{{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I   SRO-U Operating Test Number:   1 Control Room Systems
{{#Wiki_filter:ES-301                                   Control Room/In-Plant Systems Outline                               Form ES-301-2 Facility: Arkansas Nuclear One -2                                                   Date of Examination: 2/25/2008 Exam Level: RO               SRO-I         SRO-U                                   Operating Test Number:     1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) System / JPM Title Type Code*
Safety System / JPM Title                                         Type Code*
Safety Function a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S  1 Reactivity
Function
: b. ANO-2-JPM-NRC-EOP01 026 A2.03 RO 3.2 SRO 3.7 Secure Containment Spray System (inadvertent)
: a. ANO-2-JPM-NRC-CVCS2                                                                               A/D/L/S              1 004 A4.07 RO 3.9/SRO 3.7 Reactivity Perform Emergency Boration
D/L/S (ESF) 5 Containment c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO- 2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentationd. ANO-2-JPM-NRC-IA02 078 A3.01 RO 3.1 SRO 3.2 Perform actions required by low Instrument Air Header Pressure M/S 8 Plant Service Systems e. ANO-2-JPM-NRC-MTG05 045 K3.01 RO 2.9 SRO 3.2   Synchronize MTG to grid with failure of speed./load control results in excess steam demand A/D/L/S 4 RCS Heat Removal f. ANO-2-JPM-NRC-SIT01 006 A2.03 RO-3.3 SRO-3.7 High pressure fill of Safety Injection Tank A/D/S 2 RCS Inventory
: b. ANO-2-JPM-NRC-EOP01 5
: g. ANO-2-JPM-NRC-LTOP 010 K4.03   RO 3.8   SRO 4.1 Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve alignment incorrect D/L/S/P 3 Reactor Pressure Control h. ANO-2-JPM-NRC-ELEC001 062 A2.11   RO 3.7 SRO 4.1       Back feed a non-vital bus from a vital bus D/S 6 Electrical In-Plant Systems
026 A2.03 RO 3.2 SRO 3.7                                                                       D/L/S (ESF)       Containment Secure Containment Spray System (inadvertent)
@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i. ANO-2-JPM-NRC-AACGLS   064 A3.06 RO 3.3     SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6 Electrical
: c. ANO-2-JPM-NRC-CREV01 7
: j. ANO-2-JPM-NRC-FPEM1 033 A2.03 RO 3.1 SRO   3.5   Add Water from Loop I SW to SFP D/R 8 Plant Service Systems k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4 RCS Heat Removal @ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
073 A3.01 RO- 2.9 SRO-3.1                                                                     A/N/S (ESF)     Instrumentation Manually actuate control room ventilation
*Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) (P)revious 2 exams (R)CA (S)imulator  4-6 / 4-6 / 2-3
: d. ANO-2-JPM-NRC-IA02                                                                                                     8 078 A3.01 RO 3.1 SRO 3.2                                                                           M/S        Plant Service Perform actions required by low Instrument Air Header Pressure                                                     Systems
  < 9 / < 8 / < 4 > 1 / > 1 / > 1 > 1 / > 1 / > 1  > 2 / > 2 / > 1  < 3 < 3 / < 2 (randomly selected) > 1 / > 1 / > 1   ES-301, Page 23 of 27 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:  Arkansas Nuclear One -2  Date of Examination: 2/25/2008 Exam Level:  RO SRO-I  SRO-U  Operating Test Number:    1 Control Room Systems
: e. ANO-2-JPM-NRC-MTG05                                                                                                     4 045 K3.01 RO 2.9 SRO 3.2                                                                         A/D/L/S        RCS Heat Synchronize MTG to grid with failure of speed./load control results in excess steam demand                         Removal
@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) System / JPM Title Type Code*
: f. ANO-2-JPM-NRC-SIT01 2
Safety Function a. ANO-2-JPM-NRC-CVCS2 004 A4.07  RO  3.9/SRO  3.7 Perform Emergency Boration A/D/L/S  1 Reactivity
006 A2.03 RO-3.3 SRO-3.7                                                                           A/D/S        RCS Inventory High pressure fill of Safety Injection Tank
: b. c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO- 2.9  SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentationd. e.      f.      g. h. In-Plant Systems
: g. ANO-2-JPM-NRC-LTOP                                                                                                     3 010 K4.03 RO 3.8 SRO 4.1                                                                                           Reactor Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve                 D/L/S/P         Pressure alignment incorrect                                                                                                Control
@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i. ANO-2-JPM-NRC-AACGLS  064 A3.06 RO 3.3    SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6 Electrical
: h. ANO-2-JPM-NRC-ELEC001 6
: j. ANO-2-JPM-NRC-FPEM1 033 A2.03  RO 3.1  SRO  3.5 Add Water from Loop I SW to SFP D/R 8 Plant Service Systems k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4 RCS Heat Removal @ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
062 A2.11 RO 3.7 SRO 4.1                                                                           D/S            Electrical Back feed a non-vital bus from a vital bus In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
*Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) (P)revious 2 exams (R)CA (S)imulator  4-6 / 4-6 / 2-3
: i. ANO-2-JPM-NRC-AACGLS 6
064 A3.06 RO 3.3 SRO 3.4                                                                         A/D/E/P        Electrical Local start of AAC diesel generator manually and locally
: j. ANO-2-JPM-NRC-FPEM1                                                                                                   8 033 A2.03 RO 3.1 SRO 3.5                                                                             D/R        Plant Service Add Water from Loop I SW to SFP                                                                                   Systems
: k. ANO-2-JPM-NRC-LOF01                                                                                                   4 CE E06 EA1.1 RO 4.0 SRO 3.9                                                                         D/L/E        RCS Heat Align Condensate pump for start during a loss of all Feed water event                                             Removal
  @         All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
                        *Type Codes                                             Criteria for RO / SRO-I / SRO-U (A)lternate path                                                                       4-6 /  4-6 / 2-3 (C)ontrol room (D)irect from bank                                                                     <9  /  <8    / <4 (E)mergency or abnormal in-plant                                                       >1  /  >1    / >1 (L)ow-Power / Shutdown                                                                 >1  /  >1    / >1 (N)ew or (M)odified from bank including 1(A)                                           >2  /  >2    / >1 (P)revious 2 exams                                                                    <3     <3   / < 2 (randomly selected)
(R)CA                                                                                  >1 / >1   / >1 (S)imulator ES-301, Page 23 of 27


  < 9 / < 8 / < 4  > 1 / > 1 / > 1  > 1 / > 1 / > 1 > 2 / > 2 / > 1   < 3 < 3 / < 2 (randomly selected) > 1 / > 1 / > 1   ES-301, Page 23 of 27 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I   SRO-U Operating Test Number:   1 Control Room Systems
ES-301                                Control Room/In-Plant Systems Outline                          Form ES-301-2 Facility: Arkansas Nuclear One -2                                            Date of Examination: 2/25/2008 Exam Level: RO              SRO-I        SRO-U                              Operating Test Number:      1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) System / JPM Title Type Code*
Safety System / JPM Title                                    Type Code*
Safety Function a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S  1 Reactivity
Function
: b. ANO-2-JPM-NRC-EOP01 026 A2.03 RO 3.2 SRO 3.7 Secure Containment Spray System (inadvertent)
: a. ANO-2-JPM-NRC-CVCS2                                                                        A/D/L/S              1 004 A4.07 RO 3.9/SRO 3.7 Reactivity Perform Emergency Boration b.
D/L/S (ESF) 5 Containment c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO- 2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentationd. ANO-2-JPM-NRC-IA02 078 AA2.06 RO 3.1 SRO 3.2 Perform actions required by low Instrument Air Header Pressure M/S 8 Plant Service Systems e. ANO-2-JPM-NRC-MTG05 045 K3.01 RO 2.9 SRO 3.2   Synchronize MTG to grid with failure of speed./load control results in excess steam demand A/D/L/S 4 RCS Heat Removal f. ANO-2-JPM-NRC-SIT01 006 A2.03 RO-3.3 SRO-3.7 High pressure fill of Safety Injection Tank A/D/S 2 RCS Inventory
: c. ANO-2-JPM-NRC-CREV01 7
: g. ANO-2-JPM-NRC-LTOP 010 K4.03   RO 3.8   SRO 4.1 Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve alignment incorrect D/L/S/P 3 Reactor Pressure Control h. NA   In-Plant Systems
073 A3.01 RO- 2.9 SRO-3.1                                                              A/N/S (ESF)    Instrumentation Manually actuate control room ventilation d.
@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i. ANO-2-JPM-NRC-AACGLS   064 A3.06 RO 3.3     SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6 Electrical
e.
: j. ANO-2-JPM-NRC-FPEM1 033 A2.03 RO 3.1 SRO   3.5 Add Water from Loop I SW to SFP D/R 8 Plant Service Systems k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4 RCS Heat Removal @ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
f.
*Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
g.
(P)revious 2 exams (R)CA (S)imulator  4-6 / 4-6 / 2-3
h.
  < 9 / < 8 / < 4 > 1 / > 1 / > 1 > 1 / > 1 / > 1  > 2 / > 2 / > 1  < 3 < 3 / < 2 (randomly selected) > 1 / > 1 / > 1   ES-301, Page 23 of 27}}
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. ANO-2-JPM-NRC-AACGLS 6
064 A3.06 RO 3.3 SRO 3.4                                                                  A/D/E/P        Electrical Local start of AAC diesel generator manually and locally
: j. ANO-2-JPM-NRC-FPEM1                                                                                            8 033 A2.03 RO 3.1 SRO 3.5                                                                      D/R        Plant Service Add Water from Loop I SW to SFP                                                                            Systems
: k. ANO-2-JPM-NRC-LOF01                                                                                            4 CE E06 EA1.1 RO 4.0 SRO 3.9                                                                  D/L/E        RCS Heat Align Condensate pump for start during a loss of all Feed water event                                      Removal
  @        All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
                      *Type Codes                                        Criteria for RO / SRO-I / SRO-U (A)lternate path                                                                4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                              <9 / <8   / <4 (E)mergency or abnormal in-plant                                                >1  / >1   / >1 (L)ow-Power / Shutdown                                                          >1 / >1   / >1 (N)ew or (M)odified from bank including 1(A)                                    >2 / >2   / >1 (P)revious 2 exams                                                              <3     <3   / < 2 (randomly selected)
(R)CA                                                                          >1 / >1   / >1 (S)imulator ES-301, Page 23 of 27
 
ES-301                                   Control Room/In-Plant Systems Outline                               Form ES-301-2 Facility: Arkansas Nuclear One -2                                                   Date of Examination: 2/25/2008 Exam Level: RO               SRO-I         SRO-U                                   Operating Test Number:     1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title                                         Type Code*
Function
: a. ANO-2-JPM-NRC-CVCS2                                                                               A/D/L/S              1 004 A4.07 RO 3.9/SRO 3.7 Reactivity Perform Emergency Boration
: b. ANO-2-JPM-NRC-EOP01 5
026 A2.03 RO 3.2 SRO 3.7                                                                       D/L/S (ESF)       Containment Secure Containment Spray System (inadvertent)
: c. ANO-2-JPM-NRC-CREV01 7
073 A3.01 RO- 2.9 SRO-3.1                                                                     A/N/S (ESF)     Instrumentation Manually actuate control room ventilation
: d. ANO-2-JPM-NRC-IA02                                                                                                     8 078 AA2.06 RO 3.1 SRO 3.2                                                                           M/S        Plant Service Perform actions required by low Instrument Air Header Pressure                                                     Systems
: e. ANO-2-JPM-NRC-MTG05                                                                                                     4 045 K3.01 RO 2.9 SRO 3.2                                                                         A/D/L/S        RCS Heat Synchronize MTG to grid with failure of speed./load control results in excess steam demand                         Removal
: f. ANO-2-JPM-NRC-SIT01 2
006 A2.03 RO-3.3 SRO-3.7                                                                           A/D/S        RCS Inventory High pressure fill of Safety Injection Tank
: g. ANO-2-JPM-NRC-LTOP                                                                                                     3 010 K4.03 RO 3.8 SRO 4.1                                                                                           Reactor Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve                 D/L/S/P         Pressure alignment incorrect                                                                                                Control
: h. NA In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. ANO-2-JPM-NRC-AACGLS 6
064 A3.06 RO 3.3 SRO 3.4                                                                         A/D/E/P        Electrical Local start of AAC diesel generator manually and locally
: j. ANO-2-JPM-NRC-FPEM1                                                                                                   8 033 A2.03 RO 3.1 SRO 3.5                                                                             D/R        Plant Service Add Water from Loop I SW to SFP                                                                                   Systems
: k. ANO-2-JPM-NRC-LOF01                                                                                                   4 CE E06 EA1.1 RO 4.0 SRO 3.9                                                                         D/L/E        RCS Heat Align Condensate pump for start during a loss of all Feed water event                                             Removal
  @         All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
                        *Type Codes                                             Criteria for RO / SRO-I / SRO-U (A)lternate path                                                                       4-6 /  4-6 / 2-3 (C)ontrol room (D)irect from bank                                                                     <9  /  <8    / <4 (E)mergency or abnormal in-plant                                                       >1  /  >1    / >1 (L)ow-Power / Shutdown                                                                 >1  /  >1    / >1 (N)ew or (M)odified from bank including 1(A)                                           >2  /  >2    / >1 (P)revious 2 exams                                                                    <3     <3   / < 2 (randomly selected)
(R)CA                                                                                  >1 / >1   / >1 (S)imulator ES-301, Page 23 of 27}}

Revision as of 18:49, 14 November 2019

2008-02-Final Operating Exam Outline
ML080700308
Person / Time
Site: Arkansas Nuclear  
Issue date: 02/29/2008
From: Garchow S
Operations Branch IV
To:
Entergy Operations
References
50-313/08-301, 50-368/08-301, ES-301-2 50-313/08-301, 50-368/08-301
Download: ML080700308 (3)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type Code*

Function

a. ANO-2-JPM-NRC-CVCS2 A/D/L/S 1 004 A4.07 RO 3.9/SRO 3.7 Reactivity Perform Emergency Boration
b. ANO-2-JPM-NRC-EOP01 5

026 A2.03 RO 3.2 SRO 3.7 D/L/S (ESF) Containment Secure Containment Spray System (inadvertent)

c. ANO-2-JPM-NRC-CREV01 7

073 A3.01 RO- 2.9 SRO-3.1 A/N/S (ESF) Instrumentation Manually actuate control room ventilation

d. ANO-2-JPM-NRC-IA02 8 078 A3.01 RO 3.1 SRO 3.2 M/S Plant Service Perform actions required by low Instrument Air Header Pressure Systems
e. ANO-2-JPM-NRC-MTG05 4 045 K3.01 RO 2.9 SRO 3.2 A/D/L/S RCS Heat Synchronize MTG to grid with failure of speed./load control results in excess steam demand Removal
f. ANO-2-JPM-NRC-SIT01 2

006 A2.03 RO-3.3 SRO-3.7 A/D/S RCS Inventory High pressure fill of Safety Injection Tank

g. ANO-2-JPM-NRC-LTOP 3 010 K4.03 RO 3.8 SRO 4.1 Reactor Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve D/L/S/P Pressure alignment incorrect Control
h. ANO-2-JPM-NRC-ELEC001 6

062 A2.11 RO 3.7 SRO 4.1 D/S Electrical Back feed a non-vital bus from a vital bus In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. ANO-2-JPM-NRC-AACGLS 6

064 A3.06 RO 3.3 SRO 3.4 A/D/E/P Electrical Local start of AAC diesel generator manually and locally

j. ANO-2-JPM-NRC-FPEM1 8 033 A2.03 RO 3.1 SRO 3.5 D/R Plant Service Add Water from Loop I SW to SFP Systems
k. ANO-2-JPM-NRC-LOF01 4 CE E06 EA1.1 RO 4.0 SRO 3.9 D/L/E RCS Heat Align Condensate pump for start during a loss of all Feed water event Removal

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3 <3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type Code*

Function

a. ANO-2-JPM-NRC-CVCS2 A/D/L/S 1 004 A4.07 RO 3.9/SRO 3.7 Reactivity Perform Emergency Boration b.
c. ANO-2-JPM-NRC-CREV01 7

073 A3.01 RO- 2.9 SRO-3.1 A/N/S (ESF) Instrumentation Manually actuate control room ventilation d.

e.

f.

g.

h.

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. ANO-2-JPM-NRC-AACGLS 6

064 A3.06 RO 3.3 SRO 3.4 A/D/E/P Electrical Local start of AAC diesel generator manually and locally

j. ANO-2-JPM-NRC-FPEM1 8 033 A2.03 RO 3.1 SRO 3.5 D/R Plant Service Add Water from Loop I SW to SFP Systems
k. ANO-2-JPM-NRC-LOF01 4 CE E06 EA1.1 RO 4.0 SRO 3.9 D/L/E RCS Heat Align Condensate pump for start during a loss of all Feed water event Removal

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3 <3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type Code*

Function

a. ANO-2-JPM-NRC-CVCS2 A/D/L/S 1 004 A4.07 RO 3.9/SRO 3.7 Reactivity Perform Emergency Boration
b. ANO-2-JPM-NRC-EOP01 5

026 A2.03 RO 3.2 SRO 3.7 D/L/S (ESF) Containment Secure Containment Spray System (inadvertent)

c. ANO-2-JPM-NRC-CREV01 7

073 A3.01 RO- 2.9 SRO-3.1 A/N/S (ESF) Instrumentation Manually actuate control room ventilation

d. ANO-2-JPM-NRC-IA02 8 078 AA2.06 RO 3.1 SRO 3.2 M/S Plant Service Perform actions required by low Instrument Air Header Pressure Systems
e. ANO-2-JPM-NRC-MTG05 4 045 K3.01 RO 2.9 SRO 3.2 A/D/L/S RCS Heat Synchronize MTG to grid with failure of speed./load control results in excess steam demand Removal
f. ANO-2-JPM-NRC-SIT01 2

006 A2.03 RO-3.3 SRO-3.7 A/D/S RCS Inventory High pressure fill of Safety Injection Tank

g. ANO-2-JPM-NRC-LTOP 3 010 K4.03 RO 3.8 SRO 4.1 Reactor Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve D/L/S/P Pressure alignment incorrect Control
h. NA In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. ANO-2-JPM-NRC-AACGLS 6

064 A3.06 RO 3.3 SRO 3.4 A/D/E/P Electrical Local start of AAC diesel generator manually and locally

j. ANO-2-JPM-NRC-FPEM1 8 033 A2.03 RO 3.1 SRO 3.5 D/R Plant Service Add Water from Loop I SW to SFP Systems
k. ANO-2-JPM-NRC-LOF01 4 CE E06 EA1.1 RO 4.0 SRO 3.9 D/L/E RCS Heat Align Condensate pump for start during a loss of all Feed water event Removal

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3 <3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27