Line 18: |
Line 18: |
| =Text= | | =Text= |
| {{#Wiki_filter:' | | {{#Wiki_filter:' |
| .
| |
| *-
| |
| Proposed Change No. 85 E^E!/ 0 MSTFUncy j ) NNbi'UNT Y A N K ME NUCLEAR POWER COR PORATION | | Proposed Change No. 85 E^E!/ 0 MSTFUncy j ) NNbi'UNT Y A N K ME NUCLEAR POWER COR PORATION |
| ..,y . | | ..,y . |
| ,,, SEVENTY SEVEN GROVE STREET WVY-80-158 4 ~" 1 54 8.3.2.1 RUTI,AND. VElt>10NT 05701 R EPLY TO. | | ,,, SEVENTY SEVEN GROVE STREET WVY-80-158 4 ~" 1 54 8.3.2.1 RUTI,AND. VElt>10NT 05701 R EPLY TO. |
| _ ENGINEERING OFFICE | | _ ENGINEERING OFFICE TURNPlK E RO AD WESTDORO. M ASS ACHUSCTTS 01381 |
| ''
| |
| TURNPlK E RO AD WESTDORO. M ASS ACHUSCTTS 01381 | |
| ' ' ' ' ' " " ' ' " ~ " ' " " | | ' ' ' ' ' " " ' ' " ~ " ' " " |
| November 12, 1980 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Office of Nuclear Reactor Regulation Thomas A. Ippolito, Chief Operating Reactors Branch No. 2 Division of Licensing Re fere nc es : (a) License No. DP9-28 (Docket No. 50-271) | | November 12, 1980 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Office of Nuclear Reactor Regulation Thomas A. Ippolito, Chief Operating Reactors Branch No. 2 Division of Licensing Re fere nc es : (a) License No. DP9-28 (Docket No. 50-271) |
Line 40: |
Line 36: |
| Changes to Technical Specification pages 86, 87, 103, 104 and 144 to implement the NRC staff guidelines for excluding the exercising (cycling) of certain valves during plant operation as described in Reference (b) are provided as an Attachment to this letter. It should be noted that all the changes are not made to the existing Technical Specification pages, but rather the revised pages previously transmitted via Reference (c). | | Changes to Technical Specification pages 86, 87, 103, 104 and 144 to implement the NRC staff guidelines for excluding the exercising (cycling) of certain valves during plant operation as described in Reference (b) are provided as an Attachment to this letter. It should be noted that all the changes are not made to the existing Technical Specification pages, but rather the revised pages previously transmitted via Reference (c). |
| 80111E)0Cf6'52- | | 80111E)0Cf6'52- |
| !
| |
|
| |
|
| _ _ . _ _ __ _ __ _
| | 7 United _ States' Nuclear Regulatory Commission November 12, 1980 Attention: Thomas.A. Ippolito,~ Chier- Page 2 i |
| .
| |
| * 7 United _ States' Nuclear Regulatory Commission November 12, 1980 Attention: Thomas.A. Ippolito,~ Chier- Page 2 i
| |
| .
| |
| BASIS AND REASON FOR CHANGE: | | BASIS AND REASON FOR CHANGE: |
| ,
| |
| This change-was prompted by Reference (b) and by discussions with NRC staff | | This change-was prompted by Reference (b) and by discussions with NRC staff |
| .
| |
| . personnel during the on-site working session held to review our proposed j Inservice Inspection Program [ Reference (d)]. The NRC guideline listed below | | . personnel during the on-site working session held to review our proposed j Inservice Inspection Program [ Reference (d)]. The NRC guideline listed below |
| ; provides' the basis - for the proposed changes. | | ; provides' the basis - for the proposed changes. |
| - "Any valve which when exercised (cycled) could put the plant in an unsafe t- condition should not be tested. Below are some examples of the types of valves that should be specifically excluded from exercising (cycling) | | - "Any valve which when exercised (cycled) could put the plant in an unsafe t- condition should not be tested. Below are some examples of the types of valves that should be specifically excluded from exercising (cycling) |
| [ tests during plant operation. | | [ tests during plant operation. |
| '
| |
| : l. All valves whose failure in a non-conservative position during the | | : l. All valves whose failure in a non-conservative position during the |
| ; cycling test would cause a loss of system function should not be exercised. Valves in this category would typically include all | | ; cycling test would cause a loss of system function should not be exercised. Valves in this category would typically include all non-redundant valves in lines such as a single discharge line from the refueling water' storage tank, or accumulator discharge lines in PWR's and the HPCI turbine-steam supply and the HPCI pump discharge I in BWR's. Other valves may fall into this category under certain system configurations or plant operating modes. For example, when a one train of a redundant system such as ECCS is inoperable, i |
| '
| |
| non-redundant valves in lines such as a single discharge line from the refueling water' storage tank, or accumulator discharge lines in PWR's and the HPCI turbine-steam supply and the HPCI pump discharge I in BWR's. Other valves may fall into this category under certain system configurations or plant operating modes. For example, when a one train of a redundant system such as ECCS is inoperable, i | |
| non-redundant valves in the remaining train should not be cycled since their failure would cause a loss of total system function." | | non-redundant valves in the remaining train should not be cycled since their failure would cause a loss of total system function." |
| 1 I- The basis for each specific change is as follows: | | 1 I- The basis for each specific change is as follows: |
| l Section 4.5.A.2.- the requirement to test the operable Core Spray i Subsystem if the other is inoperable was deleted. Operability of | | l Section 4.5.A.2.- the requirement to test the operable Core Spray i Subsystem if the other is inoperable was deleted. Operability of |
| } the safety-related valves cannot be verified since stroking the i valves requires that they be repositioned into a nonconservative | | } the safety-related valves cannot be verified since stroking the i valves requires that they be repositioned into a nonconservative position. |
| ,
| |
| position. | |
| 9 l If.any of the valves should fail in thf, position, the remaining i C re Spray Subsystem would be inoperable since the flow would either be blocked or diverted from the reactor. Operability of the | | 9 l If.any of the valves should fail in thf, position, the remaining i C re Spray Subsystem would be inoperable since the flow would either be blocked or diverted from the reactor. Operability of the |
| , remaining Core Spray Pump cannot be verified since it requires that | | , remaining Core Spray Pump cannot be verified since it requires that a single full flow test valve be opened. This valve lineup allows j the water to be reeirculated back to the torus. If this test valve i failed in the open position, the remaining Core Spray Subsystem |
| _
| | } would be inoperable since the water would be diverted away from the reactor. |
| a single full flow test valve be opened. This valve lineup allows j the water to be reeirculated back to the torus. If this test valve i failed in the open position, the remaining Core Spray Subsystem | |
| } would be inoperable since the water would be diverted away from the | |
| ,
| |
| reactor. | |
| !
| |
| i Section 4.5.A.4 - the requirement to test the operable LPCI Subsystem valves if-the other LPCI Subsystem is inoperable was deleted. | | i Section 4.5.A.4 - the requirement to test the operable LPCI Subsystem valves if-the other LPCI Subsystem is inoperable was deleted. |
| 1 Operability of the safety-related valves cannot be verified since j - stroking the valve requires that they be repositioned into a nonconservation position. If any of the valves should fail in this position, . the remaining LPCI Subsystem would be inoperable since the | | 1 Operability of the safety-related valves cannot be verified since j - stroking the valve requires that they be repositioned into a nonconservation position. If any of the valves should fail in this position, . the remaining LPCI Subsystem would be inoperable since the |
| ~ | | ~ |
| l flow path to the' reactor would be blocked. | | l flow path to the' reactor would be blocked. |
| i | | i Bases 4.5. A. 4 5 0, 4 7. A - the reference ' to the test frequency was |
| '
| |
| Bases 4.5. A. 4 5 0, 4 7. A - the reference ' to the test frequency was | |
| .
| |
| ; deleted -for consistency. | | ; deleted -for consistency. |
| 1 | | 1 |
| ) | | ) |
| J | | J |
| .
| |
| . . ,. , , ,e, 4 - - - - - _ - , - , , - . . , , ,--n-, ,.n . - . . . . , . , . . . . . - ~ - , , , -e a | | . . ,. , , ,e, 4 - - - - - _ - , - , , - . . , , ,--n-, ,.n . - . . . . , . , . . . . . - ~ - , , , -e a |
|
| |
|
| - . - - - . . .
| | j United States Nuclear Regulatory Commission November 12, 1980 Attention: Thomas A. Ippolito, Chier -Page 3 SAFETY CONSIDERATIONS: |
| . . . . ,. -.
| | The proposed changes to the Technical Specifications concerning Alternate Test 4 Requirements in the. event one subsystem is inoperable are consistent with the NRC Guidelines provided with Reference (b). These changes will insure that 4 testing of certain pumps and valves will not place the plant in an unsafe condition through a loss of system function in the event a valve failed in its unconservative -position. |
| j | |
| .
| |
| United States Nuclear Regulatory Commission November 12, 1980 Attention: Thomas A. Ippolito, Chier -Page 3 SAFETY CONSIDERATIONS: | |
| The proposed changes to the Technical Specifications concerning Alternate Test 4 Requirements in the. event one subsystem is inoperable are consistent with the | |
| * NRC Guidelines provided with Reference (b). These changes will insure that 4 testing of certain pumps and valves will not place the plant in an unsafe condition through a loss of system function in the event a valve failed in its unconservative -position.
| |
| A The changes to the Bases are made to maintain consistency. | | A The changes to the Bases are made to maintain consistency. |
| l This change has been reviewed by the Vermont Yankee Nuclear Safety and Audit Review Committee. | | l This change has been reviewed by the Vermont Yankee Nuclear Safety and Audit Review Committee. |
Line 101: |
Line 72: |
| :- reasons, Vermont Yankee Nuclear Power Corporation proposes this change as a Class III Amendment. A payment of $4,000.00 is enclosed. | | :- reasons, Vermont Yankee Nuclear Power Corporation proposes this change as a Class III Amendment. A payment of $4,000.00 is enclosed. |
| SCHEDULE '0F CHANGE: | | SCHEDULE '0F CHANGE: |
| <
| | The revised pages will be incorporated into the Technical Specifications as soon as oossible following receipt of NRC approval. |
| The revised pages will be incorporated into the Technical Specifications as | |
| '
| |
| soon as oossible following receipt of NRC approval. | |
| We trust this submittal is acceptable to you; however, shculd you have any questions, please contact us. | | We trust this submittal is acceptable to you; however, shculd you have any questions, please contact us. |
| '
| |
| Very truly yours,- | | Very truly yours,- |
| VERMONT YANKEE NUCLEAR POWER CORPORATION NY | | VERMONT YANKEE NUCLEAR POWER CORPORATION NY I |
| :
| | L. H. Heider Vice President l COMMONWEALTH OF MASSACHUSETTS) l )ss COUNTY OF WORCESTER ) |
| I L. H. Heider Vice President
| |
| ,
| |
| l COMMONWEALTH OF MASSACHUSETTS) l )ss COUNTY OF WORCESTER ) | |
| l Then personally appeared before me, L. H. Heider, who, being duly. sworn, did state that -he is a Vice President of Vermont Yankee Nuclear Power Corporation, that he- is duly authorized to execute and file the foregoing l request in the name and on the behalf of Vermont Yankee Nuclear Power Corporation, and that the statements therein are true to the best of his | | l Then personally appeared before me, L. H. Heider, who, being duly. sworn, did state that -he is a Vice President of Vermont Yankee Nuclear Power Corporation, that he- is duly authorized to execute and file the foregoing l request in the name and on the behalf of Vermont Yankee Nuclear Power Corporation, and that the statements therein are true to the best of his |
| ; | | ; |
| knowledge and belief. . | | knowledge and belief. . |
| I | | I H.N M( /W |
| #
| |
| H.N | |
| "*""**
| |
| M( /W | |
| [*# . | | [*# . |
| *
| |
| .
| |
| h, . | | h, . |
| Robert II. Gr'oce Notary Public My Commission Expires September 14, 1984 if@i % | | Robert II. Gr'oce Notary Public My Commission Expires September 14, 1984 if@i % |
| * .' is | | * .' is |
| ,~: w | | ,~: w |
| *
| |
| ; | | ; |
| * r -
| | r - |
| ,
| |
| *
| |
| ,J 4Cll M [ | | ,J 4Cll M [ |
| l ~s 4dy .d | | l ~s 4dy .d |
| ~........ | | ~........ |
| ,
| |
| -+ - , - - ,-e-e -- r - | | -+ - , - - ,-e-e -- r - |
| w --- , - - , , . . -----,-e , - - ,}} | | w --- , - - , , . . -----,-e , - - ,}} |
|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARBVY-99-134, TS Proposed Change 228 for License DPR-28,correcting Two Textual Errors & Changing Designation of Ref Figure1999-10-21021 October 1999 TS Proposed Change 228 for License DPR-28,correcting Two Textual Errors & Changing Designation of Ref Figure BVY-99-132, TS Proposed Change 227 to License DPR-28,revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-021999-10-18018 October 1999 TS Proposed Change 227 to License DPR-28,revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-02 BVY-99-119, TS Proposed Change 198 to License DPR-28,increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank1999-09-21021 September 1999 TS Proposed Change 198 to License DPR-28,increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank BVY-99-104, TS Proposed Change 223 to License DPR-28,revising Reactor Core Spiral Reloading Pattern to Begin Around Srm.Submittal Entirely Supersedes Proposed Change 211 to TS1999-08-18018 August 1999 TS Proposed Change 223 to License DPR-28,revising Reactor Core Spiral Reloading Pattern to Begin Around Srm.Submittal Entirely Supersedes Proposed Change 211 to TS BVY-99-106, TS Proposed Change 225 to License DPR-28,revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance1999-08-18018 August 1999 TS Proposed Change 225 to License DPR-28,revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance BVY-99-105, Supplemental Application for Amend to License DPR-28, Correcting Typographical Error & Clarifying Certain Changes to Requirements for High Pressure Core Cooling Sys Contained in TS1999-08-17017 August 1999 Supplemental Application for Amend to License DPR-28, Correcting Typographical Error & Clarifying Certain Changes to Requirements for High Pressure Core Cooling Sys Contained in TS ML20210D2431999-07-20020 July 1999 Application for Amend to License DPR-28,revising & Clarifying Operability & SRs of High Pressure Core Cooling Systems ML20210D3241999-07-20020 July 1999 TS Proposed Change 218 to License DPR-28,evaluating Increase in Allowable Core Flow from 100% to 107%.Listed Specific Change Proposed ML20209G1631999-07-12012 July 1999 TS Proposed Change 221 for License DPR-28,revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 Values.Proprietary & non-proprietary GE Info Re SLMCPR Values,Encl.Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20196K2881999-06-29029 June 1999 Application for Amend to License DPR-28 to Incorporate Attached Proposed Change 220 Into Ts.Proposed Change Revises Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20196H2801999-06-24024 June 1999 TS Proposed Change 214 to License DPR-28,revising & Clarifying Terminology Re Certain RPS Scram Bypass Permissives ML20196F4011999-06-23023 June 1999 Application for Amend to License DPR-28 to Amend Previous Approvals Granted Under 10CFR20.302(a) for Disposal of Contaminated Septic Waste & Cooling Tower Silt to Allow for Disposal of Contaminated Soil ML20195J8491999-06-15015 June 1999 Application for Amend to License DPR-28,increasing Stis, Adding Allowable OOS Times,Replacing Generic ECCS Actions for Inoperable Instrument Channels with function-specific Actions & Relocating Selected Trip Functions from TS ML20195F9461999-06-0909 June 1999 Supplement to 990416 Proposed Change 213 for License DPR-28, Allowing Use of Amse Code Case N-560,in Lieu of Certain Provisions of GL 88-01 ML20195C8711999-05-26026 May 1999 TS Proposed Change 203 to License DPR-28,clarifying Suppression Chamber Water Temp SR 4.7.A, Primary Containment & Modifying Associated TS Bases ML20206H3621999-05-0606 May 1999 Application for Amend to License DPR-28,to Delete Specific Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20206J7121999-05-0505 May 1999 Application for Amend to License DPR-28,modifying TS to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to SLC Sys & Incorporate Certain Provisions of NRCs Rule on Anticipated Transients ML20205S9391999-04-20020 April 1999 TS Proposed Change 211 to License DPR-28,revising Reactor Spiral Reloading Pattern Beginning Around Source Range Monitor ML20205T4621999-04-19019 April 1999 Supplemental Application for Amend to License DPR-28 to Incorporate Certain Changes to Section 6 of Ts.Submittal Supplements 990201 Request for Amend & Revises Portions of Proposed Change 208 as listed.Marked-up TS Pages Encl ML20205S4031999-04-16016 April 1999 Application for Amend to License DPR-28,modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01 BVY-98-165, TS Proposed Change 210 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation.Change 209,withdrawn1998-12-11011 December 1998 TS Proposed Change 210 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation.Change 209,withdrawn BVY-98-119, LAR 206 to License DPR-58,correcting Error in TS 4.9.2 Re Calibr of Augmented Offgas Sys Hydrogen Monitors1998-12-10010 December 1998 LAR 206 to License DPR-58,correcting Error in TS 4.9.2 Re Calibr of Augmented Offgas Sys Hydrogen Monitors BVY-98-162, TS Proposed Change 209 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation1998-12-0707 December 1998 TS Proposed Change 209 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation BVY-98-118, Application for Amend to License DPR-28,consisting of TS Proposed Change 180,incorporating Number of Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application1998-11-0303 November 1998 Application for Amend to License DPR-28,consisting of TS Proposed Change 180,incorporating Number of Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application ML20155G4921998-11-0202 November 1998 TS Proposed Change 197 to License DPR-28,modifying Tech Specs to More Clearly Describe ECCS Actuation Instrumentation - LPCI Sys A/B RHR Pump Start Time Delay Requirements BVY-98-130, TS Proposed Change 207 to License DPR-28,increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel assemblies.Non-proprietary & Proprietary Rept Encl.Proprietary Rept Withheld (Ref 10CFR2.790(a)(4))1998-09-0404 September 1998 TS Proposed Change 207 to License DPR-28,increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel assemblies.Non-proprietary & Proprietary Rept Encl.Proprietary Rept Withheld (Ref 10CFR2.790(a)(4)) ML20236H4221998-06-30030 June 1998 Application for Amend to License DPR-28,modifying TS to Delete ECC Actuation Instrumentation/Core Spray Sys & LPCI Sys Auxiliary Power Monitor Calibr Requirement ML20247J8061998-05-0808 May 1998 TS Proposed Change 204 to License DPR-28,reducing Normal Operating Supression Pool Water Temp Limit & Adding Time Restriction for Higher Temp Allowed During Surveillances to Add Heat to Suppression Pool.Rept Re Pool Temp,Encl ML20217P3961998-05-0101 May 1998 Proposed Change 202 to License DPR-28,changing Several Editorial Changes to Administrative Control Section of TSs ML20217G6461998-04-23023 April 1998 Application for Amend to License DPR-28,revising Station SW & Alternate Cooling Sys Requirements ML20217C4491998-03-20020 March 1998 Proposed Change 201 to License DPR-28,modifying Util Licensing Basis by Limiting Time Large Purge & Vent May Be Open to 90 H Per Yr BVY-97-165, Application for Amend to License DPR-28,revising Current Value for SLMCPR for Cycle 20,next Operating Cycle. Proprietary Summary of Plant SLMCPR Evaluation for Cycle 20, Encl.Proprietary Info Withheld,Per Encl GE Affidavit1997-12-11011 December 1997 Application for Amend to License DPR-28,revising Current Value for SLMCPR for Cycle 20,next Operating Cycle. Proprietary Summary of Plant SLMCPR Evaluation for Cycle 20, Encl.Proprietary Info Withheld,Per Encl GE Affidavit BVY-97-155, Application for Amend to License DPR-28,proposing Mod to Revise Requirements for Main Station Batteries1997-11-20020 November 1997 Application for Amend to License DPR-28,proposing Mod to Revise Requirements for Main Station Batteries BVY-97-130, Application for Amend to License DPR-28,revising & Clarifying Requirements of Offsite Power Sources1997-10-10010 October 1997 Application for Amend to License DPR-28,revising & Clarifying Requirements of Offsite Power Sources BVY-97-106, Application for Amend to License DPR-28,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys1997-08-22022 August 1997 Application for Amend to License DPR-28,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys BVY-97-107, Application for Amend to License DPR-28,modifying TS to Update Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle- Specific Thermal Operating Limits in COLR1997-08-20020 August 1997 Application for Amend to License DPR-28,modifying TS to Update Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle- Specific Thermal Operating Limits in COLR ML20141H1101997-07-11011 July 1997 Application for Amend to License DPR-28,replacing Pp 147,156 Through 161,168 & 279 of Util TS W/Corrected Pages ML20148J1771997-06-0909 June 1997 Application for Amend to License DPR-28,changing TSs to Update Section 6.0 to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Validate or Generate cycle-specific Thermal Hydraulic Stability BVY-96-155, Application for Amend to License DPR-28,requesting Rev to TS to Relocate Fire Protection Requirements1996-12-10010 December 1996 Application for Amend to License DPR-28,requesting Rev to TS to Relocate Fire Protection Requirements BVY-96-120, Application for Amend to License DPR-28,revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.21996-10-11011 October 1996 Application for Amend to License DPR-28,revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.2 BVY-96-104, Application for Amend to License DPR-28,modifying Sections 2.2.B & 3.6.D.1 of Util TS & Accompanying Bases Section to Permit Operation W/Increased SRV & SV Setpoint Tolerance & to Permit Operation Up to 100% of Rated Power1996-09-11011 September 1996 Application for Amend to License DPR-28,modifying Sections 2.2.B & 3.6.D.1 of Util TS & Accompanying Bases Section to Permit Operation W/Increased SRV & SV Setpoint Tolerance & to Permit Operation Up to 100% of Rated Power ML20117C3901996-08-22022 August 1996 Application for Amend to License DPR-28,requesting Deletion of Existing Action Statement for High Range Stack Noble Gas Monitor & Replacing W/Different Action Statement ML20116J4371996-08-0909 August 1996 Application for Amend to License DPR-28,revising SLs for MCPR Based Upon Util Plant & Cycle Specific Analysis Performed by GE ML20113D8011996-06-28028 June 1996 Proposed Change 187 to License DPR-28,incorporating Std Language for Shutdown Margin Specifications to Allow Calculational Determination of Highest Wroth Control Rod,Per NUREG-1433 ML20107M7691996-04-26026 April 1996 Application for Amend to License DPR-28,deleting Definitions of Unrestricted Area, Restricted Area & Controlled Area ML20101P1261996-04-0404 April 1996 Proposed Change 184 to License DPR-28,revising TS Requirements for Secondary Containment Based on Guidance in NUREG-1433,Rev 1, STS for GE Plants,BWR/4 ML20101N1651996-04-0404 April 1996 Application for Amend to License DPR-28,consisting of Proposed Change 183,revising Existing Requirements for Control Rod & Drive Mechanism Coupling Verification,Per TS 4.3.B ML20097C0451996-02-0505 February 1996 Application for Amend to License DPR-28,consisting of Proposed Change 180 to Correct Typos & Text Inconsistencies BVY-94-123, Application for Amend to License DPR-28 to Change Instrument Identification for ECCS Actuation Instrumentation1994-12-14014 December 1994 Application for Amend to License DPR-28 to Change Instrument Identification for ECCS Actuation Instrumentation BVY-94-105, Proposed Change 177 to License DPR-28,replacing TS 3.7.B, Pages 152,153 & 154 Re Standby Gas Treatment Power Supply Requirements During Refueling Operations1994-12-0808 December 1994 Proposed Change 177 to License DPR-28,replacing TS 3.7.B, Pages 152,153 & 154 Re Standby Gas Treatment Power Supply Requirements During Refueling Operations 1999-09-21
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARBVY-99-134, TS Proposed Change 228 for License DPR-28,correcting Two Textual Errors & Changing Designation of Ref Figure1999-10-21021 October 1999 TS Proposed Change 228 for License DPR-28,correcting Two Textual Errors & Changing Designation of Ref Figure BVY-99-132, TS Proposed Change 227 to License DPR-28,revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-021999-10-18018 October 1999 TS Proposed Change 227 to License DPR-28,revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-02 BVY-99-119, TS Proposed Change 198 to License DPR-28,increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank1999-09-21021 September 1999 TS Proposed Change 198 to License DPR-28,increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank ML20212C2521999-09-17017 September 1999 Amend 175 to License DPR-28,revising TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System & Incorporate Certain Provisions of NRC Rule on Anticipated Transients BVY-99-106, TS Proposed Change 225 to License DPR-28,revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance1999-08-18018 August 1999 TS Proposed Change 225 to License DPR-28,revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance BVY-99-104, TS Proposed Change 223 to License DPR-28,revising Reactor Core Spiral Reloading Pattern to Begin Around Srm.Submittal Entirely Supersedes Proposed Change 211 to TS1999-08-18018 August 1999 TS Proposed Change 223 to License DPR-28,revising Reactor Core Spiral Reloading Pattern to Begin Around Srm.Submittal Entirely Supersedes Proposed Change 211 to TS BVY-99-105, Supplemental Application for Amend to License DPR-28, Correcting Typographical Error & Clarifying Certain Changes to Requirements for High Pressure Core Cooling Sys Contained in TS1999-08-17017 August 1999 Supplemental Application for Amend to License DPR-28, Correcting Typographical Error & Clarifying Certain Changes to Requirements for High Pressure Core Cooling Sys Contained in TS ML20210D3241999-07-20020 July 1999 TS Proposed Change 218 to License DPR-28,evaluating Increase in Allowable Core Flow from 100% to 107%.Listed Specific Change Proposed ML20210D2431999-07-20020 July 1999 Application for Amend to License DPR-28,revising & Clarifying Operability & SRs of High Pressure Core Cooling Systems ML20209G1631999-07-12012 July 1999 TS Proposed Change 221 for License DPR-28,revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 Values.Proprietary & non-proprietary GE Info Re SLMCPR Values,Encl.Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20196K2881999-06-29029 June 1999 Application for Amend to License DPR-28 to Incorporate Attached Proposed Change 220 Into Ts.Proposed Change Revises Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20196H2801999-06-24024 June 1999 TS Proposed Change 214 to License DPR-28,revising & Clarifying Terminology Re Certain RPS Scram Bypass Permissives ML20196F4011999-06-23023 June 1999 Application for Amend to License DPR-28 to Amend Previous Approvals Granted Under 10CFR20.302(a) for Disposal of Contaminated Septic Waste & Cooling Tower Silt to Allow for Disposal of Contaminated Soil ML20195J8491999-06-15015 June 1999 Application for Amend to License DPR-28,increasing Stis, Adding Allowable OOS Times,Replacing Generic ECCS Actions for Inoperable Instrument Channels with function-specific Actions & Relocating Selected Trip Functions from TS ML20195F9461999-06-0909 June 1999 Supplement to 990416 Proposed Change 213 for License DPR-28, Allowing Use of Amse Code Case N-560,in Lieu of Certain Provisions of GL 88-01 ML20195C8711999-05-26026 May 1999 TS Proposed Change 203 to License DPR-28,clarifying Suppression Chamber Water Temp SR 4.7.A, Primary Containment & Modifying Associated TS Bases ML20206H3621999-05-0606 May 1999 Application for Amend to License DPR-28,to Delete Specific Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20206J7121999-05-0505 May 1999 Application for Amend to License DPR-28,modifying TS to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to SLC Sys & Incorporate Certain Provisions of NRCs Rule on Anticipated Transients ML20205S9391999-04-20020 April 1999 TS Proposed Change 211 to License DPR-28,revising Reactor Spiral Reloading Pattern Beginning Around Source Range Monitor ML20205T4621999-04-19019 April 1999 Supplemental Application for Amend to License DPR-28 to Incorporate Certain Changes to Section 6 of Ts.Submittal Supplements 990201 Request for Amend & Revises Portions of Proposed Change 208 as listed.Marked-up TS Pages Encl ML20205S4031999-04-16016 April 1999 Application for Amend to License DPR-28,modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01 BVY-98-165, TS Proposed Change 210 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation.Change 209,withdrawn1998-12-11011 December 1998 TS Proposed Change 210 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation.Change 209,withdrawn BVY-98-119, LAR 206 to License DPR-58,correcting Error in TS 4.9.2 Re Calibr of Augmented Offgas Sys Hydrogen Monitors1998-12-10010 December 1998 LAR 206 to License DPR-58,correcting Error in TS 4.9.2 Re Calibr of Augmented Offgas Sys Hydrogen Monitors BVY-98-162, TS Proposed Change 209 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation1998-12-0707 December 1998 TS Proposed Change 209 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation BVY-98-118, Application for Amend to License DPR-28,consisting of TS Proposed Change 180,incorporating Number of Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application1998-11-0303 November 1998 Application for Amend to License DPR-28,consisting of TS Proposed Change 180,incorporating Number of Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application ML20155G4921998-11-0202 November 1998 TS Proposed Change 197 to License DPR-28,modifying Tech Specs to More Clearly Describe ECCS Actuation Instrumentation - LPCI Sys A/B RHR Pump Start Time Delay Requirements BVY-98-130, TS Proposed Change 207 to License DPR-28,increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel assemblies.Non-proprietary & Proprietary Rept Encl.Proprietary Rept Withheld (Ref 10CFR2.790(a)(4))1998-09-0404 September 1998 TS Proposed Change 207 to License DPR-28,increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel assemblies.Non-proprietary & Proprietary Rept Encl.Proprietary Rept Withheld (Ref 10CFR2.790(a)(4)) ML20236H4221998-06-30030 June 1998 Application for Amend to License DPR-28,modifying TS to Delete ECC Actuation Instrumentation/Core Spray Sys & LPCI Sys Auxiliary Power Monitor Calibr Requirement ML20247J8061998-05-0808 May 1998 TS Proposed Change 204 to License DPR-28,reducing Normal Operating Supression Pool Water Temp Limit & Adding Time Restriction for Higher Temp Allowed During Surveillances to Add Heat to Suppression Pool.Rept Re Pool Temp,Encl ML20217P3961998-05-0101 May 1998 Proposed Change 202 to License DPR-28,changing Several Editorial Changes to Administrative Control Section of TSs ML20217G6461998-04-23023 April 1998 Application for Amend to License DPR-28,revising Station SW & Alternate Cooling Sys Requirements ML20217C4491998-03-20020 March 1998 Proposed Change 201 to License DPR-28,modifying Util Licensing Basis by Limiting Time Large Purge & Vent May Be Open to 90 H Per Yr BVY-97-165, Application for Amend to License DPR-28,revising Current Value for SLMCPR for Cycle 20,next Operating Cycle. Proprietary Summary of Plant SLMCPR Evaluation for Cycle 20, Encl.Proprietary Info Withheld,Per Encl GE Affidavit1997-12-11011 December 1997 Application for Amend to License DPR-28,revising Current Value for SLMCPR for Cycle 20,next Operating Cycle. Proprietary Summary of Plant SLMCPR Evaluation for Cycle 20, Encl.Proprietary Info Withheld,Per Encl GE Affidavit BVY-97-155, Application for Amend to License DPR-28,proposing Mod to Revise Requirements for Main Station Batteries1997-11-20020 November 1997 Application for Amend to License DPR-28,proposing Mod to Revise Requirements for Main Station Batteries BVY-97-130, Application for Amend to License DPR-28,revising & Clarifying Requirements of Offsite Power Sources1997-10-10010 October 1997 Application for Amend to License DPR-28,revising & Clarifying Requirements of Offsite Power Sources BVY-97-106, Application for Amend to License DPR-28,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys1997-08-22022 August 1997 Application for Amend to License DPR-28,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys BVY-97-107, Application for Amend to License DPR-28,modifying TS to Update Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle- Specific Thermal Operating Limits in COLR1997-08-20020 August 1997 Application for Amend to License DPR-28,modifying TS to Update Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle- Specific Thermal Operating Limits in COLR ML20141H1101997-07-11011 July 1997 Application for Amend to License DPR-28,replacing Pp 147,156 Through 161,168 & 279 of Util TS W/Corrected Pages ML20148J1771997-06-0909 June 1997 Application for Amend to License DPR-28,changing TSs to Update Section 6.0 to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Validate or Generate cycle-specific Thermal Hydraulic Stability BVY-96-155, Application for Amend to License DPR-28,requesting Rev to TS to Relocate Fire Protection Requirements1996-12-10010 December 1996 Application for Amend to License DPR-28,requesting Rev to TS to Relocate Fire Protection Requirements BVY-96-120, Application for Amend to License DPR-28,revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.21996-10-11011 October 1996 Application for Amend to License DPR-28,revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.2 BVY-96-104, Application for Amend to License DPR-28,modifying Sections 2.2.B & 3.6.D.1 of Util TS & Accompanying Bases Section to Permit Operation W/Increased SRV & SV Setpoint Tolerance & to Permit Operation Up to 100% of Rated Power1996-09-11011 September 1996 Application for Amend to License DPR-28,modifying Sections 2.2.B & 3.6.D.1 of Util TS & Accompanying Bases Section to Permit Operation W/Increased SRV & SV Setpoint Tolerance & to Permit Operation Up to 100% of Rated Power ML20117C3901996-08-22022 August 1996 Application for Amend to License DPR-28,requesting Deletion of Existing Action Statement for High Range Stack Noble Gas Monitor & Replacing W/Different Action Statement ML20116J4371996-08-0909 August 1996 Application for Amend to License DPR-28,revising SLs for MCPR Based Upon Util Plant & Cycle Specific Analysis Performed by GE ML20113D8011996-06-28028 June 1996 Proposed Change 187 to License DPR-28,incorporating Std Language for Shutdown Margin Specifications to Allow Calculational Determination of Highest Wroth Control Rod,Per NUREG-1433 ML20107M7691996-04-26026 April 1996 Application for Amend to License DPR-28,deleting Definitions of Unrestricted Area, Restricted Area & Controlled Area ML20101P1261996-04-0404 April 1996 Proposed Change 184 to License DPR-28,revising TS Requirements for Secondary Containment Based on Guidance in NUREG-1433,Rev 1, STS for GE Plants,BWR/4 ML20101N1651996-04-0404 April 1996 Application for Amend to License DPR-28,consisting of Proposed Change 183,revising Existing Requirements for Control Rod & Drive Mechanism Coupling Verification,Per TS 4.3.B ML20097C0451996-02-0505 February 1996 Application for Amend to License DPR-28,consisting of Proposed Change 180 to Correct Typos & Text Inconsistencies BVY-94-123, Application for Amend to License DPR-28 to Change Instrument Identification for ECCS Actuation Instrumentation1994-12-14014 December 1994 Application for Amend to License DPR-28 to Change Instrument Identification for ECCS Actuation Instrumentation 1999-09-21
[Table view] |
Text
'
Proposed Change No. 85 E^E!/ 0 MSTFUncy j ) NNbi'UNT Y A N K ME NUCLEAR POWER COR PORATION
..,y .
,,, SEVENTY SEVEN GROVE STREET WVY-80-158 4 ~" 1 54 8.3.2.1 RUTI,AND. VElt>10NT 05701 R EPLY TO.
_ ENGINEERING OFFICE TURNPlK E RO AD WESTDORO. M ASS ACHUSCTTS 01381
' ' ' ' ' " " ' ' " ~ " ' " "
November 12, 1980 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Office of Nuclear Reactor Regulation Thomas A. Ippolito, Chief Operating Reactors Branch No. 2 Division of Licensing Re fere nc es : (a) License No. DP9-28 (Docket No. 50-271)
(b) USNRC Letter to YAEC, R. W. Reid to R. H. Groce dated November 17, 1976 (c) VYNPC Letter (WVY 79-9) to USNRC, D. E. Vandenburgh to R. W. Reid dated January 30, 1979; Proposed Change No. 77 (d) VYNPC Letter (WVY 79-51) to USNRC, R. H. Croce to T. A. Ippolito dated April 30, 1979
Subject:
Alternative Testing Requirements
Dear Sir:
Pursuant to Section 50 59 of the Commission's hules and Regulations, Vermont Yankee Nuclear Power Corporation hereby proposes the following modification to Appendix A of the Operating License.
PROPOSED CHANGE The existing Technical Specifications contain minimum requirements for systems which allow certain limiting conditions for operation to exist at any one time and, if the system is not restored to meet the requirements within the time period specified, the reactor is required to be put in some other mode.
Furthermore, the redundant subsystem that provides a cuplicate function is required to be tested to demonstrate operability immediately and periodically thereaf ter during power operation. This situation has been pointed out by NRC staff members to be contrary to the NRC guidelines contained in Reference (b).
Changes to Technical Specification pages 86, 87, 103, 104 and 144 to implement the NRC staff guidelines for excluding the exercising (cycling) of certain valves during plant operation as described in Reference (b) are provided as an Attachment to this letter. It should be noted that all the changes are not made to the existing Technical Specification pages, but rather the revised pages previously transmitted via Reference (c).
80111E)0Cf6'52-
7 United _ States' Nuclear Regulatory Commission November 12, 1980 Attention: Thomas.A. Ippolito,~ Chier- Page 2 i
BASIS AND REASON FOR CHANGE:
This change-was prompted by Reference (b) and by discussions with NRC staff
. personnel during the on-site working session held to review our proposed j Inservice Inspection Program [ Reference (d)]. The NRC guideline listed below
- provides' the basis - for the proposed changes.
- "Any valve which when exercised (cycled) could put the plant in an unsafe t- condition should not be tested. Below are some examples of the types of valves that should be specifically excluded from exercising (cycling)
[ tests during plant operation.
- l. All valves whose failure in a non-conservative position during the
- cycling test would cause a loss of system function should not be exercised. Valves in this category would typically include all non-redundant valves in lines such as a single discharge line from the refueling water' storage tank, or accumulator discharge lines in PWR's and the HPCI turbine-steam supply and the HPCI pump discharge I in BWR's. Other valves may fall into this category under certain system configurations or plant operating modes. For example, when a one train of a redundant system such as ECCS is inoperable, i
non-redundant valves in the remaining train should not be cycled since their failure would cause a loss of total system function."
1 I- The basis for each specific change is as follows:
l Section 4.5.A.2.- the requirement to test the operable Core Spray i Subsystem if the other is inoperable was deleted. Operability of
} the safety-related valves cannot be verified since stroking the i valves requires that they be repositioned into a nonconservative position.
9 l If.any of the valves should fail in thf, position, the remaining i C re Spray Subsystem would be inoperable since the flow would either be blocked or diverted from the reactor. Operability of the
, remaining Core Spray Pump cannot be verified since it requires that a single full flow test valve be opened. This valve lineup allows j the water to be reeirculated back to the torus. If this test valve i failed in the open position, the remaining Core Spray Subsystem
} would be inoperable since the water would be diverted away from the reactor.
i Section 4.5.A.4 - the requirement to test the operable LPCI Subsystem valves if-the other LPCI Subsystem is inoperable was deleted.
1 Operability of the safety-related valves cannot be verified since j - stroking the valve requires that they be repositioned into a nonconservation position. If any of the valves should fail in this position, . the remaining LPCI Subsystem would be inoperable since the
~
l flow path to the' reactor would be blocked.
i Bases 4.5. A. 4 5 0, 4 7. A - the reference ' to the test frequency was
- deleted -for consistency.
1
)
J
. . ,. , , ,e, 4 - - - - - _ - , - , , - . . , , ,--n-, ,.n . - . . . . , . , . . . . . - ~ - , , , -e a
j United States Nuclear Regulatory Commission November 12, 1980 Attention: Thomas A. Ippolito, Chier -Page 3 SAFETY CONSIDERATIONS:
The proposed changes to the Technical Specifications concerning Alternate Test 4 Requirements in the. event one subsystem is inoperable are consistent with the NRC Guidelines provided with Reference (b). These changes will insure that 4 testing of certain pumps and valves will not place the plant in an unsafe condition through a loss of system function in the event a valve failed in its unconservative -position.
A The changes to the Bases are made to maintain consistency.
l This change has been reviewed by the Vermont Yankee Nuclear Safety and Audit Review Committee.
FEE DETERMINATION:
This proposed change requires an approval that involves a single safety issue and is deemed not to involve a significant hazards consideration. Fce these
- - reasons, Vermont Yankee Nuclear Power Corporation proposes this change as a Class III Amendment. A payment of $4,000.00 is enclosed.
SCHEDULE '0F CHANGE:
The revised pages will be incorporated into the Technical Specifications as soon as oossible following receipt of NRC approval.
We trust this submittal is acceptable to you; however, shculd you have any questions, please contact us.
Very truly yours,-
VERMONT YANKEE NUCLEAR POWER CORPORATION NY I
L. H. Heider Vice President l COMMONWEALTH OF MASSACHUSETTS) l )ss COUNTY OF WORCESTER )
l Then personally appeared before me, L. H. Heider, who, being duly. sworn, did state that -he is a Vice President of Vermont Yankee Nuclear Power Corporation, that he- is duly authorized to execute and file the foregoing l request in the name and on the behalf of Vermont Yankee Nuclear Power Corporation, and that the statements therein are true to the best of his
knowledge and belief. .
I H.N M( /W
[*# .
h, .
Robert II. Gr'oce Notary Public My Commission Expires September 14, 1984 if@i %
,~: w
r -
,J 4Cll M [
l ~s 4dy .d
~........
-+ - , - - ,-e-e -- r -
w --- , - - , , . . -----,-e , - - ,