Regulatory Guide 5.49: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
{{#Wiki_filter:U.S. NUCLEAR REGULATORY  
{{#Wiki_filter:U.S. NUCLEAR REGULATORY COMMISSION                                                                                                               March 1975 REGULATORY GUIDE
COMMISSION  
OFFICE OF STANDARDS DEVELOPMENT
REGULATORY  
                                                                REGULATORY GUIDE 5.49 INTERNAL TRANSFERS OF SPECIAL NUCLEAR MATERIAL
GUIDE OFFICE OF STANDARDS  
DEVELOPMENT  
REGULATORY  
GUIDE 5.49 INTERNAL TRANSFERS  
OF SPECIAL NUCLEAR MATERIAL  


==A. INTRODUCTION==
==A. INTRODUCTION==
Paragraph
70.51(e) of 10 CFR Part 70 requires, with certain exceptions stated in the rule, that each licensee authorized to possess more than one effective kilogram of special nuclear material (SNM) maintain certain procedures.
These procedures are to include: (I) Records of the quantities of SNM added to or removed from the process; (2) Documentation of all transfers of SNM between material-balance areas to show the identity and quantity of SNM transferred;
(3) Requirements for authorized signatures on each document used to record the transfer of SNM between material-balance areas; and (4) Means for control of and accounting for internal transfer documents.
Paragraph
70.58(e) requires licensees to establish, maintain, and follow a system for measuring the SNM transferred between material-balance areas and item control area
====s. Paragraph ====
70.58(f) requires that licensees have a program that evaluates and controls the quality of their measurement system.  Additionally, all licensees authorized to possess SNM must comply with paragraph
70.51(b) of 10 CFR Part 70. That rule requires licensees to keep records showing, among other things, the inventory of all SNM in their possession and its location.
This guide sets forth acceptable methods for con trolling and documenting transfers of SNM within a plant site in order to meet the requirements listed above.


==B. DISCUSSION==
==B. DISCUSSION==
To help determine when and where losses of SNM have occurred within a plant, each licensee subject to the requirements of paragraph  
Paragraph 70.51(e) of 10 CFR Part 70 requires,                                    To help determine when and where losses of SNM
70.58(d) of 10 CFR Part 70 should divide the plant into a number of areas and account for the SNM in each of these areas separately.
with certain exceptions stated in the rule, that each                              have occurred within a plant, each licensee subject to the licensee authorized to possess more than one effective                              requirements of paragraph 70.58(d) of 10 CFR Part 70
kilogram of special nuclear material (SNM) maintain                                should divide the plant into a number of areas and certain procedures. These procedures are to include:                                account for the SNM in each of these areas separately.


The number of areas should be sufficient to localize nuclear material losses or thefts and identify the mechanisms.
The number of areas should be sufficient to localize (I) Records of the quantities of SNM added to or                            nuclear material losses or thefts and identify the removed from the process;                                                          mechanisms.


In the past, all of these accounting areas have been called "material-balance areas." More precise terminol ogy now in use distinguishes between material-balan ce areas (MBAs) and item-control areas (ICAs).* The newet usage will be followed in this guide. Under this usage.  MBAs and ICAs are contrasted on the basis of how SNM is accounted for within the area.  SNM can enter and leave an ICA only as a number of discrete, unique items. It is also accounted for as discrete items, with account books containing records of the amount of SNM in each of these items. The presence of all material in an ICA is assured by showing the presence of each item. No change takes place in the form or amount of SNM in any item in an ICA.  MBAs, in contrast, generally are process areas in which -some physical or chemical change is made in the SNM. Material in MBAs thus should be accounted for on the basis of measured amounts of input, output, and inventory.
(2) Documentation of all transfers of SNM between                                  In the past, all of these accounting areas have been material-balance areas to show the identity and quantity                            called "material-balance areas." More precise terminol of SNM transferred;                                                                  ogy now in use distinguishes between material-balan ce areas (MBAs) and item-control areas (ICAs).* The newet
        (3) Requirements for authorized signatures on each                          usage will be followed in this guide. Under this usage.


Loss of material from an MBA can be assured only by balancing these quantities.
document used to record the transfer of SNM between                                  MBAs and ICAs are contrasted on the basis of how SNM
material-balance areas; and                                                          is accounted for within the area.


However, since no measurement can be free from error, errors will be included in the material balance. Hence each material balance in an MBA results in some positive or negative *See Regulatory Guide 5.26, "Selection of Material Balance Areas and Item Control Areas." USNRC REGULATORY
(4) Means for control of and accounting for                                        SNM can enter and leave an ICA only as a number internal transfer documents.                                                        of discrete, unique items. It is also accounted for as discrete items, with account books containing records of Paragraph 70.58(e) requires licensees to establish,                         the amount of SNM in each of these items. The presence maintain, and follow a system for measuring the SNM                                of all material in an ICA is assured by showing the transferred between material-balance areas and item                                presence of each item. No change takes place in the form control areas.                                                                      or amount of SNM in any item in an ICA.
GUIDES Comments should be sent to the Secretary of the Commission.


U S Nuclear Regulatory Guides are issued to describe and make available to the public Reulatorv Commission, Washington.
Paragraph 70.58(f) requires that licensees have a                                  MBAs, in contrast, generally are process areas in program that evaluates and controls the quality of their                            which -some physical or chemical change is made in the measurement system.                                                                  SNM. Material in MBAs thus should be accounted for on the basis of measured amounts of input, output, and Additionally, all licensees authorized to possess                            inventory. Loss of material from an MBA can be assured SNM must comply with paragraph 70.51(b) of 10 CFR                                    only by balancing these quantities. However, since no Part 70. That rule requires licensees to keep records                                measurement can be free from error, errors will be showing, among other things, the inventory of all SNM                                included in the material balance. Hence each material in their possession and its location.                                                balance in an MBA results in some positive or negative This guide sets forth acceptable methods for con trolling and documenting transfers of SNM within a                                        *See Regulatory Guide 5.26, "Selection of Material Balance Areas and Item Control Areas."
plant site in order to meet the requirements listed above.


DC 2066. Attention Docketing and methods acceptable to the NRC staff of implementing specific parts of the Commission s regulations, to delineate techniques used by the staff in evalu The guides are issued in the following ten broad divisions sting specific problems or postulated accidents.
USNRC REGULATORY GUIDES                                      Comments should be sent to the Secretary of the Commission. U S        Nuclear Reulatorv  Commission,    Washington. DC     2066. Attention Docketing and Regulatory Guides are issued to describe and make available to the public methods acceptable to the NRC staff of implementing specific parts of the Commission s regulations, to delineate techniques used by the staff in evalu       The guides are issued in the following ten broad divisions sting specific problems or postulated accidents. or to provide guidance to appli cants Regulatory Guides ;ire not substitutes lot regulations. and compliance        1  Power Reactors                      6 Products with them is not required Methods and solutions different from those set out in    2  Research and Test Reactors          7 Transportation the guides will be acceptable if they provide a basis for the findings requisite to 3  Fuels and Materials Facilities      8 Occupational Health the issuance or continuance of a permit or license by the Commission                4  Environmental and Siting            9 Antitrust Review Comments and suggestrons lot improvements in these guides are encouraged            5  Materials and Plant Protection    10  General at all times and guides will he revised. as appropriate, to accommodate com ments and to reflect new information or experience However. comments on            Copies of published guides may be obtained by written request indicating the thi5 guide. if received within about two months auter its issuance. will be par    divisions desired to the U S Nuclear Regulatory Commissio


or to provide guidance to appli cants Regulatory Guides ;ire not substitutes lot regulations.
====n. Washington D C====
ticularly usilul in evaluating the need for an early revision                      20666. Attention Director, Office of Standards Development


and compliance
amount of material unaccounted for (MUF)-solely as a         who maintain surveillance between material access areas.
1 Power Reactors 6 Products with them is not required Methods and solutions different from those set out in 2 Research and Test Reactors 7 Transportation the guides will be acceptable if they provide a basis for the findings requisite to 3 Fuels and Materials Facilities
8 Occupational Health the issuance or continuance of a permit or license by the Commission
4 Environmental and Siting 9 Antitrust Review Comments and suggestrons lot improvements in these guides are encouraged
5 Materials and Plant Protection
10 General at all times and guides will he revised. as appropriate, to accommodate com ments and to reflect new information or experience However. comments on Copies of published guides may be obtained by written request indicating the thi5 guide. if received within about two months auter its issuance.


will be par divisions desired to the U S Nuclear Regulatory Commission.
result of errors made in measuring. In an ICA, on the        At least one armed guard should escort such transfers other hand, MUF cannot be ascribed to errors in              that are wholly on land under the control of the measurement: it can result only from a misplacement,          licensee. Two or more armed guards should accompany loss, or theft of one or more discrete items of SNM.          any such transfer that crosses a public road or other land not under control of the licensee.


Washington D C ticularly usilul in evaluating the need for an early revision 20666. Attention Director, Office of Standards Development March 1975 amount of material unaccounted for (MUF)-solely as a result of errors made in measuring.
Licensees control and account for their holdings of SNM, in part, by setting tIp procedures to monitor the           2. Internal material transfer tickets. The guidelines movement of SNM from one MBA or ICA to another.              under this heading pertain to the tickets that atc used The movements are documented by means of internal            for documenting transfers of SNM within a facility.


In an ICA, on the other hand, MUF cannot be ascribed to errors in measurement:  
material transfer tickets (MTs). These tickets (a) provide needed data to the nuclear material accounting office,               a. Each MT should show all of the following (b) provide a record of each internal transfer of SNM,       information:
it can result only from a misplacement, loss, or theft of one or more discrete items of SNM. Licensees control and account for their holdings of SNM, in part, by setting tIp procedures to monitor the movement of SNM from one MBA or ICA to another.
and (c) meet the signature requirements of paragraph
70.51 (e).                                                             (1) Date of transfer:
      MTs in most cases are paper forms with multiple                  (2) Identity of MBAs or ICAs from and to copies. However, they may also consist of a single            which transfer is made;
original, which contains the authorized signatures.


The movements are documented by means of internal material transfer tickets (MTs). These tickets (a) provide needed data to the nuclear material accounting office, (b) provide a record of each internal transfer of SNM, and (c) meet the signature requirements of paragraph
Copies are then made on an office copying machine or                    (3) Identity. amount, enrichment          (where are produced as computer output. Descriptions in this        applicable), and form of the SNM transferred;
70.51 (e). MTs in most cases are paper forms with multiple copies. However, they may also consist of a single original, which contains the authorized signatures.
guide arc limited to MTs of these two kinds (multiple
                                                                        (4) Sample number and/or analytical request copy and single original). Guidance will be provided later to cover the use of precoded computer cards or punched        form number:
tape as MTs by those facilities that are planning on using computerized real-time material-accounting systems.                     (5) Applicable data on


Copies are then made on an office copying machine or are produced as computer output. Descriptions in this guide arc limited to MTs of these two kinds (multiple copy and single original).
==C. REGULATORY POSITION==
Guidance will be provided later to cover the use of precoded computer cards or punched tape as MTs by those facilities that are planning on using computerized real-time material-accounting systems.
(a) Identity of uniquely identifiable items, i. Control of internal transfers of special nuclear                    (b) Ilentity of tamper-safing devices.


C. REGULATORY
material. The guidelines under this heading pertain to procedures for controlling the transfer of special nuclear                 (c) Lot number(s),
POSITION i. Control of internal transfers of special nuclear material.
material (SNM) within a facility.


The guidelines under this heading pertain to procedures for controlling the transfer of special nuclear material (SNM) within a facility.
(d) Batch number(s),
        a. The custodian of a receiving material-balance area (MBA) or item-control area (ICA) should not accept                    (e) Job number(s),
custody of SNM unless a properly completed internal material transfer ticket (MT) has been received before or                  (f) Contract number(s), and at the same time as the SNM.


a. The custodian of a receiving material-balance area (MBA) or item-control area (ICA) should not accept custody of SNM unless a properly completed internal material transfer ticket (MT) has been received before or at the same time as the SNM.  b. SNM may not be transferred into or out of an ICA unless the SNM consists only of identifiable items that are sealed sources or tamper-safed.
(g) For scrap, the appropriate classification:
        b. SNM may not be transferred into or out of an ICA unless the SNM consists only of identifiable items that are sealed sources or tamper-safed.                                (6) Signatures of the participating MBA/ICA
                                                                custodians or their designated agents.


c. For any transfer outside of a material access area that involves moving plutonium, uranium 233, or uranium enriched to 20 percent or more in the isotope U-235 in the amounts listed in paragraph  
c. For any transfer outside of a material access area that involves moving plutonium, uranium 233, or uranium enriched to 20 percent or more in the isotope               b. When possible, SNM should not be transferred U-235 in the amounts listed in paragraph 73.1(b) of 10       until analytical results have been obtained. If a transfer CFR Part 73,* the SNM should be under the continual           must be made before chemical or isotopic analysis is surveillance of two persons. Where feasible, one of these     complete, the MT should show amounts of SNM based persons should be from the originating MBA or ICA and         on nominal values or best available data. The MT should the other from the receiving MBA or ICA.                     also show the identifying number on the analytica;
73.1(b) of 10 CFR Part 73,* the SNM should be under the continual surveillance of two persons. Where feasible, one of these persons should be from the originating MBA or ICA and the other from the receiving MBA or ICA. d. For any transfer outside of a protected area that involves the amounts and kinds of SNM cited in paragraph c above, the SNM should be escorted by one or more armed guards in addition to the two persons *Material described in §73.6 of 10 CFR Part 73 is excepted.who maintain surveillance between material access areas.  At least one armed guard should escort such transfers that are wholly on land under the control of the licensee.
                                                              request form so that the nuclear material accounting d. For any transfer outside of a protected area       department can later adjust the records to the actual that involves the amounts and kinds of SNM cited in           amount transferred.


Two or more armed guards should accompany any such transfer that crosses a public road or other land not under control of the licensee.
paragraph c above, the SNM should be escorted by one or more armed guards in addition to the two persons c. The MT should contain enough information to enable the recorded measurement and tamper-safing data L1
    *Material described in §73.6  of 10  CFR Part 73 is excepted.                                                      associated with the transfer to be confirmed.


2. Internal material transfer tickets. The guidelines under this heading pertain to the tickets that atc used for documenting transfers of SNM within a facility.
5.49-2


a. Each MT should show all of the following information:  
d. Entries on MTs should not be erased or                            (1) Be made in accordance with a measurement obliterated. Alterations, as by lining through, should be        program that is controlled to conform with proposed initialed. No entry should be made by pencil.                    §70.57 of 10 CFR Part 70:
(1) Date of transfer:
        e. MTs should be prenumbered in sequence, and                        (2) Be validated by intact tamper-safing until all copies should bear the same number as the original.          the material has been accepted by the custodian of the All forms should be accounted for. The nuclear material          receiving MBA/ICA or his designated agent: and accounting department should maintain and control (assign and account for) the supply of MT forms and                          (3) Have the tamper-safing applied as a part of should record the disposition of all forms in a log book.        the sampling procedure* (if the SNM is assayed hy The supply of forms and the log book should be kept in            traditional methods based on chemical analysis) or prior a locked area when unattended.                                    to measurement (if the SNM is assayed by nondestruc tive analysis).
(2) Identity of MBAs or ICAs from and to which transfer is made; (3) Identity.
        f. The nuclear material accounting department should review each MT for completeness. Copies of                        c. When SNM is transferred via pipeline from one completed MTs should be distributed to all affected              MBA to another, the SNM should be measured in the persons or departments, including at least the custodians        receiving MBA prior to any physical or chemical change of the originating and receiving MBAs or ICAs.                    in the material.


amount, enrichment (where applicable), and form of the SNM transferred;
g. The completed original of the MT should be                    d. For any transfer of identifiable items of en retained for at least five years. As a rule, the original        capsulated SNM, the recorded amount of SNM trans should be retained by the nuclear material accounting            ferred should be that measured at the time of encapsula department. However, if the form also is used for                tion.
(4) Sample number and/or analytical request form number: (5) Applicable data on (a) Identity of uniquely identifiable items, (b) Ilentity of tamper-safing devices. (c) Lot number(s), (d) Batch number(s), (e) Job number(s), (f) Contract number(s), and (g) For scrap, the appropriate classification:
(6) Signatures of the participating MBA/ICA custodians or their designated agents. b. When possible, SNM should not be transferred until analytical results have been obtained.


If a transfer must be made before chemical or isotopic analysis is complete, the MT should show amounts of SNM based on nominal values or best available data. The MT should also show the identifying number on the analytica;
production purposes, the production department may retain the original.                                                      e. The custodian of the originating MBA should measure all tare and gross weights. The custodian of the I h. Damaged or misused MTs should be marked                  receiving MBA should measure all gross weights and
request form so that the nuclear material accounting department can later adjust the records to the actual amount transferred.
"VOID." All voided copies should be forwarded to the               confirm the absence of arithmetic errors. He may also nuclear material accounting department for logging.                confirm the tare weights as a check on the originating MBA. A duly designated agent may act for a custodian i. MTs may have uses other than those that are            in the actions named in this paragraph.


c. The MT should contain enough information to enable the recorded measurement and tamper-safing data associated with the transfer to be confirmed.
the subject of this guide. Their use in production control has been suggested above. They also may be used to                         f. If the gross weight measured at the receiving record and report such SNM accounting data as bumup,              MBA differs from that reported on the MT by the material unaccounted for (MUF), or measured discards              custodian of the originating MBA by a statistically of waste.                                                          significant amount, the SNM should be left in the transfer container until the difference has been resolved.


5.49-2 L1 d. Entries on MTs should not be erased or obliterated.
The value agreed upon must be acceptable to both of the
    3. Measurement of transferred material. The guide            MBA custodians involved and to the nuclear material lines under this heading pertain to the measurements              accounting department.


Alterations, as by lining through, should be initialed.
associated with SNM transferred within a facility.


No entry should be made by pencil. e. MTs should be prenumbered in sequence, and all copies should bear the same number as the original.
a. The following SNM may be transferred out of                               


All forms should be accounted for. The nuclear material accounting department should maintain and control (assign and account for) the supply of MT forms and should record the disposition of all forms in a log book.  The supply of forms and the log book should be kept in a locked area when unattended.
==D. IMPLEMENTATION==
 
and into MBAs or ICAs without measuring the contained SNM:                                                                    The purpose of this section is to provide informa tion to applicants and licensees regarding the NRC staff's
f. The nuclear material accounting department should review each MT for completeness.
          (1) Samples that have been determined by                plans for utilizing this regulatory guide.
 
Copies of completed MTs should be distributed to all affected persons or departments, including at least the custodians of the originating and receiving MBAs or ICAs.  g. The completed original of the MT should be retained for at least five years. As a rule, the original should be retained by the nuclear material accounting department.


However, if the form also is used for production purposes, the production department may retain the original.
other means to contain less than ten grams of pluto nium, uranium 233, or uranium 235;                                      Except in those cases in which the applicant proposes an alternate method for complying with
          (2) Reactor-irradiated fuels involved in re            specified portions of the Commission's regulations, the search, development, and evaluation programs in facil            method described herein will be used in the evaluation ities other than irradiated-fuel reprocessing plants; and        of submittals in connection with special nuclear material license, operating license, or construction permit applica
          (3) Sealed plutonium-beryllium sources.                tions docketed after October 1, 1975.


I h. Damaged or misused MTs should be marked "VOID." All voided copies should be forwarded to the nuclear material accounting department for logging.
b. Except for the items listed in paragraph 3.a., all          *See Regulatory Guides 5.10, "Selection and Use of SNM should be transferred out of and into MBAs or                  Pressure-Sensitive Seals on Containers for Onsite Storage of ICAs on the basis of acceptable accountability measure            Special Nuclear Material," and 5.15, "Security Seals for the ments. To be acceptable, the measurements should:                  Protection and Control of Special Nuclear Material."
                                                            5.49-3


i. MTs may have uses other than those that are the subject of this guide. Their use in production control has been suggested above. They also may be used to record and report such SNM accounting data as bumup, material unaccounted for (MUF), or measured discards of waste.  3. Measurement of transferred material.
If an applicant whose application for a special          to use this regulatory guide in developing submittals for nuclear material or an operating license or construction     applications, the pertinent portions of the application permit is docketed on or before October 1, 1975, wishes       will be evaluated on the basis of this guide.
 
The guide lines under this heading pertain to the measurements associated with SNM transferred within a facility.
 
a. The following SNM may be transferred out of and into MBAs or ICAs without measuring the contained SNM: (1) Samples that have been determined by other means to contain less than ten grams of pluto nium, uranium 233, or uranium 235; (2) Reactor-irradiated fuels involved in re search, development, and evaluation programs in facil ities other than irradiated-fuel reprocessing plants; and (3) Sealed plutonium-beryllium sources.
 
b. Except for the items listed in paragraph
3.a., all SNM should be transferred out of and into MBAs or ICAs on the basis of acceptable accountability measure ments. To be acceptable, the measurements should: (1) Be made in accordance with a measurement program that is controlled to conform with proposed §70.57 of 10 CFR Part 70: (2) Be validated by intact tamper-safing until the material has been accepted by the custodian of the receiving MBA/ICA or his designated agent: and (3) Have the tamper-safing applied as a part of the sampling procedure* (if the SNM is assayed hy traditional methods based on chemical analysis)
or prior to measurement (if the SNM is assayed by nondestruc tive analysis). 
c. When SNM is transferred via pipeline from one MBA to another, the SNM should be measured in the receiving MBA prior to any physical or chemical change in the material.
 
d. For any transfer of identifiable items of en capsulated SNM, the recorded amount of SNM trans ferred should be that measured at the time of encapsula tion.  e. The custodian of the originating MBA should measure all tare and gross weights. The custodian of the receiving MBA should measure all gross weights and confirm the absence of arithmetic errors. He may also confirm the tare weights as a check on the originating MBA. A duly designated agent may act for a custodian in the actions named in this paragraph.
 
f. If the gross weight measured at the receiving MBA differs from that reported on the MT by the custodian of the originating MBA by a statistically significant amount, the SNM should be left in the transfer container until the difference has been resolved.
 
The value agreed upon must be acceptable to both of the MBA custodians involved and to the nuclear material accounting department.
 
==D. IMPLEMENTATION==
The purpose of this section is to provide informa tion to applicants and licensees regarding the NRC staff's plans for utilizing this regulatory guide.  Except in those cases in which the applicant proposes an alternate method for complying with specified portions of the Commission's regulations, the method described herein will be used in the evaluation of submittals in connection with special nuclear material license, operating license, or construction permit applica tions docketed after October 1, 1975.  *See Regulatory Guides 5.10, "Selection and Use of Pressure-Sensitive Seals on Containers for Onsite Storage of Special Nuclear Material," and 5.15, "Security Seals for the Protection and Control of Special Nuclear Material." 5.49-3 If an applicant whose application for a special nuclear material or an operating license or construction permit is docketed on or before October 1, 1975, wishes UNITED STATES NUCLEAR REGULATORY
COMMISSION
WASHINGTON.


D. C. 20556 OFFICIAL MUSINESS PENALTY FOR PRIVATE USE. $300 to use this regulatory guide in developing submittals for applications, the pertinent portions of the application will be evaluated on the basis of this guide.  POSTAGE AND FEES PAID UNITED STATES NUCLEAR REGULATORY
UNITED STATES
COMMISSION
NUCLEAR REGULATORY COMMISSION
5.49-4}}
    WASHINGTON. D. C. 20556 POSTAGE AND FEES PAID
                                                                                UNITED STATES NUCLEAR
          OFFICIAL MUSINESS                                                   REGULATORY COMMISSION
  PENALTY FOR PRIVATE USE. $300
                                                        5.49-4}}


{{RG-Nav}}
{{RG-Nav}}

Latest revision as of 06:34, 24 November 2019

Internal Transfers of Special Nuclear Material
ML003739222
Person / Time
Issue date: 03/31/1975
From:
Office of Nuclear Regulatory Research
To:
References
RG-5.49
Download: ML003739222 (4)


U.S. NUCLEAR REGULATORY COMMISSION March 1975 REGULATORY GUIDE

OFFICE OF STANDARDS DEVELOPMENT

REGULATORY GUIDE 5.49 INTERNAL TRANSFERS OF SPECIAL NUCLEAR MATERIAL

A. INTRODUCTION

B. DISCUSSION

Paragraph 70.51(e) of 10 CFR Part 70 requires, To help determine when and where losses of SNM

with certain exceptions stated in the rule, that each have occurred within a plant, each licensee subject to the licensee authorized to possess more than one effective requirements of paragraph 70.58(d) of 10 CFR Part 70

kilogram of special nuclear material (SNM) maintain should divide the plant into a number of areas and certain procedures. These procedures are to include: account for the SNM in each of these areas separately.

The number of areas should be sufficient to localize (I) Records of the quantities of SNM added to or nuclear material losses or thefts and identify the removed from the process; mechanisms.

(2) Documentation of all transfers of SNM between In the past, all of these accounting areas have been material-balance areas to show the identity and quantity called "material-balance areas." More precise terminol of SNM transferred; ogy now in use distinguishes between material-balan ce areas (MBAs) and item-control areas (ICAs).* The newet

(3) Requirements for authorized signatures on each usage will be followed in this guide. Under this usage.

document used to record the transfer of SNM between MBAs and ICAs are contrasted on the basis of how SNM

material-balance areas; and is accounted for within the area.

(4) Means for control of and accounting for SNM can enter and leave an ICA only as a number internal transfer documents. of discrete, unique items. It is also accounted for as discrete items, with account books containing records of Paragraph 70.58(e) requires licensees to establish, the amount of SNM in each of these items. The presence maintain, and follow a system for measuring the SNM of all material in an ICA is assured by showing the transferred between material-balance areas and item presence of each item. No change takes place in the form control areas. or amount of SNM in any item in an ICA.

Paragraph 70.58(f) requires that licensees have a MBAs, in contrast, generally are process areas in program that evaluates and controls the quality of their which -some physical or chemical change is made in the measurement system. SNM. Material in MBAs thus should be accounted for on the basis of measured amounts of input, output, and Additionally, all licensees authorized to possess inventory. Loss of material from an MBA can be assured SNM must comply with paragraph 70.51(b) of 10 CFR only by balancing these quantities. However, since no Part 70. That rule requires licensees to keep records measurement can be free from error, errors will be showing, among other things, the inventory of all SNM included in the material balance. Hence each material in their possession and its location. balance in an MBA results in some positive or negative This guide sets forth acceptable methods for con trolling and documenting transfers of SNM within a *See Regulatory Guide 5.26, "Selection of Material Balance Areas and Item Control Areas."

plant site in order to meet the requirements listed above.

USNRC REGULATORY GUIDES Comments should be sent to the Secretary of the Commission. U S Nuclear Reulatorv Commission, Washington. DC 2066. Attention Docketing and Regulatory Guides are issued to describe and make available to the public methods acceptable to the NRC staff of implementing specific parts of the Commission s regulations, to delineate techniques used by the staff in evalu The guides are issued in the following ten broad divisions sting specific problems or postulated accidents. or to provide guidance to appli cants Regulatory Guides ;ire not substitutes lot regulations. and compliance 1 Power Reactors 6 Products with them is not required Methods and solutions different from those set out in 2 Research and Test Reactors 7 Transportation the guides will be acceptable if they provide a basis for the findings requisite to 3 Fuels and Materials Facilities 8 Occupational Health the issuance or continuance of a permit or license by the Commission 4 Environmental and Siting 9 Antitrust Review Comments and suggestrons lot improvements in these guides are encouraged 5 Materials and Plant Protection 10 General at all times and guides will he revised. as appropriate, to accommodate com ments and to reflect new information or experience However. comments on Copies of published guides may be obtained by written request indicating the thi5 guide. if received within about two months auter its issuance. will be par divisions desired to the U S Nuclear Regulatory Commissio

n. Washington D C

ticularly usilul in evaluating the need for an early revision 20666. Attention Director, Office of Standards Development

amount of material unaccounted for (MUF)-solely as a who maintain surveillance between material access areas.

result of errors made in measuring. In an ICA, on the At least one armed guard should escort such transfers other hand, MUF cannot be ascribed to errors in that are wholly on land under the control of the measurement: it can result only from a misplacement, licensee. Two or more armed guards should accompany loss, or theft of one or more discrete items of SNM. any such transfer that crosses a public road or other land not under control of the licensee.

Licensees control and account for their holdings of SNM, in part, by setting tIp procedures to monitor the 2. Internal material transfer tickets. The guidelines movement of SNM from one MBA or ICA to another. under this heading pertain to the tickets that atc used The movements are documented by means of internal for documenting transfers of SNM within a facility.

material transfer tickets (MTs). These tickets (a) provide needed data to the nuclear material accounting office, a. Each MT should show all of the following (b) provide a record of each internal transfer of SNM, information:

and (c) meet the signature requirements of paragraph

70.51 (e). (1) Date of transfer:

MTs in most cases are paper forms with multiple (2) Identity of MBAs or ICAs from and to copies. However, they may also consist of a single which transfer is made;

original, which contains the authorized signatures.

Copies are then made on an office copying machine or (3) Identity. amount, enrichment (where are produced as computer output. Descriptions in this applicable), and form of the SNM transferred;

guide arc limited to MTs of these two kinds (multiple

(4) Sample number and/or analytical request copy and single original). Guidance will be provided later to cover the use of precoded computer cards or punched form number:

tape as MTs by those facilities that are planning on using computerized real-time material-accounting systems. (5) Applicable data on

C. REGULATORY POSITION

(a) Identity of uniquely identifiable items, i. Control of internal transfers of special nuclear (b) Ilentity of tamper-safing devices.

material. The guidelines under this heading pertain to procedures for controlling the transfer of special nuclear (c) Lot number(s),

material (SNM) within a facility.

(d) Batch number(s),

a. The custodian of a receiving material-balance area (MBA) or item-control area (ICA) should not accept (e) Job number(s),

custody of SNM unless a properly completed internal material transfer ticket (MT) has been received before or (f) Contract number(s), and at the same time as the SNM.

(g) For scrap, the appropriate classification:

b. SNM may not be transferred into or out of an ICA unless the SNM consists only of identifiable items that are sealed sources or tamper-safed. (6) Signatures of the participating MBA/ICA

custodians or their designated agents.

c. For any transfer outside of a material access area that involves moving plutonium, uranium 233, or uranium enriched to 20 percent or more in the isotope b. When possible, SNM should not be transferred U-235 in the amounts listed in paragraph 73.1(b) of 10 until analytical results have been obtained. If a transfer CFR Part 73,* the SNM should be under the continual must be made before chemical or isotopic analysis is surveillance of two persons. Where feasible, one of these complete, the MT should show amounts of SNM based persons should be from the originating MBA or ICA and on nominal values or best available data. The MT should the other from the receiving MBA or ICA. also show the identifying number on the analytica;

request form so that the nuclear material accounting d. For any transfer outside of a protected area department can later adjust the records to the actual that involves the amounts and kinds of SNM cited in amount transferred.

paragraph c above, the SNM should be escorted by one or more armed guards in addition to the two persons c. The MT should contain enough information to enable the recorded measurement and tamper-safing data L1

  • Material described in §73.6 of 10 CFR Part 73 is excepted. associated with the transfer to be confirmed.

5.49-2

d. Entries on MTs should not be erased or (1) Be made in accordance with a measurement obliterated. Alterations, as by lining through, should be program that is controlled to conform with proposed initialed. No entry should be made by pencil. §70.57 of 10 CFR Part 70:

e. MTs should be prenumbered in sequence, and (2) Be validated by intact tamper-safing until all copies should bear the same number as the original. the material has been accepted by the custodian of the All forms should be accounted for. The nuclear material receiving MBA/ICA or his designated agent: and accounting department should maintain and control (assign and account for) the supply of MT forms and (3) Have the tamper-safing applied as a part of should record the disposition of all forms in a log book. the sampling procedure* (if the SNM is assayed hy The supply of forms and the log book should be kept in traditional methods based on chemical analysis) or prior a locked area when unattended. to measurement (if the SNM is assayed by nondestruc tive analysis).

f. The nuclear material accounting department should review each MT for completeness. Copies of c. When SNM is transferred via pipeline from one completed MTs should be distributed to all affected MBA to another, the SNM should be measured in the persons or departments, including at least the custodians receiving MBA prior to any physical or chemical change of the originating and receiving MBAs or ICAs. in the material.

g. The completed original of the MT should be d. For any transfer of identifiable items of en retained for at least five years. As a rule, the original capsulated SNM, the recorded amount of SNM trans should be retained by the nuclear material accounting ferred should be that measured at the time of encapsula department. However, if the form also is used for tion.

production purposes, the production department may retain the original. e. The custodian of the originating MBA should measure all tare and gross weights. The custodian of the I h. Damaged or misused MTs should be marked receiving MBA should measure all gross weights and

"VOID." All voided copies should be forwarded to the confirm the absence of arithmetic errors. He may also nuclear material accounting department for logging. confirm the tare weights as a check on the originating MBA. A duly designated agent may act for a custodian i. MTs may have uses other than those that are in the actions named in this paragraph.

the subject of this guide. Their use in production control has been suggested above. They also may be used to f. If the gross weight measured at the receiving record and report such SNM accounting data as bumup, MBA differs from that reported on the MT by the material unaccounted for (MUF), or measured discards custodian of the originating MBA by a statistically of waste. significant amount, the SNM should be left in the transfer container until the difference has been resolved.

The value agreed upon must be acceptable to both of the

3. Measurement of transferred material. The guide MBA custodians involved and to the nuclear material lines under this heading pertain to the measurements accounting department.

associated with SNM transferred within a facility.

a. The following SNM may be transferred out of

D. IMPLEMENTATION

and into MBAs or ICAs without measuring the contained SNM: The purpose of this section is to provide informa tion to applicants and licensees regarding the NRC staff's

(1) Samples that have been determined by plans for utilizing this regulatory guide.

other means to contain less than ten grams of pluto nium, uranium 233, or uranium 235; Except in those cases in which the applicant proposes an alternate method for complying with

(2) Reactor-irradiated fuels involved in re specified portions of the Commission's regulations, the search, development, and evaluation programs in facil method described herein will be used in the evaluation ities other than irradiated-fuel reprocessing plants; and of submittals in connection with special nuclear material license, operating license, or construction permit applica

(3) Sealed plutonium-beryllium sources. tions docketed after October 1, 1975.

b. Except for the items listed in paragraph 3.a., all *See Regulatory Guides 5.10, "Selection and Use of SNM should be transferred out of and into MBAs or Pressure-Sensitive Seals on Containers for Onsite Storage of ICAs on the basis of acceptable accountability measure Special Nuclear Material," and 5.15, "Security Seals for the ments. To be acceptable, the measurements should: Protection and Control of Special Nuclear Material."

5.49-3

If an applicant whose application for a special to use this regulatory guide in developing submittals for nuclear material or an operating license or construction applications, the pertinent portions of the application permit is docketed on or before October 1, 1975, wishes will be evaluated on the basis of this guide.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON. D. C. 20556 POSTAGE AND FEES PAID

UNITED STATES NUCLEAR

OFFICIAL MUSINESS REGULATORY COMMISSION

PENALTY FOR PRIVATE USE. $300

5.49-4