ML13247A227: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Attachment 10 Page 1 of 4 OBDI 202 - I OLE Process CWY - 2013 - 08 RETAKE DRAFT OPERATING TEST COMMENTS ADMIN JPM S JPM# 1. Dyn (D/S) 2. LOD (1-5) 3. Attributes
{{#Wiki_filter:CWY - 2013 - 08 RETAKE                                                     DRAFT OPERATING TEST COMMENTS                                                                   ADMIN JPMS
: 4. Job Content Errors 5. U/E/S 6. Explanation (See below for instructions)
: 4. Job Content
IC Focus Cues  Critical Steps Scope (N/B) Over- lap Job-Link Minuti a RO (A1)           N/A RO (A2)           N/A RO (A3)           N/A RO (A4)           N/A SRO (RSA-1) D 1     U    S Replace with another JPM. This is too close to the JPM parent used on the 2013 exam this year at Callaway. Sent a suggested bank JPM on a topic that has not been done at Callaway to my knowledge on work hours. It was a successful JPM at WC. Be sure to change the outline form ES
: 1.     2.                 3. Attributes                                                                                     6.
-301-1 and its associated KA if you agree and make the change with this suggested JPM
Errors 5.
. Changed to new JPM and is now Sat. Sent with final exam submittal.
JPM#      Dyn    LOD                                                                                                                Explanation U/E/S (D/S)  (1-5)    IC    Cues Critical  Scope    Over-  Job-    Minutia                                          (See below for instructions)
SRO (RSA-2) D 3       E S Need the marked up key with all applicable tables, graphs, and procedure data points needed to arrive at the answer (similar to what was done on RSA
Focus           Steps     (N/B)   lap   Link RO (A1)                                                                                     N/A RO (A2)                                                                                     N/A RO (A3)                                                                                     N/A RO (A4)                                                                                     N/A SRO         D       1                                         X                       U   Replace with another JPM. This is too close to the JPM parent used on the 2013 exam this (RSA-1)                                                                                    year at Callaway. Sent a suggested bank JPM on a topic that has not been done at Callaway to my knowledge on work hours. It was a successful JPM at WC. Be sure to change the outline form ES-301-1 and its associated KA if you agree and make the change with this suggested JPM.
-3). Sent with final exam submittal. SRO (RSA-3) D 3 X     E   S 1. Initiating cue has "Attachments 2" and it should be "Attachment 2" (remove the s).
Changed to new JPM and is now Sat. Sent with final exam submittal.
: 2. Do not capitalize "Actions" in the Initiating cue as this is cueing to TS required actions. This occurs in two spots in the Initiating Cues. 3. For step 5 of the JPM standard, "accordance" is spelled "arrordance."
SRO         D       3                                                                 E   Need the marked up key with all applicable tables, graphs, and procedure data points (RSA-2)                                                                                    needed to arrive at the answer (similar to what was done on RSA-3).
Sent with final exam submittal.
Sent with final exam submittal.
SRO (RSA-4) D 2       E S Editorial  
SRO         D       3               X                                                 E       1. Initiating cue has Attachments 2 and it should be Attachment 2 (remove the s).
- step 4 of JPM standard has a period before the number 2 and after the number 2 for 2.75 hr.
(RSA-3)                                                                                          2. Do not capitalize Actions in the Initiating cue as this is cueing to TS required actions. This occurs in two spots in the Initiating Cues.
Done. SR O (RSA-5) D 4       E S Need the marked up key with all applicable tables, graphs, and procedure data points needed to arrive at the answer (similar to what was done on RSA
: 3. For step 5 of the JPM standard, accordance is spelled arrordance.
-3). Sent with final exam submittal.
S Sent with final exam submittal.
Instructions for Completing Matrix This form is not contained in or required by NUREG
SRO         D       2                                                                 E   Editorial - step 4 of JPM standard has a period before the number 2 and after the number (RSA-4)                                                                                    2 for 2.75 hr.
-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
Done.
SRO        D       4                                                                 E   Need the marked up key with all applicable tables, graphs, and procedure data points (RSA-5)                                                                                    needed to arrive at the answer (similar to what was done on RSA-3).
Sent with final exam submittal.
Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
: 1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
: 1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
: 2. Determine level of difficulty (LOD) using established 1
: 2. Determine level of difficulty (LOD) using established 1-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level for the license being tested.
-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level for the license being tested.
: 3. Check the appropriate box when an attribute weakness is identified:
: 3. Check the appropriate box when an attribute weakness is identified:
The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin.
* The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin. 0                                                                            Page 1 of 4                                                           OBDI 202 - IOLE Process
 
* The JPM does not contain sufficient cues that are objective (not leading).
Attachment 10 Page 2 of 4 OBDI 202 - I OLE Process The JPM does not contain sufficient cues that are objective (not leading).
* All critical steps (elements) have not been properly identified.
All critical steps (elements) have not been properly identified.
* Scope of the task is either too narrow (N) or too broad (B).
Scope of the task is either too narrow (N) or too broad (B).
* Excessive overlap with other part of operating test or written examination.
Excessive overlap with other part of operating test or written examination.
: 4. Check the appropriate box when a job content error is identified:
: 4. Check the appropriate box when a job content error is identified:
Topics not linked to job content (e.g., disguised task, not required in real job).
* Topics not linked to job content (e.g., disguised task, not required in real job).
Task is trivial and without safety significance.
* Task is trivial and without safety significance.
: 5. Based on the reviewer
: 5. Based on the reviewer=s judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
=s judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
: 6. Provide a brief description of any U or E rating in the explanation column.
: 6. Provide a brief description of any U or E rating in the explanation column.
: 7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.
: 7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0                                                                      Page 2 of 4                                                OBDI 202 - IOLE Process


Attachment 10 Page 3 of 4 OBDI 202 - I OLE Process CW - 2013 - 08 RETAKE DRAFT OPERATING TEST COMMENTS CONTROL ROOM/IN
CW - 2013 - 08 RETAKE                                                     DRAFT OPERATING TEST COMMENTS                           CONTROL ROOM/IN-PLANT SYSTEMS JPMS
-PLANT SYSTEM S JPM S JPM# 1. Dyn (D/S) 2. LOD (1-5) 3. Attributes
: 4. Job Content
: 4. Job Content Errors 5. U/E/S 6. Explanation (See below for instructions)
: 1.       2.                 3. Attributes                                                                               6.
IC Focus Cues  Critical Steps Scope (N/B) Over- lap Job-Link Minutia S 1          N/A S 2          N/A S 3          N/A S 4          N/A S 5          N/A S 6          N/A S 7          N/A S 8          N/A P1           N/A P2           N/A P3           N/A             Instructions for Completing Matrix This form is not contained in or required by NUREG
Errors       5.
-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
JPM#      Dyn    LOD                                                                                                        Explanation IC    Cues Critical    Scope  Over-  Job-    Minutia U/E/S (D/S)    (1-5)                                                                                                (See below for instructions)
Focus           Steps     (N/B) lap   Link S1                                                                                      N/A S2                                                                                      N/A S3                                                                                      N/A S4                                                                                      N/A S5                                                                                      N/A S6                                                                                      N/A S7                                                                                      N/A S8                                                                                      N/A P1                                                                                     N/A P2                                                                                     N/A P3                                                                                     N/A Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
: 1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
: 1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
: 2. Determine level of difficulty (LOD) using established 1
: 2. Determine level of difficulty (LOD) using established 1-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level for the license being tested.
-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level for the license being tested.
: 3. Check the appropriate box when an attribute weakness is identified:
: 3. Check the appropriate box when an attribute weakness is identified:
$ The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin.
        $ The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin.
$ The JPM does not contain sufficient cues that are objective (not leading).
        $ The JPM does not contain sufficient cues that are objective (not leading).
$ All critical steps (elements) have not been properly identified.
        $ All critical steps (elements) have not been properly identified.
$ Scope of the task is either too narrow (N) or too broad (B).
        $ Scope of the task is either too narrow (N) or too broad (B).
$ Excessive overlap with other part of operating test or written examination.
        $ Excessive overlap with other part of operating test or written examination.
: 4. Check the appropriate box when a job content error is identified:
: 4. Check the appropriate box when a job content error is identified:
Topics not linked to job content (e.g., disguised task, not required in real job).
* Topics not linked to job content (e.g., disguised task, not required in real job).
Task is trivial and without safety significance.
* Task is trivial and without safety significance.
: 5. Based on the reviewer
: 5. Based on the reviewer=s judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
=s judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
: 6. Provide a brief description of any U or E rating in the explanation column.
: 6. Provide a brief description of any U or E rating in the explanation column.
: 7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.
: 7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0                                                                          Page 3 of 4                                                      OBDI 202 - IOLE Process


Attachment 10 Page 4 of 4 OBDI 202 - I OLE Process CW - 2013 - 08 RETAKE DRAFT OPERATING TEST COMMENTS SCENARIO S Scenario Set 1. ES 2. TS 3. Crit 4. IC 5. Pred 6. TL 7. L/C 8. Eff 9. U/E/S 10. Explanation (See below for instructions) 1         N/A 2         N/A 3         N/A             Instructions for Completing Matrix This form is not contained in or required by NUREG
CW - 2013 - 08 RETAKE                                                 DRAFT OPERATING TEST COMMENTS                                                           SCENARIOS Scenario       1.       2. 3.     4.       5.       6.       7.     8. 9.
-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating test scenario sets. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
: 10. Explanation (See below for instructions)
Set        ES        TS    Crit    IC      Pred    TL      L/C    Eff  U/E/S 1                                                                                   N/A 2                                                                                   N/A 3                                                                                   N/A Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating test scenario sets. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
: 1. ES: ES-301 checklists 4, 5, & 6 satisfied.
: 1. ES: ES-301 checklists 4, 5, & 6 satisfied.
: 2. TS: Set includes SRO TS actions for each SRO, with required actions explicitly detailed.
: 2. TS: Set includes SRO TS actions for each SRO, with required actions explicitly detailed.
: 3. Crit: Each manipulation or evolution has explicit success criteria documented in Form ES
: 3. Crit: Each manipulation or evolution has explicit success criteria documented in Form ES-D-2.
-D-2. 4. IC: Out of service equipment and other initial conditions reasonably consistent between scenarios and not predictive of scenario events and actions. 5. Pred: Scenario sequence and other factors avoid predictability issues.
: 4. IC: Out of service equipment and other initial conditions reasonably consistent between scenarios and not predictive of scenario events and actions.
: 5. Pred: Scenario sequence and other factors avoid predictability issues.
: 6. TL: Time line constructed, including event and process triggered conditions, such that scenario can run without routine examiner cuing.
: 6. TL: Time line constructed, including event and process triggered conditions, such that scenario can run without routine examiner cuing.
: 7. L/C: Length and complexity for each scenario in the set is reasonable for the crew mix being examined, such that all applicants have reasonably similar exposure and event s are needed for evaluation purposes.
: 7. L/C: Length and complexity for each scenario in the set is reasonable for the crew mix being examined, such that all applicants have reasonably similar exposure and events are needed for evaluation purposes.
: 8. Eff: Sequence of events is reasonably efficient for examination purposes, especially with respect to long delays or interactions.
: 8. Eff: Sequence of events is reasonably efficient for examination purposes, especially with respect to long delays or interactions.
: 9. Based on the reviewer
: 9. Based on the reviewer=s judgment, rate the scenario set as (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory.
=s judgment, rate the scenario set as (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory.
: 10. Provide a brief description of problem in the explanation column.
: 10. Provide a brief description of problem in the explanation column.
: 11. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.}}
: 11. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0                                                                    Page 4 of 4                                                    OBDI 202 - IOLE Process}}

Latest revision as of 14:55, 4 November 2019

CW-2013-08 Draft Op Test Comments
ML13247A227
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/27/2013
From: Kelly Clayton
Operations Branch IV
To:
Union Electric Co
laura hurley
References
50-483/13-008
Download: ML13247A227 (4)


Text

CWY - 2013 - 08 RETAKE DRAFT OPERATING TEST COMMENTS ADMIN JPMS

4. Job Content
1. 2. 3. Attributes 6.

Errors 5.

JPM# Dyn LOD Explanation U/E/S (D/S) (1-5) IC Cues Critical Scope Over- Job- Minutia (See below for instructions)

Focus Steps (N/B) lap Link RO (A1) N/A RO (A2) N/A RO (A3) N/A RO (A4) N/A SRO D 1 X U Replace with another JPM. This is too close to the JPM parent used on the 2013 exam this (RSA-1) year at Callaway. Sent a suggested bank JPM on a topic that has not been done at Callaway to my knowledge on work hours. It was a successful JPM at WC. Be sure to change the outline form ES-301-1 and its associated KA if you agree and make the change with this suggested JPM.

S Changed to new JPM and is now Sat. Sent with final exam submittal.

SRO D 3 E Need the marked up key with all applicable tables, graphs, and procedure data points (RSA-2) needed to arrive at the answer (similar to what was done on RSA-3).

S Sent with final exam submittal.

SRO D 3 X E 1. Initiating cue has Attachments 2 and it should be Attachment 2 (remove the s).

(RSA-3) 2. Do not capitalize Actions in the Initiating cue as this is cueing to TS required actions. This occurs in two spots in the Initiating Cues.

3. For step 5 of the JPM standard, accordance is spelled arrordance.

S Sent with final exam submittal.

SRO D 2 E Editorial - step 4 of JPM standard has a period before the number 2 and after the number (RSA-4) 2 for 2.75 hr.

S Done.

SRO D 4 E Need the marked up key with all applicable tables, graphs, and procedure data points (RSA-5) needed to arrive at the answer (similar to what was done on RSA-3).

S Sent with final exam submittal.

Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.

1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
2. Determine level of difficulty (LOD) using established 1-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level for the license being tested.
3. Check the appropriate box when an attribute weakness is identified:
  • The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin. 0 Page 1 of 4 OBDI 202 - IOLE Process
  • The JPM does not contain sufficient cues that are objective (not leading).
  • All critical steps (elements) have not been properly identified.
  • Scope of the task is either too narrow (N) or too broad (B).
  • Excessive overlap with other part of operating test or written examination.
4. Check the appropriate box when a job content error is identified:
  • Topics not linked to job content (e.g., disguised task, not required in real job).
  • Task is trivial and without safety significance.
5. Based on the reviewer=s judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
6. Provide a brief description of any U or E rating in the explanation column.
7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0 Page 2 of 4 OBDI 202 - IOLE Process

CW - 2013 - 08 RETAKE DRAFT OPERATING TEST COMMENTS CONTROL ROOM/IN-PLANT SYSTEMS JPMS

4. Job Content
1. 2. 3. Attributes 6.

Errors 5.

JPM# Dyn LOD Explanation IC Cues Critical Scope Over- Job- Minutia U/E/S (D/S) (1-5) (See below for instructions)

Focus Steps (N/B) lap Link S1 N/A S2 N/A S3 N/A S4 N/A S5 N/A S6 N/A S7 N/A S8 N/A P1 N/A P2 N/A P3 N/A Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.

1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
2. Determine level of difficulty (LOD) using established 1-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level for the license being tested.
3. Check the appropriate box when an attribute weakness is identified:

$ The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin.

$ The JPM does not contain sufficient cues that are objective (not leading).

$ All critical steps (elements) have not been properly identified.

$ Scope of the task is either too narrow (N) or too broad (B).

$ Excessive overlap with other part of operating test or written examination.

4. Check the appropriate box when a job content error is identified:
  • Topics not linked to job content (e.g., disguised task, not required in real job).
  • Task is trivial and without safety significance.
5. Based on the reviewer=s judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
6. Provide a brief description of any U or E rating in the explanation column.
7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0 Page 3 of 4 OBDI 202 - IOLE Process

CW - 2013 - 08 RETAKE DRAFT OPERATING TEST COMMENTS SCENARIOS Scenario 1. 2. 3. 4. 5. 6. 7. 8. 9.

10. Explanation (See below for instructions)

Set ES TS Crit IC Pred TL L/C Eff U/E/S 1 N/A 2 N/A 3 N/A Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating test scenario sets. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.

1. ES: ES-301 checklists 4, 5, & 6 satisfied.
2. TS: Set includes SRO TS actions for each SRO, with required actions explicitly detailed.
3. Crit: Each manipulation or evolution has explicit success criteria documented in Form ES-D-2.
4. IC: Out of service equipment and other initial conditions reasonably consistent between scenarios and not predictive of scenario events and actions.
5. Pred: Scenario sequence and other factors avoid predictability issues.
6. TL: Time line constructed, including event and process triggered conditions, such that scenario can run without routine examiner cuing.
7. L/C: Length and complexity for each scenario in the set is reasonable for the crew mix being examined, such that all applicants have reasonably similar exposure and events are needed for evaluation purposes.
8. Eff: Sequence of events is reasonably efficient for examination purposes, especially with respect to long delays or interactions.
9. Based on the reviewer=s judgment, rate the scenario set as (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory.
10. Provide a brief description of problem in the explanation column.
11. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0 Page 4 of 4 OBDI 202 - IOLE Process