{{#Wiki_filter:1 WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]
{{#Wiki_filter:WBN2Public Resource From:                   Boyd, Desiree L [dlboyd@tva.gov]
Sent: Tuesday, August 09, 2011 9:55 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, Rober t H Jr; Smith, James D; Crouch, William D
Sent:                   Tuesday, August 09, 2011 9:55 AM To:                     Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:                     Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Crouch, William D


==Subject:==
==Subject:==
FW: NRC PM Open Items List 8-10-11.docx Attachments:
FW: NRC PM Open Items List 8-10-11.docx Attachments:             NRC PM Open Items List 8-10-11.docx For next phone call.
NRC PM Open Items List 8-10-11.docxFor next phone call.
Note the new bridge line at top of page.
Note the new bridge line at top of page.  
Thank You,
~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764 1


Thank You,
Hearing Identifier:     Watts_Bar_2_Operating_LA_Public Email Number:           462 Mail Envelope Properties       (7AB41F650F76BD44B5BCAB7C0CCABFAF21BC4765)
 
  ~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd            WBN 2 Licensing Support  Sun Technical Services dlboyd@tva.gov 423-365-8764
 
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 462   Mail Envelope Properties   (7AB41F650F76BD44B5BCAB7C0CCABFAF21BC4765)


==Subject:==
==Subject:==
FW: NRC PM Open Items List 8-10-11.docx Sent Date:   8/9/2011 9:54:36 AM Received Date: 8/9/2011 9:54:39 AM From:   Boyd, Desiree L Created By:   dlboyd@tva.gov Recipients:     "Arent, Gordon" <garent@tva.gov>
FW: NRC PM Open Items List 8-10-11.docx Sent Date:               8/9/2011 9:54:36 AM Received Date:           8/9/2011 9:54:39 AM From:                   Boyd, Desiree L Created By:             dlboyd@tva.gov Recipients:
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov> Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com> Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov> Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov> Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> Tracking Status: None Post Office:   TVANUCXVS2.main.tva.gov
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
 
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>
Files     Size     Date & Time MESSAGE   309     8/9/2011 9:54:39 AM NRC PM Open Items List 8-10-11.docx   30797 Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Page 1 of 4    NRC PM Open Items List 8/10/11 (423) 751-7777 ID 4233652004#
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
No. Description Status Additional Comments Resp Org/Person 1. Cyber Security Plan/Controls and Implementation NRC TI issued TBD NRC Table Top/Pilot
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office:             TVANUCXVS2.main.tva.gov Files                           Size                   Date & Time MESSAGE                         309                   8/9/2011 9:54:39 AM NRC PM Open Items List 8-10-11.docx                   30797 Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Recipients Received:


Oct 2011  Procedures complete 9/30/11 Inspection Dec 2011 NRC Inspection in 2011 To be discussed at the next ACRS meeting (October  
Page 1 of 4 NRC PM Open Items List 8/10/11 (423) 751-7777 ID 4233652004#
No.                Description                    Status                    Additional Comments                        Resp Org/Person
: 1. Cyber Security Plan/Controls and          NRC TI issued  NRC Inspection in 2011                               Heinrich/Snyder Implementation                            TBD                                                                  (Bryan)
To be discussed at the next ACRS meeting (October NRC Table      5th - closed portion).
Top/Pilot Oct 2011 Procedures complete 9/30/11 Inspection Dec 2011
: 2. Instrumentation RAI List (Knuettel)      1. 9/1/11    RAI Responses                                        Eng/Hilmes
: 1. Item 3 for GA-ESI RM-1000 RAD          2. 9/9/11
* Item 1 GA/ESI is revising their CGI program but  (Smith)
Monitors.                            3. TBD            needs time to be able to provide objective
: 2. GA proprietary, non-proprietary and    4. TBD            evidence of the program changes. We will order affidavits for withholding submittals                    parts to facilitate GA developing objective
(~12 documents.)                                        evidence that their program is in compliance with
: 3. NRC comments on procedures to                            NRC regulations.
GA-ESI
* Item 2 - 3 additional document requests from NRC
: 4. RM1000 EMI meeting/telecom                                Civil via email on 7/6/11. PROP versions from the original request are ready for GA to send to TVA
* Item 3 revise GA-ESI procedures for CGI dedication
: 3. WRAG Meeting                              8/24/11        Cyber, Japan, Status, Schedule, PERT chart, (onsite)      10CFR140.11(a)(4) (financial - SSER OI 25 - sidebar)


5 th - closed portion).
Page 2 of 4 No.             Description                    Status                  Additional Comments                        Resp Org/Person
Heinrich/Snyder (Bryan) 2. Instrumentation RAI List (Knuettel)
: 4. Complete Implementation (Hemmer)       Diesel      Diesel is onsite, need support equipment            Hemmer 8/1/11                                                            (Smith)
: 1. Item 3 for GA-ESI RM-1000 RAD Monitors.
Pump        Additional clarification to Phase I actions will be Relocation  needed. Fleet wide issue.
: 2. GA proprietary, non-proprietary and affidavits for withholding submittals
11/1/11 Looking for building qualifications. What is One          substantial? May use NEI to answer.
(~12 documents.)
procedure to Issue 8/26/11 Inspection -
: 3. NRC comments on procedures to GA-ESI 4. RM1000 EMI meeting/telecom
Feb 2012 Phase I commitments 10/1/11
: 1. 9/1/11 2. 9/9/11 3. TBD 4. TBD RAI Responses
: 5. Document Control Issues for two letters TBD         TVA/Bechtel to provide non-proprietary version of    Licensing/Boyd documents that can be released to the public (10/5, 10/21, & 10/29). TVA to provide revised letter that says non-prop once prop documents removed.
* Item 1 GA/ESI is revising their CGI program but needs time to be able to provide objective evidence of the program changes. We will order parts to facilitate GA developing objective evidence that their program is in compliance with NRC regulations.
Confirm A102 in ADAMS.
* Item 2 - 3 additional document requests from NRC Civil via email on 7/6/11. PROP versions from the original request are ready for GA to send to TVA
: 6. Chapter 15.5 RAIs                      8/15/11     Will separate out FHA calc.                          Wastrack (Bryan)
* Item 3 revise GA-ESI procedures for CGI dedication Eng/Hilmes (Smith) 3. WRAG Meeting 8/24/11 (onsite) Cyber, Japan, Status, Schedule, PERT chart, 10CFR140.11(a)(4) (financial - SSER OI 25 - sidebar)
TBD telecom  follow-up telecom on offsite dose calculation method
: 7. TMI action items                        TBD          Review list - include pre-0737 items?                Licensing (Gordon)


Page 2 of 4     No. Description Status Additional Comments Resp Org/Person 4. Complete Implementation (Hemmer)
Page 3 of 4 No.               Description               Status                 Additional Comments                         Resp Org/Person
Diesel 8/1/11  Pump Relocation 11/1/11  One procedure to Issue 8/26/11  Inspection -
: 8. Fire Protection Report Questions   8/15/11   FPR revision                                            ENG/Hilmes regarding OMA                                                                                          (Crouch) 8/9/11    Group 6 rough draft RAIs received via email 6/21/11.
Feb 2012  Phase I commitments 10/1/11 Diesel is onsite, need support equipment Additional clarification to Phase I actions will be needed. Fleet wide issue.
Pull date back if possible. Additional questions relayed on 7/20/11 telecom. May require a supplement.
Looking for building qualifications. What is substantial? May use NEI to answer. Hemmer (Smith) 5. Document Control Issues for two letters TBD TVA/Bechtel to provide non-proprietary version of documents that can be released to the public (10/5, 10/21, & 10/29). TVA to provide revised letter that says non-prop once prop documents removed. Confirm A102 in ADAMS. Licensing/Boyd 6. Chapter 15.5 RAIs 8/15/11  TBD telecom Will separate out FHA calc.
TBD        OMA clarifications (add clarification to FPR rev, if necessary)
follow-up telecom on offsite dose calculation method Wastrack (Bryan) 7. TMI action items TBD Review list - include pre-0737 items?
TBD        Pre-mtg for audit plan TBD        Audit 8/31/11    Technical meeting
Licensing (Gordon)
: 9. IST Tech Spec Change               8/10/11   Pre-submittal meeting week of 7/11/11. In               TVA Corporate concurrence.                                           Licensing (Shea)
Page 3 of 4    No. Description Status Additional Comments Resp Org/Person 8. Fire Protection Report Questions regarding OMA 8/15/11 8/9/11    TBD  TBD  TBD  8/31/11 FPR revision Group 6 rough draft RAIs received via email 6/21/11. Pull date back if possible. Additional questions relayed on 7/20/11 telecom. May require a supplement.
: 10. Tech Spec Revisions from latest T/S Sept, 2011 CSST A & B - discretionary                              Licensing/Elton markup and NRC Review comments                                                                         (Bryan)
OMA clarifications (add clarification to FPR rev, if necessary)
Aug, 2011 I-131 DEI Aug, 2011 Diesel Generator Frequency 8/9/11     Issue a complete revision F
Pre-mtg for audit plan Audit Technical meeting ENG/Hilmes (Crouch) 9. IST Tech Spec Change 8/10/11 Pre-submittal meeting week of 7/11/11. In concurrence.
: 11. ASME III to XI transition           8/12/11   When does ISI program begin with partial plant N-3?     Eng/Helms Are repairs/mods after N-5 controlled under Section III (Crouch) or Section XI? The timing for the NIS-2 in the letter does not comply with the ASME Code . The NIS-2 must be before commercial operation.
TVA Corporate Licensing (Shea) 10. Tech Spec Revisions from latest T/S markup and NRC Review comments Sept, 2011 Aug, 2011 Aug, 2011 8/9/11 CSST A & B - discretionary I-131 DEI Diesel Generator Frequency Issue a complete revision F Licensing/Elton (Bryan) 11. ASME III to XI transition 8/12/11 When does ISI program begin with partial plant N-3?
: 12. ACRS Topics                         10/5/11   Cyber Security,
Are repairs/mods after N-5 controlled under Section III or Section XI? The timing for the NIS-2 in the letter does not comply with the ASME Code . The NIS-2 must be before commercial operation. Eng/Helms (Crouch) 12. ACRS Topics 10/5/11 Cyber Security,
: 13. SSER 22/23 Open Items Response     8/15/11   7/22 is the target date for the next SSER update. The expanded HH list and its status is covered periodically.
: 13. SSER 22/23 Open Items Response 8/15/11 internal telecom 7/22 is the target date for the next SSER update. The expanded HH list and it's status is covered periodically. Telecom to be set up on degraded voltage - item 30  
internal  Telecom to be set up on degraded voltage - item 30 telecom


Page 4 of 4     No. Description Status Additional Comments Resp Org/Person 14. Transient Analysis issues Boron dilution RAI response Week of 8/29/11 to discuss  Question on RG revision and modes 3, 4, & 5 ...
Page 4 of 4 No.               Description                 Status                   Additional Comments                           Resp Org/Person
FSAR is clear as to why modes 1, 2, & 6 are limiting ENG/Koontz WEC/Morgan 15. FSAR A105 8/15/11 Cut-off date of 8/5/11 for change requests. Lic/Stockton 16. FSAR A106 TBD Place holder Lic/Stockton 17. Develop list of planned License Conditions, Exemptions and Relief Requests (Crouch) 1. 9/1/11 2. 8/15/113. TBD 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0 2. Request Rod Drop deviation - place in A105 3. NRR to review current exemptions NRR/TVA (Bryan) 18. Verify Tech Spec Setpoints match calcs TS certification 9/1/11 TBD 2 SSD remaining to be issued.
: 14. Transient Analysis issues                                                                                     ENG/Koontz WEC/Morgan Boron dilution RAI response             Week of       Question on RG revision and modes 3, 4, & 5 ...
Eng/Hilmes (Bryan) 19. Issue two Unit Offsite Dose Calculation Manual (Beach)  Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/
8/29/11 to    FSAR is clear as to why modes 1, 2, & 6 are limiting discuss
Woods (Bryan) 20. Issue Unit 2 Completion Letter (Crouch) 8/1/12 Licensing 21. Submit final as-constructed FSAR figures 7/1/12 Licensing/ Stockton 0. Discretionary Actions
: 15. FSAR A105                               8/15/11       Cut-off date of 8/5/11 for change requests.             Lic/Stockton
: 1. Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12  Licensing (Crouch) 2. Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing 3. Status of GSI 199 Eastern Seismicity (Crouch) Fall 2011 No action pending upcoming Generic Letter Related information on GSI 194 may need input TVA/NRR 4. Letter to notify NRC when Vital Area Boundary returned to original location 11/1/11 Security Plan Update - Boundary to be restored by 9/30/11 Lic/Crouch 5. IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis. Waiting for NRC concurrence.
: 16. FSAR A106                               TBD           Place holder                                           Lic/Stockton
Corp SG/ Webber ISI/Tinley}}
: 17. Develop list of planned License             1. 9/1/11     1. Review Unit 1 SER for exemptions. Sand           NRR/TVA Conditions, Exemptions and Relief          2. 8/15/11        baskets, cyber security, physical security, PAD (Bryan)
Requests (Crouch)                          3. TBD            4.0
: 2. Request Rod Drop deviation - place in A105
: 3. NRR to review current exemptions
: 18. Verify Tech Spec Setpoints match calcs 9/1/11         2 SSD remaining to be issued.                           Eng/Hilmes (Bryan)
TS certification                        TBD
: 19. Issue two Unit Offsite Dose Calculation 3/1/12         Determine actual need date                             Chemistry/
Manual (Beach) Review TS Chapter 5                                                                            Woods programs also                                                                                                  (Bryan)
: 20. Issue Unit 2 Completion Letter (Crouch) 8/1/12                                                                 Licensing
: 21. Submit final as-constructed FSAR       7/1/12                                                                 Licensing/
figures                                                                                                        Stockton
: 0. Discretionary Actions
: 1. Letter to terminate Part 30/40 License 4/1/12                                                                Licensing after receipt of Part 50 License                                                                               (Crouch)
: 2. Combined U1/U2 FSAR (Stockton)         3/1/13                                                                 Licensing
: 3. Status of GSI 199 Eastern Seismicity   Fall 2011     No action pending upcoming Generic Letter               TVA/NRR (Crouch)                                              Related information on GSI 194 may need input
: 4. Letter to notify NRC when Vital Area   11/1/11       Security Plan Update - Boundary to be restored by       Lic/Crouch Boundary returned to original location                9/30/11
: 5. IEB 88-02 SG Tube Cracking             TBD           Tubes are assumed locked in the WEC analysis.           Corp SG/
Waiting for NRC concurrence.                           Webber ISI/Tinley}}

Revision as of 16:09, 12 November 2019

2011/08/09 Watts Bar 2 OL - FW: NRC PM Open Items List 8-10-11.docx
ML11224A059
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 08/09/2011
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML11224A059 (6)


Text

WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]

Sent: Tuesday, August 09, 2011 9:55 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Crouch, William D

Subject:

FW: NRC PM Open Items List 8-10-11.docx Attachments: NRC PM Open Items List 8-10-11.docx For next phone call.

Note the new bridge line at top of page.

Thank You,

~*~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 462 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF21BC4765)

Subject:

FW: NRC PM Open Items List 8-10-11.docx Sent Date: 8/9/2011 9:54:36 AM Received Date: 8/9/2011 9:54:39 AM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients:

"Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Smith, James D" <jdsmith@tva.gov>

Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>

Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>

Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>

Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 309 8/9/2011 9:54:39 AM NRC PM Open Items List 8-10-11.docx 30797 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Page 1 of 4 NRC PM Open Items List 8/10/11 (423) 751-7777 ID 4233652004#

No. Description Status Additional Comments Resp Org/Person

1. Cyber Security Plan/Controls and NRC TI issued NRC Inspection in 2011 Heinrich/Snyder Implementation TBD (Bryan)

To be discussed at the next ACRS meeting (October NRC Table 5th - closed portion).

Top/Pilot Oct 2011 Procedures complete 9/30/11 Inspection Dec 2011

2. Instrumentation RAI List (Knuettel) 1. 9/1/11 RAI Responses Eng/Hilmes
1. Item 3 for GA-ESI RM-1000 RAD 2. 9/9/11
  • Item 1 GA/ESI is revising their CGI program but (Smith)

Monitors. 3. TBD needs time to be able to provide objective

2. GA proprietary, non-proprietary and 4. TBD evidence of the program changes. We will order affidavits for withholding submittals parts to facilitate GA developing objective

(~12 documents.) evidence that their program is in compliance with

3. NRC comments on procedures to NRC regulations.

GA-ESI

  • Item 2 - 3 additional document requests from NRC
4. RM1000 EMI meeting/telecom Civil via email on 7/6/11. PROP versions from the original request are ready for GA to send to TVA
3. WRAG Meeting 8/24/11 Cyber, Japan, Status, Schedule, PERT chart, (onsite) 10CFR140.11(a)(4) (financial - SSER OI 25 - sidebar)

Page 2 of 4 No. Description Status Additional Comments Resp Org/Person

4. Complete Implementation (Hemmer) Diesel Diesel is onsite, need support equipment Hemmer 8/1/11 (Smith)

Pump Additional clarification to Phase I actions will be Relocation needed. Fleet wide issue.

11/1/11 Looking for building qualifications. What is One substantial? May use NEI to answer.

procedure to Issue 8/26/11 Inspection -

Feb 2012 Phase I commitments 10/1/11

5. Document Control Issues for two letters TBD TVA/Bechtel to provide non-proprietary version of Licensing/Boyd documents that can be released to the public (10/5, 10/21, & 10/29). TVA to provide revised letter that says non-prop once prop documents removed.

Confirm A102 in ADAMS.

6. Chapter 15.5 RAIs 8/15/11 Will separate out FHA calc. Wastrack (Bryan)

TBD telecom follow-up telecom on offsite dose calculation method

7. TMI action items TBD Review list - include pre-0737 items? Licensing (Gordon)

Page 3 of 4 No. Description Status Additional Comments Resp Org/Person

8. Fire Protection Report Questions 8/15/11 FPR revision ENG/Hilmes regarding OMA (Crouch) 8/9/11 Group 6 rough draft RAIs received via email 6/21/11.

Pull date back if possible. Additional questions relayed on 7/20/11 telecom. May require a supplement.

TBD OMA clarifications (add clarification to FPR rev, if necessary)

TBD Pre-mtg for audit plan TBD Audit 8/31/11 Technical meeting

9. IST Tech Spec Change 8/10/11 Pre-submittal meeting week of 7/11/11. In TVA Corporate concurrence. Licensing (Shea)
10. Tech Spec Revisions from latest T/S Sept, 2011 CSST A & B - discretionary Licensing/Elton markup and NRC Review comments (Bryan)

Aug, 2011 I-131 DEI Aug, 2011 Diesel Generator Frequency 8/9/11 Issue a complete revision F

11. ASME III to XI transition 8/12/11 When does ISI program begin with partial plant N-3? Eng/Helms Are repairs/mods after N-5 controlled under Section III (Crouch) or Section XI? The timing for the NIS-2 in the letter does not comply with the ASME Code . The NIS-2 must be before commercial operation.
12. ACRS Topics 10/5/11 Cyber Security,
13. SSER 22/23 Open Items Response 8/15/11 7/22 is the target date for the next SSER update. The expanded HH list and its status is covered periodically.

internal Telecom to be set up on degraded voltage - item 30 telecom

Page 4 of 4 No. Description Status Additional Comments Resp Org/Person

14. Transient Analysis issues ENG/Koontz WEC/Morgan Boron dilution RAI response Week of Question on RG revision and modes 3, 4, & 5 ...

8/29/11 to FSAR is clear as to why modes 1, 2, & 6 are limiting discuss

15. FSAR A105 8/15/11 Cut-off date of 8/5/11 for change requests. Lic/Stockton
16. FSAR A106 TBD Place holder Lic/Stockton
17. Develop list of planned License 1. 9/1/11 1. Review Unit 1 SER for exemptions. Sand NRR/TVA Conditions, Exemptions and Relief 2. 8/15/11 baskets, cyber security, physical security, PAD (Bryan)

Requests (Crouch) 3. TBD 4.0

2. Request Rod Drop deviation - place in A105
3. NRR to review current exemptions
18. Verify Tech Spec Setpoints match calcs 9/1/11 2 SSD remaining to be issued. Eng/Hilmes (Bryan)

TS certification TBD

19. Issue two Unit Offsite Dose Calculation 3/1/12 Determine actual need date Chemistry/

Manual (Beach) Review TS Chapter 5 Woods programs also (Bryan)

20. Issue Unit 2 Completion Letter (Crouch) 8/1/12 Licensing
21. Submit final as-constructed FSAR 7/1/12 Licensing/

figures Stockton

0. Discretionary Actions
1. Letter to terminate Part 30/40 License 4/1/12 Licensing after receipt of Part 50 License (Crouch)
2. Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing
3. Status of GSI 199 Eastern Seismicity Fall 2011 No action pending upcoming Generic Letter TVA/NRR (Crouch) Related information on GSI 194 may need input
4. Letter to notify NRC when Vital Area 11/1/11 Security Plan Update - Boundary to be restored by Lic/Crouch Boundary returned to original location 9/30/11
5. IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis. Corp SG/

Waiting for NRC concurrence. Webber ISI/Tinley