{{#Wiki_filter:ExelI n.Nuclear May 04, 2011 TMI-1 1-080 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289  
{{#Wiki_filter:ExelI n.
Nuclear May 04, 2011 TMI-1 1-080 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289


==Subject:==
==Subject:==
Procedure to be implemented 12/07/10  
Procedure to be implemented 12/07/10


==References:==
==References:==
 
(1)   Letter from TMI Records Management to The Document Control Desk (U.S. NRC, "Procedure to be Implemented 12/07/10," dated December 6, 2010 In the Reference 1 letter, Three Mile Island Nuclear Power Station, Unit 1 (TMI Unit 1) submitted the Exelon Generation Company, LLC (Exelon) Quality Assurance Topical Report (QATR), NO-AA-10, Revision 85. TMI Unit 1has determined that the Reference 1 submittal was not required.
(1) Letter from TMI Records Management to The Document Control Desk (U.S. NRC, "Procedure to be Implemented 12/07/10," dated December 6, 2010 In the Reference 1 letter, Three Mile Island Nuclear Power Station, Unit 1 (TMI Unit 1)submitted the Exelon Generation Company, LLC (Exelon) Quality Assurance Topical Report (QATR), NO-AA-10, Revision 85. TMI Unit 1has determined that the Reference 1 submittal was not required.Every two years Exelon submits an updated revision of the Exelon QATR, NO-AA-1 0 to satisfy the 10 CFR 50.54(a)(3) requirements.
Every two years Exelon submits an updated revision of the Exelon QATR, NO-AA-1 0 to satisfy the 10 CFR 50.54(a)(3) requirements. The Exelon QATR submittal is on behalf of the Exelon fleet and includes TMI Unit 1.
The Exelon QATR submittal is on behalf of the Exelon fleet and includes TMI Unit 1.Based on the above, TMI Unit 1 requests that the document submitted by Reference 1 be returned to the TMI Unit 1 Records Management Department.
Based on the above, TMI Unit 1 requests that the document submitted by Reference 1 be returned to the TMI Unit 1 Records Management Department.
If any additional information is needed, please contact Michael Fitzwater at (717) 948-8228.Respectfully, David Atherholt Manager -Site Regulatory Affairs Three Mile Island Nuclear Power Station cc: USNRC Project Manager, TMI, Unit 1 USNRC Senior Resident Inspector, TMI, Unit 1-,HY 2}}
If any additional information is needed, please contact Michael Fitzwater at (717) 948-8228.
Respectfully, David Atherholt Manager - Site Regulatory Affairs Three Mile Island Nuclear Power Station cc:     USNRC Project Manager, TMI, Unit 1 USNRC Senior Resident Inspector, TMI, Unit 1
                                                                                            -,HY2}}

Latest revision as of 01:00, 13 November 2019

Request, Procedure to Be Implemented 12/07/10 to Return to Records Management Department
ML11126A312
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 05/04/2011
From: Atherholt D
Exelon Nuclear, Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TMI-11-080
Download: ML11126A312 (1)


Text

ExelI n.

Nuclear May 04, 2011 TMI-1 1-080 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Procedure to be implemented 12/07/10

References:

(1) Letter from TMI Records Management to The Document Control Desk (U.S. NRC, "Procedure to be Implemented 12/07/10," dated December 6, 2010 In the Reference 1 letter, Three Mile Island Nuclear Power Station, Unit 1 (TMI Unit 1) submitted the Exelon Generation Company, LLC (Exelon) Quality Assurance Topical Report (QATR), NO-AA-10, Revision 85. TMI Unit 1has determined that the Reference 1 submittal was not required.

Every two years Exelon submits an updated revision of the Exelon QATR, NO-AA-1 0 to satisfy the 10 CFR 50.54(a)(3) requirements. The Exelon QATR submittal is on behalf of the Exelon fleet and includes TMI Unit 1.

Based on the above, TMI Unit 1 requests that the document submitted by Reference 1 be returned to the TMI Unit 1 Records Management Department.

If any additional information is needed, please contact Michael Fitzwater at (717) 948-8228.

Respectfully, David Atherholt Manager - Site Regulatory Affairs Three Mile Island Nuclear Power Station cc: USNRC Project Manager, TMI, Unit 1 USNRC Senior Resident Inspector, TMI, Unit 1

-,HY2