ML17306A501
| ML17306A501 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/14/1992 |
| From: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 102-02114-WFC-T, 102-2114-WFC-T, NUDOCS 9203060044 | |
| Download: ML17306A501 (4) | |
Text
ACCELERATED ISTRIBUTION 'DEMONSTRATION SYSTEM REGU ORY INFORMATION DISTRIBU'1N SYSTEM (RIDE)
ACCESSION NBR:9203060044 DOC.DATE: 92/02/14 NOTARIZED:
NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAYFW.F.
Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPiENT AFFILIATION MARTIN,J.B.
Region 5 (Post 820201)
SUBJECT:
Informs NRC of correction to 920207 util ltr re 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> discharge testing during Jun-Nov 1991.
DISTRIBUTION CODE:
IEOID COPIES RECEIVED:LTR 2 ENCL 0
SIZE:
T1TLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
05000528 05000529 05000530 RECIPIENT ID CODE/NAME PD5 PD THOMPSON,M INTERNAL: ACRS AEOD/DEIIB DEDRO NRR MORISSEAUFD NRR/DLPQ/LPEB10 NRR/DREP/PEPB9H NRR/PMAS/ILRB12 OE~I R G
02 EXTERNAL: EG&G/BRYCEFJ.H.
NSIC COPIES LTTR ENCL 2
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME TRAMMELL,C AEOD AEOD/DSP/TPAB NRR HARBUCK,C.
NRR/DLPQ/LHFBPT NRR/DOEA/OEAB NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS1 RGN5 FILE 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
NOTES:
NOTE TO ALL"RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 26 ENCL
WILLIAMF. CONWAY EXECUTIVEVICEPRESIOENT NUCLEAR Arizona Public Service Company P O EMBOX 53999
~
PHOENIX ARIZONA85022-3999 102-02114-WFC/TRB/DLK February 14, 1992 P" C)G) 0 F""2 )'"0 2)
/,') I'": Co Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368
Reference:
Letter No: 102-02112, dated February 7, 1992, from W. F. Conway, Executive Vice President, Nuclear, APS, to J. B. Martin, Region V Administrator, NRC
Dear Mr. Martin:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1,2, and 3 Holophane and Exide Emergency Lighting Unit Availability File: 92-070-026 The referenced letter provided the NRC with a summary of information contained in calculations 13-NC-QD-200 and 13-NC-QD-201. The letter stated, "Eight-hour discharge testing from June 1, 1990, through November 30, 1991, was performed satisfactorily with'nly.
one exception."
This sentence should read
"... only two exceptions."
The first exception, which was inadvertently omitted in the February 7th summary, consisted of the July 25, 1990, failure of 2EQDNF02. The availability numbers in the referenced letter and its attached calculations included these two failures and were correct.
APS regrets any confusion this may have caused.
Should you have any questions, please contact T. R. Bradish at (602) 393-5421.
Sincerely, WFC/TRB/DLK/rw 9203060044 S'20214 PDR ADOCK 05000528 P
i I
i