ML19209C418: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19209C421
| number = ML19209C421
| issue date = 10/11/1979
| issue date = 10/11/1979
| title = Forwards LER 79-081/03L-0
| title = LER 79-081/03L-0:on 790926,both Doors to Reactor Bldg Breezeway Airlock Could Be Opened Simultaneously.Caused by Loose Door Position Solenoids Preventing Interlock Feature from Working.Lock Washers Installed to Ensure Tightness
| author name = Tollison A
| author name = Tollison A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 06:17, 24 January 2020

Forwards LER 79-081/03L-0
Date released: 08/11/2019 Download: ML19209C418


LER 79-081/03L-0:on 790926,both Doors to Reactor Bldg Breezeway Airlock Could Be Opened Simultaneously.Caused by Loose Door Position Solenoids Preventing Interlock Feature from Working.Lock Washers Installed to Ensure Tightness
ML19209C421
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/11/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209C421 (1)
Forwards LER 79-081/03L-0
ML19209C417
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/11/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209C417 (1)