ML060800150: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 93: | Line 93: | ||
3/4 Check off each control rod movement on the CRD Exercise Checklist. | 3/4 Check off each control rod movement on the CRD Exercise Checklist. | ||
: 2. Request a second verifier VERIFIES second verifier available. | : 2. Request a second verifier VERIFIES second verifier available. | ||
Cue: Inform examinee that you will perform duties of second verifier. | Cue: Inform examinee that you will perform duties of second verifier. | ||
: 3. Obtain initial Control Rod At any NSO Process position information. Computer Display, navigate to | : 3. Obtain initial Control Rod At any NSO Process position information. Computer Display, navigate to and print the Rod Monitoring display. | ||
and print the Rod Monitoring display. | |||
Page 6 of 79 | Page 6 of 79 | ||
| Line 106: | Line 103: | ||
Evaluator will have to determine if proper steps are followed based on current conditions. | Evaluator will have to determine if proper steps are followed based on current conditions. | ||
*4. Select Control Rod C-13. Depresses Select Pushbutton for Control Rod C-13. | *4. Select Control Rod C-13. Depresses Select Pushbutton for Control Rod C-13. | ||
*5. Insert Control Rod C-13 to | *5. Insert Control Rod C-13 to | ||
* Momentarily places Rod notch 46 and verify Movement Control switch _____ _____ _____ | * Momentarily places Rod notch 46 and verify Movement Control switch _____ _____ _____ | ||
latched. to Rod In. | latched. to Rod In. | ||
o Verifies Control Rod C-13 latches at position 46. | o Verifies Control Rod C-13 latches at position 46. | ||
: 6. Verify indicated control rod Monitors rod position changes position changes during to 46 on Four Rod and/or Full | : 6. Verify indicated control rod Monitors rod position changes position changes during to 46 on Four Rod and/or Full movement. Core display. | ||
movement. Core display. | |||
*7. While returning the control Simultaneously holds rod to position 48, perform | *7. While returning the control Simultaneously holds rod to position 48, perform | ||
* Rod Movement Control the following: | * Rod Movement Control the following: | ||
Switch to Rod Notch Out 3/4 Apply continuous withdraw signal utilizing | Switch to Rod Notch Out 3/4 Apply continuous withdraw signal utilizing | ||
* Rod Out Notch Override the Rod Out Notch Switch to Notch Out Override switch. Override _____ _____ _____ | * Rod Out Notch Override the Rod Out Notch Switch to Notch Out Override switch. Override _____ _____ _____ | ||
: 8. 3/4 Verify indicated control o Monitors rod position rod position changes changes to 48 on Four during movement. Rod and/or Full Core | : 8. 3/4 Verify indicated control o Monitors rod position rod position changes changes to 48 on Four during movement. Rod and/or Full Core display. | ||
: 9. 3/4 Verify control rod does o Verifies NO loss of position not go to the overtravel indication on Four Rod position. display or double red dashes on Full Core display. | |||
display. | |||
: 9. 3/4 Verify control rod does o Verifies NO loss of position not go to the overtravel indication on Four Rod position. display or double red | |||
dashes on Full Core display. | |||
Page 7 of 79 | Page 7 of 79 | ||
| Line 132: | Line 122: | ||
withdraw signal. | withdraw signal. | ||
* Rod Movement Control Switch | * Rod Movement Control Switch | ||
* Rod Out Notch Override Switch | * Rod Out Notch Override Switch | ||
: 11. Checks off C-13 control CRD checklist marked for C-rod move on the CRD 13 control rod move. _____ _____ _____ | : 11. Checks off C-13 control CRD checklist marked for C-rod move on the CRD 13 control rod move. _____ _____ _____ | ||
| Line 139: | Line 128: | ||
Cue: If asked as the Unit Supervisor, respond: | Cue: If asked as the Unit Supervisor, respond: | ||
return the RWM to the Primary screen. | return the RWM to the Primary screen. | ||
: 13. Obtain an edit of final At any NSO Process Control Rod positions. Computer Display, navigate to | : 13. Obtain an edit of final At any NSO Process Control Rod positions. Computer Display, navigate to and print the Rod Monitoring display. | ||
and print the Rod Monitoring display. | |||
Cue: When the examinee has located a control rod position screen, provide the examinee with the after exercise copy of the rod position print out. | Cue: When the examinee has located a control rod position screen, provide the examinee with the after exercise copy of the rod position print out. | ||
: 14. Verify all Control Rods are VERIFIES all Control Rods are at their initial positions. at their initial positions. | : 14. Verify all Control Rods are VERIFIES all Control Rods are at their initial positions. at their initial positions. | ||
Page 8 of 79 | Page 8 of 79 | ||
| Line 174: | Line 160: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
| Line 279: | Line 264: | ||
40B SV Closed. | 40B SV Closed. | ||
CUE 2-1402-40B, INST SV is closed. | CUE 2-1402-40B, INST SV is closed. | ||
: 2. Verify 2B CORE SPRAY Contacts NLO to verify 2B CS MOTOR has adequate Motor oil level +0 to -1/8 inch | : 2. Verify 2B CORE SPRAY Contacts NLO to verify 2B CS MOTOR has adequate Motor oil level +0 to -1/8 inch lubrication. of the Oil Sightglass Standstill Line. | ||
lubrication. of the Oil Sightglass Standstill Line. | |||
CUE 2B Core Spray motor oil level is normal (within +0 to | CUE 2B Core Spray motor oil level is normal (within +0 to | ||
-1/8 inch band). | -1/8 inch band). | ||
: 3. Verify 2B LPCI/CS Room Contacts NLO to verify proper Cooler is operating properly. room cooler operation. | : 3. Verify 2B LPCI/CS Room Contacts NLO to verify proper Cooler is operating properly. room cooler operation. | ||
CUE 2B LPCI/CS room cooler is operating normally. | CUE 2B LPCI/CS room cooler is operating normally. | ||
: 4. Direct NLO to open 2-1402- Directs SV 2-1402-40B Open. | : 4. Direct NLO to open 2-1402- Directs SV 2-1402-40B Open. | ||
40B-SV and report | 40B-SV and report pressure. | ||
pressure. | |||
CUE 2-1402-40B Inst SV is Open. Pressure is 7 psig. | CUE 2-1402-40B Inst SV is Open. Pressure is 7 psig. | ||
: 5. Record suction pressure Pressure of 7 psig recorded on provided by NLO. Data Sheet 1. | : 5. Record suction pressure Pressure of 7 psig recorded on provided by NLO. Data Sheet 1. | ||
Page 19 of 10 | Page 19 of 10 | ||
| Line 304: | Line 283: | ||
2-1402-40B ________psig | 2-1402-40B ________psig | ||
*7. Close PP DISCH VLV, MO Rotates MO 2-1402-24B C/S 2-1402-24B CCW to Close. | *7. Close PP DISCH VLV, MO Rotates MO 2-1402-24B C/S 2-1402-24B CCW to Close. | ||
Only the Red Closed light | Only the Red Closed light illuminated. | ||
*8. Start 2B CORE SPRAY Rotates 2B Core Spray Pump Pump. C/S CW Only the Red On light illuminated Note 2B Core Spray Pump overcurrent trip malfunction is automatically inserted 10 seconds after the 2-1402-4B valve has dual indication | |||
illuminated. | *9. Open FLOW TEST VLV MO Rotates and holds MO 2-1402-2-1402-4B. 4B Control switch CW to Open. | ||
*8. Start 2B CORE SPRAY Rotates 2B Core Spray Pump Pump. C/S CW Only the Red On light | |||
illuminated Note 2B Core Spray Pump overcurrent trip malfunction is automatically inserted 10 seconds after the 2-1402-4B valve has dual indication | |||
*9. Open FLOW TEST VLV MO Rotates and holds MO 2-1402-2-1402-4B. 4B Control switch CW to | |||
Open. | |||
BEGIN ALTERNATE PATH | BEGIN ALTERNATE PATH | ||
: 10. Acknowledge and report Acknowledges alarm and alarm for 2B CS pump trip. makes report. | : 10. Acknowledge and report Acknowledges alarm and alarm for 2B CS pump trip. makes report. | ||
CUE Acknowledge report. | CUE Acknowledge report. | ||
*11. Immediately Close Rotates and holds MO 2-1402-4B. 2-1402-4B Control switch CCW to Close until only Green Closed light is _____ _____ _____ | *11. Immediately Close Rotates and holds MO 2-1402-4B. 2-1402-4B Control switch CCW to Close until only Green Closed light is _____ _____ _____ | ||
| Line 321: | Line 293: | ||
: 12. Enters DAN for Core Spray Enters DAN 902-3-B-5. | : 12. Enters DAN for Core Spray Enters DAN 902-3-B-5. | ||
pump trip. | pump trip. | ||
Page 20 of 10 | Page 20 of 10 | ||
| Line 332: | Line 303: | ||
CUE Acknowledge requests. | CUE Acknowledge requests. | ||
: 14. May enter DOA 6500-10, for States procedure should be 4kV breaker trip. entered. | : 14. May enter DOA 6500-10, for States procedure should be 4kV breaker trip. entered. | ||
CUE If examinee enters DOA 6500-10, respond that the assist NSO will execute that procedure. | CUE If examinee enters DOA 6500-10, respond that the assist NSO will execute that procedure. | ||
CUE If examinee terminates, or requests permission to terminate the surveillance OR If examinee references the DAN for pump trip and has at least considered the actions to take, then cue: | CUE If examinee terminates, or requests permission to terminate the surveillance OR If examinee references the DAN for pump trip and has at least considered the actions to take, then cue: | ||
| Line 338: | Line 308: | ||
Leave the system in the current lineup. Someone else will be assigned to verify the system is restored to normal. | Leave the system in the current lineup. Someone else will be assigned to verify the system is restored to normal. | ||
: 15. Notify Unit Supervisor of Unit Supervisor notified of task task completion. completion. | : 15. Notify Unit Supervisor of Unit Supervisor notified of task task completion. completion. | ||
CUE Acknowledge report of task completion. | CUE Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | END JPM Stop Time:_________ | ||
| Line 362: | Line 331: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
| Line 445: | Line 413: | ||
Comment # | Comment # | ||
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS | SAT UNSAT PERFORMANCE CHECKLIST STANDARDS | ||
: 1. Obtain Hardcard for Obtains Hardcard for Isolation Isolation Condenser Condenser Manual Operation | : 1. Obtain Hardcard for Obtains Hardcard for Isolation Isolation Condenser Condenser Manual Operation Manual Operation. from 902-3 panel book rack. | ||
Manual Operation. from 902-3 panel book rack. | |||
Note The 2-1301-17 & 2-1301-20 valves will already be Closed due to Group I Isolation. | Note The 2-1301-17 & 2-1301-20 valves will already be Closed due to Group I Isolation. | ||
: 2. Close the 2-1301-17 and Determines 2-1301-17 & 1301-2-1301-20 valves. 20 Red Closed lights _____ _____ _____ | : 2. Close the 2-1301-17 and Determines 2-1301-17 & 1301-2-1301-20 valves. 20 Red Closed lights _____ _____ _____ | ||
illuminated. | illuminated. | ||
*3. Rotate HAND/RESET to Rotates HAND/RESET to HAND position and HAND (CW) and releases. | *3. Rotate HAND/RESET to Rotates HAND/RESET to HAND position and HAND (CW) and releases. | ||
release. | release. | ||
: 4. Acknowledge annunciator Acknowledges annunciator 902(3)-3 B-4, ISOL 902(3)-3 B-4, ISOL CONDR CONDR VLVS OFF VLVS OFF NORMAL, alarms. | : 4. Acknowledge annunciator Acknowledges annunciator 902(3)-3 B-4, ISOL 902(3)-3 B-4, ISOL CONDR CONDR VLVS OFF VLVS OFF NORMAL, alarms. | ||
| Line 478: | Line 443: | ||
: 8. Open/Close 2-4399-74 valve as needed to maintain level | : 8. Open/Close 2-4399-74 valve as needed to maintain level | ||
: 9. Notify Unit Supervisor of Unit Supervisor notified of task task completion. completion. | : 9. Notify Unit Supervisor of Unit Supervisor notified of task task completion. completion. | ||
CUE Acknowledge report of task completion. | CUE Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | END JPM Stop Time:_________ | ||
| Line 501: | Line 465: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: RSatisfactory RUnsatisfactory Comments: | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: RSatisfactory RUnsatisfactory Comments: | ||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
| Line 643: | Line 606: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
| Line 740: | Line 702: | ||
o TR-22 to Bus 22 ACB Green Open light illuminated. | o TR-22 to Bus 22 ACB Green Open light illuminated. | ||
o Annunciator 902-8 D-2 resets. | o Annunciator 902-8 D-2 resets. | ||
: 4. Return appropriate Rotates TR-21 to Bus 22 Synchroscope switch to Off. Synchroscope selector switch | : 4. Return appropriate Rotates TR-21 to Bus 22 Synchroscope switch to Off. Synchroscope selector switch CCW to Off. | ||
CCW to Off. | |||
: 5. Verify normal Bus 22 Verifies Bus 22 amps and volts indications. normal. | : 5. Verify normal Bus 22 Verifies Bus 22 amps and volts indications. normal. | ||
Transfer Bus 24 to TR-21 | Transfer Bus 24 to TR-21 | ||
*6. Position appropriate | *6. Position appropriate | ||
| Line 767: | Line 726: | ||
o TR-22 to Bus 24 ACB Green Open light illuminated. | o TR-22 to Bus 24 ACB Green Open light illuminated. | ||
o Annunciator 902-8 B-5 resets. | o Annunciator 902-8 B-5 resets. | ||
: 9. Return appropriate Rotates TR-21 to Bus 24 Synchroscope switch to Off. Synchronization Switch CCW | : 9. Return appropriate Rotates TR-21 to Bus 24 Synchroscope switch to Off. Synchronization Switch CCW to Off. | ||
to Off. | |||
: 10. Verify normal Bus 23 Verifies Bus 24 amps and volts indications. normal. | : 10. Verify normal Bus 23 Verifies Bus 24 amps and volts indications. normal. | ||
END JPM Stop Time:_________ | END JPM Stop Time:_________ | ||
Page 52 of 10 | Page 52 of 10 | ||
| Line 794: | Line 750: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
| Line 871: | Line 826: | ||
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS Note: Provide the examinee the included copy of DOS 7500-02. | SAT UNSAT PERFORMANCE CHECKLIST STANDARDS Note: Provide the examinee the included copy of DOS 7500-02. | ||
: 1. Verify all BALL VALVES Verifies CLOSED light lit for closed at Panel 902-13 ALL BALL VALVES at Panel 902-13. | : 1. Verify all BALL VALVES Verifies CLOSED light lit for closed at Panel 902-13 ALL BALL VALVES at Panel 902-13. | ||
: 2. IF a Group 2 Isolation has Since a Group 2 Isolation has occurred, THEN reset the occurred, verifies that Group 2 TIP System by performing TIP Isolation reset light is NOT Step G.4. lit. | : 2. IF a Group 2 Isolation has Since a Group 2 Isolation has occurred, THEN reset the occurred, verifies that Group 2 TIP System by performing TIP Isolation reset light is NOT Step G.4. lit. | ||
Proceeds to Step G.4. | Proceeds to Step G.4. | ||
BEGIN ALTERNATE PATH | BEGIN ALTERNATE PATH | ||
: 3. Verify the Group 2 Condition met from initiating Isolation has been reset. cue. Examinee still may verify the Group 2 Isolation has been | : 3. Verify the Group 2 Condition met from initiating Isolation has been reset. cue. Examinee still may verify the Group 2 Isolation has been reset at the 902-5 panel by verifying alarm window 902-5 E-5 is NOT lit. | ||
reset at the 902-5 panel by verifying alarm window 902-5 E-5 is NOT lit. | |||
: 4. Verify MANUAL switches Verifies MANUAL switches in in OFF: OFF for: | : 4. Verify MANUAL switches Verifies MANUAL switches in in OFF: OFF for: | ||
o Drive Control Ch A o Drive Control Ch A o Drive Control Ch B o Drive Control Ch B | o Drive Control Ch A o Drive Control Ch A o Drive Control Ch B o Drive Control Ch B o Drive Control Ch C o Drive Control Ch C o Drive Control Ch D o Drive Control Ch D o Drive Control Ch E o Drive Control Ch E Page 61 of 12 | ||
o Drive Control Ch C o Drive Control Ch C o Drive Control Ch D o Drive Control Ch D o Drive Control Ch E o Drive Control Ch E Page 61 of 12 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
| Line 892: | Line 842: | ||
o Drive Control Ch A o Drive Control Ch A o Drive Control Ch B o Drive Control Ch B o Drive Control Ch C o Drive Control Ch C o Drive Control Ch D o Drive Control Ch D o Drive Control Ch E o Drive Control Ch E | o Drive Control Ch A o Drive Control Ch A o Drive Control Ch B o Drive Control Ch B o Drive Control Ch C o Drive Control Ch C o Drive Control Ch D o Drive Control Ch D o Drive Control Ch E o Drive Control Ch E | ||
*7. Momentarily depress | *7. Momentarily depress | ||
* Momentarily depresses GROUP 2 TIP ISOLATION GROUP 2 TIP ISOLATION RESET pushbutton; RESET pushbutton; AND, AND, | * Momentarily depresses GROUP 2 TIP ISOLATION GROUP 2 TIP ISOLATION RESET pushbutton; RESET pushbutton; AND, AND, Verify the green indicator o Verifies the green indicator light comes on. light comes on. | ||
Verify the green indicator o Verifies the green indicator light comes on. light comes on. | |||
: 8. Verify NO TIP Detector Verifies NO TIP Detector movement occurs. movement occurs. _____ _____ _____ | : 8. Verify NO TIP Detector Verifies NO TIP Detector movement occurs. movement occurs. _____ _____ _____ | ||
END ALTERNATE PATH | END ALTERNATE PATH | ||
| Line 913: | Line 861: | ||
: 14. Place MANUAL switch in Turns MANUAL switch CW OFF. from REV to OFF. _____ _____ _____ | : 14. Place MANUAL switch in Turns MANUAL switch CW OFF. from REV to OFF. _____ _____ _____ | ||
: 15. Verify READY light LIT. Verifies READY light LIT. | : 15. Verify READY light LIT. Verifies READY light LIT. | ||
: 16. Place CORE LIMIT Turns CORE LIMIT selector selector in TOP. CW from BOTTOM to TOP. | : 16. Place CORE LIMIT Turns CORE LIMIT selector selector in TOP. CW from BOTTOM to TOP. | ||
Page 63 of 12 | Page 63 of 12 | ||
| Line 921: | Line 867: | ||
Comment # | Comment # | ||
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS | SAT UNSAT PERFORMANCE CHECKLIST STANDARDS | ||
: 17. Verify CORE LIMIT display Verifies CORE LIMIT display produces a digit symbol in produces a digit symbol in | : 17. Verify CORE LIMIT display Verifies CORE LIMIT display produces a digit symbol in produces a digit symbol in each digit window. each digit window. | ||
each digit window. each digit window. | |||
: 18. Place CORE LIMIT Turns CORE LIMIT selector selector in BOTTOM. CCW from TOP to BOTTOM. | : 18. Place CORE LIMIT Turns CORE LIMIT selector selector in BOTTOM. CCW from TOP to BOTTOM. | ||
: 19. Verify CORE LIMIT display Verifies CORE LIMIT display produces a digit symbol in produces a digit symbol in each digit window. each digit window. | |||
: 19. Verify CORE LIMIT display Verifies CORE LIMIT display produces a digit symbol in produces a digit symbol in | |||
each digit window. each digit window. | |||
: 20. Verify CORE LIMIT switch Verifies CORE LIMIT switch in in BOTTOM position. BOTTOM position. | : 20. Verify CORE LIMIT switch Verifies CORE LIMIT switch in in BOTTOM position. BOTTOM position. | ||
*21. At DRIVE CONTROL CH At DRIVE CONTROL CH A, A, place MANUAL switch turns MANUAL switch CW in FWD to start TIP from OFF to FWD to start TIP detector insertion. detector insertion. | |||
*21. At DRIVE CONTROL CH At DRIVE CONTROL CH A, A, place MANUAL switch turns MANUAL switch CW | 22 Verify DETECTOR Verifies DETECTOR POSITION rises from the POSITION rises from the IN-IN-SHIELD position toward SHIELD position toward 0000 0000 in slow speed. in slow speed. | ||
*23. WHEN DETECTOR WHEN DETECTOR POSITION has counted 20 POSITION has counted 20 to to 25 digits, THEN place 25 digits, THEN turns MANUAL switch in OFF. MANUAL switch CCW from FWD to OFF. | |||
in FWD to start TIP from OFF to FWD to start TIP detector insertion. detector insertion. | |||
22 Verify DETECTOR Verifies DETECTOR POSITION rises from the POSITION rises from the IN- | |||
IN-SHIELD position toward SHIELD position toward 0000 0000 in slow speed. in slow speed. | |||
*23. WHEN DETECTOR WHEN DETECTOR POSITION has counted 20 POSITION has counted 20 to | |||
to 25 digits, THEN place 25 digits, THEN turns MANUAL switch in OFF. MANUAL switch CCW from FWD to OFF. | |||
: 24. Verify the IN-SHIELD light Verifies the IN-SHIELD light is is off at the applicable off at the applicable Drive Unit. | : 24. Verify the IN-SHIELD light Verifies the IN-SHIELD light is is off at the applicable off at the applicable Drive Unit. | ||
Drive Unit. | Drive Unit. | ||
Page 64 of 12 | Page 64 of 12 | ||
| Line 948: | Line 881: | ||
Comment # | Comment # | ||
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS | SAT UNSAT PERFORMANCE CHECKLIST STANDARDS | ||
: 25. Inform the Unit Supervisor Informs the Unit Supervisor that 2A TIP Detector is at that 2A TIP Detector is at the | : 25. Inform the Unit Supervisor Informs the Unit Supervisor that 2A TIP Detector is at that 2A TIP Detector is at the the isolation test position. isolation test position. | ||
the isolation test position. isolation test position. | |||
Cue: Acknowledge report. | Cue: Acknowledge report. | ||
END JPM Stop Time:_________ | END JPM Stop Time:_________ | ||
| Line 974: | Line 905: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
| Line 1,074: | Line 1,004: | ||
923-5 A-6, STBY GAS TRT SYS A TROUBLE 923-5 B-6, STBY _____ _____ _____ | 923-5 A-6, STBY GAS TRT SYS A TROUBLE 923-5 B-6, STBY _____ _____ _____ | ||
GAS TRT SYS B TROUBLE | GAS TRT SYS B TROUBLE | ||
* 2. Verify 2/3B SBGT Turns 2/3 B SBGT SELECT SELECT switch in STBY switch CCW from PRI to | * 2. Verify 2/3B SBGT Turns 2/3 B SBGT SELECT SELECT switch in STBY switch CCW from PRI to position. STBY. | ||
position. STBY. | |||
Note 60 sec. after the 2/3A SBGT control switch is placed to START, the following malfunction is inserted automatically: CIGP2I. | Note 60 sec. after the 2/3A SBGT control switch is placed to START, the following malfunction is inserted automatically: CIGP2I. | ||
(Spurious Group II isolation) | (Spurious Group II isolation) | ||
* 3. Place 2/3A SBGT Turns 2/3A SBGT SELECT SELECT switch to switch from STBY to START. | * 3. Place 2/3A SBGT Turns 2/3A SBGT SELECT SELECT switch to switch from STBY to START. | ||
START position Note The Initial Run Time data has already been recorded. | START position Note The Initial Run Time data has already been recorded. | ||
(This was in the initial cues) | (This was in the initial cues) | ||
: 4. Records the Initial Run Verifies the Initial Run Time Time data for SBGT data for SBGT Train "A" on | : 4. Records the Initial Run Verifies the Initial Run Time Time data for SBGT data for SBGT Train "A" on Train "A" on Checklist A. Checklist A. | ||
Train "A" on Checklist A. Checklist A. | |||
S-N-g Page 75 of 11 | S-N-g Page 75 of 11 | ||
| Line 1,091: | Line 1,016: | ||
Comment # | Comment # | ||
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS | SAT UNSAT PERFORMANCE CHECKLIST STANDARDS | ||
: 5. Verify the 2/3A SBGT Begins to verify the 2/3A train equipment aligned SBGT train equipment aligned | : 5. Verify the 2/3A SBGT Begins to verify the 2/3A train equipment aligned SBGT train equipment aligned properly. properly. | ||
properly. properly. | |||
: 6. Determine Group 2 Determines Group 2 Isolation Isolation has occurred. has occurred. | : 6. Determine Group 2 Determines Group 2 Isolation Isolation has occurred. has occurred. | ||
Proceeds to the Limitation and Action section for required actions. | Proceeds to the Limitation and Action section for required actions. | ||
BEGIN ALTERNATE PATH | BEGIN ALTERNATE PATH | ||
* 7. Place the SELECT Turns the SELECT SWITCH SWITCH for the non- for 2/3B SBGT train CW from | * 7. Place the SELECT Turns the SELECT SWITCH SWITCH for the non- for 2/3B SBGT train CW from running train to PRI. STBY to PRI. | ||
* 8. Place the control switch Turns the SELECT SWITCH for the train under test to for 2/3A SBGT train CCW from OFF. START to OFF. | |||
running train to PRI. STBY to PRI. | : 9. Verify train in PRI has Verifies flow of 3900 to 4700 sufficient flow AND the cfm AND 2/3B SBGT heater is heater is operating. ON. | ||
* 8. Place the control switch Turns the SELECT SWITCH for the train under test to for 2/3A SBGT train CCW from | * 10. Place the Train Turns the SELECT SWITCH previously under test for 2/3A SBGT train CW from to STBY. OFF to STBY. | ||
OFF. START to OFF. | |||
: 9. Verify train in PRI has Verifies flow of 3900 to 4700 sufficient flow AND the cfm AND 2/3B SBGT heater is | |||
heater is operating. ON. | |||
* 10. Place the Train Turns the SELECT SWITCH previously under test for 2/3A SBGT train CW from | |||
to STBY. OFF to STBY. | |||
: 11. Verifies a Reactor Starts to take action to verify Building Isolation has the Reactor Building Isolation. | : 11. Verifies a Reactor Starts to take action to verify Building Isolation has the Reactor Building Isolation. | ||
occurred on Panel 923-4. | occurred on Panel 923-4. | ||
Cue: When the examinee starts to take action to verify the Reactor Building Isolation, inform him as the Unit Supervisor that another operator will be assigned the verification. | Cue: When the examinee starts to take action to verify the Reactor Building Isolation, inform him as the Unit Supervisor that another operator will be assigned the verification. | ||
| Line 1,119: | Line 1,032: | ||
Comment # | Comment # | ||
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS | SAT UNSAT PERFORMANCE CHECKLIST STANDARDS | ||
: 12. Verify the control Verifies the control switches switches for U2 AND U3 for U2 AND U3 DW & Torus | : 12. Verify the control Verifies the control switches switches for U2 AND U3 for U2 AND U3 DW & Torus DW & Torus Purge Fans Purge Fans in PULL TO LOCK in PULL TO LOCK at at Panel 923-5: | ||
DW & Torus Purge Fans Purge Fans in PULL TO LOCK in PULL TO LOCK at at Panel 923-5: | |||
Panel 923-5. | Panel 923-5. | ||
o 2-8605A, 2A DW & | o 2-8605A, 2A DW & | ||
| Line 1,129: | Line 1,040: | ||
TORUS PURGE FAN | TORUS PURGE FAN | ||
: 13. Notify Unit Supervisor of Unit Supervisor notified. | : 13. Notify Unit Supervisor of Unit Supervisor notified. | ||
the change in status of | the change in status of the surveillance. | ||
the surveillance. | |||
Cue: Acknowledge report END JPM Stop Time:_________ | Cue: Acknowledge report END JPM Stop Time:_________ | ||
S-N-g Page 77 of 11 | S-N-g Page 77 of 11 | ||
| Line 1,154: | Line 1,063: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
Revision as of 08:39, 14 March 2020
| ML060800150 | |
| Person / Time | |
|---|---|
| Site: | Dresden (DPR-019, DPR-025) |
| Issue date: | 02/06/2006 |
| From: | Charles Phillips NRC/RGN-III/DRS/OLB |
| To: | Exelon Generation Co, Exelon Nuclear |
| References | |
| 50-237/06-301, 50-249/06-301 | |
| Download: ML060800150 (79) | |
Text
Exelon Nuclear Job Performance Measure Control Rod Exercise JPM Number: S-N-a Revision Number: 00 Date: 10/05 Developed By:
Instructor Date Approved By:
Training Department Date Page 1 of 79
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, or simulator)
________ 4. Initial setup conditions are identified.
________ 5. Initiating and terminating cues are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. Date
________ 9. Pilot test the JPM:
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 79
Revision Record (Summary)
From Bank: JPM S-0300-04 Page 3 of 79
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC with control rod C-13 at position 48.
- 2. Verify NO Control Rods are selected.
NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
- 4. This completes the setup for this JPM.
DOCUMENT PREPARATION Markup a copy of DOS 0300-01 as follows:
o Mark ALL Prerequisites complete EXCEPT for enabling the ROD EXERCISE function of the Rod Worth Minimizer.
o Mark Unit as 2 on Checklist 1.
o Mark NO for Stall Flows and Drive Water Pressure required on Checklist 1.
o Mark all rods Except C-13 N/A on Checklist 1.
o Print out 2 copies of a Control Rod position scan after the simulator has been setup.
Designate one as the before exercising copy and the other as the after exercising copy.
Page 4 of 79
INITIAL CONDITIONS
- 1. The CRD System engineer has requested exercising Control Rod C-13.
INITIATING CUE
- 1. The Unit Supervisor has directed you to perform DOS 0300-01, Control Rod Exercise, for Control Rod C-13 ONLY.
- 2. The prerequisites are completed except for enabling the ROD EXERCISE function of the Rod Worth Minimizer.
- 3. Stall flow and drive pressure are NOT required.
- 4. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information for Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
- (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
Page 5 of 79
JPM Start Time: _________
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS Note: Provide the Examinee the included copies of DOS 0300-01 and DOP 0400-02.
- 1. Enable the ROD
- Selects Special Modes on EXERCISE function of the RWM.
- Selects Rod Exercise on _____ _____ _____
DOP 0400-02, Rod Worth Minimizer. (RWM). RWM.
Note: Although not a procedure step a second verifier is required.
Second Verifier Duties:
3/4 Proper rod selected 3/4 Insert and Withdraw limits understood.
3/4 Verifies RWM is in exercise mode, has no errors and has blocks enabled.
3/4 Check off each control rod movement on the CRD Exercise Checklist.
- 2. Request a second verifier VERIFIES second verifier available.
Cue: Inform examinee that you will perform duties of second verifier.
- 3. Obtain initial Control Rod At any NSO Process position information. Computer Display, navigate to and print the Rod Monitoring display.
Page 6 of 79
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS Cue: When the examinee has located a control rod position screen, provide the examinee with the before exercise copy of the rod position print out.
Note: If inserted past position 46, performs DOA 0300-12.
Evaluator will have to determine if proper steps are followed based on current conditions.
- 4. Select Control Rod C-13. Depresses Select Pushbutton for Control Rod C-13.
- 5. Insert Control Rod C-13 to
- Momentarily places Rod notch 46 and verify Movement Control switch _____ _____ _____
latched. to Rod In.
o Verifies Control Rod C-13 latches at position 46.
- 6. Verify indicated control rod Monitors rod position changes position changes during to 46 on Four Rod and/or Full movement. Core display.
- 7. While returning the control Simultaneously holds rod to position 48, perform
- Rod Movement Control the following:
Switch to Rod Notch Out 3/4 Apply continuous withdraw signal utilizing
- Rod Out Notch Override the Rod Out Notch Switch to Notch Out Override switch. Override _____ _____ _____
- 8. 3/4 Verify indicated control o Monitors rod position rod position changes changes to 48 on Four during movement. Rod and/or Full Core display.
- 9. 3/4 Verify control rod does o Verifies NO loss of position not go to the overtravel indication on Four Rod position. display or double red dashes on Full Core display.
Page 7 of 79
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 10. Removes continuous Releases:
withdraw signal.
- Rod Movement Control Switch
- Rod Out Notch Override Switch
- 11. Checks off C-13 control CRD checklist marked for C-rod move on the CRD 13 control rod move. _____ _____ _____
exercise checklist.
Cue: If asked as the Unit Supervisor, respond:
return the RWM to the Primary screen.
- 13. Obtain an edit of final At any NSO Process Control Rod positions. Computer Display, navigate to and print the Rod Monitoring display.
Cue: When the examinee has located a control rod position screen, provide the examinee with the after exercise copy of the rod position print out.
- 14. Verify all Control Rods are VERIFIES all Control Rods are at their initial positions. at their initial positions.
Page 8 of 79
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 15. Inform Unit Supervisor that Informs Unit Supervisor that Control Rod C-13 Control Rod C-13 exercising is exercising is complete and complete and second second verification and verification and Unit _____ _____ _____
Unit Supervisor verification Supervisor verification is is required. required.
Cue: Acknowledge the report as the Unit Supervisor END JPM Stop Time:_________
Page 9 of 79
Operators Name: ___________________________________
Job
Title:
Title:
Control Rod Exercise JPM Number: S-N-a Revision Number: 00 Task Number and
Title:
201L006, Perform daily/weekly CRD exercise.
K/A Number and Importance: 201003A4.02 3.5 /3.5 Suggested Testing Environment: Simulator Actual Testing Environment: ;Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes ; No
- Perform SRO Only
- Yes ; No Time Critical: Yes ;No Estimated Time to Complete: 5 minutes Actual Time Used: _______minutes
References:
DOS 0300-01, R41, Control Rod Exercise DOP 0400-02, R20, Rod Worth Minimizer EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
Page 10 of 79
INITIAL CONDITIONS
- 1. The CRD System engineer has requested exercising Control Rod C-13.
INITIATING CUE
- 1. The Unit Supervisor has directed you to perform DOS 0300-01, Control Rod Exercise, for Control Rod C-13 ONLY.
- 2. The prerequisites are completed except for enabling the ROD EXERCISE function of the Rod Worth Minimizer.
- 3. Stall flow and drive pressure are NOT required.
- 4. Inform the Unit Supervisor when the task is complete.
Page 11 of 1
Page 12 of 1
Exelon Nuclear Job Performance Measure Perform Core Spray Pump Test With Torus Available JPM Number: S-N-b Revision Number: 00 Date: 10/05 Developed By:
Instructor Date Approved By:
Training Department Date Page 13 of 1
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________ 12. Task description and number, JPM description and number are identified.
________ 13. Knowledge and Abilities (K/A) references are included.
________ 14. Performance location specified. (in-plant, control room, or simulator)
________ 15. Initial setup conditions are identified.
________ 16. Initiating and terminating cues are properly identified.
________ 17. Task standards identified and verified by SME review.
________ 18. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 19. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
________ 20. Pilot test the JPM:
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
________ 21. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 22. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 14 of 10
Revision Record (Summary)
From Bank: S-1400-04 Page 15 of 10
SIMULATOR SETUP INSTRUCTIONS
- 1. Core Spray pump operability surveillance can be performed from any IC with Core Spray in the normal standby lineup.
NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Start the LPCI/CS room cooler fans.
- 3. Enter the following Expert commands to set up an automatic trigger to trip the Core Spray pump after the test valve is opened.
NOTE: The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs.
- Event Trigger 1 Activates when MO 1402-4B OPEN light turns ON.
- After 10 sec, inserts a 2B Core Spray pump trip.
Enter the following Expert commands:
- trgset 1 "cslop4b"
- imf csppbflt (1 10)
DOCUMENT PREPARATION Markup a copy of DOS 1400-05 as complete up through Step I.6. (Ready to start 2B Core Spray Pump per step I.7)
Page 16 of 10
INITIAL CONDITIONS
- 1. The Unit 2 Core Spray operability surveillance is due.
- 2. The operability surveillance for the 2A Core Spray pump has already been completed (system is filled and vented).
- 3. Required valve operability surveillance has been completed.
- 4. Unit 2 NLO is standing by in the corner room.
- 5. LPCI/Core Spray Room Coolers are running.
- 6. DOS 1400-05 is complete up to point of starting 2B Core Spray pump.
INITIATING CUE
- 1. The Unit Supervisor directs you to perform DOS 1400-05 step I.7 for the 2B Core Spray pump.
- 2. All applicable Prerequisites have been met.
- 3. Your Pre-Job Brief has been completed.
- 4. Notify the Unit Supervisor upon completion of step I.7.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information for Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
- (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of Page 17 of 10
Job Performance Measure (JPM) the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM.
It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The time clock starts when the candidate acknowledges the initiating cue.
Page 18 of 10
JPM Start Time: _________
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS Note Provide the Examinee the provided copy of DOS 1400-05
- 1. Verify the following valve Verifies the following:
line up.
- MO 2-1402-4B Closed Green Closed light On
- MO 2-1402-38B Open Green Open light On
- 2-1402-6B Open Green Open light On
- MO 2-1402-25B Closed Green Closed light On
- MO 2-1402-3B Open Green Open light On
- 2-1402-40B-SV Closed Directs NLO to Verify 2-1402- _____ _____ _____
40B SV Closed.
CUE 2-1402-40B, INST SV is closed.
- 2. Verify 2B CORE SPRAY Contacts NLO to verify 2B CS MOTOR has adequate Motor oil level +0 to -1/8 inch lubrication. of the Oil Sightglass Standstill Line.
CUE 2B Core Spray motor oil level is normal (within +0 to
-1/8 inch band).
- 3. Verify 2B LPCI/CS Room Contacts NLO to verify proper Cooler is operating properly. room cooler operation.
CUE 2B LPCI/CS room cooler is operating normally.
40B-SV and report pressure.
CUE 2-1402-40B Inst SV is Open. Pressure is 7 psig.
- 5. Record suction pressure Pressure of 7 psig recorded on provided by NLO. Data Sheet 1.
Page 19 of 10
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 6. Calculate 2-1402-8B initial DP Calculated:
closed DP.
2-1450-1B ________ psig Minus _____ _____ _____
2-1402-40B ________psig
Only the Red Closed light illuminated.
- 8. Start 2B CORE SPRAY Rotates 2B Core Spray Pump Pump. C/S CW Only the Red On light illuminated Note 2B Core Spray Pump overcurrent trip malfunction is automatically inserted 10 seconds after the 2-1402-4B valve has dual indication
BEGIN ALTERNATE PATH
- 10. Acknowledge and report Acknowledges alarm and alarm for 2B CS pump trip. makes report.
CUE Acknowledge report.
- 11. Immediately Close Rotates and holds MO 2-1402-4B. 2-1402-4B Control switch CCW to Close until only Green Closed light is _____ _____ _____
illuminated.
- 12. Enters DAN for Core Spray Enters DAN 902-3-B-5.
pump trip.
Page 20 of 10
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 13. May dispatch operator to NLO dispatched to pump.
check the pump and switch NLO dispatched to Bus 24-1 _____ _____ _____
gear.
CUE Acknowledge requests.
- 14. May enter DOA 6500-10, for States procedure should be 4kV breaker trip. entered.
CUE If examinee enters DOA 6500-10, respond that the assist NSO will execute that procedure.
CUE If examinee terminates, or requests permission to terminate the surveillance OR If examinee references the DAN for pump trip and has at least considered the actions to take, then cue:
Terminate the surveillance.
Leave the system in the current lineup. Someone else will be assigned to verify the system is restored to normal.
- 15. Notify Unit Supervisor of Unit Supervisor notified of task task completion. completion.
CUE Acknowledge report of task completion.
END JPM Stop Time:_________
Page 21 of 10
Operators Name: ___________________________________
Job
Title:
Title:
Perform Core Spray Pump Test With Torus Available JPM Number: S-N-b Revision Number: 00 Task Number and
Title:
209L004 K/A Number and Importance: 209001A4.01 3.8/3.6 Suggested Testing Environment: Simulator Actual Testing Environment: ; Simulator Plant Control Room Testing Method: Simulate Alternate Path: ; Yes No
- Perform SRO Only
- Yes ; No Time Critical: Yes ;No Estimated Time to Complete: _ 20 minutes Actual Time Used:
_______minutes
References:
DOS 1400-05, R31, Core Spray System Pump Test With Torus Available DOP 040-01, Station Motor Operated Valves DAN 902-3 B-5, Core Spray PP Trip EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Page 22 of 10
Evaluators Signature: ___________________________ Date: _________
INITIAL CONDITIONS
- 1. The Unit 2 Core Spray operability surveillance is due.
- 2. The operability surveillance for the 2A Core Spray pump has already been completed (system is filled and vented).
- 3. Required valve operability surveillance has been completed.
- 4. Unit 2 NLO is standing by in the corner room.
- 5. LPCI/Core Spray Room Coolers are running.
- 6. DOS 1400-05 is complete up to point of starting 2B Core Spray pump.
INITIATING CUE
- 1. The Unit Supervisor directs you to perform DOS 1400-05 step I.7 for the 2B Core Spray pump.
- 2. All applicable Prerequisites have been met.
- 3. Your Pre-Job Brief has been completed.
- 4. Notify the Unit Supervisor upon completion of step I.7.
Page 23 of 10
Exelon Nuclear Job Performance Measure Manually Operate the Isolation Condenser JPM Number: S-N-c Revision Number: 00 Date: 10/05 Developed By:
Instructor Date Approved By:
Training Department Date Page 24 of 10
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________ 23. Task description and number, JPM description and number are identified.
________ 24. Knowledge and Abilities (K/A) references are included.
________ 25. Performance location specified. (in-plant, control room, or simulator)
________ 26. Initial setup conditions are identified.
________ 27. Initiating and terminating cues are properly identified.
________ 28. Task standards identified and verified by SME review.
________ 29. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 30. Verify the procedure referenced by this JPM matches the most current revision of that procedure: DOP 1300-03 Procedure Rev. _____ Date _____________
________ 31. Pilot test the JPM:
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
________ 32. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 33. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 25 of 10
Revision Record (Summary)
From Bank: S-1300-01 Page 26 of 10
SIMULATOR SETUP INSTRUCTIONS:
- 1. JPM can be conducted with any IC/setup where reactor pressure is greater than 150 psig, but less than the Isolation condenser auto initiation setpoint.
- 2. Close the Isolation Condenser 2-1301-17 and 2-1301-20 Vent Valves as Initial Conditions for this JPM state that Unit 2 has a Group I Isolation condition.
- 3. Verify Hardcard for Isolation Condenser Manual Operation erased and at its proper location.
REMOTES/ALARMS REQUIRED None MALFUNCTIONS REQUIRED None Page 27 of 10
INITIAL CONDITIONS
- 1. A transient has occurred on Unit 2 resulting in a Group I Isolation.
- 2. Due to the transient, Emergency Depressurization is required.
- 3. The Isolation Condenser has NOT auto-initiated.
INITIATING CUE
- 1. The Unit Supervisor has directed you to initiate the Isolation Condenser to maximum flow.
- 2. Use Hardcards.
- 3. Notify the Unit Supervisor upon task completion.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information for Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
- (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Page 28 of 10
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The time clock starts when the candidate acknowledges the initiating cue.
Page 29 of 10
JPM Start Time: _________
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 1. Obtain Hardcard for Obtains Hardcard for Isolation Isolation Condenser Condenser Manual Operation Manual Operation. from 902-3 panel book rack.
Note The 2-1301-17 & 2-1301-20 valves will already be Closed due to Group I Isolation.
- 2. Close the 2-1301-17 and Determines 2-1301-17 & 1301-2-1301-20 valves. 20 Red Closed lights _____ _____ _____
illuminated.
- 3. Rotate HAND/RESET to Rotates HAND/RESET to HAND position and HAND (CW) and releases.
release.
- 4. Acknowledge annunciator Acknowledges annunciator 902(3)-3 B-4, ISOL 902(3)-3 B-4, ISOL CONDR CONDR VLVS OFF VLVS OFF NORMAL, alarms.
NORMAL, alarms.
- 5. Open the 2-1301-3 valve.
- Places 2-1301-3 valve C/S to the Open position.
o Only the Red OPEN light is _____ _____ _____
illuminated.
- 6. Open the 2-4399-74
- Places 2-4399-74 valve valve. C/S to Open position.
o Only Red OPEN light is _____ _____ _____
illuminated.
Page 30 of 10
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 7. Start one ISOL CNDR
- Places 2/3A or 2/3B ISOL M-U PP from 923-1 panel. CNDR M-U PP C/S to Close.
o Amber TRIP light illuminates and then extinguishes.
o Red ON light is illuminated.
o 923-1 A-6 ISO CONDR DEMIN WTR M-U TROUBLE annunciator _____ _____ _____
illuminated - alarm acknowledged.
Note Examinee may report IC initiated to max flow prior to monitoring level.
- 8. Open/Close 2-4399-74 valve as needed to maintain level
- 9. Notify Unit Supervisor of Unit Supervisor notified of task task completion. completion.
CUE Acknowledge report of task completion.
END JPM Stop Time:_________
Page 31 of 10
Operators Name: ___________________________________
Job
Title:
Title:
Manually Operate the Isolation Condenser JPM Number: S-N-c Revision Number: 00 Task Number and
Title:
207L003, Manually Operate the Isolation Condenser K/A Number and Importance: 207000A4.07 4.2/4.3 Suggested Testing Environment: Simulator Actual Testing Environment: ; Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes ; No
- Perform SRO Only
- Yes ; No Time Critical: Yes ;No Estimated Time to Complete: _ 5__minutes Actual Time Used: _______minutes
References:
DOP 1300-03, R23, Manual Operation of the Isolation Condenser EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: RSatisfactory RUnsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
Page 32 of 10
INITIAL CONDITIONS
- 1. A transient has occurred on Unit 2 resulting in a Group I Isolation.
- 2. Due to the transient, Emergency Depressurization is required.
- 4. The Isolation Condenser has NOT auto-initiated.
INITIATING CUE
- 1. The Unit Supervisor has directed you to initiate the Isolation Condenser to maximum flow.
- 2. Use Hardcards.
- 3. Notify the Unit Supervisor upon task completion.
Page 33 of 9
Page 34 of 9
Exelon Nuclear Job Performance Measure Verify Spurious Group 3 Isolation - Incomplete JPM Number: S-N-d Revision Number: 00 Date: 10/05 Developed By:
Instructor Date Approved By:
Training Department Date Page 35 of 9
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________ 34. Task description and number, JPM description and number are identified.
________ 35. Knowledge and Abilities (K/A) references are included.
________ 36. Performance location specified. (in-plant, control room, or simulator)
________ 37. Initial setup conditions are identified.
________ 38. Initiating and terminating cues are properly identified.
________ 39. Task standards identified and verified by SME review.
________ 40. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 41. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. Date
________ 42. Pilot test the JPM:
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
________ 43. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 44. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 36 of 9
Revision Record (Summary)
Previously used JPM S-1200-03 (ILT 03-1 Cert Exam)
Page 37 of 9
SIMULATOR SETUP INSTRUCTIONS
NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 6. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
- 7. Enter the following Expert commands:
- IMF CIRWCUAP (RWCU incomplete inboard isolation)
- IMF CIRWCUBP (RWCU incomplete outboard isolation)
- IMF CIRWCUI (Spurious RWCU Isolation Circuit Failure - above malfuctions must be entered prior to this one being entered)
- IMF SER0957 ON (Group 3 Isolation Initiated alarm - relay 595-105A)
- IMF SER1054 ON (Group 3 Isolation Initiated alarm - relay 595-105B)
- 8. Acknowledge alarms.
- 9. Verify MO 2-1201-1 & 2 remained open.
- 10. This completes the setup for this JPM.
Page 38 of 9
INITIAL CONDITIONS
- 2. A spurious Group 3 isolation has occurred.
INITIATING CUE
- 5. The Unit 2 Unit Supervisor has directed you to verify the Group 3 isolation is complete.
- 6. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information for Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
- (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
Page 39 of 9
JPM Start Time: _________
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 1. Examinee acquires DAN 902- Examinee acquires DAN 5 D-5, GROUP 3 ISOLATION 902-5 D-5, GROUP 3 INITIATED or Hard Card. ISOLATION INITIATED hard card or DAN. _____ _____ _____
- MO 2-1201-1A valves OPEN light OFF and
- MO 2-1201-3 CLOSED light LIT.
- MO 2-1201-7 Examinee recognizes that
- MO 2-1201-1 MO 2-1201-1 & 2-1201-2 _____ _____ _____
- MO 2-1201-2 did not close.
- 3. Close RWCU Valve MO
- Momentarily places 2-1201-1 RWCU Valve MO 2-1201-1 control switch to the CLOSE position. _____ _____ _____
o Verifies CLOSE light turns ON immediately.
o Verifies OPEN light turns OFF when valve full closes.
- 4. Close RWCU Valve MO
- Momentarily places 2-1201-2 RWCU Valve MO 2-1201-2 control switch to the CLOSE position. _____ _____ _____
o Verifies CLOSE light turns ON immediately.
o Verifies OPEN light turns OFF when valve full closes.
Page 40 of 9
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- MO 2-1001-1A OPEN light OFF and
- MO 2-1001-1B CLOSED light LIT.
- MO 2-1001-2A
- MO 2-1001-2B
- MO 2-1001-2C
- MO 2-1001-4A
- MO 2-1001-4B
- MO 2-1001-4C
- MO 2-1001-5A
- MO 2-1001-5B _____ _____ _____
- 6. Informs the Unit Supervisor Report Group 3 isolation Group 3 isolation has been complete and MO 2-1201-1 verified complete. and MO 2-1201-2 failed to close automatically. _____ _____ _____
CUE Respond as US when examinee informs the US the task is complete.
END JPM Stop Time:_________
Page 41 of 9
Operators Name: ___________________________________
Job
Title:
Title:
Verify Spurious Group 3 Isolation - Incomplete JPM Number: S-N-d Revision Number: 00 Task Number and
Title:
295L022, Initiate/Verify automatic actuations of Emergency Systems.
K/A Number and Importance: 223002A4.01 3.6 /3.5 Suggested Testing Environment: Simulator Actual Testing Environment: ;Simulator Plant Control Room Testing Method: Simulate Alternate Path: ; Yes No
- Perform SRO Only
- Yes ; No Time Critical: Yes ;No Estimated Time to Complete: 5 minutes Actual Time Used: _______minutes
References:
DAN 902(3)-5 D-5 (hardcard), Rev. 12 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
Page 42 of 9
INITIAL CONDITIONS
- 1. A spurious Group 3 isolation has occurred.
INITIATING CUE
- 1. The Unit 2 Unit Supervisor has directed you to verify the Group 3 isolation is complete.
- 2. Inform the Unit Supervisor when the task is complete.
Page 43 of 10
Page 44 of 10
Exelon Nuclear Job Performance Measure Transfer Auxiliary Power to TR-21 from TR-22 JPM Number: S-N-e Revision Number: 00 Date: 10/05 Developed By:
Instructor Date Approved By:
Training Department Date Page 45 of 10
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________ 45. Task description and number, JPM description and number are identified.
________ 46. Knowledge and Abilities (K/A) references are included.
________ 47. Performance location specified. (in-plant, control room, or simulator)
________ 48. Initial setup conditions are identified.
________ 49. Initiating and terminating cues are properly identified.
________ 50. Task standards identified and verified by SME review.
________ 51. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 52. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
________ 53. Pilot test the JPM:
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
________ 54. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 55. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 46 of 10
Revision Record (Summary)
New JPM Page 47 of 10
SIMULATOR SETUP INSTRUCTIONS:
- Recirc pumps at minimum speed.
- ONLY 1 RFP and 2 Condensate pumps running.
- Generator on line with normal TR-21 and TR-22 lineup.
Page 48 of 10
INITIAL CONDITIONS
- 1. Unit 2 is performing a special test procedure for the electric plant.
- 2. The next step is to transfer Auxiliary Power to TR-21.
- 3. Another operator will verify TR-21 loading remains below the restrictions of the procedure.
INITIATING CUE The Unit Supervisor has directed you to transfer Auxiliary Power from TR-22 to TR-21 in accordance with DOP 6500-01.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information for Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
- (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
Page 49 of 10
JPM Start Time: _________
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS NOTE: This JPM has two parts, which can be done in any order. Go to the appropriate section based on the examinees actions.
Note Provide the examinee the included copy of DOS 7500-02.
Transfer Bus 22 to TR-21
- 1. Position appropriate
- Rotates TR-21 to Bus 22 synchroscope selector Synchroscope selector _____ _____ _____
switch to On. switch CW to ON.
o Verify incoming and running voltages ~ equal.
o Verify Synchronizing meter at 12 oclock position and not rotating.
o Verify Synchronizing meter lights not glowing.
- 2. Position appropriate
- Rotates TR-21 to Bus 22 breaker control switch to ACB control switch CW to _____ _____ _____
Close. Close.
o Verify Synchronizing meter at 12 oclock.
o TR-21 to Bus 22 ACB red closed light illuminated.
o Annunciator 902-8 D-2 is in alarm Page 50 of 10
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 3. Open breaker of power
- Rotates TR-22 to Bus 22 source being removed. ACB CCW to Trip. _____ _____ _____
o TR-22 to Bus 22 ACB Green Open light illuminated.
o Annunciator 902-8 D-2 resets.
- 4. Return appropriate Rotates TR-21 to Bus 22 Synchroscope switch to Off. Synchroscope selector switch CCW to Off.
- 5. Verify normal Bus 22 Verifies Bus 22 amps and volts indications. normal.
Transfer Bus 24 to TR-21
- 6. Position appropriate
- Rotates TR-21 to Bus 24 synchroscope selector Synchroscope selector _____ _____ _____
switch to On. switch CW to ON.
o Verify incoming and running voltages ~ equal.
o Verify Synchronizing meter at 12 oclock position and not rotating.
o Verify Synchronizing meter lights not glowing.
Page 51 of 10
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 7. Position appropriate
- Rotates TR-21 to Bus 24 breaker control switch to ACB control switch CW to _____ _____ _____
Close. Close.
o Verify Synchronizing meter at 12 oclock.
o TR-21 to Bus 24 ACB red closed light illuminated.
o Annunciator 902-8 B-5 in alarm.
- 8. Open breaker of power
- Rotates TR-22 to Bus 24 source being removed. ACB CCW to Trip. _____ _____ _____
o TR-22 to Bus 24 ACB Green Open light illuminated.
o Annunciator 902-8 B-5 resets.
- 9. Return appropriate Rotates TR-21 to Bus 24 Synchroscope switch to Off. Synchronization Switch CCW to Off.
- 10. Verify normal Bus 23 Verifies Bus 24 amps and volts indications. normal.
END JPM Stop Time:_________
Page 52 of 10
Operators Name: ___________________________________
Job
Title:
Title:
Transfer Auxiliary Power to TR-21 from TR-22 JPM Number: S-N-e Revision Number: 00 Task Number and
Title:
262L024, Transfer a 4160 volt bus between power supplies.
K/A Number and Importance: 262001A4.04 3.6/3.7 Suggested Testing Environment: Simulator Actual Testing Environment: ; Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes ; No
- Perform SRO Only
- Yes ; No Time Critical: RYes ;No Estimated Time to Complete: _ 14__minutes Actual Time Used: _______minutes
References:
DOP 6500-01, R08, Transfer of 4160 Volt Bus Power Supply EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
Page 53 of 10
INITIAL CONDITIONS
- 1. Unit 2 is performing a special test procedure for the electric plant.
- 2. The next step is to transfer Auxiliary Power to TR-21.
- 3. Another operator will verify TR-21 loading remains below the restrictions of the procedure.
INITIATING CUE The Unit Supervisor has directed you to transfer Auxiliary Power from TR-22 to TR-21 in accordance with DOP 6500-01.
Page 54 of 12
Page 55 of 12
Exelon Nuclear Job Performance Measure Driving Tip Detectors To The Isolation Test Position JPM Number: S-N-f Revision Number: 00 Date: 10/05 Developed By:
Instructor Date Approved By:
Training Department Date Page 56 of 12
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________ 56. Task description and number, JPM description and number are identified.
________ 57. Knowledge and Abilities (K/A) references are included.
________ 58. Performance location specified. (in-plant, control room, or simulator)
________ 59. Initial setup conditions are identified.
________ 60. Initiating and terminating cues are properly identified.
________ 61. Task standards identified and verified by SME review.
________ 62. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 63. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. Date
________ 64. Pilot test the JPM:
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
________ 65. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 66. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 57 of 12
Revision Record (Summary)
New JPM Page 58 of 12
SIMULATOR SETUP INSTRUCTIONS
- 11. Reset the simulator to any IC with the Group 2 Isolation reset.
NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 12. Enter the following Expert command:
- SET NIRK11R = FALSE (changes the TIP Group 2 Isolation relay status to the NOT reset state)
- 13. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
- 14. This completes the setup for this JPM.
Page 59 of 12
INITIAL CONDITIONS
- 3. Post Maintenance Testing is required on the 2A TIP machine.
- 4. A Group 2 Isolation occurred several minutes ago and was reset on the 902-5 panel.
INITIATING CUE The Unit Supervisor has directed you to drive the 2A TIP Detector in 20 to 25 digits from its current position by using step G.3 of DOP 0700-06, Traversing Incore Probe (TIP) System Operation.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information for Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
- (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
Page 60 of 12
JPM Start Time: _________
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS Note: Provide the examinee the included copy of DOS 7500-02.
- 1. Verify all BALL VALVES Verifies CLOSED light lit for closed at Panel 902-13 ALL BALL VALVES at Panel 902-13.
- 2. IF a Group 2 Isolation has Since a Group 2 Isolation has occurred, THEN reset the occurred, verifies that Group 2 TIP System by performing TIP Isolation reset light is NOT Step G.4. lit.
Proceeds to Step G.4.
BEGIN ALTERNATE PATH
- 3. Verify the Group 2 Condition met from initiating Isolation has been reset. cue. Examinee still may verify the Group 2 Isolation has been reset at the 902-5 panel by verifying alarm window 902-5 E-5 is NOT lit.
- 4. Verify MANUAL switches Verifies MANUAL switches in in OFF: OFF for:
o Drive Control Ch A o Drive Control Ch A o Drive Control Ch B o Drive Control Ch B o Drive Control Ch C o Drive Control Ch C o Drive Control Ch D o Drive Control Ch D o Drive Control Ch E o Drive Control Ch E Page 61 of 12
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 5. Verify all BALL VALVES Verifies all BALL VALVES closed: closed for: _____ _____ _____
o Vlv Control Ch 1 o Vlv Control Ch 1 o Vlv Control Ch 2 o Vlv Control Ch 2 o Vlv Control Ch 3 o Vlv Control Ch 3 o Vlv Control Ch 4 o Vlv Control Ch 4 o Vlv Control Ch 5 o Vlv Control Ch 5
- 6. Verify MAN. VALVE Verifies MAN. VALVE CONTROL switches in CONTROL switches in CLOSE _____ _____ _____
CLOSE: for:
o Drive Control Ch A o Drive Control Ch A o Drive Control Ch B o Drive Control Ch B o Drive Control Ch C o Drive Control Ch C o Drive Control Ch D o Drive Control Ch D o Drive Control Ch E o Drive Control Ch E
- 7. Momentarily depress
- Momentarily depresses GROUP 2 TIP ISOLATION GROUP 2 TIP ISOLATION RESET pushbutton; RESET pushbutton; AND, AND, Verify the green indicator o Verifies the green indicator light comes on. light comes on.
- 8. Verify NO TIP Detector Verifies NO TIP Detector movement occurs. movement occurs. _____ _____ _____
END ALTERNATE PATH
Page 62 of 12
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 10. Place MODE switch in Turns MODE switch CW from MAN. OFF to MAN. _____ _____ _____
- 11. Place MAN. VALVE Turns MAN. VALVE CONTROL in OPEN. CONTROL CW from CLOSED _____ _____ _____
to OPEN.
Note: NO unwanted light indications will be present.
Therefore, the next step is not necessary. However, the examinee may still cycle the MODE switch to ensure the machine is operating properly.
- 12. IF necessary, THEN cycle May turn the MODE switch MODE switch to AUTO CW from MAN to AUTO, then _____ _____ _____
AND back to MAN. CCW back to MAN.
- 13. Place MANUAL switch in Turns MANUAL switch CCW REV. from OFF to REV. _____ _____ _____
- 14. Place MANUAL switch in Turns MANUAL switch CW OFF. from REV to OFF. _____ _____ _____
- 15. Verify READY light LIT. Verifies READY light LIT.
Page 63 of 12
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 17. Verify CORE LIMIT display Verifies CORE LIMIT display produces a digit symbol in produces a digit symbol in each digit window. each digit window.
- 19. Verify CORE LIMIT display Verifies CORE LIMIT display produces a digit symbol in produces a digit symbol in each digit window. each digit window.
- 20. Verify CORE LIMIT switch Verifies CORE LIMIT switch in in BOTTOM position. BOTTOM position.
- 21. At DRIVE CONTROL CH At DRIVE CONTROL CH A, A, place MANUAL switch turns MANUAL switch CW in FWD to start TIP from OFF to FWD to start TIP detector insertion. detector insertion.
22 Verify DETECTOR Verifies DETECTOR POSITION rises from the POSITION rises from the IN-IN-SHIELD position toward SHIELD position toward 0000 0000 in slow speed. in slow speed.
- 23. WHEN DETECTOR WHEN DETECTOR POSITION has counted 20 POSITION has counted 20 to to 25 digits, THEN place 25 digits, THEN turns MANUAL switch in OFF. MANUAL switch CCW from FWD to OFF.
- 24. Verify the IN-SHIELD light Verifies the IN-SHIELD light is is off at the applicable off at the applicable Drive Unit.
Drive Unit.
Page 64 of 12
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 25. Inform the Unit Supervisor Informs the Unit Supervisor that 2A TIP Detector is at that 2A TIP Detector is at the the isolation test position. isolation test position.
Cue: Acknowledge report.
END JPM Stop Time:_________
Page 65 of 12
Operators Name: ___________________________________
Job
Title:
Title:
Driving Tip Detectors to the Isolation Test Position JPM Number: S-N-f Revision Number: 00 Task Number and
Title:
215L032, Manually drive the TIPs Detectors to the Isolation Test Position.
K/A Number and Importance: 215001A4.03 3.0 /3.1 Suggested Testing Environment: Simulator Actual Testing Environment: ;Simulator Plant Control Room Testing Method: Simulate Alternate Path: ; Yes No
- Perform SRO Only
- Yes ; No Time Critical: Yes ;No Estimated Time to Complete: 5 minutes Actual Time Used: _______minutes
References:
DOP 0700-06, Traversing Incore Probe (TIP) System Operation EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
Page 66 of 12
INITIAL CONDITIONS
- 1. Post Maintenance Testing is required on the 2A TIP machine.
- 2. A Group 2 Isolation occurred several minutes ago and was reset on the 902-5 panel.
INITIATING CUE The Unit Supervisor has directed you to drive the 2A TIP Detector in 20 to 25 digits from its current position by using step G.3 of DOP 0700-06, Traversing Incore Probe (TIP) System Operation.
S-N-g Page 67 of 11
S-N-g Page 68 of 11
Exelon Nuclear Job Performance Measure SBGT Post Maintenance Testing with receipt of an Auto Initiation Signal JPM Number: S-N-g Revision Number: 00 Date: 10/05 Developed By:
Instructor Date Approved By:
Facility Representative Date S-N-g Page 69 of 11
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________ 67. Task description and number, JPM description and number are identified.
________ 68. Knowledge and Abilities (K/A) references are included.
________ 69. Performance location specified. (in-plant, control room, or simulator)
________ 70. Initial setup conditions are identified.
________ 71. Initiating and terminating cues are properly identified.
________ 72. Task standards identified and verified by SME review.
________ 73. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 74. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
________ 75. Pilot test the JPM:
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
________ 76. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 77. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor Date SME/Instructor Date SME/Instructor Date S-N-g Page 70 of 11
Revision Record (Summary)
Previously used JPM S-7500-03. (ILT 03-1 NRC Exam)
S-N-g Page 71 of 11
SIMULATOR SETUP INSTRUCTIONS
- 15. Reset the simulator to any IC with Reactor Building Ventilation operating in a normal lineup.
NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 18. Have the following malfunction ready to automatically insert when the 2/3A SBGT Control Switch is placed to start.
NOTE: The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs.
- Event Trigger 1 Activates when 2/3A SBGT switch is placed to START.
- After 60 sec, inserts a spurious Group II isolation.
Enter the following Expert commands:
- trgset 1 "vgdstrta_drw"
- imf cigp2i (1 60)
DOCUMENT PREPARATION Markup a copy of DOS 7500-02 as follows:
o Initial ALL Prerequisites as completed.
o Mark IST Testing steps N/A.
o Mark steps for testing 2/3B SBGT Train N/A.
o Enter a Cumulative Run Time on Checklist A.
S-N-g Page 72 of 11
INITIAL CONDITIONS
- 1. 2/3B SBGT train is operable and 2/3A SBGT train is in day 2 of a 7 day LCO per TS 3.6.4.3 Condition A.
- 2. Minor maintenance has been completed on the 2/3 A SBGT train and the train is back in service.
- 4. The Initial Cumulative Run Time has been recorded.
- 5. You are the Center Desk NSO.
INITIATING CUE
- 2. Notify the Unit 2 Supervisor when the task is complete up to step I.12.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information for Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
- (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
S-N-g Page 73 of 11
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-g Page 74 of 11
JPM Start Time: _________
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS Note Provide the examinee the included copy of DOS 7500-02.
- 1. Ensures the following: Correctly verifies.
- 2/3 A and B AIR HEATERS are OFF.
- 2/3 A and B Fans are OFF.
- The following Annunciators are not in alarm:
923-5 A-6, STBY GAS TRT SYS A TROUBLE 923-5 B-6, STBY _____ _____ _____
GAS TRT SYS B TROUBLE
- 2. Verify 2/3B SBGT Turns 2/3 B SBGT SELECT SELECT switch in STBY switch CCW from PRI to position. STBY.
Note 60 sec. after the 2/3A SBGT control switch is placed to START, the following malfunction is inserted automatically: CIGP2I.
(Spurious Group II isolation)
START position Note The Initial Run Time data has already been recorded.
(This was in the initial cues)
- 4. Records the Initial Run Verifies the Initial Run Time Time data for SBGT data for SBGT Train "A" on Train "A" on Checklist A. Checklist A.
S-N-g Page 75 of 11
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 5. Verify the 2/3A SBGT Begins to verify the 2/3A train equipment aligned SBGT train equipment aligned properly. properly.
- 6. Determine Group 2 Determines Group 2 Isolation Isolation has occurred. has occurred.
Proceeds to the Limitation and Action section for required actions.
BEGIN ALTERNATE PATH
- 7. Place the SELECT Turns the SELECT SWITCH SWITCH for the non- for 2/3B SBGT train CW from running train to PRI. STBY to PRI.
- 8. Place the control switch Turns the SELECT SWITCH for the train under test to for 2/3A SBGT train CCW from OFF. START to OFF.
- 9. Verify train in PRI has Verifies flow of 3900 to 4700 sufficient flow AND the cfm AND 2/3B SBGT heater is heater is operating. ON.
- 10. Place the Train Turns the SELECT SWITCH previously under test for 2/3A SBGT train CW from to STBY. OFF to STBY.
- 11. Verifies a Reactor Starts to take action to verify Building Isolation has the Reactor Building Isolation.
occurred on Panel 923-4.
Cue: When the examinee starts to take action to verify the Reactor Building Isolation, inform him as the Unit Supervisor that another operator will be assigned the verification.
S-N-g Page 76 of 11
Comment #
SAT UNSAT PERFORMANCE CHECKLIST STANDARDS
- 12. Verify the control Verifies the control switches switches for U2 AND U3 for U2 AND U3 DW & Torus DW & Torus Purge Fans Purge Fans in PULL TO LOCK in PULL TO LOCK at at Panel 923-5:
Panel 923-5.
o 2-8605A, 2A DW &
TORUS PURGE FAN o 2-8605B, 2B DW &
TORUS PURGE FAN o 3-8605A, 3A DW &
TORUS PURGE FAN o 3-8605B, 3B DW &
TORUS PURGE FAN
- 13. Notify Unit Supervisor of Unit Supervisor notified.
the change in status of the surveillance.
Cue: Acknowledge report END JPM Stop Time:_________
S-N-g Page 77 of 11
Operators Name: ___________________________________
Job
Title:
Title:
SBGT Post Maintenance Testing with receipt of an Auto Initiation Signal JPM Number: S-N-g Revision Number: 00 Task Number and
Title:
261L002, Start the SBGT system.
K/A Number and Importance: 261000A2.10 3.1/3.2 Suggested Testing Environment: Simulator Actual Testing Environment: ;Simulator Plant Control Room Testing Method: Simulate Alternate Path: ; Yes No
- Perform SRO Only
- Yes ; No Time Critical: Yes ;No Estimated Time to Complete: 15 minutes Actual Time Used: _______minutes
References:
DOS 7500-02, R35, SBGT System Surveillance and IST Test EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
S-N-g Page 78 of 11
INITIAL CONDITIONS
- 1. 2/3B SBGT train is operable and 2/3A SBGT train is in day 2 of a 7 day LCO per TS 3.6.4.3 Condition A.
- 2. The minor maintenance has been completed on the 2/3 A SBGT train and the train is back in service.
- 4. The Initial Cumulative Run Time has been recorded.
- 5. You are the Center Desk NSO.
INITIATING CUE
- 2. Notify the Unit 2 Supervisor when the task is complete up to step I.12.
Page 79 of 11