ML18057A894: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:" | {{#Wiki_filter:" | ||
consumers Power POWERIN& | consumers Power POWERIN& | ||
MICHl&AN'S PRD&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 May 7, 1991 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of April, _1991. | MICHl&AN'S PRD&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 May 7, 1991 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of April, _1991. | ||
| Line 77: | Line 76: | ||
: 16. 791 INSTRUCTIONS: | : 16. 791 INSTRUCTIONS: | ||
On this format, list the average daiiy unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt. | On this format, list the average daiiy unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt. | ||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE FOR APRIL 1991 The plant began the month at 953 power and achieved 1003 power on the 8th. | OF OPERATING EXPERIENCE FOR APRIL 1991 The plant began the month at 953 power and achieved 1003 power on the 8th. | ||
The plant maintained full power through the end of the month.}} | The plant maintained full power through the end of the month.}} | ||
Revision as of 11:27, 3 February 2020
| ML18057A894 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 04/30/1991 |
| From: | Handlovits S, Mlynarek S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9105140233 | |
| Download: ML18057A894 (4) | |
Text
"
consumers Power POWERIN&
MICHl&AN'S PRD&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 May 7, 1991 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of April, _1991.
If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.
Sincerely, MG Mlynarek _*
Reactor Engineer CC: DPHoffman, P26~117B RMRice, Palisades ABDavis, USNRC JLKuemin, Palisades Resident Irispector, Palisades DRHahn, 'Div of Rad Health S~rvites, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, MI RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades HRSnider, P21-129 Administrator, USNRC Document Control, 950*22*35*10/L
-SMH91*012
( ' 910514<)233. 91043(1 '*" j'\ "\
'p[1R: ADOCK 05000255 \ :
I R -- PDR \ __,
- . l_._ A CMS' ENER5YCOMPANY
OPERATING DATA REPORT DOCKET NO 50-255 DATE 04-30-91 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 OPERATING STATUS: NOTES:
- l. UNIT NAME Palisades
- 2. REPORTING PERIOD: 910401-910430
- 3. LICENSED THERMAL POWER (MWt) 2530.0
- 4. NAMEPLATE RATING (GROSS MWe) 811.7
- 5. DESIGN ELECTRICAL RATING (NET MWe) 8D5.0 6.. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS 3-7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
This Month Yr-to-Date Cumulative
- 11. HOURS IN REPORTING PERIOD 719.0 2879.0 169742.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 1207.9 91409.0
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE 719.0 1086.4 87304.0
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1809167.0 2289623.0 183042068.0
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 591090.0 736780.0 57373315.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 562380.0 692948.0 53991071. 0
- 19. UNIT SERVICE FACTOR 100.0% 37.7% 51.4%
- 20. UNIT AVAILABILITY FACTOR 100.0% 37.7% 51.4%
- 21. UNIT CAPACITY FACTOR (USING MOC NET) 107.1% 33.0% 48.2%*
- 22. UNIT CAPACITY FACTOR (USING DER NET) 97.2% 29.9% 39.5%
- 23. UNIT FORCED OUTAGE RATE 0.0% 3.8% 32.6%
24 .. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- Weighted Average (635 MWe used as MOC Net prior to October 1985)
AVERAGE DAILY UNIT POWER LEVEL DOC KET NO _ _____;;5~0-'-2=-=5:. =5 UNIT Palisades DATE 05/01/91 COMPLETED BY _S_M_H_a~nd_._l_o~v,~.t~s MONTH APRIL 1991 TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)
- 1. 743 17. 791
- 2. 752 18. 791
- 3. 754 .19. 791
- 4. 760 20. 793
- 5. 767 21. 791 6.. 772 22. 791
- 7. 778 23. 790
- 8. 780 24. 792
- 9. 788 25. 792
- 10. 791 26. 779
- 11. 792 27. 785
- 12. 790 28. 785
- 13. 790 29. 777
- 14. 787 30. 793
- 15. 790
- 16. 791 INSTRUCTIONS:
On this format, list the average daiiy unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.
SUMMARY
OF OPERATING EXPERIENCE FOR APRIL 1991 The plant began the month at 953 power and achieved 1003 power on the 8th.
The plant maintained full power through the end of the month.