{{#Wiki_filter:April 16, 2012   David A. Repka, Esq.
{{#Wiki_filter:April 16, 2012 David A. Repka, Esq.                                  Diane Curran, Esq.
Tyson Smith, Esq.
Tyson Smith, Esq.                                     Harmon, Curran, Spielberg, and Eisenberg Carlos Sisco                                           1726 M Street NW Winston & Strawn LLP                                   Washington, DC 20036 101 California Street                                 Suite 600 San Francisco, CA 94111-5802                           E-mail: dcurran@harmoncurran.com E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com Jill ZamEk, Esq.
Carlos Sisco Winston & Strawn LLP 101 California Street San Francisco, CA 94111
San Luis Obispo Mothers for Peace 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2)
-5802 E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com Jill ZamEk, Esq.
Docket Nos. 50-275-LR and 50-323-LR
San Luis Obispo Mothers for Peace 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net Diane Curran, Esq.
Harmon, Curran, Spielberg, and Eisenberg


1726 M Street NW Washington, DC 20036 Suite 600 E-mail: dcurran@harmoncurran.com In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2
==Dear Parties:==
) Docket Nos. 5 0-275-LR and 5 0-323-LR 


==Dear Parties:==
Pursuant to the Licensing Board's Memorandum and Order dated September 15, 2010, the Staff will monthly provide the parties an index identifying the hearing file and mandatory disclosures in accordance with 10 C.F.R. §§ 2.1203 and 2.336. For purposes of producing the mandatory disclosures and hearing file, and considering any document as privileged or protected, the Staff treated documents created by agents and contractors of the NRC the same as if those documents were created by the Staff. Accordingly, the Staff did not produce any documents to be disclosed since the last mandatory disclosure and therefore there is no index.
Pursuant to the Licensing Board's Memorandum and Order dated September 15, 20 10, the Staff will monthly provid e the parties an index identifying the hearing file and mandatory disclosures in accordance with 10 C.F.R. §§ 2.1203 and 2.336
Attached is the Affidavit of Elaine M. Keegan, as required by 10 C.F.R. § 2.336(c).
. For purposes of producing the mandatory disclosures and hearing file, and considering any document as privileged or protected, the Staff treated documents created by agents and contractors of the NRC the same as if those documents were created by the Staff.
Respectfully submitted,
Accordingly, the Staff did not produce any documents to be disclosed since the last mandatory disclosure and therefore there is no index. Attac hed is the Affidavit of Elaine M. Keegan, as required by 10 C.F.R. § 2.336(c).                 Respectfully submitted,           /signed (electronically) by/
                                                              /signed (electronically) by/
Lloyd B. Subin Counsel for the NRC Staff
Lloyd B. Subin Counsel for the NRC Staff : Affidavit of Elaine M. Keegan
:
 
Affidavit of Elaine M. Keegan
In the Matter of PACIFIC GAS & ELECTRIC COMPANY (Diablo Canyon Nuclear Power Plant, Units 1 and 2)
Docket Nos. SO-27S-LR and SO-323-LR NRC Staff Transmittal Letter dated April 16, 2012 Attachment 1 Affidavit of Elaine M. Keegan


In the Matter PACIFIC GAS & ELECTRIC (Diablo Canyon Nuclear Power Plant, Units 1 and Docket Nos. SO-27S-LR and NRC Staff Transmittal Letter dated April 16, Attachment Affidavit of Elaine M.
April 16, 2012 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                       )
April 16, 2012 UNITED STATES OF NUCLEAR REGULATORY BEFORE THE ATOMIC SAFETY AND LICENSING In the Matter of ) ) PACIFIC GAS & ELECTRIC COMPANY ) Docket Nos. SO-27S-LRI SO-323-LR ) (Diablo Canyon Nuclear Power Plant ) Units 1 and 2) AFFIDAVIT OF ELAINE KEEGAN CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b) I, Elaine M. Keegan, do hereby state as follows: 1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's
                                                        )
("NRC") Office of Nuclear Reactor Regulation.
PACIFIC GAS & ELECTRIC COMPANY                         )       Docket Nos. SO-27S-LRI SO-323-LR
I serve as a project manager for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 license renewal application
                                                        )
("LRA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
(Diablo Canyon Nuclear Power Plant                     )
: 2. I hereby certify that all relevant materials related to the issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified by the Staff as of April 16, 2012. 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief. Executed in Rockville, Maryland this 16 th day of April, 2012}}
Units 1 and 2)
AFFIDAVIT OF ELAINE KEEGAN CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
I, Elaine M. Keegan, do hereby state as follows:
: 1.     I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. I serve as a project manager for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 license renewal application ("LRA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
: 2.       I hereby certify that all relevant materials related to the issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified by the Staff as of April 16, 2012.
: 3.     I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
Executed in Rockville, Maryland this 16th day of April, 2012}}

Revision as of 04:47, 12 November 2019

2012/04/16 - Diablo Canyon - April 2012 Hearing File Update
ML12109A071
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/16/2012
From: Subin L
NRC/OGC
To: Curran D, Repka D, Sisco C, Tanya Smith, Zamek J
Atomic Safety and Licensing Board Panel, Harmon, Curran, Harmon, Curran, Spielberg & Eisenberg, LLP, San Luis Obispo Mothers for Peace, Winston & Strawn, LLP
Subin L
References
50-275-LR, 50-323-LR
Download: ML12109A071 (3)


Text

April 16, 2012 David A. Repka, Esq. Diane Curran, Esq.

Tyson Smith, Esq. Harmon, Curran, Spielberg, and Eisenberg Carlos Sisco 1726 M Street NW Winston & Strawn LLP Washington, DC 20036 101 California Street Suite 600 San Francisco, CA 94111-5802 E-mail: dcurran@harmoncurran.com E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com Jill ZamEk, Esq.

San Luis Obispo Mothers for Peace 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR

Dear Parties:

Pursuant to the Licensing Board's Memorandum and Order dated September 15, 2010, the Staff will monthly provide the parties an index identifying the hearing file and mandatory disclosures in accordance with 10 C.F.R. §§ 2.1203 and 2.336. For purposes of producing the mandatory disclosures and hearing file, and considering any document as privileged or protected, the Staff treated documents created by agents and contractors of the NRC the same as if those documents were created by the Staff. Accordingly, the Staff did not produce any documents to be disclosed since the last mandatory disclosure and therefore there is no index.

Attached is the Affidavit of Elaine M. Keegan, as required by 10 C.F.R. § 2.336(c).

Respectfully submitted,

/signed (electronically) by/

Lloyd B. Subin Counsel for the NRC Staff : Affidavit of Elaine M. Keegan

In the Matter of PACIFIC GAS & ELECTRIC COMPANY (Diablo Canyon Nuclear Power Plant, Units 1 and 2)

Docket Nos. SO-27S-LR and SO-323-LR NRC Staff Transmittal Letter dated April 16, 2012 Attachment 1 Affidavit of Elaine M. Keegan

April 16, 2012 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

PACIFIC GAS & ELECTRIC COMPANY ) Docket Nos. SO-27S-LRI SO-323-LR

)

(Diablo Canyon Nuclear Power Plant )

Units 1 and 2)

AFFIDAVIT OF ELAINE KEEGAN CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Elaine M. Keegan, do hereby state as follows:

1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. I serve as a project manager for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 license renewal application ("LRA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
2. I hereby certify that all relevant materials related to the issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified by the Staff as of April 16, 2012.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

Executed in Rockville, Maryland this 16th day of April, 2012