{{#Wiki_filter:CATEGORY 1 REGULAT INFORMATION DISTRIBUTION STEM (RIDS)ACCESSIOQ NBR:9705130080 DOC.DATE: 97/04/30 NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REGULAT       INFORMATION DISTRIBUTION                   STEM (RIDS)
NO FACIL:50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana M AUTH.NAME AUTHOR AFFILIATION
ACCESSIOQ NBR:9705130080           DOC.DATE:       97/04/30         NOTARIZED: NO             DOCKET FACIL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana                           M 05000316 AUTH. NAME           AUTHOR AFFILIATION Indiana Michigan Power Co.
'INOR,J.W.
                                                'INOR,J.W.
Indiana Michigan Power Co.SAMPSON,J.R.
SAMPSON,J.R.         Indiana Michigan Power Co.
Indiana Michigan Power Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000316
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Apr 1997 for DC Cook Nuclear Plant Unit 2.W/970502 ltr.DISTRISDTION CODE: IE24D COPIES RECEIVED:LTR I ENCL i SIZE.TITLE: Monthly Operating Report (per Tech Specs)NOTES: C'RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN3 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME HICKMAN J LE CENTER 01 OC'BA"'P'D" COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D 0 N NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept       for Apr 1997           for   DC Cook   Nuclear Plant Unit 2.W/970502       ltr.                                                                 C' DISTRISDTION CODE: IE24D         COPIES RECEIVED:LTR I                 ENCL   i   SIZE.
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10  
TITLE: Monthly Operating Report (per Tech Specs)
~K~I 1 I Indiana Michig'an Power Company~Cook NUclear Plant~One Cook Place Biidgman, MI 49106 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 May 2, 1997 Gentlemen, Pursuant to the requirements of Donald C.Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of April 1997 is submitted.
NOTES:
Sincerely, J.R.Sampson Plant Manager/mr Attachment y3000'7 NRC Region III D.R.Hahn R.C.Callen S.Hamming INPO Records Center ANI Nuclear Engineering Department E.E.Fitzpatrick A.A.Blind P.A.Barrett S.J.Brewer D.W.Paul J.A.Kobyra D.L.Noble W.H.Schalk D.G;Turner B.L.Bartlett M.E.Russo t!IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
RECIPIENT          COPIES                      RECIPIENT             COPIES ID CODE/NAME         LTTR ENCL                ID CODE/NAME          LTTR ENCL PD3-3 PD                 1    1              HICKMAN J                1    1 INTERNAL: AEOD/SPD/RRAB               1    1                LE CENTER      01      1    1 NRR/DRPM/PECB             1     1               OC'BA" 'P 'D"           1     1 RGN3                      1     1 EXTERNAL: LITCO BRYCE,J       H       1     1               NOAC                      1     1 NRC PDR                  1     1 D
'705i30080 970430 PDR ADQCK 050003ih R PDR  
0 N
\tQ N.R.C.OPERATING DATA REPORT DOCKET NO.50-316 DATE May 2, 1997 COMPLETED BY JW Minor TELEPHONE 616465-5901 OPERATING STATUS 1.Unit Name 2.Reporting Period 3.Licensed Thermal Power (MWt)4.Name Plate Rating (Gross MWe)5.Design Electrical Rating (Net MWe)6.Maximum Dependable Capacity (GROSS M 7.Maximum Dependable Capacity (Net MWe)D.C.Cook Unit2 Apr-97 3411 1133 1090 We)1100 1060 Notes: 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons: I 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: 11.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Gen.(MWH)17.Gross Electrical Energy Gen.(MWH)18.Net Electrical Energy Gen.(MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (MDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate This Month 720.0 720.0 0.0 720.0 0.0 2451401.1 809740.0 783532.0 100.0 100.0 102.7 99.8 0.0 Year-to-Date 2880.0 2754.2 0.0 2717.5 0.0 8738130.9 2878300.0 2781404.0 94.4 94.4 91.1 88.6 5.6 Cumulative 169440.0 118766.1 0.0 115165.1 0.0 355916397.9 115382690.0 111163970.0 69.0 69.0 62.7 61.1 14.0 24.Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
NOTE TO ALL "RIDS" RECIPIENTS:
Refuelin outa e to be in Se tember19 1997 for an estimated duration of48da s 25.If Shut Down At End of Report Period, Estimated Date of Startup: 26.Units in Test Status (Prior to Commercial Operation):
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR                     10   ENCL     10
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast Achieved E~DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-316 D.C.Cook Unit 2 May 2, 1997 JW Minor 616465-5901 AVERAGE DAILY POWER LEVEL (MWe-Net)APRIL 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 4/1/97 4/2/97 4/3/97 4/4/97 4/5/97 4/6/97 4/7/97 4/8/97 4/9/97 4/10/97 4/11/97 4/12/97 4/13/97 4/14/97 4/15/97 4/16/97 1090 1096 1096 1091 1073 1084 1079 1081 1075 1078 1080 1096 1096 1093 1093 1095 4/17/97 4/18/97 4/1 9/97 4/20/97 4/21/97 4/22/97'/23/97 4/24/97 4/25/97 4/26/97 4/27/97 4/28/97 4/29/97 4/30/97 1086 1086 1092 1093 1093 1093 1092 1093 1089 1090 1089 1088 1084 1084
 
~~1 DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE'PAGE 50-316 D.C.Cook Unit 2 May 2, 1997 ME Russo 616-697-5100 1 of1 MONTHLY OPERATING ACTIVITIES
      ~ K ~
-APRIL 1997 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100%RTP.The unit exited this reporting period in Mode 1 at 100%RTP.There were no challenges to the pressurizer safety valves or power operated relief valves.Gross electrical generation for the month of April was 809740 MWh.DETAILS No details to report.
I 1
f~,n DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C.Cook Unit 2-f May 2, 1997 ME Russo 616497-5100 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS
I
-APRIL 1997 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.DATE TYPE" HOURS REASON2 REACTOR>REPORT NO.CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE None There were no unit shutdowns or significant power reductions from 100%RTP this month.1 TYPE: F: Forced S: Scheduled 2 REASON: A: Equipment Failure (Explain)B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)H: Other (Explain)3 METHOD: 1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)4 SYSTEM: Exhibit G-Instructions for preparation of data entry sheets for Licensee Event Report (LER)File (NUREG 0161)5 COMPONENT:
 
Exhibit I: Same Source}}
Indiana Michig'an Power Company Cook NUclear Plant
                              ~
                              ~
One Cook Place Biidgman, MI 49106 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 May 2, 1997 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of April 1997 is submitted.
Sincerely, J.R. Sampson Plant Manager
        /mr Attachment NRC Region III D.R. Hahn R.C. Callen t!
S. Hamming INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul J.A. Kobyra D.L. Noble W.H. Schalk D.G; Turner B.L. Bartlett y3000'7            M.E. Russo IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 970430 050003ih
                                                                              '705i30080 PDR ADQCK R                   PDR
 
tQ
        \
N.R.C. OPERATING DATA REPORT DOCKET NO.             50 - 316 DATE                   May 2, 1997 COMPLETED BY           JW Minor TELEPHONE             616465-5901 OPERATING STATUS                                                     Notes:
: 1. Unit Name                                   D. C. Cook Unit2
: 2. Reporting Period                                       Apr-97
: 3. Licensed Thermal Power (MWt)                           3411
: 4. Name Plate Rating (Gross MWe)                           1133
: 5. Design Electrical Rating (Net MWe)                     1090
: 6. Maximum Dependable Capacity (GROSS MWe)                1100
: 7. Maximum Dependable Capacity (Net MWe)                   1060
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
I
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month            Year-to-Date                  Cumulative
: 11. Hours in Reporting Period                         720.0                  2880.0                  169440.0
: 12. No. of Hrs. Reactor Was Critical                 720.0                  2754.2                  118766.1
: 13. Reactor Reserve Shutdown Hours                       0.0                    0.0                        0.0
: 14. Hours Generator on Line                           720.0                  2717.5                  115165.1
: 15. Unit Reserve Shutdown Hours                         0.0                    0.0                        0.0
: 16. Gross Thermal Energy Gen. (MWH)             2451401.1                8738130.9              355916397.9
: 17. Gross Electrical Energy Gen. (MWH)           809740.0                2878300.0              115382690.0
: 18. Net Electrical Energy Gen. (MWH)             783532.0                2781404.0                111163970.0
: 19. Unit Service Factor                               100.0                    94.4                      69.0
: 20. Unit Availability Factor                         100.0                    94.4                      69.0
: 21. Unit Capacity Factor (MDC Net)                   102.7                    91.1                      62.7
: 22. Unit Capacity Factor (DER Net)                     99.8                   88.6                       61.1
: 23. Unit Forced Outage Rate                              0.0                     5.6                      14.0
: 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
Refuelin outa e to be in Se tember19 1997 for an estimated duration   of48da s
: 25. If Shut Down At End of Report Period, Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast               Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
 
E ~
DOCKET NO.             50- 316 UNIT NAME              D.C. Cook Unit 2 DATE                    May 2, 1997 COMPLETED BY            JW Minor TELEPHONE              616465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
APRIL 1997 DAY   AVERAGE DAILY                       DAY           AVERAGE DAILY POWER LEVEL                                        POWER LEVEL 4/1/97     1090                          4/17/97               1086 4/2/97     1096                          4/18/97               1086 4/3/97     1096                          4/1 9/97               1092 4/4/97     1091                          4/20/97               1093 4/5/97     1073                          4/21/97               1093 4/6/97     1084                          4/22/97               1093 4/7/97     1079                                    '/23/97 1092 4/8/97     1081                          4/24/97               1093 4/9/97     1075                          4/25/97               1089 4/10/97     1078                          4/26/97               1090 4/11/97     1080                          4/27/97               1089 4/12/97     1096                          4/28/97               1088 4/13/97     1096                          4/29/97               1084 4/14/97     1093                          4/30/97               1084 4/15/97     1093 4/16/97     1095
 
  ~   ~ 1 DOCKET NO.           50 - 316 UNIT NAME            D.C. Cook Unit 2 DATE                  May 2, 1997 COMPLETED BY          ME Russo TELEPHONE            616-697-5100
                                                                    'PAGE                  1 of1 MONTHLYOPERATING ACTIVITIES - APRIL 1997 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100% RTP.
The unit exited this reporting period in Mode 1 at 100% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of April was 809740 MWh.
DETAILS No details to report.
 
f
~,n
 
DOCKET NO.             50 - 316 UNIT NAME              D.C. Cook Unit 2-f DATE                  May 2, 1997 COMPLETED BY          ME Russo TELEPHONE              616497-5100 PAGE                  1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - APRIL 1997 METHOD OF SHUTTING     LICENSEE DURATION                   DOWN         EVENT         SYSTEM     COMPONENT             CAUSE AND CORRECTIVE ACTION NO.     DATE TYPE"     HOURS         REASON2     REACTOR>     REPORT NO. CODE4     CODE5                     TO PREVENT RECURRENCE None                                                                                                           There were no unit shutdowns or significant power reductions from 100%
RTP this month.
1 TYPE:             2 REASON:                              3 METHOD:                4 SYSTEM:                                  5 COMPONENT:
F: Forced           A: Equipment Failure (Explain)         1: Manual                Exhibit G - Instructions                    Exhibit I: Same Source S: Scheduled        B: Maintenance or Test                 2: Manual Scram          for preparation of data C: Refueling                           3: Automatic Scram        entry sheets for Licensee D: Regulatory Restriction             4: Other (Explain)        Event Report (LER) File E: Operator Training and                                         (NUREG 0161)
License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain)}}

Revision as of 11:18, 22 October 2019

Monthly Operating Rept for Apr 1997 for DC Cook Nuclear Plant Unit 2.W/970502 Ltr
ML17334B623
Person / Time
Site: Cook 
Issue date: 04/30/1997
From: Minor J, Sampson J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9705130080
Download: ML17334B623 (8)


Text

CATEGORY 1 REGULAT INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSIOQ NBR:9705130080 DOC.DATE: 97/04/30 NOTARIZED: NO DOCKET FACIL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION Indiana Michigan Power Co.

'INOR,J.W.

SAMPSON,J.R. Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Apr 1997 for DC Cook Nuclear Plant Unit 2.W/970502 ltr. C' DISTRISDTION CODE: IE24D COPIES RECEIVED:LTR I ENCL i SIZE.

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 PD 1 1 HICKMAN J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 LE CENTER 01 1 1 NRR/DRPM/PECB 1 1 OC'BA" 'P 'D" 1 1 RGN3 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

~ K ~

I 1

I

Indiana Michig'an Power Company Cook NUclear Plant

~

~

One Cook Place Biidgman, MI 49106 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 May 2, 1997 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of April 1997 is submitted.

Sincerely, J.R. Sampson Plant Manager

/mr Attachment NRC Region III D.R. Hahn R.C. Callen t!

S. Hamming INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul J.A. Kobyra D.L. Noble W.H. Schalk D.G; Turner B.L. Bartlett y3000'7 M.E. Russo IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 970430 050003ih

'705i30080 PDR ADQCK R PDR

tQ

\

N.R.C. OPERATING DATA REPORT DOCKET NO. 50 - 316 DATE May 2, 1997 COMPLETED BY JW Minor TELEPHONE 616465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit2
2. Reporting Period Apr-97
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:

I

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 720.0 2880.0 169440.0
12. No. of Hrs. Reactor Was Critical 720.0 2754.2 118766.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 720.0 2717.5 115165.1
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Gen. (MWH) 2451401.1 8738130.9 355916397.9
17. Gross Electrical Energy Gen. (MWH) 809740.0 2878300.0 115382690.0
18. Net Electrical Energy Gen. (MWH) 783532.0 2781404.0 111163970.0
19. Unit Service Factor 100.0 94.4 69.0
20. Unit Availability Factor 100.0 94.4 69.0
21. Unit Capacity Factor (MDC Net) 102.7 91.1 62.7
22. Unit Capacity Factor (DER Net) 99.8 88.6 61.1
23. Unit Forced Outage Rate 0.0 5.6 14.0
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

Refuelin outa e to be in Se tember19 1997 for an estimated duration of48da s

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

E ~

DOCKET NO. 50- 316 UNIT NAME D.C. Cook Unit 2 DATE May 2, 1997 COMPLETED BY JW Minor TELEPHONE 616465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

APRIL 1997 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 4/1/97 1090 4/17/97 1086 4/2/97 1096 4/18/97 1086 4/3/97 1096 4/1 9/97 1092 4/4/97 1091 4/20/97 1093 4/5/97 1073 4/21/97 1093 4/6/97 1084 4/22/97 1093 4/7/97 1079 '/23/97 1092 4/8/97 1081 4/24/97 1093 4/9/97 1075 4/25/97 1089 4/10/97 1078 4/26/97 1090 4/11/97 1080 4/27/97 1089 4/12/97 1096 4/28/97 1088 4/13/97 1096 4/29/97 1084 4/14/97 1093 4/30/97 1084 4/15/97 1093 4/16/97 1095

~ ~ 1 DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2 DATE May 2, 1997 COMPLETED BY ME Russo TELEPHONE 616-697-5100

'PAGE 1 of1 MONTHLYOPERATING ACTIVITIES - APRIL 1997 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100% RTP.

The unit exited this reporting period in Mode 1 at 100% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of April was 809740 MWh.

DETAILS No details to report.

f

~,n

DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2-f DATE May 2, 1997 COMPLETED BY ME Russo TELEPHONE 616497-5100 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - APRIL 1997 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE" HOURS REASON2 REACTOR> REPORT NO. CODE4 CODE5 TO PREVENT RECURRENCE None There were no unit shutdowns or significant power reductions from 100%

RTP this month.

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)