ML19263E798: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19263E799
| number = ML19263E799
| issue date = 06/18/1979
| issue date = 06/18/1979
| title = Forwards LER 79-017/01T-2
| title = LER 79-017/01T-2 on 790330:util Notified by Westinghouse of Single Dropped Rod W/Potential for Calculated DNB Ratios Lower than Reported to NRC for Floating Nuclear Plants. Caused by Incorrect Measurement During Rod Drop Events
| author name = Hairston W
| author name = Hairston W
| author affiliation = ALABAMA POWER CO.
| author affiliation = ALABAMA POWER CO.

Latest revision as of 10:45, 23 January 2020

Forwards LER 79-017/01T-2
Date released: 10/04/2019 Download: ML19263E798


LER 79-017/01T-2 on 790330:util Notified by Westinghouse of Single Dropped Rod W/Potential for Calculated DNB Ratios Lower than Reported to NRC for Floating Nuclear Plants. Caused by Incorrect Measurement During Rod Drop Events
ML19263E799
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/18/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19263E799 (3)
Forwards LER 79-017/01T-2
ML19263E797
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/18/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19263E797 (1)