{{#Wiki_filter:RISK INFORMED TECHNICAL SPECIFICATION TASK FORCE (RITSTF) RISK MANAGEMENT TECHNICAL SPECIFICATION INITIATIVE STATUS NEI RITSTF  NEI Biff Bradley 202 739-8083 WOG Jack Stringfellow, Southern Nuclear 205 992-7037 CEOG Alan Hackerott, OPPD 402 533-7276  Tony Pietrangelo 202 739-8081  Jim Andrachek, Westinghouse 412 374-5018  Gary Chung, SCE 949 368-9431 TSTF Donald Hoffman, EXCEL 301 984-4400  Jerry Andre, Westinghouse 412 374-4723  Ray Schneider, CE 860 731-6461 EPRI Frank Rahn 650 855-2037 BWOG Paul Infanger, Progress Energy 352 563-4796 BWROG Fred Emerson, GE  John Gaertner 704 547-6169  Stanley Levinson, Framatome 434 832-2768  Dusty Rhoads, Energy Northwest 509 377-4298      Mike Kitlan, Duke 980 373-8348
{{#Wiki_filter:RISK INFORMED TECHNICAL SPECIFICATION TASK FORCE (RITSTF)
 
RISK MANAGEMENT TECHNICAL SPECIFICATION INITIATIVE STATUS INITIATIVE               TITLE               INITIATIVE STATUS                           NEXT ACTIONS/SCHEDULE/                             TSTF NUMBER RESPONSIBILITY 1           Technical Specification
Page 1 of 8 8/17/2005 INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ RESPONSIBILITY TSTF NUMBER 1 Technical Specification Required Actions Preferred End States
* NRC issued the CLIIP
* NRC issued the CLIIP Notice of Availability for TSTF-422 on July 7, 2005.
* NRC issued the TSTF-422 Notice of Availability     TSTF-422 R0 (CEOG)
* NRC plans to issue CLIIP Notice for Comment for TSTF-423 in September 2005.
Required Actions            Notice of Availability for            on July 7, 2005.
* NRC issued the TSTF-422 Notice of Availability on July 7, 2005.
Preferred End States        TSTF-422 on July 7, 2005.                                                                 TSTF-423 R0 (BWROG)
* TSTF-423 was submitted to the NRC on 8/12/03.
* TSTF-423 was submitted to the NRC on 8/12/03.
* BWROG working with NRC to address one issue for the Implementation Guidance regarding time to stay above 500 psig in MODE 3.
* NRC plans to issue CLIIP                                                                  TSTF-431 R0 (BWOG)
Notice for Comment for
* BWROG working with NRC to address one issue TSTF-423 in September                for the Implementation Guidance regarding time     TSTF-432 R0 (WOG) 2005.                                to stay above 500 psig in MODE 3.                   (Not created)
* The TSTF will submit the final TSTF-423 implementation guidance in September 2005.
* The TSTF will submit the final TSTF-423 implementation guidance in September 2005.
* NRC plans to issue TSTF-423 Notice for Comment in September 2005.
* NRC plans to issue TSTF-423 Notice for Comment in September 2005.
Line 31: Line 33:
* NRC plans to issue Notice for Comment for TSTF 431 by 12/05.
* NRC plans to issue Notice for Comment for TSTF 431 by 12/05.
* WOG plans to submit their Topical in 9/05.
* WOG plans to submit their Topical in 9/05.
TSTF-422 R0 (CEOG)
NEI RITSTF NEI    Biff Bradley            202 739-8083  WOG      Jack Stringfellow, Southern Nuclear    205 992-7037    CEOG   Alan Hackerott, OPPD          402 533-7276 Tony Pietrangelo        202 739-8081            Jim Andrachek, Westinghouse            412 374-5018            Gary Chung, SCE                949 368-9431 TSTF   Donald Hoffman, EXCEL    301 984-4400            Jerry Andre, Westinghouse              412 374-4723            Ray Schneider, CE              860 731-6461 EPRI  Frank Rahn              650 855-2037  BWOG Paul Infanger, Progress Energy            352 563-4796    BWROG Fred Emerson, GE John Gaertner            704 547-6169            Stanley Levinson, Framatome            434 832-2768            Dusty Rhoads, Energy Northwest 509 377-4298 Mike Kitlan, Duke                      980 373-8348 Page 1 of 8                                                                  8/17/2005
 
TSTF-423 R0 (BWROG)
 
TSTF-431 R0 (BWOG)
 
TSTF-432 R0 (WOG)
(Not created)


RITSTF INITIATIVE STATUS Page 2 of 8 8/17/2005 INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ RESPONSIBILITY TSTF NUMBER 2 Missed Surveillances SR 3.0.3
RITSTF INITIATIVE STATUS INITIATIVE         TITLE             INITIATIVE STATUS                         NEXT ACTIONS/SCHEDULE/                       TSTF NUMBER RESPONSIBILITY 2     Missed Surveillances
* TSTF-358, R6, has been approved and published for CLIIP adoption.
* TSTF-358, R6, has been
* Initiative Complete.
* Initiative Complete.                            TSTF-358 R6 SR 3.0.3                  approved and published for CLIIP adoption.
* TSTF and RITSTF will issue implementation guidance in the fourth quarter of 2005.
* TSTF and RITSTF will issue implementation guidance in the fourth quarter of 2005.
TSTF-358 R6 3 Increase Flexibility in Mode Restraints LCO 3.0.4
3     Increase Flexibility in
* TSTF-359, R9, has been approved and published for CLIIP adoption.
* TSTF-359, R9, has been
* The final Implementation Guidance, NEI-03-10, was issued on September 5, 2003.
* Initiative Complete.                            TSTF-359 R9 Mode Restraints LCO        approved and published for 3.0.4                      CLIIP adoption.
* Initiative Complete.
* Revisions are needed to clarify the implementation guidance. The TSTF and RITSTF
* Revisions are needed to clarify the implementation guidance. The TSTF and RITSTF will revise and reissue the implementation guidance in the fourth quarter of 2005.
* The final Implementation            will revise and reissue the implementation Guidance, NEI-03-10, was            guidance in the fourth quarter of 2005.
TSTF-359 R9 4a Individual Risk Informed Completion Times
issued on September 5, 2003.
* Owners Groups (OGs) are pursuing generic Risk Informed Completion Time extensions through OG-specific Topicals and license amendments.
4a   Individual Risk
* Ongoing.
* Owners Groups (OGs) are
* Ongoing.                                       TSTF-373 R2 (CEOG)
Informed Completion        pursuing generic Risk
* TSTF-373R2 approved on 2/27/04.
* TSTF-373R2 approved on 2/27/04.
* TSTF-430R0 approved on 8/5/04.
Times                      Informed Completion Time
* NRC issued the TSTF-454 FRN Notice for Comment on 5/25/05. The TSTF provided comments on 7/25/05. The TSTF is preparing a revision to TSTF-454 to reflect the NRC-approved Topical Report.
* TSTF-430R0 approved on 8/5/04.                 TSTF-409 R1 (CEOG) extensions through OG-
* TSTF-439R2 was submitted to the NRC on 6/20/05.
* NRC issued the TSTF-454 FRN Notice for specific Topicals and              Comment on 5/25/05. The TSTF provided           TSTF-417 R0 (WOG) license amendments.                comments on 7/25/05. The TSTF is preparing a revision to TSTF-454 to reflect the NRC-       TSTF-430 R0 (BWOG) approved Topical Report.
* The NRC expects to issue the TSTF-409R1 CLIIP Notice for Comment in August 2005.
* TSTF-439R2 was submitted to the NRC on         TSTF-439 R2 (ALL OG) 6/20/05.
* The NRC expects to complete their review of the Topical Reports that support TSTF-417R0 and TSTF-446R0 in August 2005. Review of the Travelers will follow approval of the Topical Reports. TSTF-373 R2 (CEOG)
* The NRC expects to issue the TSTF-409R1 CLIIP   TSTF-446 R0 (WOG)
 
Notice for Comment in August 2005.
TSTF-409 R1 (CEOG)
* The NRC expects to complete their review of the TSTF-454 R0 (BWROG)
 
Topical Reports that support TSTF-417R0 and TSTF-446R0 in August 2005. Review of the Travelers will follow approval of the Topical Reports.
TSTF-417 R0 (WOG)
Page 2 of 8                                                            8/17/2005
TSTF-430 R0 (BWOG)
 
TSTF-439 R2 (ALL OG)


TSTF-446 R0 (WOG)
RITSTF INITIATIVE STATUS INITIATIVE         TITLE           INITIATIVE STATUS                             NEXT ACTIONS/SCHEDULE/                             TSTF NUMBER RESPONSIBILITY 4b   Risk Informed
 
* Fort Calhoun, South Texas
TSTF-454 R0 (BWROG)
* RITSTF will develop a White Paper to address the     TSTF-424 R0 Completion Times        Project, and Prairie Island            interface of the a.4 process to the Initiative 4b and With Configuration      have volunteered to develop            Initiative 6 process to show the overlap and Risk Management        pilot submittals.                      transition for ITS and non ITS plants and will Program or                                                    provide to NRC in 4/05.
 
Maintenance Rule
RITSTF INITIATIVE STATUS Page 3 of 8 8/17/2005 INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ RESPONSIBILITY TSTF NUMBER 4b Risk Informed Completion Times With Configuration Risk Management Program or Maintenance Rule Backstop
* Fort Calhoun and South Backstop                Texas Project have
* Fort Calhoun, South Texas Project, and Prairie Island have volunteered to develop pilot submittals.
* Fort Calhoun and South Texas Project have submitted their pilots.
* The RITSTF is working to resolve the NRC's comments on the Risk Management Guidelines, the STP submittal, and the Traveler.
* RITSTF will develop a White Paper to address the interface of the a.4 process to the Initiative 4b and Initiative 6 process to show the overlap and transition for ITS and non ITS plants and will provide to NRC in 4/05.
* NRC provided 3 separate RAIs in 8/04 to NEI.
* NRC provided 3 separate RAIs in 8/04 to NEI.
* The RITSTF has created an Initiative 4b Subgroup to coordinate responses to the NRC RAIs.
submitted their pilots.
* The RITSTF provided responses to the NRC and met to discuss these responses on 12/15/04.
* The RITSTF has created an Initiative 4b Subgroup
* The RITSTF is working to              to coordinate responses to the NRC RAIs.
resolve the NRCs comments on the Risk
* The RITSTF provided responses to the NRC and Management Guidelines,                met to discuss these responses on 12/15/04.
the STP submittal, and the Traveler.
* NRC visited STP week of 1/18/05 to evaluate applications of Initiative 4b.
* NRC visited STP week of 1/18/05 to evaluate applications of Initiative 4b.
* NRC and RITSTF met 3/17-18/05 and 5/3-5/4, 2005 to discuss policy issues. NRC will issue meeting summaries of these meetings.
* NRC and RITSTF met 3/17-18/05 and 5/3-5/4, 2005 to discuss policy issues. NRC will issue meeting summaries of these meetings.
* NRC will provide comments on the RMTS Guidelines by late 9/05.
* NRC will provide comments on the RMTS Guidelines by late 9/05.
* The RITSTF has revised the draft Risk-Managed Technical Specifications (RMTS) Guidelines document incorporating the results of the discussions with the NRC. The revised draft RMTS document was provided to the NRC at the August RITSTF/NRC meeting.
* The RITSTF has revised the draft Risk-Managed Technical Specifications (RMTS) Guidelines document incorporating the results of the discussions with the NRC. The revised draft RMTS document was provided to the NRC at the August RITSTF/NRC meeting.
* NRC will provide comments on the draft RMTS to RITSTF in 9/05.
* NRC will provide comments on the draft RMTS to RITSTF in 9/05.
TSTF-424 R0 5a Relocate Surveillance Requirements Not Related to Safety
5a   Relocate Surveillance
* Deterministic portion of Initiative 5 transferred to TSTF responsibility.
* Deterministic portion of
* TSTF reviewing candidate SRs to be relocated.
* TSTF reviewing candidate SRs to be relocated.        None assigned Requirements Not        Initiative 5 transferred to Related to Safety        TSTF responsibility.
* TSTF will provide a Traveler to the NRC by 6/06.
* TSTF will provide a Traveler to the NRC by 6/06.
None assigned RITSTF INITIATIVE STATUS Page 4 of 8 8/17/2005 INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ RESPONSIBILITY TSTF NUMBER 5b Relocate Surveillance Test Intervals to Licensee Control
Page 3 of 8                                                                   8/17/2005
* RITSTF/BWROG/Pilot Plant will be applying the methodology and interfacing with the NRC on the issues in 2004.
 
* The Limerick lead plant license amendment was submitted on 6/11/04.
RITSTF INITIATIVE STATUS INITIATIVE         TITLE           INITIATIVE STATUS                           NEXT ACTIONS/SCHEDULE/                         TSTF NUMBER RESPONSIBILITY 5b   Relocate Surveillance
* RITSTF/BWROG/Pilot
* The Limerick lead plant license amendment was     TSTF-425 R0 Test Intervals to        Plant will be applying the          submitted on 6/11/04.
Licensee Control        methodology and interfacing with the NRC
* TSTF-425 was submitted to the NRC on 8/31/04.
* TSTF-425 was submitted to the NRC on 8/31/04.
on the issues in 2004.
* NEI provided the formal methodology document to the NRC on 2/3/05.
* NEI provided the formal methodology document to the NRC on 2/3/05.
* NRC reviewed the Limerick LAR, TSTF-425, and the methodology document and issued RAIs 4/12/05 to the RITSTF.
* NRC reviewed the Limerick LAR, TSTF-425, and the methodology document and issued RAIs 4/12/05 to the RITSTF.
* A separate subcommittee was formed by the RITSTF to respond to the NRC's RAIs.
* A separate subcommittee was formed by the RITSTF to respond to the NRCs RAIs.
* The 5b subcommittee met with the NRC on June 3 to discuss the RAI responses.
* The 5b subcommittee met with the NRC on June 3 to discuss the RAI responses.
* The RITSTF plans to respond to the RAIs in September, 2005.
* The RITSTF plans to respond to the RAIs in September, 2005.
TSTF-425 R0 6a Modify LCO 3.0.3 Actions and Timing 1 hour - 24 hours
6a   Modify LCO 3.0.3
* On hold.
* On hold.
* On hold for resolution of Initiative 6b and 6c to determine if Initiative 6a is required.
* On hold for resolution of Initiative 6b and 6c to None assigned Actions and Timing 1                                          determine if Initiative 6a is required.
None assigned RITSTF INITIATIVE STATUS Page 5 of 8 8/17/2005 INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ RESPONSIBILITY TSTF NUMBER 6b Provide Conditions in the LCOs for Those Levels of Degradation Where No Condition Currently Exists to Preclude Entry Into LCO 3.0.3
hour - 24 hours Page 4 of 8                                                               8/17/2005
* NRC issued Safety Evaluation for Topical Report on 7/9/04.
 
* TSTF-426 R0 was submitted to the NRC on 8/30/04.
RITSTF INITIATIVE STATUS INITIATIVE         TITLE           INITIATIVE STATUS                       NEXT ACTIONS/SCHEDULE/                         TSTF NUMBER RESPONSIBILITY 6b   Provide Conditions in
* CEOG submitted revised version of Topical Report to address NRC RAIs in 10/03.
* NRC issued Safety
* NRC issued Safety Evaluation for Topical Report on 7/9/04.
* CEOG submitted revised version of Topical        TSTF-426 R0 the LCOs for Those       Evaluation for Topical            Report to address NRC RAIs in 10/03.
Levels of Degradation   Report on 7/9/04.
Where No Condition
* NRC issued Safety Evaluation for Topical Report Currently Exists to
* TSTF-426 R0 was                   on 7/9/04.
Preclude Entry Into      submitted to the NRC on LCO 3.0.3                8/30/04.
* TSTF-426 R0 was submitted to the NRC on 8/30/04.
* TSTF-426 R0 was submitted to the NRC on 8/30/04.
* NRC provided an RAI on TSTF-426 on 11/13/04.
* NRC provided an RAI on TSTF-426 on 11/13/04.
* The TSTF has developed Implementation Guidance and will provide it to the NRC in 8/05.
* The TSTF has developed Implementation Guidance and will provide it to the NRC in 8/05.
* The TSTF provided responses to the NRC's RAIs on 4/27/05.
* The TSTF provided responses to the NRCs RAIs on 4/27/05.
* The TSTF 426 Implementation Guidance was provided to NRC in early 8/05.
* The TSTF 426 Implementation Guidance was provided to NRC in early 8/05.
* NRC plans to issue the Notice for Comment in September 2005. TSTF-426 R0 RITSTF INITIATIVE STATUS Page 6 of 8 8/17/2005 INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ RESPONSIBILITY TSTF NUMBER 6c Provide Specific Times in the LCO For Those Conditions That Require Entry Into LCO 3.0.3 Immediately
* NRC plans to issue the Notice for Comment in September 2005.
* NRC issued Safety Evaluation for Topical Report on 7/9/04.
Page 5 of 8                                                           8/17/2005
* TSTF-426 R0 was submitted to the NRC on 8/30/04.
 
* CEOG submitted revised version of Topical Report to address NRC RAIs in 10/03.
RITSTF INITIATIVE STATUS INITIATIVE        TITLE           INITIATIVE STATUS                       NEXT ACTIONS/SCHEDULE/                         TSTF NUMBER RESPONSIBILITY 6c   Provide Specific Times
* NRC issued Safety Evaluation for Topical Report on 7/9/04.
* NRC issued Safety
* CEOG submitted revised version of Topical        TSTF-426 R0 in the LCO For Those     Evaluation for Topical            Report to address NRC RAIs in 10/03.
Conditions That           Report on 7/9/04.
Require Entry Into
* NRC issued Safety Evaluation for Topical Report LCO 3.0.3 Immediately
* TSTF-426 R0 was                   on 7/9/04.
submitted to the NRC on 8/30/04.
* TSTF-426 R0 was submitted to the NRC on 8/30/04.
* TSTF-426 R0 was submitted to the NRC on 8/30/04.
* NRC provided an RAI on TSTF-426 on 11/13/04.
* NRC provided an RAI on TSTF-426 on 11/13/04.
* The TSTF has developed Implementation Guidance and will provide it to the NRC in 8/05.
* The TSTF has developed Implementation Guidance and will provide it to the NRC in 8/05.
* The TSTF provided responses to the NRC's RAIs on 4/27/05.
* The TSTF provided responses to the NRCs RAIs on 4/27/05.
* The TSTF 426 Implementation Guidance was provided to NRC in early 8/05.
* The TSTF 426 Implementation Guidance was provided to NRC in early 8/05.
NRC plans to issue the Notice for Comment in September 2005. TSTF-426 R0
NRC plans to issue the Notice for Comment in September 2005.
Page 6 of 8                                                            8/17/2005


RITSTF INITIATIVE STATUS Page 7 of 8 8/17/2005 INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ RESPONSIBILITY TSTF NUMBER 7a Impact of Non Technical Specification Design Features on Operability Requirements - Barriers
RITSTF INITIATIVE STATUS INITIATIVE         TITLE             INITIATIVE STATUS                           NEXT ACTIONS/SCHEDULE/                           TSTF NUMBER RESPONSIBILITY 7a   Impact of Non
* The NRC issued the FRN Notice of Availability for TSTF-372, Rev. 4 on 5/4/05.
* The NRC issued the FRN
* RITSTF to respond to NRC comments on the TSTF-427 implementation guidance.
* The NRC published the FRN Notice of                  TSTF-372 R4 Technical Specification    Notice of Availability for          Availability for TSTF-372 on 5/4/05.
* The NRC published the FRN Notice of Availability for TSTF-372 on 5/4/05.
Design Features on         TSTF-372, Rev. 4 on                                                                      TSTF-427 R0 Operability                5/4/05.
* NRC provided feedback on RITSTF responses on TSTF-427 in February 2004.
* NRC provided feedback on RITSTF responses on Requirements - Barriers                                        TSTF-427 in February 2004.
* TSTF will delete the additions to the definition of OPERABILITY for TSTF-427 to address NRC concerns.
* RITSTF to respond to NRC comments on the TSTF-427
* TSTF will delete the additions to the definition of implementation guidance.            OPERABILITY for TSTF-427 to address NRC concerns.
* TSTF-427 implementation guidance was provided to the NRC on 09/21/04. NRC provided comments on the draft guidance on 10/13/04.
* TSTF-427 implementation guidance was provided to the NRC on 09/21/04. NRC provided comments on the draft guidance on 10/13/04.
* NRC provided an RAI on TSTF-427 on 11/13/04.
* NRC provided an RAI on TSTF-427 on 11/13/04.
* RITSTF provided responses to the NRC's RAIs on 3/23/05.
* RITSTF provided responses to the NRCs RAIs on 3/23/05.
* The NRC provided additional questions on the TSTF-427 implementation guidance in a letter dated June 2, 2005. RITSTF to respond.
* The NRC provided additional questions on the TSTF-427 implementation guidance in a letter dated June 2, 2005. RITSTF to respond.
* Members of the TSTF & RITSTF met with the NRC on 7/28/05 to discuss NRC comments. The TSTF is preparing a revision of TSTF-427 to be submitted to the NRC in October 2005.
* Members of the TSTF & RITSTF met with the NRC on 7/28/05 to discuss NRC comments. The TSTF is preparing a revision of TSTF-427 to be submitted to the NRC in October 2005.
* There was discussion of the LCO 3.0.9 that requires revision. The RITSTF will develop changes to LCO 3.0.9 and TSTF 427 Implementation Guidance to address the barrier that affects both trains of a system and the emergent condition of 1 barrier that affects 1 train and the second train becomes inoperable for another reason.
* There was discussion of the LCO 3.0.9 that requires revision. The RITSTF will develop changes to LCO 3.0.9 and TSTF 427 Implementation Guidance to address the barrier that affects both trains of a system and the emergent condition of 1 barrier that affects 1 train and the second train becomes inoperable for another reason.
* The revised implementation guidance and revised TSTF-427 will be distributed to the RITSTF for review in September for submittal to the NRC in October 2005.
* The revised implementation guidance and revised TSTF-427 will be distributed to the RITSTF for review in September for submittal to the NRC in October 2005.
TSTF-372 R4
Page 7 of 8                                                                8/17/2005
 
TSTF-427 R0


RITSTF INITIATIVE STATUS Page 8 of 8 8/17/2005 INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ RESPONSIBILITY TSTF NUMBER 7b Impact of Non TS Design Features on Operability Requirements - All other SSCs not in Technical Specifications
RITSTF INITIATIVE STATUS INITIATIVE                 TITLE           INITIATIVE STATUS                           NEXT ACTIONS/SCHEDULE/                           TSTF NUMBER RESPONSIBILITY 7b           Impact of Non TS
* A White Paper on the process to address this scope of SSCs is being developed.
* A White Paper on the
* RITSTF will develop a White Paper to outline the process to address this scope of SSCs in 9/05.
* RITSTF will develop a White Paper to outline the   None assigned Design Features on        process to address this scope        process to address this scope of SSCs in 9/05.
* RITSTF/TSTF reviewed and has commented on the revised Operability guidance that will supersede the guidance distributed with GL 91-18.
Operability              of SSCs is being developed.
Requirements - All
* RITSTF/TSTF reviewed and has commented on other SSCs not in                                              the revised Operability guidance that will Technical                                                      supersede the guidance distributed with GL 91-18.
Specifications
* RITSTF/TSTF will develop a TSTF and submit to NRC by 6/06.
* RITSTF/TSTF will develop a TSTF and submit to NRC by 6/06.
None assigned 8a Remove or Relocate Systems LCOs That Do Not Meet the 4 Criterion of 10 CFR 50.36 From Technical Specifications
8a           Remove or Relocate
* A White Paper on the application of the 10 CFR 50.36 criteria is being developed.
* A White Paper on the
* NEI 00-04 is being reviewed and will serve as the basis for Criterion 4 application.
* NEI 00-04 is being reviewed and will serve as the None assigned Systems LCOs That Do      application of the 10 CFR            basis for Criterion 4 application.
* RITSTF will develop a White Paper to outline the guidance and methodology based on NEI 00-04 for the application of the four criteria of 10 CFR 50.36 and a list of the systems identified for relocation. RITSTF working on the schedule - current plans are fourth quarter 2005.
Not Meet the 4            50.36 criteria is being Criterion of 10 CFR        developed.
None assigned 8b Modify 50.36 Rule to Permit Removal or Relocation of Non Risk Significant Systems out of Technical Specifications
* RITSTF will develop a White Paper to outline the 50.36 From Technical                                            guidance and methodology based on NEI 00-04 Specifications                                                  for the application of the four criteria of 10 CFR 50.36 and a list of the systems identified for relocation. RITSTF working on the schedule -
current plans are fourth quarter 2005.
8b           Modify 50.36 Rule to
* Requires Rulemaking
* Requires Rulemaking
* RITSTF looking at coordinating Initiative 8b with longer term initiatives given the requirements for rulemaking.
* RITSTF looking at coordinating Initiative 8b with Not applicable Permit Removal or                                              longer term initiatives given the requirements for Relocation of Non Risk                                          rulemaking.
* Approach favored by NEI and NRC is making Criterion 4 a "two way door" (e.g., if it doesn't meet Criterion 4, Specification can be relocated even if it meets Criteria 1, 2, or 3).
Significant Systems out of Technical
Not applicable BWOG - Active in Initiatives 1, 4 and 7 CEOG - Active in Initiatives 1, 4, 5 and 6 BWROG - Active in Initiatives 1, 4, 5 and 8 WOG - Active in Initiatives 1, 4, and 5}}
* Approach favored by NEI and NRC is making Specifications                                                Criterion 4 a two way door (e.g., if it doesnt meet Criterion 4, Specification can be relocated even if it meets Criteria 1, 2, or 3).
BWOG - Active in Initiatives 1, 4 and 7 CEOG - Active in Initiatives 1, 4, 5 and 6 BWROG - Active in Initiatives 1, 4, 5 and 8 WOG - Active in Initiatives 1, 4, and 5 Page 8 of 8                                                                8/17/2005}}

Revision as of 00:05, 24 November 2019

Risk Informed Technical Specification Task Force (RITSTF) Risk Management Technical Specification Initiative Status
ML052490186
Person / Time
Issue date: 09/06/2005
From:
NRC/NRR/DIPM/IROB
To:
Nuclear Energy Institute
Tjader T., NRC/IROB, 415-1187
Shared Package
ML052490174 List:
References
Download: ML052490186 (8)


Text

RISK INFORMED TECHNICAL SPECIFICATION TASK FORCE (RITSTF)

RISK MANAGEMENT TECHNICAL SPECIFICATION INITIATIVE STATUS INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ TSTF NUMBER RESPONSIBILITY 1 Technical Specification

Required Actions Notice of Availability for on July 7, 2005.

Preferred End States TSTF-422 on July 7, 2005. TSTF-423 R0 (BWROG)

  • TSTF-423 was submitted to the NRC on 8/12/03.

Notice for Comment for

  • BWROG working with NRC to address one issue TSTF-423 in September for the Implementation Guidance regarding time TSTF-432 R0 (WOG) 2005. to stay above 500 psig in MODE 3. (Not created)
  • The TSTF will submit the final TSTF-423 implementation guidance in September 2005.
  • NRC plans to issue TSTF-423 Notice for Comment in September 2005.
  • TSTF-431 was distributed to the BWOG and the RITSTF for review on 7/11/04.
  • BWOG Topical Report (BAW-2441) was submitted to NRC on 1/19/04. The NRC provided RAIs on 6/29/04. The BWOG responded to the RAIs in 2/05.
  • NRC is currently reviewing the BWOG RAI responses.
  • NRC plans to issue Notice for Comment for TSTF 431 by 12/05.
  • WOG plans to submit their Topical in 9/05.

NEI RITSTF NEI Biff Bradley 202 739-8083 WOG Jack Stringfellow, Southern Nuclear 205 992-7037 CEOG Alan Hackerott, OPPD 402 533-7276 Tony Pietrangelo 202 739-8081 Jim Andrachek, Westinghouse 412 374-5018 Gary Chung, SCE 949 368-9431 TSTF Donald Hoffman, EXCEL 301 984-4400 Jerry Andre, Westinghouse 412 374-4723 Ray Schneider, CE 860 731-6461 EPRI Frank Rahn 650 855-2037 BWOG Paul Infanger, Progress Energy 352 563-4796 BWROG Fred Emerson, GE John Gaertner 704 547-6169 Stanley Levinson, Framatome 434 832-2768 Dusty Rhoads, Energy Northwest 509 377-4298 Mike Kitlan, Duke 980 373-8348 Page 1 of 8 8/17/2005

RITSTF INITIATIVE STATUS INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ TSTF NUMBER RESPONSIBILITY 2 Missed Surveillances

  • TSTF and RITSTF will issue implementation guidance in the fourth quarter of 2005.

3 Increase Flexibility in

  • Initiative Complete. TSTF-359 R9 Mode Restraints LCO approved and published for 3.0.4 CLIIP adoption.
  • Revisions are needed to clarify the implementation guidance. The TSTF and RITSTF
  • The final Implementation will revise and reissue the implementation Guidance, NEI-03-10, was guidance in the fourth quarter of 2005.

issued on September 5, 2003.

4a Individual Risk

  • Owners Groups (OGs) are

Informed Completion pursuing generic Risk

  • TSTF-373R2 approved on 2/27/04.

Times Informed Completion Time

  • TSTF-430R0 approved on 8/5/04. TSTF-409 R1 (CEOG) extensions through OG-
  • NRC issued the TSTF-454 FRN Notice for specific Topicals and Comment on 5/25/05. The TSTF provided TSTF-417 R0 (WOG) license amendments. comments on 7/25/05. The TSTF is preparing a revision to TSTF-454 to reflect the NRC- TSTF-430 R0 (BWOG) approved Topical Report.
  • TSTF-439R2 was submitted to the NRC on TSTF-439 R2 (ALL OG) 6/20/05.

Notice for Comment in August 2005.

  • The NRC expects to complete their review of the TSTF-454 R0 (BWROG)

Topical Reports that support TSTF-417R0 and TSTF-446R0 in August 2005. Review of the Travelers will follow approval of the Topical Reports.

Page 2 of 8 8/17/2005

RITSTF INITIATIVE STATUS INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ TSTF NUMBER RESPONSIBILITY 4b Risk Informed

  • Fort Calhoun, South Texas
  • RITSTF will develop a White Paper to address the TSTF-424 R0 Completion Times Project, and Prairie Island interface of the a.4 process to the Initiative 4b and With Configuration have volunteered to develop Initiative 6 process to show the overlap and Risk Management pilot submittals. transition for ITS and non ITS plants and will Program or provide to NRC in 4/05.

Maintenance Rule

  • Fort Calhoun and South Backstop Texas Project have
  • NRC provided 3 separate RAIs in 8/04 to NEI.

submitted their pilots.

  • The RITSTF has created an Initiative 4b Subgroup
  • The RITSTF is working to to coordinate responses to the NRC RAIs.

resolve the NRCs comments on the Risk

  • The RITSTF provided responses to the NRC and Management Guidelines, met to discuss these responses on 12/15/04.

the STP submittal, and the Traveler.

  • NRC visited STP week of 1/18/05 to evaluate applications of Initiative 4b.
  • NRC and RITSTF met 3/17-18/05 and 5/3-5/4, 2005 to discuss policy issues. NRC will issue meeting summaries of these meetings.
  • NRC will provide comments on the RMTS Guidelines by late 9/05.
  • The RITSTF has revised the draft Risk-Managed Technical Specifications (RMTS) Guidelines document incorporating the results of the discussions with the NRC. The revised draft RMTS document was provided to the NRC at the August RITSTF/NRC meeting.
  • NRC will provide comments on the draft RMTS to RITSTF in 9/05.

5a Relocate Surveillance

  • Deterministic portion of
  • TSTF reviewing candidate SRs to be relocated. None assigned Requirements Not Initiative 5 transferred to Related to Safety TSTF responsibility.
  • TSTF will provide a Traveler to the NRC by 6/06.

Page 3 of 8 8/17/2005

RITSTF INITIATIVE STATUS INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ TSTF NUMBER RESPONSIBILITY 5b Relocate Surveillance

  • RITSTF/BWROG/Pilot
  • The Limerick lead plant license amendment was TSTF-425 R0 Test Intervals to Plant will be applying the submitted on 6/11/04.

Licensee Control methodology and interfacing with the NRC

  • TSTF-425 was submitted to the NRC on 8/31/04.

on the issues in 2004.

  • NEI provided the formal methodology document to the NRC on 2/3/05.
  • NRC reviewed the Limerick LAR, TSTF-425, and the methodology document and issued RAIs 4/12/05 to the RITSTF.
  • A separate subcommittee was formed by the RITSTF to respond to the NRCs RAIs.
  • The 5b subcommittee met with the NRC on June 3 to discuss the RAI responses.
  • The RITSTF plans to respond to the RAIs in September, 2005.

6a Modify LCO 3.0.3

  • On hold.
  • On hold for resolution of Initiative 6b and 6c to None assigned Actions and Timing 1 determine if Initiative 6a is required.

hour - 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Page 4 of 8 8/17/2005

RITSTF INITIATIVE STATUS INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ TSTF NUMBER RESPONSIBILITY 6b Provide Conditions in

  • NRC issued Safety
  • CEOG submitted revised version of Topical TSTF-426 R0 the LCOs for Those Evaluation for Topical Report to address NRC RAIs in 10/03.

Levels of Degradation Report on 7/9/04.

Where No Condition

  • NRC issued Safety Evaluation for Topical Report Currently Exists to

Preclude Entry Into submitted to the NRC on LCO 3.0.3 8/30/04.

  • TSTF-426 R0 was submitted to the NRC on 8/30/04.
  • The TSTF has developed Implementation Guidance and will provide it to the NRC in 8/05.
  • The TSTF provided responses to the NRCs RAIs on 4/27/05.
  • The TSTF 426 Implementation Guidance was provided to NRC in early 8/05.
  • NRC plans to issue the Notice for Comment in September 2005.

Page 5 of 8 8/17/2005

RITSTF INITIATIVE STATUS INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ TSTF NUMBER RESPONSIBILITY 6c Provide Specific Times

  • NRC issued Safety
  • CEOG submitted revised version of Topical TSTF-426 R0 in the LCO For Those Evaluation for Topical Report to address NRC RAIs in 10/03.

Conditions That Report on 7/9/04.

Require Entry Into

  • NRC issued Safety Evaluation for Topical Report LCO 3.0.3 Immediately

submitted to the NRC on 8/30/04.

  • TSTF-426 R0 was submitted to the NRC on 8/30/04.
  • The TSTF has developed Implementation Guidance and will provide it to the NRC in 8/05.
  • The TSTF provided responses to the NRCs RAIs on 4/27/05.
  • The TSTF 426 Implementation Guidance was provided to NRC in early 8/05.

NRC plans to issue the Notice for Comment in September 2005.

Page 6 of 8 8/17/2005

RITSTF INITIATIVE STATUS INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ TSTF NUMBER RESPONSIBILITY 7a Impact of Non

  • The NRC issued the FRN
  • The NRC published the FRN Notice of TSTF-372 R4 Technical Specification Notice of Availability for Availability for TSTF-372 on 5/4/05.

Design Features on TSTF-372, Rev. 4 on TSTF-427 R0 Operability 5/4/05.

  • NRC provided feedback on RITSTF responses on Requirements - Barriers TSTF-427 in February 2004.
  • TSTF will delete the additions to the definition of implementation guidance. OPERABILITY for TSTF-427 to address NRC concerns.
  • TSTF-427 implementation guidance was provided to the NRC on 09/21/04. NRC provided comments on the draft guidance on 10/13/04.
  • RITSTF provided responses to the NRCs RAIs on 3/23/05.
  • The NRC provided additional questions on the TSTF-427 implementation guidance in a letter dated June 2, 2005. RITSTF to respond.
  • Members of the TSTF & RITSTF met with the NRC on 7/28/05 to discuss NRC comments. The TSTF is preparing a revision of TSTF-427 to be submitted to the NRC in October 2005.
  • There was discussion of the LCO 3.0.9 that requires revision. The RITSTF will develop changes to LCO 3.0.9 and TSTF 427 Implementation Guidance to address the barrier that affects both trains of a system and the emergent condition of 1 barrier that affects 1 train and the second train becomes inoperable for another reason.
  • The revised implementation guidance and revised TSTF-427 will be distributed to the RITSTF for review in September for submittal to the NRC in October 2005.

Page 7 of 8 8/17/2005

RITSTF INITIATIVE STATUS INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ TSTF NUMBER RESPONSIBILITY 7b Impact of Non TS

  • A White Paper on the
  • RITSTF will develop a White Paper to outline the None assigned Design Features on process to address this scope process to address this scope of SSCs in 9/05.

Operability of SSCs is being developed.

Requirements - All

  • RITSTF/TSTF reviewed and has commented on other SSCs not in the revised Operability guidance that will Technical supersede the guidance distributed with GL 91-18.

Specifications

  • RITSTF/TSTF will develop a TSTF and submit to NRC by 6/06.

8a Remove or Relocate

  • A White Paper on the
  • NEI 00-04 is being reviewed and will serve as the None assigned Systems LCOs That Do application of the 10 CFR basis for Criterion 4 application.

Not Meet the 4 50.36 criteria is being Criterion of 10 CFR developed.

  • RITSTF will develop a White Paper to outline the 50.36 From Technical guidance and methodology based on NEI 00-04 Specifications for the application of the four criteria of 10 CFR 50.36 and a list of the systems identified for relocation. RITSTF working on the schedule -

current plans are fourth quarter 2005.

8b Modify 50.36 Rule to

  • Requires Rulemaking
  • RITSTF looking at coordinating Initiative 8b with Not applicable Permit Removal or longer term initiatives given the requirements for Relocation of Non Risk rulemaking.

Significant Systems out of Technical

  • Approach favored by NEI and NRC is making Specifications Criterion 4 a two way door (e.g., if it doesnt meet Criterion 4, Specification can be relocated even if it meets Criteria 1, 2, or 3).

BWOG - Active in Initiatives 1, 4 and 7 CEOG - Active in Initiatives 1, 4, 5 and 6 BWROG - Active in Initiatives 1, 4, 5 and 8 WOG - Active in Initiatives 1, 4, and 5 Page 8 of 8 8/17/2005