{{#Wiki_filter:Dominion Energy Kewaunee, Inc. i000 Ihrnm~on Roulcvard, Glen Allen, VA 2 3060 December 5, 2006 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 5 Dominion' Serial No. 06-724 KPSILICIMH:
{{#Wiki_filter:Dominion Energy Kewaunee, Inc.
R1 Docket No.
i 0 0 0 I h r n m ~ o nRoulcvard, Glen Allen, VA 2 3 0 6 0 5  Dominion' December 5, 2006 U. S. Nuclear Regulatory Commission                                         Serial No. 06-724 Attention: Document Control Desk                                             KPSILICIMH: R1 Washington, DC 20555                                                         Docket No. 50-305 License No. DPR-43 DOMINION ENERGY KEWAUNEE. INC.
50-305 License No. DPR-43 DOMINION ENERGY KEWAUNEE.
KEWAUNEE POWER STATION CLOSURE OF KEWAUNEE IMPROVEMENT INITIATIVES TO CORRECTIVE ACTION PROGRAM This letter provides notification that Dominion Energy Kewaunee, Inc. (DEK) no longer intends to provide the Nuclear Regulatory Commission (NRC) staff periodic updates regarding the Kewaunee Power Station improvement initiative commitments. These commitments were initially defined in a letter dated March 18, 2005 (reference 1).
INC. KEWAUNEE POWER STATION CLOSURE OF KEWAUNEE IMPROVEMENT INITIATIVES TO CORRECTIVE ACTION PROGRAM This letter provides notification that Dominion Energy Kewaunee, Inc. (DEK) no longer intends to provide the Nuclear Regulatory Commission (NRC) staff periodic updates regarding the Kewaunee Power Station improvement initiative commitments.
These commitments were initially defined in a letter dated March 18, 2005 (reference 1).
These commitments were endorsed and adopted with clarifications by DEK in a letter dated September 15, 2005 (reference 2). In a letter dated November 14, 2005 (reference 3), DEK provided an update to these initiatives.
These commitments were endorsed and adopted with clarifications by DEK in a letter dated September 15, 2005 (reference 2). In a letter dated November 14, 2005 (reference 3), DEK provided an update to these initiatives.
DEK will continue to monitor the implementation and effectiveness of the improvement initiatives through the site corrective action program and the station's excellence plan.
DEK will continue to monitor the implementation and effectiveness of the improvement initiatives through the site corrective action program and the station's excellence plan.
Adjustments to these improvement initiatives may be necessary in the future based on their effectiveness.
Adjustments to these improvement initiatives may be necessary in the future based on their effectiveness. These adjustments will be managed in accordance with the site corrective action program and during periodic review of the station's excellence plan.
These adjustments will be managed in accordance with the site corrective action program and during periodic review of the station's excellence plan.
As always, the status and dispositioning of these corrective actions remain available for NRC review. Therefore, DEK considers the November 15, 2005 letter (reference 3) containing our stated improvement initiatives closed.
As always, the status and dispositioning of these corrective actions remain available for NRC review. Therefore, DEK considers the November 15, 2005 letter (reference
The attachment to this letter restates the Kewaunee Power Station improvement initiative commitments and contains a reference to the corrective action program entry for the stated commitment.
: 3) containing our stated improvement initiatives closed. The attachment to this letter restates the Kewaunee Power Station improvement initiative commitments and contains a reference to the corrective action program entry for the stated commitment.
If you have questions or require additional information, please feel free to contact Mr. Tom Breene at 920-388-8599.
If you have questions or require additional information, please feel free to contact Mr. Tom Breene at 920-388-8599.
Very truly yours, uWA W. R. Matthews Senior Vice President - Nuclear Operations Serial No. 06-724 Page 2 of 2  
Very truly yours, u W A W. R. Matthews Senior Vice President - Nuclear Operations
 
Serial No. 06-724 Page 2 of 2


==References:==
==References:==
: 1. Letter from C. W. Lambert (NMC) to Document Control Desk (NRC), "Kewaunee lmprovement Initiatives - Commitments," dated March 18, 2005 (ADAMS Accession No. MLO50820213).
: 1. Letter from C. W. Lambert (NMC) to Document Control Desk (NRC), "Kewaunee lmprovement Initiatives - Commitments," dated March 18, 2005 (ADAMS Accession No. MLO50820213).
: 2. Letter from E. S. Grecheck (DEK) to Document Control Desk (NRC), "Endorsement and Adoption of Licensing Actions," dated September 15, 2005 (ADAMS Accession No. ML052590234).
: 2. Letter from E. S. Grecheck (DEK) to Document Control Desk (NRC), "Endorsement and Adoption of Licensing Actions," dated September 15, 2005 (ADAMS Accession No. ML052590234).
: 3. Letter from W. R. Matthews (DEK) to Document Control Desk (NRC), "Update on lmprovement Initiatives," dated November 14, 2005 (ADAMS Accession No. 0531 90099).
: 3. Letter from W. R. Matthews (DEK) to Document Control Desk (NRC), "Update on lmprovement Initiatives," dated November 14, 2005 (ADAMS Accession No.
0531 90099).
Attachment
Attachment
: 1. Kewaunee lmprovement Initiatives with Reference to Corrective Action Program Entry Commitments made by this letter: NONE cc: Regional Administrator U. S. Nuclear Regulatory Commission Region Ill 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Mr. L. Raghavan U.S. Nuclear Regulatory Commission Mail Stop 8-H4A Washington, D. C. 20555 Mr. S. C. Burton NRC Senior Resident Inspector Kewaunee Power Station Serial No. 06-724 Update On Improvement Initiatives Attachment 1 KEWAUNEE IMPROVEMENT INITIATIVES WITH REFERENCE TO CORRECTIVE ACTION PROGRAM ENTRY KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.
: 1. Kewaunee lmprovement Initiatives with Reference to Corrective Action Program Entry Commitments made by this letter: NONE cc:   Regional Administrator U. S. Nuclear Regulatory Commission Region Ill 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Mr. L. Raghavan U.S. Nuclear Regulatory Commission Mail Stop 8-H4A Washington, D. C. 20555 Mr. S. C. Burton NRC Senior Resident Inspector Kewaunee Power Station
Serial No.
 
06-724 Docket No. 05-305 Attachment Objective Implement NMC Fleet Operations Mentoring Program to improve Conduct of Operations. Raise standards of performance within Operations.
Serial No. 06-724 Update On Improvement Initiatives Attachment 1 KEWAUNEE IMPROVEMENT INITIATIVES WITH REFERENCE TO CORRECTIVE ACTION PROGRAM ENTRY KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.
Summary of Commitment Steps To provide an immediate improvement in the Conduct of Operations, experienced SRO License holders from the NMC fleet have been temporarily placed on shift with the Kewaunee Operations crews to provide mentoring and feedback.
 
This objective will be achieved by: 1. conducting a gap analysis between current conduct of Operations and industry best practices, 2. improving annunciator response expectations, 3. improving turnover and pre-shift brief expectations, and 4. improving log keeping expectations and "operator at the controls" expectations.
Serial No. 06-724 Docket No. 05-305 Attachment Corrective Objective                 Summary of              Action  Completion      Methods to Verify Commitment Steps            Program        Date        Commitment Met Entry Implement NMC Fleet Operations To provide an immediate                  Prior to Startup  Fleet NOS Mentoring Program to improve                                   CA 18561 improvement in the                      from the Spring    observations.
: 5. implement Check Operator Program to provide feedback on standard adherence.
Conduct of Operations.         Conduct of Operations,                   2005 Forced experienced SRO License                 Outage            Documented holders from the NMC fleet                                 feedback from have been temporarily                                       mentors.
: 3. implement Dominion Corrective Action Program Entry CA 18561 CA 18845 COM 21 608 Completion Date Prior to Startup from the Spring 2005 Forced Outage Methods to Verify Commitment Met Fleet NOS observations.
placed on shift with the Kewaunee Operations crews to provide mentoring                                   Conduct a follow-up and feedback.                                                assessment for an effectiveness review 3Q05.
Documented feedback from mentors. Conduct a follow-up assessment for an effectiveness review 3Q05. Revised Conduct of Operations Procedure issued. Assess as part of mentor follow-up effectiveness review 3Q05. Check Operator Program implemented. DNOS a roved and PP Page 1 of 22 Serial No. 06-724 Docket No. 05-305 Attachment issued. Nuclear Operations Standards (DNOS).
Raise standards of performance This objective will be         CA 18845                    Revised Conduct of within Operations.            achieved by:                                                Operations Procedure issued.
COM 21609 Corrective Action Program Entry CA 18846 Completion Date Methods to Verify Commitment Met Item 1 (Cont'd) Summary of Commitment Steps Objective lmprove understanding of what an Operations - led organization looks like. To gain a broader perspective and improved understanding of what an Operations - led organization is, all Shift Managers will participate in a benchmarking trip to plants recommended by INPO or other industry groups. Trip reports documenting benchmarking trip results, including improvement actions. lmprove Operations training.
: 1. conducting a gap analysis between                                     Assess as part of current conduct of                                     mentor follow-up Operations and                                       effectiveness review industry best practices,                             3Q05.
To improve performance of the Operations Department, experienced personnel from INPO and the NMC fleet have been temporarily placed with Kewaunee Operations Training staff. This will provide an immediate improvement in the conduct of Operations Training, recognizing that additional actions will be nitiated based on the scheduled self- wsessment.
: 2. improving annunciator response expectations,
Documented feedback from mentors. Self-assessment of the Operations Training Programs. The self-assessment will include industry peers. mprove the effectiveness of ~perational decision making.
: 3. improving turnover and pre-shift brief expectations, and
The Kewaunee Operational Decision Making procedure Nil1 be upgraded to align Nith a more effective 3perational decision making model, based on ndustry practices.
: 4. improving log keeping expectations and "operator at the controls" expectations.
4ppropriate training and/or ~riefing will be conducted Page 2 of 22 Effectiveness Review of original procedure. Operational Decision Making Procedure revision issued.   
: 5. implement Check Operator Program to                                   Check Operator provide feedback on                                   Program standard adherence.                                    implemented.
: 3. implement Dominion Page 1 of 22 COM 21608 PPDNOS a     roved and
 
Serial No. 06-724 Docket No. 05-305 Attachment Nuclear Operations                            issued.
Standards (DNOS).
COM 21609 Corrective Item 1                                              Summary of              Action   Completion Methods to Verify (Cont'd)
Objective Commitment Steps           Program    Date    Commitment Met Entry lmprove understanding of what an   To gain a broader            CA 18846              Trip reports Operations - led organization looks perspective and improved                             documenting like.                              understanding of what an                             benchmarking trip Operations - led                                     results, including organization is, all Shift                           improvement actions.
Managers will participate in a benchmarking trip to plants recommended by INPO or other industry groups.
lmprove Operations training.       To improve performance of                           Documented the Operations                                     feedback from Department, experienced                             mentors.
personnel from INPO and the NMC fleet have been                             Self-assessment of temporarily placed with                             the Operations Kewaunee Operations                                 Training Programs.
Training staff. This will                           The self-assessment provide an immediate                               will include industry improvement in the                                 peers.
conduct of Operations Training, recognizing that additional actions will be nitiated based on the scheduled self-wsessment.
mprove the effectiveness of         The Kewaunee Operational                            Effectiveness Review
        ~perationaldecision making.         Decision Making procedure                           of original procedure.
Nil1 be upgraded to align Nith a more effective                               Operational Decision 3perational decision                               Making Procedure making model, based on                             revision issued.
ndustry practices.
4ppropriate training and/or
                                            ~riefingwill be conducted Page 2 of 22
 
Serial No. 06-724 Docket No. 05-305 Attachment 1 to revise the listed KPS COM 21 621                                        I EOPIAOPs into 2-column format.                                        L ~ sPublished t
COM 21 621 Work-off curve established.
Corrective Item 1                                        Summary of            Action  Completion  Methods to Verify (Cont'd)
Objective Commitment Steps          Program    Date      Commitment Met Entry Improve Non-Licensed Operator Revise the Nuclear          COM 21622            Program revised.
Continuing Training program  Auxiliary Operator Training Program Description to improve the focus on systems.
Develop, review, and approve the 2006-2007      COM 21623            Develop, review and Non-Licensed Operator                            approve plan.
Continuing Two-Year Training Plan.
Perform effectiveness review.
COM 21624            Effectiveness review completed.
Page 4 of 22
 
Serial No. 06-724 Docket No. 05-305 Attachment 1 Corrective Summary of            Action  Completion      Methods to Verify 0bjective                                                                        Commitment Met Commitment Steps          Program        Date Entry Improve the quality of Operability    Combined Engineering and    CAP 26045  Prior to Startup  Training attendance Determinations.                      Operations training on                from the Spring  records.
Operability Determinations  CE 15568  2005 Forced and Recommendations has                Outage            Effectiveness review been conducted. The          CA 19128                    4Q05.
audience for this training was and will be Shift Managers, Shift Technical Advisors, and those Engineers qualified to perform Operability Recommendations.
Validate the quality of existing open To confirm quality and      CA 18563  Prior to Startup  Documented Operability Determinations.          applicability of the                  from the Spring  summary of reviews.
operability determinations            2005 Forced for all Operable but                  Outage            PORC concurrence Degraded and Operable                                    of open operability but Non-conforming                                      determinations.
conditions, an independent review of the associated operability recommendations will be completed. This review will encompass those which will remain open following startup from the Spring 2005 Forced Outage.
Page 5 of 22
 
Serial No. 06-724 Docket No. 05-305 Attachment 1 Corrective Summary of              Action    Completion      Methods to Verify Objective Commitment Steps            Program        Date        Commitment Met
                                --
Entry Confirm prior NRC commitments      A representative sample of   CAP 26046  Prior to Startup  Documented have been implemented as            existing commitments will                from the Spring    assessment results.
required.                           be performed to confirm        CE 15569  2005 Forced the implementation of prior              Outage commitments that              CA 19103 Kewaunee has made to the NRC.
CAP 27239 CA 19531 Confirm assumptions made in        A validation will be                      Prior to Startup    Documented critical engineering calculations, performed of all time critical            from the Spring    assessment results of that require operator actions to be operator actions assumed                  2005 Forced        top 19 components performed within specific times,    in engineering calculations              Outage            prior to startup from the reflect actual operator response    for the top 19 high risk / low                              current outage.
times.                              margin components prior to startup from the current outage.
The balance of the top 50                                    Documented high risk components will                                    assessment results of be completed by 4Q05.                                        top 50 components 4Q05.
Provide reasonable assurance of    Assessments and plant                    Prior to Startup  Documented walk design basis compliance for high    walk downs are being                      from the Spring    down results.
energy line breaks, tornados,      conducted to identify                    2005 Forced flooding, and seismic events.      significant issues with high              3utage energy line break, tornados, seismic and flooding. The walk downs are designed to identify:
: 1. potential vulnerabilities to pipe whip, and/or postulated concurrent equipment failures, and
: 2. potential component or Page 6 of 22


Item 1 (Cont'd) Objective Improve Non-Licensed Operator Continuing Training program to revise the listed KPS EOPIAOPs into 2-column format. Summary of Commitment Steps Revise the Nuclear Auxiliary Operator Training Program Description to improve the focus on systems. Develop, review, and approve the 2006-2007 Non-Licensed Operator Continuing Two-Year Training Plan. Perform effectiveness review. COM 21 621 COM 21 621 Corrective Action Program Entry COM 21 622 COM 21623 COM 21624 Completion Date Serial No. 06-724 Docket No. 05-305 Attachment 1 I L~st Published Work-off curve established.
Serial No. 06-724 Docket No. 05-305 structural failures that could impact the operability of safety-related equipment.
Methods to Verify Commitment Met Program revised. Develop, review and approve plan. Effectiveness review completed.
Corrective Summary of                Action   Completion       Methods to Verify Objective                                                            Date       Commitment Met Commitment Steps             Program Entry Resolve auxiliary feedwater       Modifications will be          CA 18934  Prior to Startup  Modification system operability concerns due to implemented to restore                    from the Spring  documents.
Page 4 of 22 0 bjective Improve the quality of Operability Determinations.
loss of suction from the           operability of the auxiliary             2005 Forced Condensate System.                feedwater system. The                     Outage scope of the modification will include re-routing of the auxiliary feedwater pump suction piping, and installation of a low suction pressure trip function.
Validate the quality of existing open Operability Determinations.
Address the turbine building      Modification and repairs                  Prior to Startup Modification flooding concerns.                 will be completed to                     from the Spring  documents.
Summary of Commitment Steps Combined Engineering and Operations training on Operability Determinations and Recommendations has been conducted.
address the turbine                       2005 Forced building internal flooding               Outage issue.
The audience for this training was and will be Shift Managers, Shift Technical Advisors, and those Engineers qualified to perform Operability Recommendations.
Reduce potential for residual heat Implement modification to      COM 21626                    Approved design removal pump pit flooding during   reduce flooding potential                                   description, approved shutdown.                          for RHR pump pits.                                         10CFR50.59, completed work order.
To confirm quality and applicability of the operability determinations for all Operable but Degraded and Operable but Non-conforming conditions, an independent review of the associated operability recommendations will be completed. This review will encompass those which will remain open following startup from the Spring 2005 Forced Outage. Corrective Action Program Entry CAP 26045 CE 15568 CA 191 28 CA 18563 Completion Date Prior to Startup from the Spring 2005 Forced Outage Prior to Startup from the Spring 2005 Forced Outage Serial No. 06-724 Docket No. 05-305 Attachment 1 Methods to Verify Commitment Met Training attendance records. Effectiveness review 4Q05. Documented summary of reviews. PORC concurrence of open operability determinations. Page 5 of 22 Serial No. 06-724 Docket No. 05-305 Attachment 1 Objective
Submit flooding license basis. Submit flooding license       COM 21627                   LAR submitted.
-- Confirm prior NRC commitments have been implemented as required.
amendment request.
Confirm assumptions made in critical engineering calculations, that require operator actions to be performed within specific times, reflect actual operator response times. Provide reasonable assurance of design basis compliance for high energy line breaks, tornados, flooding, and seismic events. Summary of Commitment Steps A representative sample of existing commitments will be performed to confirm the implementation of prior commitments that Kewaunee has made to the NRC. A validation will be performed of all time critical operator actions assumed in engineering calculations for the top 19 high risk
Resolve auxiliary feedwater local The auxiliary feedwater       COM 21628  NLT RFO-29        Local operator actions operator actions                  system local manual                                         eliminated.
/ low margin components prior to startup from the current outage. The balance of the top 50 high risk components will be completed by 4Q05. Assessments and plant walk downs are being conducted to identify significant issues with high energy line break, tornados, seismic and flooding. The walk downs are designed to identify:
operator actions as described in the license amendment request submitted May 5, 2005, and supplemented on June 9, 2005 will be eliminated.
: 1. potential vulnerabilities to pipe whip, and/or postulated concurrent equipment failures, and 2. potential component or Corrective Action Program Entry CAP 26046 CE 15569 CA 19103 CAP 27239 CA 19531 Completion Date Prior to Startup from the Spring 2005 Forced Outage Prior to Startup from the Spring 2005 Forced Outage Prior to Startup from the Spring 2005 Forced 3utage Methods to Verify Commitment Met Documented assessment results. Documented assessment results of top 19 components prior to startup from the current outage. Documented assessment results of top 50 components 4Q05. Documented walk down results. Page 6 of 22 Serial No. 06-724 Docket No. 05-305 structural failures that could impact the operability of safety- related equipment.
Page 7 of 22
Corrective Action Program Entry CA 18934 Completion Methods to Verify Date Commitment Met Summary of Commitment Steps Objective Resolve auxiliary feedwater system operability concerns due to loss of suction from the Condensate System.
Modifications will be implemented to restore operability of the auxiliary feedwater system. The scope of the modification will include re-routing of the auxiliary feedwater pump suction piping, and installation of a low suction pressure trip function. Prior to Startup Modification from the Spring documents. 2005 Forced Outage Prior to Startup Modification from the Spring documents. 2005 Forced Outage Address the turbine building flooding concerns. Modification and repairs will be completed to address the turbine building internal flooding issue. Reduce potential for residual heat removal pump pit flooding during shutdown. Implement modification to reduce flooding potential for RHR pump pits. COM 21626 Approved design description, approved 1 OCFR50.59, completed work order.
Submit flooding license basis. Submit flooding license amendment request. COM 21627 LAR submitted.
Resolve auxiliary feedwater local operator actions The auxiliary feedwater system local manual operator actions as described in the license amendment request submitted May 5, 2005, and supplemented on June 9, 2005 will be eliminated.
Page 7 of 22 COM 21628 NLT RFO-29 Local operator actions eliminated.
Serial No.
06-724 Docket No. 05-305 Update PRA Model Objective Validate and improve documentation of the design basis for: Internal Flooding, High Energy Line Breaks, Station Blackout, Tornados, and Seismic Events Complete documentation and validation of the license bases for the safety functions of the most risk significant safety systems. Incorporate turbine building flood modifications and operations procedure changes Summary of Commitment Steps A project plan will be developed and implemented to complete design basis topical reports. CA 18849 A project plan will be developed and implemented for the documentation and field validation of license bases for the safety functions of the Auxiliary Feedwater System, Service Water System, Residual Heat Removal System, Component Cooling Water System, and Emergency Diesel Generators, 4kV electrical system and DC electrical system. CA 18850 COM 21629 Corrective Action Program Entry COM 21749 COM 21751 COM 21753 COM 21754 COM 21756 COM 21737 COM 21738 COM 21748 COM 21739 COM 21740 COM 21741 COM 21742 COM 21 743 Completion Date Attachment PRA Notebook issued Methods to Verify Commitment Met Internal flooding topical report completed High energy line break topical report completed Station blackout topical report completed Tornado topical report completed Seismic topical report completed AFW System completed SW System completed Interim project progress review RHR System completed CCW System completed EDG completed 4kV System completed DC System completed Page 8 of 22 Item 5 (Cont'd) Objective Improve retrievability and control of calculations of record. Updating of Environmental Qualification (EQ) Program Summary of Commitment Steps The following will be completed:
: 1. Complete populating the current safety related calculations into the calculation database, and
: 2. Incorporating cross- reference information of inputs/outputs between calculations. Conduct a validation assessment of a sample of completed EQ program documents for adequacy in incorporating design basis information and assess prioritization of update plan. Corrective Action Program Entry CA 18851 COM 21631 Completion Date Serial No. 06-724 Docket No.
05-305 Attachment 1 Methods to Verify Commitment Met Electronic database population complete.
Cross-referencing between calculations in database complete.
Effectiveness review. Perform assessment of completed file upgrades and plan.
Page 9 of 22 Serial No.
06-724 Docket No. 05-305 Attachment 1 Objective Complete AC electrical models and calculations to provide clear bases for safety related settings and loads. Complete DC electrical models and calculations to provide clear bases for safety related settings and loads. Summary of Commitment Steps Complete AC electrical calculations for:
: 1. load flow, CA 18853 2. short-circuit currents, CA 18853 3. EDG loading, CA 18853 4. relay setting, cA 18853 5. protection coordination, CA 18853 6. control circuit voltage drops, cA 18853 7. cable ampacity, CA 18853 8. thermal overload relays. CA 18853 Complete DC electrical calculations for: 1. battery sizing, CA 18854 2. charger sizing, CA 18854 3. voltage drop, CA 18854 4. short-circuit currents, CA 18854 5. control circuit voltage Corrective Action Program Entry COM 21832 COM 21 833 COM 21834 COM 21837 COM 21833 COM 21837 COM 21834 Completion Date Methods to Verify Commitment Met lnterim project progress review. lnterim project progress review.
Calculations completed, validated, and issued. 0 lnterim Progress Review lnterim project progress review. lnterim project progress review.
Calculations completed, validated and issued. Page 10 of 22 


0 bjective Improve the quality of Engineering products.
Serial No. 06-724 Docket No. 05-305 Attachment Update PRA Model                    Incorporate turbine building COM 21629              PRA Notebook issued flood modifications and operations procedure changes Corrective Summary of               Action  Completion Methods to Verify Objective Commitment Steps           Program    Date      Commitment Met Entry Validate and improve                A project plan will be        COM 21749              Internal flooding topical documentation of the design basis  developed and                                         report completed for:                                implemented to complete design basis topical reports. CA 18849            COM 21751              High energy line break Internal Flooding, topical report completed High Energy Line Breaks, COM 21753              Station blackout topical Station Blackout,                                                                      report completed Tornados, and                                                  COM 21754              Tornado topical report completed Seismic Events                                                COM 21756              Seismic topical report completed Complete documentation and          A project plan will be        COM 21737            AFW System completed validation of the license bases for developed and the safety functions of the most    implemented for the                                SW System completed risk significant safety systems. documentation and field      COM 21738 validation of license bases                        Interim project progress for the safety functions of   COM 21748 review the Auxiliary Feedwater System, Service Water                              RHR System completed System, Residual Heat        COM 21739 Removal System, COM 21740            CCW System completed Component Cooling Water System, and Emergency                              EDG completed Diesel Generators, 4kV        COM 21741 electrical system and DC electrical system. CA         COM 21742            4kV System completed 18850 COM 21743 DC System completed Page 8 of 22
Summary of Commitment Steps An assessment of engineering has been conducted using NMC fleet and external expertise to identify the key areas for improvement and to develop associated action plans. To improve the quality of Engineering products, an interim Independent Review Group (IRG) has been established to provide an in-line independent review of engineering products, including:
: 1. Operability Recommendations, 2. 10 CFR 50.59 evaluations, 3. calculations important to safety, and 4. modifications important to safety.
Training will be conducted to reinforce expectations regarding Engineering product quality. Corrective Action Program Entry CE 15571 CA 18890 CA 18891 Completion Date Prior to Startup from the Spring 2005 Forced Outage Prior to Startup from the Spring 2005 Forced


Outage Serial No. 06-724 Docket No. 05-305 Attachment 1 Methods to Verify Commitment Met Completed assessment report.
Serial No. 06-724 Docket No. 05-305 Attachment 1 Corrective Item 5                                                Summary of          Action  Completion Methods to Verify Objective (Cont'd)                                         Commitment Steps         Program    Date    Commitment Met Entry Improve retrievability and control of The following will be       CA 18851            Electronic database calculations of record.               completed:                                      population complete.
IRG Implemented Engineering quality effectiveness review 4Q05. Training attendance records. Page 12 of 22 Serial No. 06-724 Docket No. 05-305 Attachment 1 Item 7 (Cont'd) Objective lmprove Engineering knowledge and understanding of design and licensing bases. lmprove the interface between Operations, Maintenance, and Engineering.
: 1. Complete populating                        Cross-referencing the current safety                          between calculations related calculations                        in database complete.
lmprove Station Engineering Support lmprove Equipment Reliability Summary of Commitment Steps Training will be conducted on design and licensing bases for Engineering personnel.
into the calculation database, and                               Effectiveness review.
Roles and responsibilities for Operations, Maintenance, and Engineering as they relate to Engineering support will be examined and re- defined as necessary.
: 2. Incorporating cross-reference information of inputs/outputs between calculations.
Corrective Action Program Entry CA 18855 CA 18856 Establish System Engineering COM 21 808 COM 21809 Completion Date Methods to Verify Establish a Station Equipment Reliability Team (SERT) and Station Equipment Reliability Issues List (SERIL). Commitment
Updating of Environmental            Conduct a validation      COM 21631              Perform assessment Qualification (EQ) Program            assessment of a sample of                         of completed file completed EQ program                              upgrades and plan.
~et Training attendance records. COM 21 81 2 COM 2181 4 Effectiveness review 2Q06. Roles and responsibilities documented.
documents for adequacy in incorporating design basis information and assess prioritization of update plan.
1 Q06 1 Q06 Effectiveness review 4Q05. Dominion Assist Visit Implement Dominion Plant Health Reports.
Page 9 of 22
Team established List developed Page 13 of 22 Serial No. 06-724 Docket No. 05-305 Attachment 1 Objective Ensure station personnel are aware of their roles and responsibilities in the Corrective Action Program (CAP). Validate the appropriateness of the significance level assigned for all wrrently open conditions adverse to quality in the Corrective Action Dr~gram. 4ssure CAP trends are identified and
~sed in the significance and level of ?ffort assigned during CAP screening.
Summary of Commitment Steps Actions will be taken to ensure that station personnel are aware of their roles and responsibilities as they pertain to the Corrective Action Program. Implement communications campaign to reinforce roles and responsibilities. An independent review of all open conditions adverse to quality in the Corrective Action Program is being completed. Trend information related to repeat CAP items will be provided to the daily CAP screen team. Corrective Action Program Entry CA 18857 COM 21632 Completion Date - - Prior to Startup from the Spring 2005 Forced Outage hior to Startup 'rom the Spring 2005 Forced 3utage Methods to Verify Commitment Met Employee briefings completed. New employee training program revised. Copies of D-15 and presentation materials.
Documented results of the assessment.
Generation of adverse trend CAPS. Effectiveness review 4Q05. Page 14 of 22 Item 8 (Cont'd) Objective Assure that managers recognize the significance of long standing issues.
Summary of Commitment Steps Training on risk significance will be provided to the management team.
This training is also part of the corrective actions to prevent recurrence from the containment equipment hatch close root cause evaluation.
Corrective Action Program Entry CA 18858 Completion Date Serial No. 06-724 Docket No. 05-305 Attachment 1 Methods to Verify Commitment Met Training attendance records. Assessments indicate no significant CAP prioritization errors.
Goal is to have: No level "A misclassifications 2 90% level "B issues properly classified.
Page 15 of 22


Serial No. 06-724 Docket No. 05-305 Attachment 1 Objective Validate the timeliness for resolution of current open significant issues. Assure operable but degraded / non- conforming issues are corrected in a timely manner. Upgrade the KPS Emergency Action Levels (EAL) to the NEI 99-01 EAL scheme as submitted to NRC on October 26, 2004 Summary of Commitment Steps An independent review is being conducted of all open corrective actions from level "A and "B action requests to validate the timeliness of resolution for significant issues. Administrative procedures have been revised to include requirements for timely resolution of operable but degraded / non-conforming issues.
Serial No. 06-724 Docket No. 05-305 Attachment 1 Corrective Objective                       Summary of               Action   Completion  Methods to Verify Commitment Steps           Program    Date      Commitment Met Entry Complete AC electrical models and       Complete AC electrical      COM 21832                  lnterim project calculations to provide clear bases for calculations for:                                        progress review.
As of March 15, 2005,28 open OBDs remain. Conduct training.
safety related settings and loads.
Implement new EALs. Corrective Action Program Entry CE 15567 COM 21635 COM 21636 Completion Date Prior to Startup from the Spring 2005 Forced Outage 6 months after NRC approval.
: 1. load flow, CA 18853      COM 21833 lnterim project progress review.
6 months after NRC approval Methods to Verify Commitment Met Documentation of results from the review. Revision to procedure GNP 11.08.01 issued. March 15, 2005 backlog of open operable but degraded / non- conforming conditions reduced by 2 50%. Training completed Procedures revised.
: 2. short-circuit currents, CA 18853                COM 21834 Calculations
Page 17 of 22 Objective Communicate Kewaunee "Picture of Excellence" to employees to help facilitate sustained performance improvement. NRC-05-118 stated to the NRC that DEK no longer commits to the Kewaunee Picture of Excellence but rather the Kewaunee Passion for Excellence.
: 3. EDG loading, CA 18853                              completed, validated, and
Summary of Commitment Steps Action steps to meet this objective include communicating and reinforcing the "Picture of Excellence" to improve accountability and individual behaviors. Training for managers and supervisors has begun, and will be completed prior to unit startup. Corrective Action Program Entry CA 1 8861 Completion Date Serial No. 06-724 Docket No. 05-305 Attachment 1 Methods to Verify Commitment Met Training attendance records. Page 1 8 of 22 Serial No. 06-724 Docket No. 05-305 Attachment 1 Objective Provide the necessary infrastructure and tools required to execute and reinforce the "Picture of Excellence". Build depth in Emergency Response Organization Summary of Commitment Steps The implementation steps include: Incorporating ACEMAN into daily Plan Of the Next Day (POND) meetings.
: 4. relay setting, c A 18853                            issued.
Implementation of a daily meeting (D-15) between supervisors and individual contributors. The purpose of the D-15 meetings is to improve communication between employees, supervisors and managers.
COM 21837
They are designed to enhance the information flow between employees and all levels of management and create an environment for open communication.
: 5. protection                                    0    lnterim Progress coordination, CA 18853                              Review
Alignment of Performance Management Plans to the "Picture of Excellence" Establishing monthly
: 6. control circuit voltage drops, c A 18853
: 7. cable ampacity, CA 18853
: 8. thermal overload relays. CA 18853 Complete DC electrical models and       Complete DC electrical        COM 21833                lnterim project calculations to provide clear bases for calculations for:                                      progress review.
safety related settings and loads.
: 1. battery sizing,          COM 21837 lnterim project CA 18854 progress review.
: 2. charger sizing,          COM 21834 CA 18854                                            Calculations completed,
: 3. voltage drop, CA 18854                              validated and issued.
: 4. short-circuit currents, CA 18854
: 5. control circuit voltage Page 10 of 22


Picture of Excellence Review Group (PERG) meetings to foster accountability for implementation of the site Excellence Plans.
Serial No. 06-724 Docket No. 05-305 Attachment 1 Corrective Summary of              Action  Completion      Methods to Verify 0bjective              Commitment Steps            Program        Date        Commitment Met Entry Improve the quality of Engineering  An assessment of          CE 15571  Prior to Startup  Completed products.                            engineering has been                from the Spring    assessment report.
Assess staffing needs and qualification in Emergency Preparedness positions.
conducted using NMC                2005 Forced fleet and external                  Outage expertise to identify the key areas for improvement and to develop associated action plans.
To improve the quality of Engineering                      Prior to Startup from the Spring    IRG Implemented products, an interim      CA 18890 Independent Review                  2005 Forced Group (IRG) has been                Outage established to provide an in-line independent review of engineering Engineering quality products, including:
effectiveness review 4Q05.
: 1. Operability Recommendations,
: 2. 10 CFR 50.59 evaluations,
: 3. calculations important to safety, and
: 4. modifications important to safety.
Training will be conducted to reinforce                                Training attendance expectations regarding                                records.
Engineering product quality.                  CA 18891 Page 12 of 22
 
Serial No. 06-724 Docket No. 05-305 Attachment 1 Corrective Item 7                                            Summary of              Action  Completion Methods to Verify Objective (Cont'd)                                      Commitment Steps          Program      Date  Commitment ~ e t Entry lmprove Engineering knowledge and  Training will be conducted  CA 18855              Training attendance understanding of design and        on design and licensing                            records.
licensing bases.                    bases for Engineering personnel.                                          Effectiveness review 2Q06.
lmprove the interface between      Roles and responsibilities  CA 18856              Roles and Operations, Maintenance, and        for Operations,                                    responsibilities Engineering.                        Maintenance, and                                    documented.
Engineering as they relate to Engineering support will                        Effectiveness review be examined and re-                                4Q05.
defined as necessary.
lmprove Station Engineering Support Establish System            COM 21808              Dominion Assist Visit Engineering COM 21809              Implement Dominion Plant Health Reports.
lmprove Equipment Reliability      Establish a Station        COM 21812  1Q06        Team established Equipment Reliability Team (SERT) and Station          COM 21814  1Q06        List developed Equipment Reliability Issues List (SERIL).
Page 13 of 22
 
Serial No. 06-724 Docket No. 05-305 Attachment 1 Corrective Summary of            Action    Completion          Methods to Verify Objective Commitment Steps          Program          Date          Commitment Met Entry Ensure station personnel are aware      Actions will be taken to    CA 18857                          Employee briefings of their roles and responsibilities in  ensure that station                                            completed.
the Corrective Action Program            personnel are aware of (CAP).                                  their roles and                                                New employee responsibilities as they                                      training program pertain to the Corrective                                      revised.
Action Program.
Implement communications                                      Copies of D-15 and campaign to reinforce roles                                    presentation and responsibilities.        COM 21632 materials.
                                                                                                  - -
Validate the appropriateness of the    An independent review of                Prior to Startup      Documented results significance level assigned for all    all open conditions adverse            from the Spring        of the assessment.
wrrently open conditions adverse to    to quality in the Corrective            2005 Forced quality in the Corrective Action        Action Program is being                Outage Dr~gram.                                completed.
4ssure CAP trends are identified and    Trend information related              h i o r to Startup    Generation of
~ s e din the significance and level of to repeat CAP items will be            'rom the Spring        adverse trend CAPS.
?ffort assigned during CAP              provided to the daily CAP              2005 Forced screening.                              screen team.                            3utage                Effectiveness review 4Q05.
Page 14 of 22
 
Serial No. 06-724 Docket No. 05-305 Attachment 1 Corrective Item 8                                                Summary of              Action  Completion Methods to Verify Objective (Cont'd)                                        Commitment Steps            Program    Date    Commitment Met Entry Assure that managers recognize the    Training on risk              CA 18858              Training attendance significance of long standing issues. significance will be                                records.
provided to the management team. This                              Assessments training is also part of the                        indicate no corrective actions to                              significant CAP prevent recurrence from                            prioritization errors.
the containment equipment                          Goal is to have:
hatch close root cause evaluation.
No level " A misclassifications 2 90% level " B issues properly classified.
Page 15 of 22
 
Serial No. 06-724 Docket No. 05-305 Attachment 1 Corrective Summary of              Action  Completion      Methods to Verify Objective Commitment Steps            Program        Date        Commitment Met Entry Validate the timeliness for resolution An independent review is      CE 15567  Prior to Startup  Documentation of of current open significant issues. being conducted of all open            from the Spring    results from the corrective actions from                2005 Forced        review.
level " A and " B action                Outage requests to validate the timeliness of resolution for significant issues.
Assure operable but degraded / non-    Administrative procedures                                  Revision to conforming issues are corrected in a  have been revised to                                      procedure GNP timely manner.                        include requirements for                                  11.08.01 issued.
timely resolution of operable but degraded /                                    March 15, 2005 non-conforming issues. As                                  backlog of open of March 15, 2005,28 open                                  operable but OBDs remain.                                              degraded / non-conforming conditions reduced by 2 50%.
Upgrade the KPS Emergency Action      Conduct training.            COM 21635  6 months after    Training completed Levels (EAL) to the NEI 99-01 EAL                                              NRC approval.
scheme as submitted to NRC on October 26, 2004 Implement new EALs.          COM 21636  6 months after    Procedures revised.
NRC approval Page 17 of 22
 
Serial No. 06-724 Docket No. 05-305 Attachment 1 Corrective Summary of            Action  Completion Methods to Verify Objective Commitment Steps          Program    Date    Commitment Met Entry Communicate Kewaunee "Picture of  Action steps to meet this    CA 18861              Training attendance Excellence" to employees to help  objective include                                  records.
facilitate sustained performance  communicating and improvement.                      reinforcing the "Picture of Excellence" to improve NRC-05-118 stated to the NRC that  accountability and DEK no longer commits to the      individual behaviors.
Kewaunee Picture of Excellence but Training for managers and rather the Kewaunee Passion for    supervisors has begun, Excellence.                        and will be completed prior to unit startup.
Page 18 of 22
 
Serial No. 06-724 Docket No. 05-305 Attachment 1 Corrective Summary of                Action    Completion Methods to Verify Objective Commitment Steps              Program      Date    Commitment Met Entry Provide the necessary infrastructure  The implementation steps and tools required to execute and      include:
reinforce the "Picture of Excellence". Incorporating ACEMAN        CA 18958              ACEMAN grading into daily Plan Of the Next                        employed at POND Day (POND) meetings.                                meetings.
Implementation of a daily    C A 18958              D-15 meetings meeting (D-15) between                              implemented.
supervisors and individual contributors. The purpose of the D-15 meetings is to improve communication between employees, supervisors and managers. They are designed to enhance the information flow between employees and all levels of management and create an environment for open communication.
Alignment of Performance                              "Picture of Excellence" C A 18993 Management Plans to the                              and ACEMAN "Picture of Excellence"                              incorporated into station Performance Management Plans.
Establishing monthly          C A 18958              PERG Picture of Excellence Review Group (PERG) meetings to foster accountability for implementation of the site Excellence Plans.
Build depth in Emergency Response      Assess staffing needs and       C O M 21637              Assessment Report Organization                          qualification in Emergency Preparedness positions.
Train additional personnel.
Train additional personnel.
Corrective Action Program Entry CA 18958 CA 18958 CA 18993 CA 18958 COM 21637 COM 21 638 Completion Date Methods to Verify Commitment Met ACEMAN grading employed at POND meetings. D-15 meetings implemented. "Picture of Excellence" and ACEMAN incorporated into station Performance Management Plans.
C O M 21 638 Training attendance records.
PERG Assessment Report Training attendance records. Page 19 of 22 Serial No.
Page 19 of 22
06-724 Docket No. 05-305 Objective lmprove the leadership capability of supervisors in: 1. Operations, 2. Operations Training, and 3. Engineering.
 
lmprove the leadership capability of supervisors in: Maintenance, Chemistry, Outage and Planning, Emergency Planning, & Radiation Protection Summary of Commitment Steps A leadership assessment will be conducted for the: 1. Assistant Operations Managers, 2. Shift Managers, 3. Control Room Supervisors, 4. Operations Instructors, 5. Engineering Managers, and 6. Engineering Supervisors.
Serial No. 06-724 Docket No. 05-305 Attachment 1 Corrective Summary of              Action    Completion      Methods to Verify Objective Commitment Steps              Program          Date      Commitment Met Entry lmprove the leadership capability of A leadership assessment        CAP 26038  Operations &      Documented results supervisors in:                       will be conducted for the:                Operations        of the assessments.
The assessment will focus on leadership capabilities and capacity to implement a continuous improvement zulture. Results of the assessments will be factored into individual Improvement plans. 4 leadership assessment tvill be conducted for:
Training will be
Maintenance Supervision
: 1. Operations,                      1. Assistant Operations   Engineering completed        Individual Managers,               CA 18562  2Q05              Performance
:hemistry Supervision 3utage and Planning Supervision Emergency Planning Corrective Action Program Entry CAP 26038 Engineering CA 18562 CA 18972 Operations CA 18973 CA 1921 1 COM 21639 COM 21643 COM 21644 COM 21641 Completion Date Operations
: 2. Operations Training, and                                        CA 18972                    Management Plans
& Operations Training will be completed 2Q05 Engineering will be completed 3Q05 Attachment 1 Methods to Verify Commitment Met Documented results of the assessments.
: 2. Shift Managers,                                       updated with
Individual Performance Management Plans updated with improvement areas. Documented results of the assessments.
: 3. Engineering.                                                                                  improvement areas.
Individual
: 3. Control Room Supervisors,                       Engineering Operations  will be
: 4. Operations Instructors, CA 18973  completed CA 19211  3Q05
: 5. Engineering Managers, and
: 6. Engineering Supervisors.
The assessment will focus on leadership capabilities and capacity to implement a continuous improvement zulture. Results of the assessments will be factored into individual Improvement plans.
lmprove the leadership capability of  4 leadership assessment supervisors in: Maintenance,          tvill be conducted for:
Chemistry, Outage and Planning,                                                                    Documented results Emergency Planning, & Radiation                                      COM 21639 Maintenance Supervision                                     of the assessments.
Protection COM 21643
:hemistry Supervision                                       Individual COM 21644                    Performance 3utage and Planning                                         Management Plans Supervision                                                 updated with COM 21641                    improvement areas.
Emergency Planning Page 20 of 22
 
Serial No. 06-724 Docket No. 05-305 Attachment    '
Supervision          COM 21645 Radiation Protection Supervision Corrective Item 12                                          Summary of        Action   Completion Methods to Verify Objective                                    Program    Date    Commitment Met (Cont'd)                                    Commitment Steps Entry Improve line manager ownership and Implement DNAP 01 14, COM 21646              DNAP Approved.
accountability.                    Dominion Nuclear Self Evaluation Program.                         Station Self Assessment Meeting (SSEM) Held Page 21 of 22


Performance Management Plans updated with improvement areas.
Serial No. 06-724 Docket No. 05-305 Attachment 1 Corrective Summary of            Action  Completion Methods to Verify ltem 13            0bjective            Commitment Steps          Program      Date    Commitment Met Entry lmprove Nuclear Oversight (NOS) Implement mentors from     CA 18862  3Q05        Rotation policy in-effectiveness.                  other NMC sites for a                             place.
Page 20 of 22 Item 12 (Cont'd) Supervision Radiation Protection Supervision Objective Summary of Commitment Steps Improve line manager ownership and accountability. Implement DNAP 01 14, Dominion Nuclear Self Evaluation Program.
period of 6 weeks, assign assessors to a functional                         Assessors assigned area, and implement a                             to functional areas.
COM 21645 Corrective Action Program Entry COM 21646 Completion Date Serial No. 06-724 Docket No. 05-305 Attachment  
rotation plan. An improvement plan                                 Develop addressing assessor                               improvement plan.
' Methods to Verify Commitment Met DNAP Approved.
performance will be developed which will include additional actions                       Review effectiveness of Nuclear Oversight processes.
Station Self Assessment Meeting (SSEM) Held Page 21 of 22 Serial No.
Strengthen Nuclear Oversight    Implement Dominion         COM 21647              Establish and fill Assessment Processes            Nuclear Oversight model                           positions which includes separate Specialist Assessment and Audit Programs Corrective Summary of            Action   Completion Methods to Verify ltem 14             0 bjective Commitment Steps          Program      Date    Commitment Met Entry lmprove understanding of       Site management will        CA 18863              Training attendance conservative decision making by conduct training on                              records.
06-724 Docket No. 05-305 Attachment 1 ltem 13 0 bjective lmprove Nuclear Oversight (NOS) effectiveness. Strengthen Nuclear Oversight Assessment Processes Summary of Commitment Steps Implement mentors from other NMC sites for a period of 6 weeks, assign assessors to a functional area, and implement a rotation plan. An improvement plan addressing assessor performance will be developed which will include additional actions Implement Dominion Nuclear Oversight model which includes separate Specialist Assessment and Audit Programs Corrective Action Program Entry CA 18862 COM 21647 Completion Date 3Q05 Methods to Verify Commitment Met Rotation policy in- place. Assessors assigned to functional areas. Develop improvement plan. Review effectiveness of Nuclear Oversight processes.
managers and supervisors.       conservative decision making for managers and supervisors.
Establish and fill positions ltem 14 0 bjective lmprove understanding of conservative decision making by managers and supervisors.
Page 22 of 22}}
Summary of Commitment Steps Training attendance records. Site management will conduct training on conservative decision making for managers and supervisors.
Page 22 of 22 Corrective Action Program Entry CA 18863 Completion Date Methods to Verify Commitment Met}}

Revision as of 11:36, 23 November 2019

Closure of Kewaunee Improvement Initiatives to Corrective Action Program
ML063390666
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 12/05/2006
From: Matthews W
Dominion Energy Kewaunee
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
06-724
Download: ML063390666 (25)


Text

Dominion Energy Kewaunee, Inc.

i 0 0 0 I h r n m ~ o nRoulcvard, Glen Allen, VA 2 3 0 6 0 5 Dominion' December 5, 2006 U. S. Nuclear Regulatory Commission Serial No.06-724 Attention: Document Control Desk KPSILICIMH: R1 Washington, DC 20555 Docket No. 50-305 License No. DPR-43 DOMINION ENERGY KEWAUNEE. INC.

KEWAUNEE POWER STATION CLOSURE OF KEWAUNEE IMPROVEMENT INITIATIVES TO CORRECTIVE ACTION PROGRAM This letter provides notification that Dominion Energy Kewaunee, Inc. (DEK) no longer intends to provide the Nuclear Regulatory Commission (NRC) staff periodic updates regarding the Kewaunee Power Station improvement initiative commitments. These commitments were initially defined in a letter dated March 18, 2005 (reference 1).

These commitments were endorsed and adopted with clarifications by DEK in a letter dated September 15, 2005 (reference 2). In a letter dated November 14, 2005 (reference 3), DEK provided an update to these initiatives.

DEK will continue to monitor the implementation and effectiveness of the improvement initiatives through the site corrective action program and the station's excellence plan.

Adjustments to these improvement initiatives may be necessary in the future based on their effectiveness. These adjustments will be managed in accordance with the site corrective action program and during periodic review of the station's excellence plan.

As always, the status and dispositioning of these corrective actions remain available for NRC review. Therefore, DEK considers the November 15, 2005 letter (reference 3) containing our stated improvement initiatives closed.

The attachment to this letter restates the Kewaunee Power Station improvement initiative commitments and contains a reference to the corrective action program entry for the stated commitment.

If you have questions or require additional information, please feel free to contact Mr. Tom Breene at 920-388-8599.

Very truly yours, u W A W. R. Matthews Senior Vice President - Nuclear Operations

Serial No.06-724 Page 2 of 2

References:

1. Letter from C. W. Lambert (NMC) to Document Control Desk (NRC), "Kewaunee lmprovement Initiatives - Commitments," dated March 18, 2005 (ADAMS Accession No. MLO50820213).
2. Letter from E. S. Grecheck (DEK) to Document Control Desk (NRC), "Endorsement and Adoption of Licensing Actions," dated September 15, 2005 (ADAMS Accession No. ML052590234).
3. Letter from W. R. Matthews (DEK) to Document Control Desk (NRC), "Update on lmprovement Initiatives," dated November 14, 2005 (ADAMS Accession No.

0531 90099).

Attachment

1. Kewaunee lmprovement Initiatives with Reference to Corrective Action Program Entry Commitments made by this letter: NONE cc: Regional Administrator U. S. Nuclear Regulatory Commission Region Ill 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Mr. L. Raghavan U.S. Nuclear Regulatory Commission Mail Stop 8-H4A Washington, D. C. 20555 Mr. S. C. Burton NRC Senior Resident Inspector Kewaunee Power Station

Serial No.06-724 Update On Improvement Initiatives Attachment 1 KEWAUNEE IMPROVEMENT INITIATIVES WITH REFERENCE TO CORRECTIVE ACTION PROGRAM ENTRY KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.

Serial No.06-724 Docket No.05-305 Attachment Corrective Objective Summary of Action Completion Methods to Verify Commitment Steps Program Date Commitment Met Entry Implement NMC Fleet Operations To provide an immediate Prior to Startup Fleet NOS Mentoring Program to improve CA 18561 improvement in the from the Spring observations.

Conduct of Operations. Conduct of Operations, 2005 Forced experienced SRO License Outage Documented holders from the NMC fleet feedback from have been temporarily mentors.

placed on shift with the Kewaunee Operations crews to provide mentoring Conduct a follow-up and feedback. assessment for an effectiveness review 3Q05.

Raise standards of performance This objective will be CA 18845 Revised Conduct of within Operations. achieved by: Operations Procedure issued.

1. conducting a gap analysis between Assess as part of current conduct of mentor follow-up Operations and effectiveness review industry best practices, 3Q05.
2. improving annunciator response expectations,
3. improving turnover and pre-shift brief expectations, and
4. improving log keeping expectations and "operator at the controls" expectations.
5. implement Check Operator Program to Check Operator provide feedback on Program standard adherence. implemented.
3. implement Dominion Page 1 of 22 COM 21608 PPDNOS a roved and

Serial No.06-724 Docket No.05-305 Attachment Nuclear Operations issued.

Standards (DNOS).

COM 21609 Corrective Item 1 Summary of Action Completion Methods to Verify (Cont'd)

Objective Commitment Steps Program Date Commitment Met Entry lmprove understanding of what an To gain a broader CA 18846 Trip reports Operations - led organization looks perspective and improved documenting like. understanding of what an benchmarking trip Operations - led results, including organization is, all Shift improvement actions.

Managers will participate in a benchmarking trip to plants recommended by INPO or other industry groups.

lmprove Operations training. To improve performance of Documented the Operations feedback from Department, experienced mentors.

personnel from INPO and the NMC fleet have been Self-assessment of temporarily placed with the Operations Kewaunee Operations Training Programs.

Training staff. This will The self-assessment provide an immediate will include industry improvement in the peers.

conduct of Operations Training, recognizing that additional actions will be nitiated based on the scheduled self-wsessment.

mprove the effectiveness of The Kewaunee Operational Effectiveness Review

~perationaldecision making. Decision Making procedure of original procedure.

Nil1 be upgraded to align Nith a more effective Operational Decision 3perational decision Making Procedure making model, based on revision issued.

ndustry practices.

4ppropriate training and/or

~riefingwill be conducted Page 2 of 22

Serial No.06-724 Docket No.05-305 Attachment 1 to revise the listed KPS COM 21 621 I EOPIAOPs into 2-column format. L ~ sPublished t

COM 21 621 Work-off curve established.

Corrective Item 1 Summary of Action Completion Methods to Verify (Cont'd)

Objective Commitment Steps Program Date Commitment Met Entry Improve Non-Licensed Operator Revise the Nuclear COM 21622 Program revised.

Continuing Training program Auxiliary Operator Training Program Description to improve the focus on systems.

Develop, review, and approve the 2006-2007 COM 21623 Develop, review and Non-Licensed Operator approve plan.

Continuing Two-Year Training Plan.

Perform effectiveness review.

COM 21624 Effectiveness review completed.

Page 4 of 22

Serial No.06-724 Docket No.05-305 Attachment 1 Corrective Summary of Action Completion Methods to Verify 0bjective Commitment Met Commitment Steps Program Date Entry Improve the quality of Operability Combined Engineering and CAP 26045 Prior to Startup Training attendance Determinations. Operations training on from the Spring records.

Operability Determinations CE 15568 2005 Forced and Recommendations has Outage Effectiveness review been conducted. The CA 19128 4Q05.

audience for this training was and will be Shift Managers, Shift Technical Advisors, and those Engineers qualified to perform Operability Recommendations.

Validate the quality of existing open To confirm quality and CA 18563 Prior to Startup Documented Operability Determinations. applicability of the from the Spring summary of reviews.

operability determinations 2005 Forced for all Operable but Outage PORC concurrence Degraded and Operable of open operability but Non-conforming determinations.

conditions, an independent review of the associated operability recommendations will be completed. This review will encompass those which will remain open following startup from the Spring 2005 Forced Outage.

Page 5 of 22

Serial No.06-724 Docket No.05-305 Attachment 1 Corrective Summary of Action Completion Methods to Verify Objective Commitment Steps Program Date Commitment Met

--

Entry Confirm prior NRC commitments A representative sample of CAP 26046 Prior to Startup Documented have been implemented as existing commitments will from the Spring assessment results.

required. be performed to confirm CE 15569 2005 Forced the implementation of prior Outage commitments that CA 19103 Kewaunee has made to the NRC.

CAP 27239 CA 19531 Confirm assumptions made in A validation will be Prior to Startup Documented critical engineering calculations, performed of all time critical from the Spring assessment results of that require operator actions to be operator actions assumed 2005 Forced top 19 components performed within specific times, in engineering calculations Outage prior to startup from the reflect actual operator response for the top 19 high risk / low current outage.

times. margin components prior to startup from the current outage.

The balance of the top 50 Documented high risk components will assessment results of be completed by 4Q05. top 50 components 4Q05.

Provide reasonable assurance of Assessments and plant Prior to Startup Documented walk design basis compliance for high walk downs are being from the Spring down results.

energy line breaks, tornados, conducted to identify 2005 Forced flooding, and seismic events. significant issues with high 3utage energy line break, tornados, seismic and flooding. The walk downs are designed to identify:

1. potential vulnerabilities to pipe whip, and/or postulated concurrent equipment failures, and
2. potential component or Page 6 of 22

Serial No.06-724 Docket No.05-305 structural failures that could impact the operability of safety-related equipment.

Corrective Summary of Action Completion Methods to Verify Objective Date Commitment Met Commitment Steps Program Entry Resolve auxiliary feedwater Modifications will be CA 18934 Prior to Startup Modification system operability concerns due to implemented to restore from the Spring documents.

loss of suction from the operability of the auxiliary 2005 Forced Condensate System. feedwater system. The Outage scope of the modification will include re-routing of the auxiliary feedwater pump suction piping, and installation of a low suction pressure trip function.

Address the turbine building Modification and repairs Prior to Startup Modification flooding concerns. will be completed to from the Spring documents.

address the turbine 2005 Forced building internal flooding Outage issue.

Reduce potential for residual heat Implement modification to COM 21626 Approved design removal pump pit flooding during reduce flooding potential description, approved shutdown. for RHR pump pits. 10CFR50.59, completed work order.

Submit flooding license basis. Submit flooding license COM 21627 LAR submitted.

amendment request.

Resolve auxiliary feedwater local The auxiliary feedwater COM 21628 NLT RFO-29 Local operator actions operator actions system local manual eliminated.

operator actions as described in the license amendment request submitted May 5, 2005, and supplemented on June 9, 2005 will be eliminated.

Page 7 of 22

Serial No.06-724 Docket No.05-305 Attachment Update PRA Model Incorporate turbine building COM 21629 PRA Notebook issued flood modifications and operations procedure changes Corrective Summary of Action Completion Methods to Verify Objective Commitment Steps Program Date Commitment Met Entry Validate and improve A project plan will be COM 21749 Internal flooding topical documentation of the design basis developed and report completed for: implemented to complete design basis topical reports. CA 18849 COM 21751 High energy line break Internal Flooding, topical report completed High Energy Line Breaks, COM 21753 Station blackout topical Station Blackout, report completed Tornados, and COM 21754 Tornado topical report completed Seismic Events COM 21756 Seismic topical report completed Complete documentation and A project plan will be COM 21737 AFW System completed validation of the license bases for developed and the safety functions of the most implemented for the SW System completed risk significant safety systems. documentation and field COM 21738 validation of license bases Interim project progress for the safety functions of COM 21748 review the Auxiliary Feedwater System, Service Water RHR System completed System, Residual Heat COM 21739 Removal System, COM 21740 CCW System completed Component Cooling Water System, and Emergency EDG completed Diesel Generators, 4kV COM 21741 electrical system and DC electrical system. CA COM 21742 4kV System completed 18850 COM 21743 DC System completed Page 8 of 22

Serial No.06-724 Docket No.05-305 Attachment 1 Corrective Item 5 Summary of Action Completion Methods to Verify Objective (Cont'd) Commitment Steps Program Date Commitment Met Entry Improve retrievability and control of The following will be CA 18851 Electronic database calculations of record. completed: population complete.

1. Complete populating Cross-referencing the current safety between calculations related calculations in database complete.

into the calculation database, and Effectiveness review.

2. Incorporating cross-reference information of inputs/outputs between calculations.

Updating of Environmental Conduct a validation COM 21631 Perform assessment Qualification (EQ) Program assessment of a sample of of completed file completed EQ program upgrades and plan.

documents for adequacy in incorporating design basis information and assess prioritization of update plan.

Page 9 of 22

Serial No.06-724 Docket No.05-305 Attachment 1 Corrective Objective Summary of Action Completion Methods to Verify Commitment Steps Program Date Commitment Met Entry Complete AC electrical models and Complete AC electrical COM 21832 lnterim project calculations to provide clear bases for calculations for: progress review.

safety related settings and loads.

1. load flow, CA 18853 COM 21833 lnterim project progress review.
2. short-circuit currents, CA 18853 COM 21834 Calculations
3. EDG loading, CA 18853 completed, validated, and
4. relay setting, c A 18853 issued.

COM 21837

5. protection 0 lnterim Progress coordination, CA 18853 Review
6. control circuit voltage drops, c A 18853
7. cable ampacity, CA 18853
8. thermal overload relays. CA 18853 Complete DC electrical models and Complete DC electrical COM 21833 lnterim project calculations to provide clear bases for calculations for: progress review.

safety related settings and loads.

1. battery sizing, COM 21837 lnterim project CA 18854 progress review.
2. charger sizing, COM 21834 CA 18854 Calculations completed,
3. voltage drop, CA 18854 validated and issued.
4. short-circuit currents, CA 18854
5. control circuit voltage Page 10 of 22

Serial No.06-724 Docket No.05-305 Attachment 1 Corrective Summary of Action Completion Methods to Verify 0bjective Commitment Steps Program Date Commitment Met Entry Improve the quality of Engineering An assessment of CE 15571 Prior to Startup Completed products. engineering has been from the Spring assessment report.

conducted using NMC 2005 Forced fleet and external Outage expertise to identify the key areas for improvement and to develop associated action plans.

To improve the quality of Engineering Prior to Startup from the Spring IRG Implemented products, an interim CA 18890 Independent Review 2005 Forced Group (IRG) has been Outage established to provide an in-line independent review of engineering Engineering quality products, including:

effectiveness review 4Q05.

1. Operability Recommendations,
2. 10 CFR 50.59 evaluations,
3. calculations important to safety, and
4. modifications important to safety.

Training will be conducted to reinforce Training attendance expectations regarding records.

Engineering product quality. CA 18891 Page 12 of 22

Serial No.06-724 Docket No.05-305 Attachment 1 Corrective Item 7 Summary of Action Completion Methods to Verify Objective (Cont'd) Commitment Steps Program Date Commitment ~ e t Entry lmprove Engineering knowledge and Training will be conducted CA 18855 Training attendance understanding of design and on design and licensing records.

licensing bases. bases for Engineering personnel. Effectiveness review 2Q06.

lmprove the interface between Roles and responsibilities CA 18856 Roles and Operations, Maintenance, and for Operations, responsibilities Engineering. Maintenance, and documented.

Engineering as they relate to Engineering support will Effectiveness review be examined and re- 4Q05.

defined as necessary.

lmprove Station Engineering Support Establish System COM 21808 Dominion Assist Visit Engineering COM 21809 Implement Dominion Plant Health Reports.

lmprove Equipment Reliability Establish a Station COM 21812 1Q06 Team established Equipment Reliability Team (SERT) and Station COM 21814 1Q06 List developed Equipment Reliability Issues List (SERIL).

Page 13 of 22

Serial No.06-724 Docket No.05-305 Attachment 1 Corrective Summary of Action Completion Methods to Verify Objective Commitment Steps Program Date Commitment Met Entry Ensure station personnel are aware Actions will be taken to CA 18857 Employee briefings of their roles and responsibilities in ensure that station completed.

the Corrective Action Program personnel are aware of (CAP). their roles and New employee responsibilities as they training program pertain to the Corrective revised.

Action Program.

Implement communications Copies of D-15 and campaign to reinforce roles presentation and responsibilities. COM 21632 materials.

- -

Validate the appropriateness of the An independent review of Prior to Startup Documented results significance level assigned for all all open conditions adverse from the Spring of the assessment.

wrrently open conditions adverse to to quality in the Corrective 2005 Forced quality in the Corrective Action Action Program is being Outage Dr~gram. completed.

4ssure CAP trends are identified and Trend information related h i o r to Startup Generation of

~ s e din the significance and level of to repeat CAP items will be 'rom the Spring adverse trend CAPS.

?ffort assigned during CAP provided to the daily CAP 2005 Forced screening. screen team. 3utage Effectiveness review 4Q05.

Page 14 of 22

Serial No.06-724 Docket No.05-305 Attachment 1 Corrective Item 8 Summary of Action Completion Methods to Verify Objective (Cont'd) Commitment Steps Program Date Commitment Met Entry Assure that managers recognize the Training on risk CA 18858 Training attendance significance of long standing issues. significance will be records.

provided to the management team. This Assessments training is also part of the indicate no corrective actions to significant CAP prevent recurrence from prioritization errors.

the containment equipment Goal is to have:

hatch close root cause evaluation.

No level " A misclassifications 2 90% level " B issues properly classified.

Page 15 of 22

Serial No.06-724 Docket No.05-305 Attachment 1 Corrective Summary of Action Completion Methods to Verify Objective Commitment Steps Program Date Commitment Met Entry Validate the timeliness for resolution An independent review is CE 15567 Prior to Startup Documentation of of current open significant issues. being conducted of all open from the Spring results from the corrective actions from 2005 Forced review.

level " A and " B action Outage requests to validate the timeliness of resolution for significant issues.

Assure operable but degraded / non- Administrative procedures Revision to conforming issues are corrected in a have been revised to procedure GNP timely manner. include requirements for 11.08.01 issued.

timely resolution of operable but degraded / March 15, 2005 non-conforming issues. As backlog of open of March 15, 2005,28 open operable but OBDs remain. degraded / non-conforming conditions reduced by 2 50%.

Upgrade the KPS Emergency Action Conduct training. COM 21635 6 months after Training completed Levels (EAL) to the NEI 99-01 EAL NRC approval.

scheme as submitted to NRC on October 26, 2004 Implement new EALs. COM 21636 6 months after Procedures revised.

NRC approval Page 17 of 22

Serial No.06-724 Docket No.05-305 Attachment 1 Corrective Summary of Action Completion Methods to Verify Objective Commitment Steps Program Date Commitment Met Entry Communicate Kewaunee "Picture of Action steps to meet this CA 18861 Training attendance Excellence" to employees to help objective include records.

facilitate sustained performance communicating and improvement. reinforcing the "Picture of Excellence" to improve NRC-05-118 stated to the NRC that accountability and DEK no longer commits to the individual behaviors.

Kewaunee Picture of Excellence but Training for managers and rather the Kewaunee Passion for supervisors has begun, Excellence. and will be completed prior to unit startup.

Page 18 of 22

Serial No.06-724 Docket No.05-305 Attachment 1 Corrective Summary of Action Completion Methods to Verify Objective Commitment Steps Program Date Commitment Met Entry Provide the necessary infrastructure The implementation steps and tools required to execute and include:

reinforce the "Picture of Excellence". Incorporating ACEMAN CA 18958 ACEMAN grading into daily Plan Of the Next employed at POND Day (POND) meetings. meetings.

Implementation of a daily C A 18958 D-15 meetings meeting (D-15) between implemented.

supervisors and individual contributors. The purpose of the D-15 meetings is to improve communication between employees, supervisors and managers. They are designed to enhance the information flow between employees and all levels of management and create an environment for open communication.

Alignment of Performance "Picture of Excellence" C A 18993 Management Plans to the and ACEMAN "Picture of Excellence" incorporated into station Performance Management Plans.

Establishing monthly C A 18958 PERG Picture of Excellence Review Group (PERG) meetings to foster accountability for implementation of the site Excellence Plans.

Build depth in Emergency Response Assess staffing needs and C O M 21637 Assessment Report Organization qualification in Emergency Preparedness positions.

Train additional personnel.

C O M 21 638 Training attendance records.

Page 19 of 22

Serial No.06-724 Docket No.05-305 Attachment 1 Corrective Summary of Action Completion Methods to Verify Objective Commitment Steps Program Date Commitment Met Entry lmprove the leadership capability of A leadership assessment CAP 26038 Operations & Documented results supervisors in: will be conducted for the: Operations of the assessments.

Training will be

1. Operations, 1. Assistant Operations Engineering completed Individual Managers, CA 18562 2Q05 Performance
2. Operations Training, and CA 18972 Management Plans
2. Shift Managers, updated with
3. Engineering. improvement areas.
3. Control Room Supervisors, Engineering Operations will be
4. Operations Instructors, CA 18973 completed CA 19211 3Q05
5. Engineering Managers, and
6. Engineering Supervisors.

The assessment will focus on leadership capabilities and capacity to implement a continuous improvement zulture. Results of the assessments will be factored into individual Improvement plans.

lmprove the leadership capability of 4 leadership assessment supervisors in: Maintenance, tvill be conducted for:

Chemistry, Outage and Planning, Documented results Emergency Planning, & Radiation COM 21639 Maintenance Supervision of the assessments.

Protection COM 21643

hemistry Supervision Individual COM 21644 Performance 3utage and Planning Management Plans Supervision updated with COM 21641 improvement areas.

Emergency Planning Page 20 of 22

Serial No.06-724 Docket No.05-305 Attachment '

Supervision COM 21645 Radiation Protection Supervision Corrective Item 12 Summary of Action Completion Methods to Verify Objective Program Date Commitment Met (Cont'd) Commitment Steps Entry Improve line manager ownership and Implement DNAP 01 14, COM 21646 DNAP Approved.

accountability. Dominion Nuclear Self Evaluation Program. Station Self Assessment Meeting (SSEM) Held Page 21 of 22

Serial No.06-724 Docket No.05-305 Attachment 1 Corrective Summary of Action Completion Methods to Verify ltem 13 0bjective Commitment Steps Program Date Commitment Met Entry lmprove Nuclear Oversight (NOS) Implement mentors from CA 18862 3Q05 Rotation policy in-effectiveness. other NMC sites for a place.

period of 6 weeks, assign assessors to a functional Assessors assigned area, and implement a to functional areas.

rotation plan. An improvement plan Develop addressing assessor improvement plan.

performance will be developed which will include additional actions Review effectiveness of Nuclear Oversight processes.

Strengthen Nuclear Oversight Implement Dominion COM 21647 Establish and fill Assessment Processes Nuclear Oversight model positions which includes separate Specialist Assessment and Audit Programs Corrective Summary of Action Completion Methods to Verify ltem 14 0 bjective Commitment Steps Program Date Commitment Met Entry lmprove understanding of Site management will CA 18863 Training attendance conservative decision making by conduct training on records.

managers and supervisors. conservative decision making for managers and supervisors.

Page 22 of 22