ML18347A839: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 21: Line 21:
Sincerely, James A. Meineke JAM:db cc: J.G.Keppler, NRC R.L.Haueter R.B.Sewell
Sincerely, James A. Meineke JAM:db cc: J.G.Keppler, NRC R.L.Haueter R.B.Sewell


                .-
I .~
I .~
  *.I    .-.
  *.I    .-.
Line 36: Line 35:
Compute to the nearest whole megawatt.
Compute to the nearest whole megawatt.
* These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum
* These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum
(.o
(.o dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power le\'cl exceeds the I 00% line (or the restricted power level* line). In such cases, the av:ragc daily unit power ontput sheet should be footnoted to explainthc apparent anomaly . . . . . .
* dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power le\'cl exceeds the I 00% line (or the restricted power level* line). In such cases, the av:ragc daily unit power ontput sheet should be footnoted to explainthc apparent anomaly . . . . . .
  *L-..~.--..,,~**~ " ~~~-~~&#xa5;<+~-*---~,n ~                                                                              ' '!
  *L-..~.--..,,~**~ " ~~~-~~&#xa5;<+~-*---~,n ~                                                                              ' '!


Line 77: Line 75:
IS. UNJTS IN TEST ST:\ TVS (PRIOR TO CO'.\i:l!ERCIAL OPERATION) REPORT THE FOLLOWING:
IS. UNJTS IN TEST ST:\ TVS (PRIOR TO CO'.\i:l!ERCIAL OPERATION) REPORT THE FOLLOWING:
DATE LAST                        DATE FORECAST                      ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (I)    REACTOR A\'AILABILITY FACTOR                                                          x 100 HOURS IN REPORTING PERIOD HOURS GENERA TOR ON LINE t:NIT AVAILABILITY FACTOR                  -----------~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL PO\\'FR GENERATED (3)    UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWc*NET) X HOURS IN RU'ORTIN<.; l'E!UOD f~~
DATE LAST                        DATE FORECAST                      ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (I)    REACTOR A\'AILABILITY FACTOR                                                          x 100 HOURS IN REPORTING PERIOD HOURS GENERA TOR ON LINE t:NIT AVAILABILITY FACTOR                  -----------~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL PO\\'FR GENERATED (3)    UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWc*NET) X HOURS IN RU'ORTIN<.; l'E!UOD f~~
.,
FORCED Ol:TAGE HOURS
FORCED Ol:TAGE HOURS
. l L
. l L
Line 95: Line 92:
!'                                                                                                                                                                                                        COMPLETED BY                          *n.Bollnow                                  t
!'                                                                                                                                                                                                        COMPLETED BY                          *n.Bollnow                                  t
                                                                                                                                                                                                                                                                                               ~
                                                                                                                                                                                                                                                                                               ~
REPORT MONTH                                April 1975                                                                                                                  r NO. DATE
REPORT MONTH                                April 1975                                                                                                                  r NO. DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)                            REASON (1)
                                  '
TYPE F-FORCED S-SCHEDULED DURATION (HOURS)                            REASON (1)
METHOD OF SHUTTING DOWN THE REACTOR (2)                        CORRECTIVg ACTIONS/COMMENTS etI t
METHOD OF SHUTTING DOWN THE REACTOR (2)                        CORRECTIVg ACTIONS/COMMENTS etI t
[
[
Line 103: Line 98:
F 3662.1 2.6 B
F 3662.1 2.6 B
A 1
A 1
1 Completion of Steam Gen. Repair/Inspection
1 Completion of Steam Gen. Repair/Inspection Off-Line to Repair Leaking F.W.Heater Valve Ir r*
                                                                                                                                                                                              '
Off-Line to Repair Leaking F.W.Heater Valve Ir r*
[
[
:.... 2    750422            F                                              14.l                              A                                          3              Trip due to E.H. oil Line failure on                                                                        r Turbine control system
:.... 2    750422            F                                              14.l                              A                                          3              Trip due to E.H. oil Line failure on                                                                        r Turbine control system (1) REASON A*-EQUIPMENT FAILURE:(EXPLAIN)
                                                                                                                                                                                      '->,
(1) REASON A*-EQUIPMENT FAILURE:(EXPLAIN)
B- MAlNT. OR TEST C-REFUELING D-REGULATORY RESTRICTION E-Ol'ERATOR TRAINING AND (2) METHOD 1-MANUAL
B- MAlNT. OR TEST C-REFUELING D-REGULATORY RESTRICTION E-Ol'ERATOR TRAINING AND (2) METHOD 1-MANUAL
* 2-MANUAL SCRAM 3-AUTOMATIC*
* 2-MANUAL SCRAM 3-AUTOMATIC*
SCRAM
SCRAM
                                                                                                                                                                                                                                                                                        ..
                                                                                                                                                                                                                                                                                         .. l,.
                                                                                                                                                                                                                                                                                         .. l,.
f,.
f,.
Line 120: Line 110:
{EXPLAIN)
{EXPLAIN)
H-OTHER (EXPLAIN)                                                                                        ..
H-OTHER (EXPLAIN)                                                                                        ..
                                                                                                                                                                                                                                                                                                  .
                                                                                                                        ..                          ! *
                                                                                                                                                                                                                                                                    ..
ri:
ri:


==SUMMARY==
==SUMMARY==
:                                                                                                                                            '  .
Turbine balancing was performed on 1st and 2nd; then unit went up in power in accordance with a
Turbine balancing was performed on 1st and 2nd; then unit went up in power in accordance with a
                         $team Generator flushing.program. Plant.is running at 80% power with F.W. Heaters #1 and 2 out                                                                                                                                                                          I[
                         $team Generator flushing.program. Plant.is running at 80% power with F.W. Heaters #1 and 2 out                                                                                                                                                                          I[

Revision as of 14:27, 2 February 2020

Monthly Operating Data for April 1975
ML18347A839
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/02/1975
From: Meincke J
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A839 (4)


Text

consumers

  • Fiie Cy.

Power company U.S.Nuclear Regulatory Commission Mail and Records section Washington, D.C., 20555 Gentlemen:

Enclosed is a copy of the monthly operating data for the Palisades Plant for the month of April, 1975*

Sincerely, James A. Meineke JAM:db cc: J.G.Keppler, NRC R.L.Haueter R.B.Sewell

I .~

  • .I .-.
__,~ APPp.JDIX C (0 DOCKET NO.

UNIT 50-255.

Palisades DATE 5/2/75 COMPLETED BY DBollnow AVERAGE DAILY UNIT POWER LEVEL MONTH April 1975 AVERA GE DAILY PO\\iER LEVEL AVERAGE DAILY POWER LEVEL.

(.MWe-net) DAY (MWe-nct)

DAY 1 0 17* 550 2 0 18 /./

577

/

3 4* 19 231 4 117. . 20. 268 5 162 21 216 6 131 22 560 c~* .0

  • ._._; 7 261 23 121 8 350 24 501. ';.

9 388 25 266 10 446 26 531 11 389 27. 431 461 28 430 12 13 518 29 482 14 361 30 503 t5 . 501 31 16 529 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit powe:r level in ivt\Ve-net for each day in the reporting month.

Compute to the nearest whole megawatt.

  • These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum

(.o dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power le\'cl exceeds the I 00% line (or the restricted power level* line). In such cases, the av:ragc daily unit power ontput sheet should be footnoted to explainthc apparent anomaly . . . . . .

  • L-..~.--..,,~**~ " ~~~-~~¥<+~-*---~,n ~ ' '!

APPENDIX D*

UNIT _P_a_.:_1_J_ .. s_a_cl_e_s_ __

DATE lfJB.y 2, 1975 616-*764..:8913*

. COMPLETED BY D.Bollnow .

DOCKET N0. __5_0_-_2_5_5_ _ __

OPERATiNG ST ATUS I. REPORTING PERIOD: . 750401 THROUGH _ _7.J...,,5"-'0::...4..:....~""-'0::____ _ _ _ _ __

HOURS IN REPORTl'.'\G PERIOD: _ _ _7'-l__,9'-----------.,--------------,7'7"1""r--

2. CURRENTLY AUTHORIZED POWER.LEVEL ('.\1Wth) 220Q_ MAX. DEPENDABLE CAPACITY (MWe-NET) _O_t3_l_!*_ _
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (M\Ve-NET):_--06:...3=0'- 1

---~---

4. REASONS FOR RESTRICTION (IF ANY): Power Restricted to 2100 .MWT due to low Pr:i.mary Coolant Flow caused by Steam Generator Plugging THIS CUMULATIVE

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _R_E_P_ORTING PE_R....:10:...:D'-----=-Y..:..R'-'T:...:O:....D=-A:..:c.TE.o.;.,;...'_ _ _ _ T...:O._D_A_T_E_

5. HOURS REACTOR WAS CRITICAL. . . . . . . . . . . . . 709.5 739.8 lG,976.7
6. REACTOR RESERVE SHUTDOWN HOURS . . . . . . .

,. 0 0 0

7. HOURS GENERATOR ON LINE.* . . . . . . . . . . . * * . 657.8 657.8 9.978.9
8. lTNJT RESER VE Sil UTDOWN HOURS . . . . . . . . * *
  • 0 0 0
9. . GROSS THER'.\1AL ENERGY GENERATED ('.\1WH) . * . * . . * * * * * . * * * * * * * *
  • 967;.872 . 967,872 15,081,432 IO.. GROSS ELECTRICAL ENERGY
  • ,.--.o. * .

( *. .

11.

-GENERATED ('.\l\VH) . . . . . . . . . . . . . . . . . . . . .

NET ELECTRICAL ENERGY GENERATED (MWH) ..*.*...***..*..*.*.***.**.*.

291,04o 266,769 291,04o 266,769 4,795,290 4,520,474

  • -~:**** 12. RL\CTOR AVAILABILITY FACTOR (l) . . . . - . . . . 98.7% 25. 7% 37 ..6%* .
13. UNIT A \'AILABILITY FACTOR (2) . . * * . . * . . * .
  • 91.5% 22.8% 34.2~ .*
14. l NIT CAPACITY FACTOR (3) . . . . . . . . . . . . * . .

1 54.2% 13.5% '26.2% -

IS. UNIT FORCED OllTAGE RATE (4) . . . . . . * * . * *

  • 8.6°/o 77.'?} 63.2°/o
16. 1 S!ll TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):
17. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _ _ _ _ _ _ _ _ _ _ __

IS. UNJTS IN TEST ST:\ TVS (PRIOR TO CO'.\i:l!ERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL (I) REACTOR A\'AILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERA TOR ON LINE t:NIT AVAILABILITY FACTOR -----------~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL PO\\'FR GENERATED (3) UNIT CAPACITY FACTOR MAX. DEPENDABLE CAPACITY (MWc*NET) X HOURS IN RU'ORTIN<.; l'E!UOD f~~

FORCED Ol:TAGE HOURS

. l L

(4) t:NIT FORCEDOL'TAGE RATE -~-~---------XlOO

(~\.~.>3

. ~~

. HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

).16*D*l . . .

_.:~-*=-~~~7~*~-~~~-=~-~~~-~-

~.--- I t.,,.\ e:. .J~*

J. 0 '-k'"~"""""-"'"'""""...;"'"'";,.~. . . .,,...,. ___.,. . . . . . ._,. . .,. . . . . . . .-.. .~..............,.,~....,. . .,,. . . . *A*P(l-'pi~*-*----*---...- - -....*->=-*"""*,_.....,

  • .*_..._.-**-~-0-C-.K~E....~........N-m-.- ~ 5~0~ *2=0*5:;. .: 5'-*-* _-_~.......<.->'\~*I

~ ~ f j UNIT SHUTDOWNS UNIT NAME Palisades l

  • 1.*
  • DATE 5-2-75 l I

!' COMPLETED BY *n.Bollnow t

~

REPORT MONTH April 1975 r NO. DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS) REASON (1)

METHOD OF SHUTTING DOWN THE REACTOR (2) CORRECTIVg ACTIONS/COMMENTS etI t

[

1 3 . 741104 7504o6 F

F 3662.1 2.6 B

A 1

1 Completion of Steam Gen. Repair/Inspection Off-Line to Repair Leaking F.W.Heater Valve Ir r*

[

.... 2 750422 F 14.l A 3 Trip due to E.H. oil Line failure on r Turbine control system (1) REASON A*-EQUIPMENT FAILURE:(EXPLAIN)

B- MAlNT. OR TEST C-REFUELING D-REGULATORY RESTRICTION E-Ol'ERATOR TRAINING AND (2) METHOD 1-MANUAL

  • 2-MANUAL SCRAM 3-AUTOMATIC*

SCRAM

.. l,.

f,.

LICENSE EXAMINATION ~

. . F-ADMINISTRATIVE G-OPERATIONAL ERROR t,, .

{EXPLAIN)

H-OTHER (EXPLAIN) ..

ri:

SUMMARY

Turbine balancing was performed on 1st and 2nd; then unit went up in power in accordance with a

$team Generator flushing.program. Plant.is running at 80% power with F.W. Heaters #1 and 2 out I[

of service which is restrictive* on power..

  • t
  • r