Commonw6th Edison One First Nai-Plaza, ~htGego, Illinois Address Reply to: Post Office Box 767 Chicago, lllinoi~ 60690 BBS Ltr. #769-75 Mr~ James G. Keppler, Regional Director Directorate of Regulatory Op~ration - Region IiI U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 | Commonw6th Edison One First Nai-Plaza, ~htGego, Illinois Address Reply to: Post Office Box 767 Chicago, lllinoi~ 60690 BBS Ltr. #769-75 Mr~ James G. Keppler, Regional Director Directorate of Regulatory Op~ration - Region IiI U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 | ||
| Line 45: | Line 44: | ||
- -~ .. | - -~ .. | ||
manufactured *by Crane,.Val 1/e -~Co; | manufactured *by Crane,.Val 1/e -~Co; | ||
'( ; .. | '( ; .. | ||
~ | ~ | ||
' *--_,: ~ -: :~: *~.'; ''. .. ,~ - i. | ' *--_,: ~ -: :~: *~.'; ''. .. ,~ - i. | ||
. phen~on Superintendent BBS:GAR:aw lfile/NRC f}} | . phen~on Superintendent BBS:GAR:aw lfile/NRC f}} | ||
Revision as of 07:35, 24 February 2020
| ML17252B459 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 11/20/1975 |
| From: | Stephenson B Commonwealth Edison Co |
| To: | James Keppler NRC/RGN-III |
| References | |
| BBS Ltr. #769-75 LER 75-052-00 | |
| Download: ML17252B459 (2) | |
Text
Commonw6th Edison One First Nai-Plaza, ~htGego, Illinois Address Reply to: Post Office Box 767 Chicago, lllinoi~ 60690 BBS Ltr. #769-75 Mr~ James G. Keppler, Regional Director Directorate of Regulatory Op~ration - Region IiI U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
SUBJECT:
REPORT OF ABNORMAL OCCURRENCE PER SECTION.6.6.A OF THE TECHNICAL SPECIFICATIONS RAPID CLOSURE OF UNIT-2 MAIN STEAM ISOLATION VALVE 203-lC
References:
- 1) Regulatory G~ide- 1.16 Rev. 1 Appendix A
- 2) Notification of Region III of U.S. Nuclear Regulatory Connnissi_on Telephone_:. Region III Headquarters, Duty Office, 0855 hours0.0099 days <br />0.238 hours <br />0.00141 weeks <br />3.253275e-4 months <br /> on November 16, 1975 Telegram:. J. Keppler, 12-SO hours on Report Number: 50-237/197--5..:.52 Report Date: November 20:, 1975 Occurrence Date: November 16, 1975
.IDENTIFICATION OF OCCURRENCE Main steam isolation valve AO 2-203-lC closed in iess than 3.0 seconds, which is contrary to section 3.7.-D.l of the Technical Specifications.
CONDITIONS PRIOR TO OCCURRENCE Unit-2 was in the Run mode at a power level of 428 MWt and 103 MWe. Quarterly surveillance testi~g of the main steam isolation valves was in progress.
DESCRIPTION OF OCCURRENCE At approximately 0330 hours0.00382 days <br />0.0917 hours <br />5.456349e-4 weeks <br />1.25565e-4 months <br /> on November 16, 1975, main steam isolation valve 203-lC exhibited a closure time of 2.7 seconds. Technical Specifications require that for closure time *t, 3.0 sec ..2_ t 2_ 5 .0 sec. The valve was left in the isolated position, and the unit was subsequently shut down.
13509
,n Mr. James G. Keppl.
.. 41tNovember 20, 1975
.J~rl ,_./'"
DESIGNATION OF APPARENT CAUSE OF OCCURRENCE (Component Failure)
Inspection of valve 203-lC revealed that the hydraulic bleed-off valve was out of adjustment. The bleed-off valve controls the rate of oil exchange across th~ valve operator piston, thus controlling the valve's rate of closure. The bleed-off valve adjustment discrepancy was attributed to normal valve wear.
ANALYSIS OF OCCURRENCE All eight main steam isolation valves had been satisfactorily tested on September 9, 1975. Had a reactor scram occurred while valve 203-lC was out_
of adj.ustment, the resultant premature isolation of the "C" main steam line would have.:presented minimal safety implications. The remaining three steam lines would have effectively equalized any pressure spike, thereby'precluding the 1wssibility of a significant transient within the reactor vessel.. This occurrence did not endanger plant perso~nel or the general public.
- CORRECTIVE ACTION Following shutdown of the unit, the bleed-off valve on 203-lC w~s readjusted to bring the valve closure time within specifications. .i\t 1720 hours0.0199 days <br />0.478 hours <br />0.00284 weeks <br />6.5446e-4 months <br />.on November 16, .valve. 203-lC was successfully tested three t'imes, with an
.average closure time of. 3.6 seconds. The valve was then returned to service in preparation .for _unit start-up .
. FAILURE DATA Four similar isolation valve timing failures have occurred at Dresden since 1970.
The main steam isolation valve~.are air-operate_d, ZO" Y-pattern. globe yalves,
- -~ ..
manufactured *by Crane,.Val 1/e -~Co;
'( ; ..
~
' *--_,: ~ -: :~: *~.'; . .. ,~ - i.
. phen~on Superintendent BBS:GAR:aw lfile/NRC f