ML18038A898: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 6: Line 6:
| number = ML18039A937
| number = ML18039A937
| issue date = 06/06/1994
| issue date = 06/06/1994
| title = Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures
| title = Approval Seismic Testing of High Voltage Shutdown Relay.
| author name =  
| author name =  
| author affiliation = NUCLEAR LOGISTICS, INC. (NLI)
| author affiliation = NUCLEAR LOGISTICS, INC. (NLI)

Latest revision as of 05:23, 6 March 2020

Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures
Date released: 09/27/2018 Download: ML18038A898


Approval Seismic Testing of High Voltage Shutdown Relay.
ML18039A937
Person / Time
Site: San Onofre 
Issue date: 06/06/1994
From:
NUCLEAR LOGISTICS, INC. (NLI)
To:
References
Download: ML18039A937 (14)
Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures
ML18038A897
Person / Time
Site: San Onofre 
Issue date: 09/07/1994
From: Kinden T
C&D CHARTER POWER SYSTEMS, INC. (FORMERLY C&D POWER
To:
NRC
References
REF-PT21-94
Download: ML18038A897 (10)