ML17306A501: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ACCELERATED ISTRIBUTION | {{#Wiki_filter:ACCELERATED ISTRIBUTION 'DEMONSTRATION SYSTEM REGU . ORY INFORMATION DISTRIBU'1N SYSTEM (RIDE) | ||
'DEMONSTRATION SYSTEM REGU.ORY INFORMATION DISTRIBU'1N SYSTEM (RIDE)ACCESSION NBR:9203060044 DOC.DATE: 92/02/14 NOTARIZED: | ACCESSION NBR:9203060044 DOC.DATE: 92/02/14 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION CONWAYFW.F. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPiENT AFFILIATION MARTIN,J.B. Region 5 (Post 820201) | ||
NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAYFW.F. | |||
Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECIPiENT AFFILIATION MARTIN,J.B. | |||
Region 5 (Post 820201) | |||
==SUBJECT:== | ==SUBJECT:== | ||
Informs NRC of correction to 920207 util | Informs NRC of correction to 920207 util discharge testing during Jun-Nov 1991. | ||
ltr re 8 hour DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR T1TLE: General (50 Dkt)-Insp Rept/Notice of Violation Response 2 ENCL 0 SIZE: | |||
NRR/DLPQ/LHFBPT NRR/DOEA/OEAB NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS1 RGN5 FILE 01 NRC PDR | NOTES:STANDARDIZED PLANT 05000528 Standardized plant. 05000529 Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD TRAMMELL,C THOMPSON,M INTERNAL: ACRS 2 AEOD 1 AEOD/DEIIB 1 AEOD/DSP/TPAB 1 DEDRO 1 NRR HARBUCK,C. 1 NRR MORISSEAUFD 1 NRR/DLPQ/LHFBPT 1 NRR/DLPQ/LPEB10 1 NRR/DOEA/OEAB 1 NRR/DREP/PEPB9H 1 NRR/DST/DIR 8E2 1 NRR/PMAS/ILRB12 1 NUDOCS-ABSTRACT 1 OE~I R 1 OGC/HDS1 1 G 02 1 RGN5 FILE 01 1 EXTERNAL: EG&G/BRYCEFJ.H. NRC PDR NSIC NOTES: | ||
NOTE TO ALL "RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! | |||
TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL | |||
P" C)G'') 0 Arizona Public Service Company PO EMBOX 53999 ~ PHOENIX ARIZONA85022-3999 F""2 )'"0 2) /,') I'": Co WILLIAMF. CONWAY 102-02114-WFC/TRB/DLK EXECUTIVEVICEPRESIOENT NUCLEAR February 14, 1992 Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 | |||
==Reference:== | ==Reference:== | ||
Letter No: 102-02112, dated February 7, 1992, from W. F. Conway, Executive Vice President, Nuclear, APS, to J. B. Martin, Region V Administrator, NRC | |||
==Dear Mr. Martin:== | |||
== | ==Subject:== | ||
Palo Verde Nuclear Generating Station (PVNGS) | |||
Units 1,2, and 3 Holophane and Exide Emergency Lighting Unit Availability File: 92-070-026 The referenced letter provided the NRC with a summary of information contained in calculations 13-NC-QD-200 and 13-NC-QD-201. The letter stated, "Eight-hour discharge testing from June 1, 1990, through November 30, 1991, was performed satisfactorily with'nly. | |||
one exception." This sentence should read "... only two exceptions." The first exception, which was inadvertently omitted in the February 7th summary, consisted of the July 25, 1990, failure of 2EQDNF02. The availability numbers in the referenced letter and its attached calculations included these two failures and were correct. APS regrets any confusion this may have caused. | |||
Should you have any questions, please contact T. R. Bradish at (602) 393-5421. | |||
Sincerely, WFC/TRB/DLK/rw 9203060044 S'20214 PDR ADOCK 05000528 P PDR | |||
i I | |||
i}} | |||
Revision as of 09:11, 29 October 2019
| ML17306A501 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/14/1992 |
| From: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 102-02114-WFC-T, 102-2114-WFC-T, NUDOCS 9203060044 | |
| Download: ML17306A501 (4) | |
Text
ACCELERATED ISTRIBUTION 'DEMONSTRATION SYSTEM REGU . ORY INFORMATION DISTRIBU'1N SYSTEM (RIDE)
ACCESSION NBR:9203060044 DOC.DATE: 92/02/14 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION CONWAYFW.F. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPiENT AFFILIATION MARTIN,J.B. Region 5 (Post 820201)
SUBJECT:
Informs NRC of correction to 920207 util discharge testing during Jun-Nov 1991.
ltr re 8 hour DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR T1TLE: General (50 Dkt)-Insp Rept/Notice of Violation Response 2 ENCL 0 SIZE:
NOTES:STANDARDIZED PLANT 05000528 Standardized plant. 05000529 Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD TRAMMELL,C THOMPSON,M INTERNAL: ACRS 2 AEOD 1 AEOD/DEIIB 1 AEOD/DSP/TPAB 1 DEDRO 1 NRR HARBUCK,C. 1 NRR MORISSEAUFD 1 NRR/DLPQ/LHFBPT 1 NRR/DLPQ/LPEB10 1 NRR/DOEA/OEAB 1 NRR/DREP/PEPB9H 1 NRR/DST/DIR 8E2 1 NRR/PMAS/ILRB12 1 NUDOCS-ABSTRACT 1 OE~I R 1 OGC/HDS1 1 G 02 1 RGN5 FILE 01 1 EXTERNAL: EG&G/BRYCEFJ.H. NRC PDR NSIC NOTES:
NOTE TO ALL "RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL
P" C)G) 0 Arizona Public Service Company PO EMBOX 53999 ~ PHOENIX ARIZONA85022-3999 F""2 )'"0 2) /,') I'": Co WILLIAMF. CONWAY 102-02114-WFC/TRB/DLK EXECUTIVEVICEPRESIOENT NUCLEAR February 14, 1992 Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368
Reference:
Letter No: 102-02112, dated February 7, 1992, from W. F. Conway, Executive Vice President, Nuclear, APS, to J. B. Martin, Region V Administrator, NRC
Dear Mr. Martin:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1,2, and 3 Holophane and Exide Emergency Lighting Unit Availability File: 92-070-026 The referenced letter provided the NRC with a summary of information contained in calculations 13-NC-QD-200 and 13-NC-QD-201. The letter stated, "Eight-hour discharge testing from June 1, 1990, through November 30, 1991, was performed satisfactorily with'nly.
one exception." This sentence should read "... only two exceptions." The first exception, which was inadvertently omitted in the February 7th summary, consisted of the July 25, 1990, failure of 2EQDNF02. The availability numbers in the referenced letter and its attached calculations included these two failures and were correct. APS regrets any confusion this may have caused.
Should you have any questions, please contact T. R. Bradish at (602) 393-5421.
Sincerely, WFC/TRB/DLK/rw 9203060044 S'20214 PDR ADOCK 05000528 P PDR
i I
i