ML17317B263: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 6: Line 6:
| number = ML17317B264
| number = ML17317B264
| issue date = 06/08/1979
| issue date = 06/08/1979
| title = Forwards LER 79-019/01T-0
| title = LER 79-019/01T-0 on 790519:cracks Found in 16-inch Feedwater Elbows Adjacent to Nozzle Welds Caused Buildup of Nonradioactive Water in Containment Sump.Caused Being Determined.Elbows in Generators Being Replaced
| author name = Shaller D
| author name = Shaller D
| author affiliation = INDIANA MICHIGAN POWER CO.
| author affiliation = INDIANA MICHIGAN POWER CO.

Latest revision as of 09:44, 7 March 2020

Forwards LER 79-019/01T-0
Date released: 05/31/2018 Download: ML17317B263


LER 79-019/01T-0 on 790519:cracks Found in 16-inch Feedwater Elbows Adjacent to Nozzle Welds Caused Buildup of Nonradioactive Water in Containment Sump.Caused Being Determined.Elbows in Generators Being Replaced
ML17317B264
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/08/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B264 (34)
Forwards LER 79-019/01T-0
ML17317B262
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/07/1979
From: Dolan J
INDIANA MICHIGAN POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17317B262 (3)