ML19350E224: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19350E227 | | number = ML19350E227 | ||
| issue date = 06/11/1981 | | issue date = 06/11/1981 | ||
| title = | | title = LER 80-055/03L-1:on 801218,load Sequence Block 3 Trip Circuit Would Not Reset Following Actuation Test.Caused by Loose Connection in Relay 62-2/RC3 Mounting Block.Relay Reinstalled | ||
| author name = Hernandez V | | author name = Hernandez V | ||
| author affiliation = FLORIDA POWER CORP. | | author affiliation = FLORIDA POWER CORP. |
Latest revision as of 16:26, 16 January 2020
Date released: 12/30/2019 | Download: ML19350E224 |
---|---|
ML19350E227 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 06/11/1981 |
From: | Hernandez V FLORIDA POWER CORP. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19350E227 (2) | |
ML19350E223 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 06/11/1981 |
From: | Baynard P FLORIDA POWER CORP. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19350E223 (1) | |