ML19263B555: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML19263B555
| number = ML19263B555
| issue date = 12/19/1978
| issue date = 12/19/1978
| title = Permittee'S Motion to Dismiss Petitioner to Intervene, Northern Thunder Contention on Technical Qualifications. Asserts Nothern Thunder'S Failure to Reply to Aslb 781117 Directive Is Cause for Dismissal.Certificate of Svc Encl
| title = Permittee'S Motion to Dismiss Petitioner to Intervene, Northern Thunder Contention on Technical Qualifications. Asserts Nothern Thunder'S Failure to Reply to ASLB 781117 Directive Is Cause for Dismissal.Certificate of Svc Encl
| author name = Silberg J
| author name = Silberg J
| author affiliation = SHAW, PITTMAN, POTTS & TROWBRIDGE
| author affiliation = SHAW, PITTMAN, POTTS & TROWBRIDGE

Revision as of 19:17, 29 November 2019

Permittee'S Motion to Dismiss Petitioner to Intervene, Northern Thunder Contention on Technical Qualifications. Asserts Nothern Thunder'S Failure to Reply to ASLB 781117 Directive Is Cause for Dismissal.Certificate of Svc Encl
ML19263B555
Person / Time
Site: 05000484
Issue date: 12/19/1978
From: Silberg J
SHAW, PITTMAN, POTTS & TROWBRIDGE
To:
References
NUDOCS 7901180386
Download: ML19263B555 (5)


Text

. . .

,

December 19, 1978 L:.. .

.

~'

'-

.:OQg ,

',C' --.

N

,

. .

f /i z ,e g UNITED STATES OF AMERICA 7 sf

.

.#

NUCLEAR REGULATORY COMMISSION Ig m

, ,

.,-

-

'k.-

-

- ', -

1

,c C' BEFORE THE ATOMI" SAFETY AND LICENSING x;BOARD '

.-

a

~/

-T 7fk

\ / j , , . f. '

In the Matter of )

)

NORTHERN STATES POWER COMPANY, ) Docket No. STN 50-484 ET AL. )

)

(Tyrone Energy Park, Unit 1) )

PERMITTEES' MOTION TO DISMISS NORTHERN THUNDER CONTENTIONS ON TECHNICAL QUALIFICATIONS Permittees move the Atomic Safety and Licensing Board to dismiss Northern Thunder's contentions on technical qualifica-tions (Contentions 3.A and 3.B). The grounds for this motion are as follows.

In its Memorandum and Order Concerning Northern Thunder's Contentions on Remanded Matters, dated July 28, 1978, the Board admitted three contentions proferred by Northern Thunder as issues in this proceeding. Two of the contentions, 3.A and 3.B, deair with the technical qualifications of Northern States Power Company (Wisconsin) to design and construct the Tyrone facility.

Pursuant to the schedule established by the Board, Permittees on August 25, 1978, submitted interrogatories to Northern Thunder.

Following receipt of Northern Thunder's responses, Permittees on October 3, 1978, filed a motion to compel on the grounds that several of Northern Thunder's responses, including those to 79011863 %

-

.

- .

. .

-2*

interrogatories 2a and b on the technical qualifications issue, were evasive and incomplete. Northern Thunder failed to respond to the motion.

In its Memorandum and Order Ruling on Motions to Compel Discovery, dated November 17, 1978, the Board stated that Northern Thunder's responses to interrogatories 2a and b raised the question "whether Northern Thunder seriously supports its technical qualifications contention or whether the Board erred in admitting the contention without a basis." To assist the Board in making this determination, Northern Thunder was ordered to answer interrogatories 2a and b within fourteen days of service of the order.

The time per.iod fixed by the Board has now elapsed.-1/

Northern Thunder has submitted no response to the Board's directive.

Northern Thunder has not even requested an extension of time in which to file a response.-2/ Based upon this failure to comply with the Board's order and Northern Thunder's initial responses 1/ The Memorandum and Order was served on November 18, 1978.

The fourteen day period expired on December 1,1978.

Allowing five days for mailing (10 CFR 52.710), Northern Thunder's answer should have been filed on December 6, 1978.

2/ Although the hearings before the Wisconsin Public Service Commission on the Tyrone facility are now in progress, these hearings did not start until December 11, 1978, five days after the due date for Northern Thunder's filing.

.

  • -

to interrogatories 2a and b, it should be clear that Northern Thunder's technical qualifications cententiens lack any basis and that Northern Thunder is unlikely to make any contribution to the record on this issue. There#cre, Contentions 3.A and 3.B should be dismissed.

Respectfully submitted, SHAW, PITTELN, POTTS & TROWBRIDGE R n

/ -

\

('

  • By \ 6% /W ' C_

Jay /Z . 11 berg . "]

~

CognselforPermittees 1800 M Street, North West Washington, D. C. 20036 (202)331-4100 Dated: December 19, 1978

.

. UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

NORTHERN STATES POWER COMPANY ) Docket No. STN 50-484 ET AL. )

)

(Tyrone Energy Park, Unit 1) )

CERTIFICATE OF SERVICE I hereby certify that a copy of the foregoing "Permittees' Motion to Dismiss Northern Thunder Contentions on Technical Qualifications", dated December 19, 1978, has been served upor.

each of the persons listed on the attached service list by deposit in the mail, postage prepaid, first class, this 19th day of December, 1978.

/%
  • R _.

Jay lE. Silberg ([,~/

Cohnsel V

for Permittees Dated: December 19, 1978

~

.

. . s a r. s = . - . . . -s u :,

. _ . . , ..

. .-u.r r-

. ,2' C f. r. i. o.. C.~; G 7 .s n. .'. V. Ci . ' . c. _T.)'. .

.

In the htter of ' )

)

. , ._,m n r. e J. 0-. i,. . ...r ,

a .. ,, ,_.-

. , . . ,. _ .....y,

_

. . . ~ . )

. , , , .

. x r. L . . ) w -:r ...e , .. - m.

..o . a t .. u, ,. ,, .s

'

)

(Tyrone Energy Park, Unit 1) )

SERVICE LIST rdchard S. Sairnn, Esc.uire, Chainan reter A. Pechek, Ear.uire

, , < c. .m....

e, . . . s.4 7. : '_,

, , ,

s,. ..a :

. ; . ..

g,q _. . 3- m

__.w a m. -

,- , ..y ; ,, .

A,._,... . . ;. .s

. r

. .... .g . w %.: .

n. . .e . ..,3...

.o -. wr.. .3 ,ms_, ;, r.c, . -. i_ .. . .iv.

. . -1 1'

-, . . s, .>. e.,r_

._ a. <.m,1

._

.:asc.i;gten, D.C. 0555 'adisen, .:W: nsin

-

5',702 L i iel C. T'.rrar, Es;uire

. . - . . .;y .n e .g_a . ,a .r.:. (-- . e. - . - . ,. ,., ,n_

,

. ,

,1- -c. .w.- a ._.A.._...,..., c. p. .. .._. .

n. . e . . . , t. ; .w.

. . . . _

._3-

, p.m . -- ;. c.c-.- .. - :. ~: i,s,  :~.

. . . . & ,. , , _,.

.

a. .*.

'Taskim ton, D.C.

-

20555 Turtle La'se, '. _scensin 54339 Dr. W. Revi Johnson Joceiv.n ruruane.lar Ols n, ism. ire Atcr.ic Safaty r.d Licansinv Au.eal 3 card .

S,recial Assistant Attcrney C-anaral U.S. :.uclear F2?alatory Ccclssion  :.'innesota Polluticn Ccatrol Agency

.

ashincten, D.'. 20555 1935 W. Cc'mtry 3 cad B2

?cseville, :*lnnesota 55113 Ivan W. S-ith, Esquire, Chairan Atcnic Safety and Licansing Ecard Richard Ihrig, Esquire U.S. :.tclear Regulatcry Cc rission 400 E< change Euilding Washington, D.C. 20003 +th and Canter Wincna, :.'enesota 55987 Dr. Gecrge C. Anderson Oceancgraphy Depart.nnt, ;.B-10  :'.ichael J. Cain, Escuire Universi'f cf Washincton Sureau of Ia:al Services -

Seattle. cicshington 93195 C apart ant of ::atural Rescurces Icx 7921

4r. I,2 ster Fc =blith, Jr.  :.'adison, Wiscensin 53707 Ata-ic Sa'ety r.d Licensing Scard U.S. ::uclear Re.:ulatorv. Cenmissicn Steven M. Schur< E.m.uire Washingtcn, D.C. 20555 Chief Ccunsel

??blic Scr; ice Ccardssion of Wismsin Stephen H. Lewis, Esqaire Hill Fac's State Office Euildinw Cffice of the Decutive Ieaal Director 4302 Shche'.gan Avenue U.S. ::uclear Regulatory Ccmrissicn  :'adiscn, h consin 53702 Washington, D.C. 20555

4r. Stanley Cider Cccketing and Ser/ ice Secticn c/o Durand Tc3 raster Of fice of the Secretarv .

T.crcne,~ a nsin 54736

.. S. .'uc' :ir F---gulaterf Cc nissica

_

.. m ing: ,, D.C a555

'D**Dge <

l'D'T J M

'

$

.m