ML19274E683: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19274E685
| number = ML19274E685
| issue date = 04/05/1979
| issue date = 04/05/1979
| title = Forwards LER 79-026/03L-0
| title = LER 79-026/03L-0 on 790318:during Reactor Startup,Discovered Absolute Position Indication for Rod 8 Was Inoperable.Caused by Sticking Reed Switch.Variable Ac Frequency,Applied to Reed Switch Circuit,Eliminated Sticking
| author name = Cooper J
| author name = Cooper J
| author affiliation = FLORIDA POWER CORP.
| author affiliation = FLORIDA POWER CORP.

Latest revision as of 07:50, 23 January 2020

Forwards LER 79-026/03L-0
Date released: 10/15/2019 Download: ML19274E683


LER 79-026/03L-0 on 790318:during Reactor Startup,Discovered Absolute Position Indication for Rod 8 Was Inoperable.Caused by Sticking Reed Switch.Variable Ac Frequency,Applied to Reed Switch Circuit,Eliminated Sticking
ML19274E685
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/05/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274E685 (2)
Forwards LER 79-026/03L-0
ML19274E682
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/09/1979
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274E682 (1)