.5S. Shukla/NRR A BNFL Group company

CAW-06-2 136 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:

55 COUNTY OF ALLEGHENY:

Before me, the undersigned authority, personally appeared B. F. Maurer, who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief:

B. F. Maurer, Acting Manager Regulatory Compliance and Plant Licensing Sworn to and subscribed before me this day of U7Ae20 I

Notary Public NotailSeed Sharon L Rioi, Notary PtUIic Mor~eBoro, Allegheny County my ansin expires January 29, 2007 member, Pennsylvania Association of Notaries

2 CAW-06-21 36 (1) 1 am Acting Manager, Regulatory Compliance and Plant Licensing, in Nuclear Services, Westinghouse Electric Company LLC (W.estinghouse), and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.

(2) 1 am making this Affidavit in conformnance with the provisions of 10 CER Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse application for withholding accompanying this Affidavit.

(3) 1 have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information.

(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.3 90 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.

(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.

(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.

Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:

(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.

(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.

(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.

3 3 ~CAW-06-21 36 (d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.

(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.

(f) It contains patentable ideas, for which patent protection may be desirable.

There are sound policy reasons behind the Westinghouse system which include the following:

(a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.

(b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.

(c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.

(d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.

(e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.

(1) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.

(iii) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390, it is to be received in confidence by the Commission.

(iv) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.

4 4 ~CAW-06-21 36 (v) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in WCAP-165 13-P Revision 1, "South Texas Project Spent Fuel Pool and In-Containment Storage Racks Criticality Analysis," January 2006 (Proprietary), for review and approval, being transmitted by the South Texas Nuclear Operating Company letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse for South Texas Nuclear Generating Station Units 1 and 2 is for review and approval. Note that a non-proprietary version of the report has not been included since the entire report is deemed proprietary by Westinghouse and a non-proprietary version would be essentially all blank pages.

This information is part of that which will enable Westinghouse to:

(a) Provide technical information in support of spent fuel pool and in-containment storage rack criticality analysis licensing.

(b) Assist customer to obtain license change.

Further this information has substantial commercial value as follows:

(a) Westinghouse can use this information to further enhance their licensing position with their competitors.

(b) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.

Public disclosure of this proprietary information is likely to cause substantial harmn to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar analyses and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.

The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.

In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.

Further the deponent sayeth not.

Proprietary Information Notice Transmitted herewith are proprietary and/or non-proprietary versions of documents furnished to the NRC in connection with requests for generic and/or plant-specific review and approval.

In order to conform to the requirements of 10 CFR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted). The justification for claiming the information so designated as proprietary is indicated in both versions by means of lower case letters (a) through (f) located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary or in the margin opposite such information. These lower case letters refer to the types of information Westinghouse customarily holds in confidence identified in Sections (4)(ii)(a) through (4)(ii)(f) of the affidavit accompanying this transmittal pursuant to 10 CFR 2.390(b)(1).

Copyright Notice The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding. With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.

NOC-AE-0600201 3 Attachment 5 Table of Commitments

NOC-AE-0600201 3 Attachment 5 Page 1 of 1 Table of Commitments The following table identifies the actions in this document to which the STP Nuclear Operating Company has committed. Statements in this submittal with the exception of those in the table below are provided for information purposes and are not considered commitments. Please direct questions regarding this commitment to John Conly at (361) 972-7336.

Commitment Expected CR Action No.

Completion Date Add the following paragraph to TRM Section 5.6. 1:

"Fuel shall be stored in compliance with the 05/21/2007 04-12271-6 requirements below OR in accordance with the requirements of Technical Specification 5.6.1 during the implementation period of May 15, 2007 to September 15, 2007. After September 15, 2007, fuel shall be stored in compliance with the requirements of Technical Specification 5.6.1 only."