L-MT-13-111, ISFSI - Thirty (30) Day Notification for the Fourth and Fifth Dry Shielded Canisters Pursuant to 10 CFR 72.212, Conditions of General License Issued Under 10 CFR 72.210, for the Storage of Spent Fuel: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Xcel Energy@ November 4, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 Monticello Nuclear Generating Plant 2807 W County Road 75 Monticello, MN 55362 L-MT-13-111 10 CFR 72.212(b)(2)
{{#Wiki_filter:Xcel Energy@                                                 Monticello Nuclear Generating Plant 2807 W County Road 75 Monticello, MN 55362 November 4, 2013 L-MT-13-111 10 CFR 72.212(b)(2)
Independent Spent Fuel Storage Installation Docket Number 72-1004 Thirty (30) Day Notification for the Fourth and Fifth Dry Shielded Canisters Pursuant to 10 CFR 72.212, Conditions of General License Issued Under 10 CFR 72.210, for the Storage of Spent Fuel In accordance with 10 CFR 72.212(b)(2), Northern States Power Company-Minnesota (NSPM), doing business as Xcel Energy, is registering the use of two U. S. Nuclear Regulatory Commission (NRC) approved spent fuel storage casks at the Monticello Nuclear Generating Plant (MNGP) Independent Spent Fuel Storage Installation (ISFSI). Registration of a cask is required no later than 30 days after utilizing the spent fuel storage cask to store spent fuel in accordance with 10 CFR 72.212(b)(2).
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 Independent Spent Fuel Storage Installation Docket Number 72-1004 Thirty (30) Day Notification for the Fourth and Fifth Dry Shielded Canisters Pursuant to 10 CFR 72.212, Conditions of General License Issued Under 10 CFR 72.210, for the Storage of Spent Fuel In accordance with 10 CFR 72.212(b)(2), Northern States Power Company- Minnesota (NSPM), doing business as Xcel Energy, is registering the use of two U. S. Nuclear Regulatory Commission (NRC) approved spent fuel storage casks at the Monticello Nuclear Generating Plant (MNGP) Independent Spent Fuel Storage Installation (ISFSI).
Cask-specific registration information is provided for each NUHOMS-61 BTH Dry Shielded Canister (DSC) in Enclosure
Registration of a cask is required no later than 30 days after utilizing the spent fuel storage cask to store spent fuel in accordance with 10 CFR 72.212(b)(2). Cask-specific registration information is provided for each NUHOMS-61 BTH Dry Shielded Canister (DSC) in Enclosure 1.
: 1. If you have any questions or require additional information, please contact Mr. Richard Loeffler, Senior Regulatory Affairs Engineer, at (763) 295-1247.
If you have any questions or require additional information, please contact Mr. Richard Loeffler, Senior Regulatory Affairs Engineer, at (763) 295-1247.
Summary of Commitments This letter proposes no new commitments and does not revise any existing commitments.
Summary of Commitments This letter proposes no new commitments and does not revise any existing commitments.
Karen D. Fili Site Vice President Monticello Nuclear Generating Plant Northern States Power Company-Minnesota Document Control Desk L-MT-13-111 Page 2 of 2 Enclosure cc: Regional Administrator, Region Ill, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC Resident Inspector, Monticello Nuclear Generating Plant, USNRC ENCLOSURE MONTICELLO NUCLEAR GENERATING PLANT  
Karen D. Fili Site Vice President Monticello Nuclear Generating Plant Northern States Power Company- Minnesota
 
Document Control Desk L-MT-13-111 Page 2 of 2 Enclosure cc:   Regional Administrator, Region Ill, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC Resident Inspector, Monticello Nuclear Generating Plant, USNRC
 
ENCLOSURE MONTICELLO NUCLEAR GENERATING PLANT


==SUMMARY==
==SUMMARY==
OF REGISTRATION INFORMATION FOR THE FOURTH AND FIFTH DRY SHIELDED CANISTERS LOADED DURING THE 2013 LOADING CAMPAIGN (1 Page Follows)
OF REGISTRATION INFORMATION FOR THE FOURTH AND FIFTH DRY SHIELDED CANISTERS LOADED DURING THE 2013 LOADING CAMPAIGN (1 Page Follows)
L-MT-13-111 Enclosure Page 1 of 1  
 
L-MT-13-111 Enclosure Page 1 of 1


==SUMMARY==
==SUMMARY==
OF REGISTRATION INFORMATION FOR THE FOURTH AND FIFTH DRY SHIELDED CANISTERS LOADED DURING THE 2013 LOADING CAMPAIGN HSM Model Number HSM Serial Date Placed Number into Service Cask Certificate of No. 1004 Compliance:
OF REGISTRATION INFORMATION FOR THE FOURTH AND FIFTH DRY SHIELDED CANISTERS LOADED DURING THE 2013 LOADING CAMPAIGN HSM Model Number HSM Serial   Date Placed Number       into Service Cask Certificate of   No. 1004 Compliance:
Cask Amendment Amendment 10 Number: DSC Model Number: NUHOMS-61 BTH DSC Serial Number: MNP-61 BTH-1-B-2-014 NUHOMS HSM-H HSM-8A 10/07/2013 MNP-61 BTH-1-B-2-015 NUHOMS HSM-H HSM-9A 10/14/2013}}
Cask Amendment       Amendment 10 Number:
DSC Model Number:     NUHOMS-61 BTH DSC Serial Number:     MNP-61 BTH-1-B-2-014 NUHOMS HSM-H     HSM-8A       10/07/2013 MNP-61 BTH-1-B-2-015 NUHOMS HSM-H     HSM-9A       10/14/2013}}

Revision as of 12:33, 4 November 2019

ISFSI - Thirty (30) Day Notification for the Fourth and Fifth Dry Shielded Canisters Pursuant to 10 CFR 72.212, Conditions of General License Issued Under 10 CFR 72.210, for the Storage of Spent Fuel
ML13310A568
Person / Time
Site: Monticello, 07201004  
(DPR-022)
Issue date: 11/04/2013
From: Fili K
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
L-MT-13-111
Download: ML13310A568 (4)


Text

Xcel Energy@ Monticello Nuclear Generating Plant 2807 W County Road 75 Monticello, MN 55362 November 4, 2013 L-MT-13-111 10 CFR 72.212(b)(2)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 Independent Spent Fuel Storage Installation Docket Number 72-1004 Thirty (30) Day Notification for the Fourth and Fifth Dry Shielded Canisters Pursuant to 10 CFR 72.212, Conditions of General License Issued Under 10 CFR 72.210, for the Storage of Spent Fuel In accordance with 10 CFR 72.212(b)(2), Northern States Power Company- Minnesota (NSPM), doing business as Xcel Energy, is registering the use of two U. S. Nuclear Regulatory Commission (NRC) approved spent fuel storage casks at the Monticello Nuclear Generating Plant (MNGP) Independent Spent Fuel Storage Installation (ISFSI).

Registration of a cask is required no later than 30 days after utilizing the spent fuel storage cask to store spent fuel in accordance with 10 CFR 72.212(b)(2). Cask-specific registration information is provided for each NUHOMS-61 BTH Dry Shielded Canister (DSC) in Enclosure 1.

If you have any questions or require additional information, please contact Mr. Richard Loeffler, Senior Regulatory Affairs Engineer, at (763) 295-1247.

Summary of Commitments This letter proposes no new commitments and does not revise any existing commitments.

Karen D. Fili Site Vice President Monticello Nuclear Generating Plant Northern States Power Company- Minnesota

Document Control Desk L-MT-13-111 Page 2 of 2 Enclosure cc: Regional Administrator, Region Ill, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC Resident Inspector, Monticello Nuclear Generating Plant, USNRC

ENCLOSURE MONTICELLO NUCLEAR GENERATING PLANT

SUMMARY

OF REGISTRATION INFORMATION FOR THE FOURTH AND FIFTH DRY SHIELDED CANISTERS LOADED DURING THE 2013 LOADING CAMPAIGN (1 Page Follows)

L-MT-13-111 Enclosure Page 1 of 1

SUMMARY

OF REGISTRATION INFORMATION FOR THE FOURTH AND FIFTH DRY SHIELDED CANISTERS LOADED DURING THE 2013 LOADING CAMPAIGN HSM Model Number HSM Serial Date Placed Number into Service Cask Certificate of No. 1004 Compliance:

Cask Amendment Amendment 10 Number:

DSC Model Number: NUHOMS-61 BTH DSC Serial Number: MNP-61 BTH-1-B-2-014 NUHOMS HSM-H HSM-8A 10/07/2013 MNP-61 BTH-1-B-2-015 NUHOMS HSM-H HSM-9A 10/14/2013