ML19209C418

From kanterella
Jump to navigation Jump to search
Forwards LER 79-081/03L-0
Date released: 08/11/2019 Download: ML19209C418


LER 79-081/03L-0:on 790926,both Doors to Reactor Bldg Breezeway Airlock Could Be Opened Simultaneously.Caused by Loose Door Position Solenoids Preventing Interlock Feature from Working.Lock Washers Installed to Ensure Tightness
ML19209C421
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/11/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209C421 (1)
Forwards LER 79-081/03L-0
ML19209C417
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/11/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209C417 (1)