ML19350E224: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19350E227
| number = ML19350E227
| issue date = 06/11/1981
| issue date = 06/11/1981
| title = Forwards LER 80-055/03L-1
| title = LER 80-055/03L-1:on 801218,load Sequence Block 3 Trip Circuit Would Not Reset Following Actuation Test.Caused by Loose Connection in Relay 62-2/RC3 Mounting Block.Relay Reinstalled
| author name = Hernandez V
| author name = Hernandez V
| author affiliation = FLORIDA POWER CORP.
| author affiliation = FLORIDA POWER CORP.

Latest revision as of 16:26, 16 January 2020

Forwards LER 80-055/03L-1
Date released: 12/30/2019 Download: ML19350E224


LER 80-055/03L-1:on 801218,load Sequence Block 3 Trip Circuit Would Not Reset Following Actuation Test.Caused by Loose Connection in Relay 62-2/RC3 Mounting Block.Relay Reinstalled
ML19350E227
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/11/1981
From: Hernandez V
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19350E227 (2)
Forwards LER 80-055/03L-1
ML19350E223
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/11/1981
From: Baynard P
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19350E223 (1)