ENS 53703: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 21: Line 21:
St. Lucie Unit 2 was unaffected and remains in Mode 1 at 100% power.
St. Lucie Unit 2 was unaffected and remains in Mode 1 at 100% power.
This report is submitted in accordance with 10CFR50.72(b)(2)(iv)(B) for the reactor trip.
This report is submitted in accordance with 10CFR50.72(b)(2)(iv)(B) for the reactor trip.
The NRC Senior Resident Inspector has been notified."
The NRC Senior Resident Inspector has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/20181030en.html#en53703
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/20181030en.html#en53703
}}{{unit info
}}{{unit info

Latest revision as of 01:00, 24 February 2020

ENS 53703 +/-
Where
Saint Lucie NextEra Energy icon.png
Florida (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation
Time - Person (Reporting Time:+12.78 h0.533 days <br />0.0761 weeks <br />0.0175 months <br />)
Opened: Reese Kilian
16:47 Oct 29, 2018
NRC Officer: Andrew Waugh
Last Updated: Oct 29, 2018
53703 - NRC Website
Loading map...