{{#Wiki_filter:ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)UNITS 2 AND 3 PROPOSED TECHNICAL SPECIFICATION (TS)CHANGES TS-391T MARKED PAGES-CUSTOM TS I.AFFE TED PA E LI T Unit 2-page 3.9/4.9-9 Unit 3-page 3.9/4.9-8 See attached.970702024i 9706i9 PDR ADOCK 05000260 P PDR  
{{#Wiki_filter:ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNITS 2 AND 3 PROPOSED   TECHNICAL SPECIFICATION (TS) CHANGES TS-391T MARKED PAGES CUSTOM TS I. AFFE TED PA   E LI T Unit 2   page   3.9/4.9-9 Unit 3   page 3.9/4.9-8 See attached.
970702024i 9706i9 PDR   ADOCK 05000260 P               PDR


LIMITIHG COHDITIOHS FOR OPERATIOH NOV i8 1988 SURVEILLAHCE REQUIREMEHTS
NOV                  i8 1988 LIMITIHG COHDITIOHS   FOR OPERATIOH                   SURVEILLAHCE REQUIREMEHTS 4.9.B.                         '.9.B.
'.9.B.4.9.B.3~When one of the units 1 and 2 diesel generator is IHOPEKQKZ, continued REACTOR POWER OPERATIOH is permissible during the succeeding 7 days, provided that 2 offsite power sources are available as specified in 3.9.A.l.c and all of the CS, RHR (LPCI and containment cooling)systems, and the remaining three units 1 and 2 diesel generators are OPERABLZ.If this requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the COLD SHUTDOWH COHDITIOH within 24 hours.3.When one of the units 1 and 2 diesel generators is found to be IHOPERABLE, all of the remaining diesel generators shall be demonstrated to be OPERABLZ within 24 hours, and power availability for the associated boards shall be verified within 1 hour and at least once per 8 hours thereafter.
3~ When one of     the units   1                     3. When one of the and 2 diesel     generator     is                       units 1 and 2 diesel IHOPEKQKZ, continued                                     generators is found REACTOR POWER     OPERATIOH is                           to be  IHOPERABLE, permissible during the                                   all of  the remaining succeeding 7 days,                                       diesel generators provided that     2 offsite                             shall be demonstrated power sources are                                       to be OPERABLZ within available as specified                                   24  hours, and power in 3.9.A.l.c and all of                                 availability for                  the the CS, RHR (LPCI and                                   associated boards containment cooling)                                     shall be verified systems, and the remaining                               within 1 hour and three units 1 and 2 diesel                               at least once per generators are OPERABLZ.                                 8 hours thereafter.
4, When one units 1 and 2 4-kV shutdown board is IHOPERABLZ, continued REACTOR POWER OPERATIOH is permissible for a period of 5 days provided that 2 offsite power sources are available as specified in 3.9.A.l.c and the remaining 4-kV shutdown boards and associated diesel generators, CS, RHR (LPCI and containment cooling)systems, and all 480-V emergency power boards are OPERABLE.If this requirement cannot be met, an orderly shutdown shall b'e initiated and the reactor shall be in the COLD SHUTDOWH COHDITIOH within 24 hours.4.When one 4-kV shutdown board is found to be IHOPERABLE, all diesel generators associated with the remaining 4-kV'hutdown boards shall be demonstrated to be OPERABLZ within 24 hours, and power availability for the remaining 4-kV'hutdown boards shall be verified within 1 hours and at least once per 8 hours thereafter.
If   this requirement cannot be met, an orderly shutdown   shall   be initiated   and the   reactor shall   be in the COLD SHUTDOWH COHDITIOH within 24 hours.
[Temporary Change: The preceding 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid.This allowance can be.used only once for each individual diesel generator).
4, When one   units   1 and 2                         4. When one   4-kV 4-kV shutdown board is                                  shutdown board            is IHOPERABLZ, continued                                   found to be REACTOR POWER OPERATIOH                                 IHOPERABLE,  all is permissible for a period                             diesel generators of 5 days provided that                                 associated with the 2 offsite power sources                                 remaining 4-kV are available as                                                   boards shall  'hutdown specified in 3.9.A.l.c                                   be demonstrated to be and the remaining 4-kV                                   OPERABLZ within 24 hours, shutdown boards and                                     and power  availability associated diesel                                       for the remaining 4-kV generators, CS, RHR (LPCI                                           boards                      'hutdown and containment cooling)                               shall be verified systems,   and all   480-V                             within 1 hours and emergency power boards                                 at least once per are OPERABLE.     If this                             8 hours thereafter.
BFH Unit 2 3'/4.9-9 AMENDMENT NO.15 4 4 UX R E EC IC SYS NG COtjtD 0 S 0 OP T 0 AUB 19 1888 CE U S 3.9.B.0 erat o v th o erable~ui>~me t 4.9.B.0 erat o with no erable~uiment Whenever the reactor is in STARTUP mode or RUH mode and not in a Cold Condition, the availability of electric power shall be as specified in 3.9.A except as specified herein.1.From and after the date that only one offsite pover source is available, reactor operation is permissible under this condition for seven days.1.When only one offsite pover source is OPERABLE, all unit 3 diesel generators must be demonstrated to be OPERABLE vithin 24 hours, and pover availability for the associated boards shall be verified vithin 1 hour and at least once per 8 hours thereafter.
requirement cannot be met, an orderly shutdown shall b'e initiated   and                 [Temporary Change: The preceding 7-day LCO time limit may be the reactor shall      be in                extended to 14 days to support completion of the COLD SHUTDOWH      COHDITIOH            maintenance activities within 24 hours.                              during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be. used only once for       each individual diesel generator).
2.When one unit 3 diesel generator (3A, 3B, 3C, or 3D)is inoperable, continued reactor operation is permissible during the succeeding 7 days, provided that tvo offsite pover sources are available as specified in 3.9.A.l.c.
BFH                                           3 '/4.9-9                 AMENDMENT NO.                   15 4 Unit 2
and all of the CS, RHR (LPCI and containment cooling)systems, and the remaining three unit 3 diesel generators are OPERABLE.f th s require-ment cannot be met, an orderly shutdown shall be initiated and the reactor shall be shut dovn and in the Cold Condition vithin 24 hours.2.When one unit 3 diesel generator is found to be inoperable, all of the remaining unit 3 diesel generators shall be demonstrated to be OPERABLE vithin 24 hours, and pover availability for the associated boards shall be verified vithin 1 hour and at least once per 8 hours thereafter.
[Temporary Change: The preceding extended to 14 days to support comp e maintenance activities 1, 1998, to February 1, 19 the time period 99 hi temporary change This allowance which time t s e is no longer val can be used only once for eac individual diesel genezatorj.
/<~~"+)BFH Unit 3 3.9/4.9-8 AMENDMBfT Hg, y p 4


ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)UNITS 2 AND 3 PROPOSED TECHNICAL SPECIFICATION (TS)CHANGES TS-391T REVISED PAGES-CUSTOM TS I.AFFE TED PA E LI T Unit 2-page 3.9/4.9-9 Unit: 3-page 3.9/4.9-8 II.VI ED PA E See attached.
4       UX        R    E EC  IC    SYS AUB 19 1888 NG COtjtD      0  S  0  OP    T 0                            CE      U            S 3.9.B. 0  erat    o   v th     o  erable             4.9.B.     0  erat  o    with     no erable
4 E CTRIC STE*J LI T G CONDI ONS FO OP ION SURVEI LANCE RE UXREMENTS 3.9.B.O eration With I o e able~Ei ment 3.When one of the units 1 and 2 diesel generator is INOPERABLE, continued REACTOR POWER OPERATION is permissible during the succeeding 7 days, provided that 2 offsite power sources are available as specified in 3.9.A.l.c and all of the CS, RHR (LPCI and containment cooling)systems, and the remaining three units 1 and 2 diesel generators are OPERABLE.4.9.8.0 eration W th Ino erable~Ei imermt 3.When one of the units 1 and 2 diesel generators is found to be INOPERABLE, all of the remaining diesel generators shall be demonstrated to be OPERABLE within 24 hours, and power availability for the associated boards shall be verified within 1 hour and at least once per 8 hours thereafter.
          ~ui    >~me  t                                             ~uiment Whenever the         reactor is in STARTUP mode         or RUH mode and not in     a   Cold Condition, the availability of electric power shall be as specified in 3.9.A except as specified herein.
P'emporary Change: The preceding 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities, during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid.This allowance can be used only once for each individual diesel generator.]
: 1. From and       after the date                     1. When    only one that only       one   offsite                         offsite pover source pover source is available,                             is OPERABLE, all unit             3 reactor operation is                                diesel generators must permissible under this                                be demonstrated           to be condition for seven days.                            OPERABLE       vithin 24 hours, and pover availability for the associated boards shall be verified vithin 1 hour and   at least once per           8 hours thereafter.
If this requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the COLD SHUTDOWN CONDITION within 24 hours.'4.When one units 1 and 2 4-kV shutdown board is INOPERABLE, continued REACTOR POWER OPERATION is permissible for a period of 5 days provided that 2 offsite power sources are available as specified in 3.9.A.l.c and the remaining 4-kV shutdown boards and associated diesel generatorsg CSg RHR (LPCI and containment cooling)systems, and all 480-V emergency power boards are OPERABLE.If this requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the COLD SHUTDOWN CONDITION within 24 hours.4.When one 4-kV shutdown board is found to be INOPERABLE, all diesel generators associated with the remaining 4-kV shutdown boards shall be demonstrated to be OPERABLE within 24 hours, and power availability for the remaining 4-kV shutdown boards shall be verified within 1 hours and at least once per 8 hours thereafter.
: 2. When one        unit  3  diesel                    2. When one       unit   3 diesel generator (3A, 3B, 3C,                               generator is found to be or 3D) is inoperable,                                 inoperable, all of the continued reactor operation                           remaining unit 3 diesel is permissible during the                             generators shall be succeeding 7 days, provided                           demonstrated to be that tvo offsite pover                                OPERABLE vithin 24 hours, sources are available as                             and pover availability specified in 3.9.A.l.c.                               for the associated boards and all of the CS, RHR                               shall    be  verified vithin (LPCI and containment                                 1  hour and at least once cooling) systems, and the                             per 8 hours thereafter.
BFN Unit 2 3.9/4.9-9 r~
remaining three         unit 3 diesel generators are OPERABLE.         f th s require-ment cannot be met, an                                                  preceding
3.9 UXILI Y ELECTRICAL S STE I LIM TI CONDIT ONS F OPERATIO SURVEILLANCE RE UIREMENTS 3.9.B.eratio w t Ino erable EcCE~>m~ef Whenever the reactor is in STARTUP mode or RUN mode and not in a Cold Condition, the availability of electric power shall be as specified in 3.9.A except as specified herein.4.9.B.0 eration wit I o erable~cCu~iient l.From and after the date that only one offsite power source is available, reactor operation is permissible under this condition for seven days.1.When only one offsite power source is OPERABLE, all unit 3 diesel generators must be demonstrated to be OPERABLE within 24 hours, and power availability for the associated boards shall be verified within l hour and at least once per 8 hours thereafter.
[Temporary Change: The orderly shutdown shall be                                                         comp e initiated and the reactor                 extended to 14 days to support shall be shut dovn and in                  maintenance activities the time period the Cold Condition vithin                                  1, 1998, to Februarychange 1, 19 99 24   hours.                                     which time   t hi s  temporary e
2.When one unit 3 diesel generator (3A, 3B, 3C, or 3D)is inoperable, continued reactor operation is permissible during the succeeding 7 days, provided that two offsite power sources are available as specified in 3.9.A.l.c.
This allowance is no longer   val can be used   only once   for eac individual diesel genezatorj.
and all of the CS, RHR (LPCI and containment cooling)systems, and the remaining three unit 3 diesel generators are OPERABLE.2.When one unit 3 diesel generator is found to be inoperable, all of the remaining unit 3 diesel generators shall be demonstrated to be OPERABLE within 24 hours, and power availability for the associated boards shall be verified within l hour and at least once per 8 hours thereafter.
                                                              /<~ ~ "+)
[Temporary Change: The preceding 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid.This allowance can be used.only once for each individual diesel generator.]
BFH                                            3.9/4.9-8             AMENDMBfTHg,        yp4 Unit  3
If this requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be shut down and in the Cold Condition within 24 hours.BFN Unit 3 3.9/4.9-8 4~~
ENCLOSURE 4 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)UNITS 2 AND 3 PROPOSED IMPROVED STANDARD TECHNICAL SPECIFICATIONS (ISTS)CHANGE TS-391T MARKED PAGES-ISTS I.AFFE TED PA E LI T Unit 2 and 3-page 3.8-3 II.D PA E See attached.
~AC Sources-Operating 3.8.1 ACTIONS COND IT ION REQUIRED ACTION COMPLETION TIME B.(continued)
B.3.1 Determine OPERABLE Unit 1 and 2 DG(s)are not inoperable due to commo'n cause failure.24 hours OR B.3.2 Perform SR 3.8.1.1 for OPERABLE Unit 1 and 2 DG(s).24 hours AND B.4 Restore Unit 1 and 2 DG to OPERABLE status.7 day AND 14 days from discovery of failure to meet LCO.C.One division of 480 V load shed logic inoperable.
C.l Restore required division of 480 V load shed logic to OPERABLE status.7 days D.One division of common accident signal logic inoperable.
D.1 Restore required division of common accident signal logic to OPERABLE status.7 days (continued)
*[Temporary Change: This 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid.This allowance can be used only once fo each individual diesel.]BFN-UNIT 2 3.8-3 Amendment*Rl AC Sources-Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COHPLETION TIHE B.{continued)
B.3.1 Determine OPERABLE Unit 3 DG(s)are not inoperable due to common cause'ailure.
24 hours OR 8.3.2 Perform SR 3.8.1.1 for OPERABLE Unit 3 DG(s).AND 24 hours B.4 Restore Unit 3 DG to OPERABLE status, 7 days AND 14 days from discovery of failure to meet LCO C.One division of 480 V load shed logic inoperable.
C.1 Restore required division of 480 V load shed logic to OPERABLE status.7 days D.One division of common accident signal logic inoperable.
0.1 Restore required division of common accident signal logic to OPERABLE status.7 days (continued)
*(Temporary Change: This 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999, after which time this)temporary change is no longer valid.This allowance can be used only once for g each individual diesel.]8FN-UNIT 3 3.8-3 Amendment*Rl ENCLOSURE 5 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)UNITS 2 AND 3 PROPOSED IMPROVED STANDARD TECHNICAL SPECIFICATIONS (ISTS)CHANGES-TS-391T REVISED PAGES-ISTS I.AFFE TED PA E LI T Unit 2 and 3 page 3.8-3 page 3.8-3a II.REVI ED PA E See attached.
~AC Sources-Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.(continued)
B.3.1 OR Determine OPERABLE Unit 1 and 2 DG(s)are not inoperable due to common cause failure.24 hours B.3.2 Perform SR 3.8.1.2 for OPERABLE Unit 1 and 2 DG(s).AND 24 hours B.4 Restore Unit 1 and 2 DG to OPERABLE status.7 days[Temporary Change: This 7 day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid.This allowance can be used only once for each individual diesel.]AND (continued)
BFN-UNIT 2 3.8-3 Amendment*Rl
~~
AC Sources-Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.(continued) 14 days from discovery of failure to meet LCO C.One division of 480 V load shed logic inoperable.
C.I Restore required division of 480 V load shed logic to OPERABLE status.7 days D.One division of common accident signal logic inoperable.
D.1 Restore required division of common accident signal logic to OPERABLE status.7 days (continued)
BFN-UNIT 2 3.8-3a Amendment AC Sources-Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.(continued) 8.3.1 Determine OPERABLE Unit 3 DG(s)are not inoperable due to common cause failure.OR B.3.2 Perform SR 3.8.1.1 for OPERABLE Unit 3 DG(s).AND B.4 Restore Unit 3 DG to OPERABLE status.24 hours 24 hours 7 days)Temporary Change: This 7 day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid.This allowance can be used only once for each individual diesel.]AND (continued)
BFN-UNIT 3 3.8-3 Amendment*RI


AC Sources-Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.(continued) 14 days from discovery of failure to meet LCO C.One division of 480 V load shed logic inoperable.
ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
C.1 Restore required division of 480 Y load shed logic to OPERABLE status.7 days D.One di vi s i on of common accident signal logic inoperable.
UNITS 2 AND 3 PROPOSED    TECHNICAL SPECIFICATION (TS) CHANGES TS-391T REVISED PAGES  CUSTOM TS I. AFFE TED PA    E LI T Unit  2  page  3.9/4.9-9 Unit:  3  page  3.9/4.9-8 II. VI  ED PA E See  attached.
D.l Restore required division of common accident signal logic to OPERABLE status.7 days (continued)
 
BFN-UNIT 3 3.8-3a Amendment a t gp V ENCLOSURE 6 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)TS-391T UNITS 2 AND 3 COMMITMENT
4                    E    CTRIC          STE
                                      *J LI T    G CONDI      ONS FO      OP      ION              SURVEI LANCE RE UXREMENTS 3.9.B. O  eration With      I  o e  able              4.9.8. 0  eration  W th Ino erable
          ~Ei    ment                                              ~Ei imermt
: 3. When one      of the units 1                        3. When one  of the and 2    diesel generator is                              units 1 and 2 diesel INOPERABLE,      continued                              generators is found REACTOR POWER OPERATION            is                    to be INOPERABLE, permissible during the                                    all of the remaining succeeding 7 days,                                        diesel generators provided that 2 offsite                                  shall be demonstrated power sources are                                        to be OPERABLE within available as specified                                    24 hours, and power in 3.9.A.l.c and all of                                  availability for the the CS, RHR (LPCI and                                    associated boards containment cooling)                                      shall be verified systems, and the remaining                                within 1 hour and three units 1 and 2 diesel                                at least once per generators are        OPERABLE.                          8 hours thereafter.
P'emporary Change: The preceding 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities, during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be used only once for each individual diesel generator.]
If this    requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the COLD SHUTDOWN CONDITION within 24 hours.
          '4. When one      units  1  and 2                      4. When one  4-kV 4-kV shutdown board            is                        shutdown board    is INOPERABLE,        continued                              found to be REACTOR POWER OPERATION                                  INOPERABLE,  all is permissible for          a  period                  diesel generators of  5  days provided that                                associated with the 2  offsite    power sources                              remaining 4-kV are available as                                          shutdown boards shall specified in 3.9.A.l.c                                  be demonstrated to be and the remaining 4-kV                                    OPERABLE within 24 hours, shutdown boards and                                      and power availability associated diesel                                        for the remaining 4-kV generatorsg CSg RHR (LPCI                                  shutdown boards and containment cooling)                                  shall be verified systems, and all 480-V                                  within 1 hours and emergency power boards                                    at least once per are OPERABLE.        If  this                          8 hours thereafter.
requirement cannot be met, an orderly shutdown shall  be  initiated      and the reactor shall be in the COLD SHUTDOWN CONDITION within 24 hours.
BFN                                                    3.9/4.9-9 Unit  2
 
r~
3.9        UXILI    Y ELECTRICAL S STE I
LIM TI  CONDIT ONS F          OPERATIO                  SURVEILLANCE RE UIREMENTS 3.9.B. eratio    w t    Ino erable                  4.9.B. 0  eration wit
                                                                    ~cCu~iient I  o erable EcCE~>m~ef Whenever    the reactor is in STARTUP mode      or RUN mode and not in  a  Cold Condition, the availability of electric power  shall be as specified in 3.9.A except as specified herein.
: l. From and    after the date that only one offsite
: 1. When only one offsite power source power source is available,                            is  OPERABLE,  all unit  3 reactor operation is                                  diesel generators must permissible under this                                be demonstrated to be condition for seven days.                              OPERABLE  within  24 hours, and power  availability for the associated boards shall be verified within l hour and  at least once per    8 hours  thereafter.
: 2. When one    unit  3  diesel                      2. When one unit 3 diesel generator (3A, 3B, 3C,                                generator is found to be or 3D) is inoperable,                                  inoperable, all of the continued reactor operation                            remaining unit 3 diesel is permissible during the                              generators shall be succeeding 7 days, provided                            demonstrated to be that two offsite power                                OPERABLE within 24 hours, sources are available as                              and power availability specified in 3.9.A.l.c.                                for the associated boards and all of the CS, RHR                                shall be verified within (LPCI and containment                                l hour and at least once per 8 hours thereafter.
cooling) systems, and the remaining three unit 3 diesel generators are OPERABLE.
[Temporary Change: The preceding 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be used. only once for each individual diesel generator.]
If  this requirement cannot be met, an orderly shutdown shall be  initiated and the reactor shall be shut down and in the Cold Condition within 24 hours.
BFN                                                3.9/4.9-8 Unit  3
 
4
  ~ ~
 
ENCLOSURE 4 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNITS 2 AND 3 PROPOSED  IMPROVED STANDARD TECHNICAL SPECIFICATIONS (ISTS) CHANGE TS-391T MARKED PAGES  ISTS I. AFFE TED PA E    LI T Unit  2  and  3  page 3.8-3 II.        D PA E See  attached.
 
                                                                        ~
AC Sources Operating 3.8.1 ACTIONS COND IT ION                      REQUIRED ACTION                  COMPLETION TIME B.  (continued)                  B.3.1    Determine    OPERABLE        24 hours Unit  1  and 2 DG(s) are not inoperable due  to  commo'n  cause failure.
OR B.3.2      Perform    SR  3.8.1.1        24 hours for  OPERABLE    Unit  1 and  2  DG(s).
AND B.4        Restore Unit      1  and 2    7 day DG  to OPERABLE status.                        AND 14 days    from discovery of failure to meet LCO  .
C. One  division of    480  V    C.l        Restore required              7  days load shed logic                          division of 480 V inoperable.                              load shed logic to OPERABLE    status.
D. One  division of    common    D. 1      Restore required              7  days accident signal logic                    division of      common inoperable.                              accident signal logic to OPERABLE status.
(continued)
*[Temporary Change: This 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities                  during the time time this 1999,  after period from January 1, 1998, to February 1, allowance can be used      which temporary change is no      longer  valid. This                              only once fo each  individual diesel.]
BFN-UNIT 2                                  3. 8-3                                Amendment *Rl
 
AC Sources Operating 3.8.1 ACTIONS CONDITION                     REQUIRED ACTION               COHPLETION TIHE B.  {continued)              B.3. 1    Determine  OPERABLE        24 hours Unit 3 DG(s) are not inoperable due to common  cause'ailure.
OR 8.3.2      Perform  SR  3.8.1.1 for  OPERABLE  Unit  3      24 hours DG(s).
AND B.4        Restore Unit  3 DG  to OPERABLE  status,          7  days AND 14  days from discovery of failure to meet LCO C. One division of  480 V    C.1        Restore required            7  days load shed logic                    division of 480 V inoperable.                          load shed logic to OPERABLE  status.
D. One  division of  common  0.1        Restore required            7  days accident signal logic              division of    common inoperable.                          accident signal logic to OPERABLE status.
(continued)
*(Temporary Change: This 7-day    LCO  time  limit may  be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be used only once for g )
each individual  diesel.]
8FN-UNIT 3                              3.8-3                              Amendment  *Rl
 
ENCLOSURE 5 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNITS 2 AND 3 PROPOSED  IMPROVED STANDARD TECHNICAL SPECIFICATIONS (ISTS)
CHANGES  TS-391T REVISED PAGES -ISTS I. AFFE TED PA E  LI  T Unit  2  and  3        page 3.8-3 page 3.8-3a II. REVI ED PA    E See  attached.
 
                                              ~  AC Sources Operating 3.8.1 ACTIONS CONDITION        REQUIRED ACTION            COMPLETION TIME B. (continued)   B.3.1  Determine  OPERABLE      24 hours Unit  1 and 2 DG(s) are not inoperable due  to common cause failure.
OR B.3.2  Perform  SR 3.8.1.2      24 hours for  OPERABLE Unit  1 and 2 DG(s).
AND B.4    Restore Unit  1  and 2    7  days DG  to OPERABLE status.                  [Temporary Change:    This 7 day LCO time limit may  be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999,  after which time this temporary change is no longer valid. This allowance can be used only once for each individual diesel.]
AND (continued)
BFN-UNIT 2                3.8-3                            Amendment  *Rl
 
~ ~
AC Sources Operating 3.8.1 ACTIONS CONDITION              REQUIRED ACTION            COMPLETION TIME B.  (continued)                                            14 days  from discovery of failure to meet LCO C. One division of 480 V C.I    Restore required        7 days load shed logic               division of 480 V inoperable.                  load shed logic to OPERABLE status.
D. One division of common D. 1  Restore required        7 days accident signal logic        division of  common inoperable.                  accident signal logic to OPERABLE  status.
(continued)
BFN-UNIT 2                      3.8-3a                            Amendment
 
AC Sources -Operating 3.8.1 ACTIONS CONDITION        REQUIRED ACTION              COMPLETION TIME B.  (continued)    8.3.1    Determine  OPERABLE      24 hours Unit 3 DG(s) are not inoperable due to common cause  failure.
OR B.3.2    Perform  SR  3.8.1.1 for  OPERABLE  Unit 3      24 hours DG(s).
AND B.4      Restore Unit  3 DG  to OPERABLE  status.          7  days
                                                        )Temporary Change:    This 7 day LCO time limit may  be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999,  after which time this temporary change is no longer valid. This allowance can be used only once for each individual diesel.]
AND (continued)
BFN-UNIT 3                  3.8-3                            Amendment *RI
 
AC Sources -Operating 3.8.1 ACTIONS CONDITION                  REQUIRED ACTION            COMPLETION TIME B.  (continued)                                              14 days from discovery of failure to meet LCO C. One  division of    480 V  C.1   Restore required         7 days load shed logic                  division of 480 Y inoperable.                      load shed logic to OPERABLE status.
D. One di vi s i on of common D.l   Restore required         7 days accident signal logic            division of common inoperable.                      accident signal logic to OPERABLE status.
(continued)
BFN-UNIT 3                         3.8-3a                             Amendment
 
a t gp V
 
ENCLOSURE 6 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
TS-391T UNITS 2 AND 3 COMMITMENT  


==SUMMARY==
==SUMMARY==
These compensatory measures will be included as activity restrictions in the plant outage schedule for the EDGs and will be applied for any EDG outage time past the current EDG 7-day LCO.Require that another off-site power source be available to the affected unit in addition to TS requirement that two off-site sources be available.
 
Requiring a third off-site source further reduces the likelihood that EDGs would be needed.3.Restrict any work activities that would affect the ability to cross-tie the opposite unit EDG to the 4-kV shutdown board for the EDG in the outage (i.e., EDG A cross-tie capability to 4-kV Shutdown Board 3EA).This would ensure that an on-site power source would be readily available for manual alignment to the affected shutdown board if needed.Restrict work activities on the 500-kV switchyard cross-tie breakers supporting the affected unit.This will ensure the required 500-kV off-site sources have access to both 500-kV buses, reducing the likelihood that a 500-kV source would be lost to the affected unit.4.No high risk switchyard maintenance will be scheduled during the outage time period when the EDG is unavailable.
These compensatory   measures   will be included as activity restrictions in the plant outage schedule for the EDGs and will be applied for any EDG outage time past the current EDG 7-day LCO.
High risk emergent work, if any, will be required to be approved by the Plant Manager and Operations Manager.  
Require that another off-site power source be available to the affected unit in addition to TS requirement off-site sources be available. Requiring a thirdthat      two off-site source further reduces the likelihood that EDGs would be needed.
~+~~Lo I}}
Restrict any work activities that would affect the ability to cross-tie the opposite unit EDG to the 4-kV shutdown board for the EDG in the outage (i.e., EDG A cross-tie capability to 4-kV Shutdown Board 3EA). This would ensure that an on-site power source would be readily available for manual alignment to the     affected shutdown board if needed.
: 3. Restrict work activities on the 500-kV switchyard cross-tie breakers supporting the affected unit. This will ensure the required 500-kV off-site sources have access to both 500-kV buses, reducing the likelihood that a 500-kV source would be lost to the affected unit.
: 4. No high risk switchyard maintenance will be scheduled during the outage time period when the EDG is unavailable.
High risk emergent work,     if any, will be required to be approved by the Plant Manager and Operations Manager.
 
  ~ + ~ ~
Lo I}}

Revision as of 22:16, 21 October 2019

Proposed Tech Specs Supporting one-time 14-day Limiting Condition for Operation for Each EDG to Accommodate Pending Vendor Recommended Maint Activities
ML18038B906
Person / Time
Site: Browns Ferry  
Issue date: 06/19/1997
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML18038B905 List:
References
NUDOCS 9707020241
Download: ML18038B906 (23)


Text

ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 2 AND 3 PROPOSED TECHNICAL SPECIFICATION (TS) CHANGES TS-391T MARKED PAGES CUSTOM TS I. AFFE TED PA E LI T Unit 2 page 3.9/4.9-9 Unit 3 page 3.9/4.9-8 See attached.

970702024i 9706i9 PDR ADOCK 05000260 P PDR

NOV i8 1988 LIMITIHG COHDITIOHS FOR OPERATIOH SURVEILLAHCE REQUIREMEHTS 4.9.B. '.9.B.

3~ When one of the units 1 3. When one of the and 2 diesel generator is units 1 and 2 diesel IHOPEKQKZ, continued generators is found REACTOR POWER OPERATIOH is to be IHOPERABLE, permissible during the all of the remaining succeeding 7 days, diesel generators provided that 2 offsite shall be demonstrated power sources are to be OPERABLZ within available as specified 24 hours, and power in 3.9.A.l.c and all of availability for the the CS, RHR (LPCI and associated boards containment cooling) shall be verified systems, and the remaining within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and three units 1 and 2 diesel at least once per generators are OPERABLZ. 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

If this requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the COLD SHUTDOWH COHDITIOH within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

4, When one units 1 and 2 4. When one 4-kV 4-kV shutdown board is shutdown board is IHOPERABLZ, continued found to be REACTOR POWER OPERATIOH IHOPERABLE, all is permissible for a period diesel generators of 5 days provided that associated with the 2 offsite power sources remaining 4-kV are available as boards shall 'hutdown specified in 3.9.A.l.c be demonstrated to be and the remaining 4-kV OPERABLZ within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, shutdown boards and and power availability associated diesel for the remaining 4-kV generators, CS, RHR (LPCI boards 'hutdown and containment cooling) shall be verified systems, and all 480-V within 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and emergency power boards at least once per are OPERABLE. If this 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

requirement cannot be met, an orderly shutdown shall b'e initiated and [Temporary Change: The preceding 7-day LCO time limit may be the reactor shall be in extended to 14 days to support completion of the COLD SHUTDOWH COHDITIOH maintenance activities within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be. used only once for each individual diesel generator).

BFH 3 '/4.9-9 AMENDMENT NO. 15 4 Unit 2

4 UX R E EC IC SYS AUB 19 1888 NG COtjtD 0 S 0 OP T 0 CE U S 3.9.B. 0 erat o v th o erable 4.9.B. 0 erat o with no erable

~ui >~me t ~uiment Whenever the reactor is in STARTUP mode or RUH mode and not in a Cold Condition, the availability of electric power shall be as specified in 3.9.A except as specified herein.

1. From and after the date 1. When only one that only one offsite offsite pover source pover source is available, is OPERABLE, all unit 3 reactor operation is diesel generators must permissible under this be demonstrated to be condition for seven days. OPERABLE vithin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and pover availability for the associated boards shall be verified vithin 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.
2. When one unit 3 diesel 2. When one unit 3 diesel generator (3A, 3B, 3C, generator is found to be or 3D) is inoperable, inoperable, all of the continued reactor operation remaining unit 3 diesel is permissible during the generators shall be succeeding 7 days, provided demonstrated to be that tvo offsite pover OPERABLE vithin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, sources are available as and pover availability specified in 3.9.A.l.c. for the associated boards and all of the CS, RHR shall be verified vithin (LPCI and containment 1 hour and at least once cooling) systems, and the per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

remaining three unit 3 diesel generators are OPERABLE. f th s require-ment cannot be met, an preceding

[Temporary Change: The orderly shutdown shall be comp e initiated and the reactor extended to 14 days to support shall be shut dovn and in maintenance activities the time period the Cold Condition vithin 1, 1998, to Februarychange 1, 19 99 24 hours. which time t hi s temporary e

This allowance is no longer val can be used only once for eac individual diesel genezatorj.

/<~ ~ "+)

BFH 3.9/4.9-8 AMENDMBfTHg, yp4 Unit 3

ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 2 AND 3 PROPOSED TECHNICAL SPECIFICATION (TS) CHANGES TS-391T REVISED PAGES CUSTOM TS I. AFFE TED PA E LI T Unit 2 page 3.9/4.9-9 Unit: 3 page 3.9/4.9-8 II. VI ED PA E See attached.

4 E CTRIC STE

  • J LI T G CONDI ONS FO OP ION SURVEI LANCE RE UXREMENTS 3.9.B. O eration With I o e able 4.9.8. 0 eration W th Ino erable

~Ei ment ~Ei imermt

3. When one of the units 1 3. When one of the and 2 diesel generator is units 1 and 2 diesel INOPERABLE, continued generators is found REACTOR POWER OPERATION is to be INOPERABLE, permissible during the all of the remaining succeeding 7 days, diesel generators provided that 2 offsite shall be demonstrated power sources are to be OPERABLE within available as specified 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and power in 3.9.A.l.c and all of availability for the the CS, RHR (LPCI and associated boards containment cooling) shall be verified systems, and the remaining within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and three units 1 and 2 diesel at least once per generators are OPERABLE. 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

P'emporary Change: The preceding 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities, during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be used only once for each individual diesel generator.]

If this requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the COLD SHUTDOWN CONDITION within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

'4. When one units 1 and 2 4. When one 4-kV 4-kV shutdown board is shutdown board is INOPERABLE, continued found to be REACTOR POWER OPERATION INOPERABLE, all is permissible for a period diesel generators of 5 days provided that associated with the 2 offsite power sources remaining 4-kV are available as shutdown boards shall specified in 3.9.A.l.c be demonstrated to be and the remaining 4-kV OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, shutdown boards and and power availability associated diesel for the remaining 4-kV generatorsg CSg RHR (LPCI shutdown boards and containment cooling) shall be verified systems, and all 480-V within 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and emergency power boards at least once per are OPERABLE. If this 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the COLD SHUTDOWN CONDITION within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

BFN 3.9/4.9-9 Unit 2

r~

3.9 UXILI Y ELECTRICAL S STE I

LIM TI CONDIT ONS F OPERATIO SURVEILLANCE RE UIREMENTS 3.9.B. eratio w t Ino erable 4.9.B. 0 eration wit

~cCu~iient I o erable EcCE~>m~ef Whenever the reactor is in STARTUP mode or RUN mode and not in a Cold Condition, the availability of electric power shall be as specified in 3.9.A except as specified herein.

l. From and after the date that only one offsite
1. When only one offsite power source power source is available, is OPERABLE, all unit 3 reactor operation is diesel generators must permissible under this be demonstrated to be condition for seven days. OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and power availability for the associated boards shall be verified within l hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.
2. When one unit 3 diesel 2. When one unit 3 diesel generator (3A, 3B, 3C, generator is found to be or 3D) is inoperable, inoperable, all of the continued reactor operation remaining unit 3 diesel is permissible during the generators shall be succeeding 7 days, provided demonstrated to be that two offsite power OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, sources are available as and power availability specified in 3.9.A.l.c. for the associated boards and all of the CS, RHR shall be verified within (LPCI and containment l hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

cooling) systems, and the remaining three unit 3 diesel generators are OPERABLE.

[Temporary Change: The preceding 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be used. only once for each individual diesel generator.]

If this requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be shut down and in the Cold Condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

BFN 3.9/4.9-8 Unit 3

4

~ ~

ENCLOSURE 4 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 2 AND 3 PROPOSED IMPROVED STANDARD TECHNICAL SPECIFICATIONS (ISTS) CHANGE TS-391T MARKED PAGES ISTS I. AFFE TED PA E LI T Unit 2 and 3 page 3.8-3 II. D PA E See attached.

~

AC Sources Operating 3.8.1 ACTIONS COND IT ION REQUIRED ACTION COMPLETION TIME B. (continued) B.3.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Unit 1 and 2 DG(s) are not inoperable due to commo'n cause failure.

OR B.3.2 Perform SR 3.8.1.1 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for OPERABLE Unit 1 and 2 DG(s).

AND B.4 Restore Unit 1 and 2 7 day DG to OPERABLE status. AND 14 days from discovery of failure to meet LCO .

C. One division of 480 V C.l Restore required 7 days load shed logic division of 480 V inoperable. load shed logic to OPERABLE status.

D. One division of common D. 1 Restore required 7 days accident signal logic division of common inoperable. accident signal logic to OPERABLE status.

(continued)

  • [Temporary Change: This 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time time this 1999, after period from January 1, 1998, to February 1, allowance can be used which temporary change is no longer valid. This only once fo each individual diesel.]

BFN-UNIT 2 3. 8-3 Amendment *Rl

AC Sources Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COHPLETION TIHE B. {continued) B.3. 1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Unit 3 DG(s) are not inoperable due to common cause'ailure.

OR 8.3.2 Perform SR 3.8.1.1 for OPERABLE Unit 3 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> DG(s).

AND B.4 Restore Unit 3 DG to OPERABLE status, 7 days AND 14 days from discovery of failure to meet LCO C. One division of 480 V C.1 Restore required 7 days load shed logic division of 480 V inoperable. load shed logic to OPERABLE status.

D. One division of common 0.1 Restore required 7 days accident signal logic division of common inoperable. accident signal logic to OPERABLE status.

(continued)

  • (Temporary Change: This 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be used only once for g )

each individual diesel.]

8FN-UNIT 3 3.8-3 Amendment *Rl

ENCLOSURE 5 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 2 AND 3 PROPOSED IMPROVED STANDARD TECHNICAL SPECIFICATIONS (ISTS)

CHANGES TS-391T REVISED PAGES -ISTS I. AFFE TED PA E LI T Unit 2 and 3 page 3.8-3 page 3.8-3a II. REVI ED PA E See attached.

~ AC Sources Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.3.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Unit 1 and 2 DG(s) are not inoperable due to common cause failure.

OR B.3.2 Perform SR 3.8.1.2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for OPERABLE Unit 1 and 2 DG(s).

AND B.4 Restore Unit 1 and 2 7 days DG to OPERABLE status. [Temporary Change: This 7 day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be used only once for each individual diesel.]

AND (continued)

BFN-UNIT 2 3.8-3 Amendment *Rl

~ ~

AC Sources Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) 14 days from discovery of failure to meet LCO C. One division of 480 V C.I Restore required 7 days load shed logic division of 480 V inoperable. load shed logic to OPERABLE status.

D. One division of common D. 1 Restore required 7 days accident signal logic division of common inoperable. accident signal logic to OPERABLE status.

(continued)

BFN-UNIT 2 3.8-3a Amendment

AC Sources -Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) 8.3.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Unit 3 DG(s) are not inoperable due to common cause failure.

OR B.3.2 Perform SR 3.8.1.1 for OPERABLE Unit 3 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> DG(s).

AND B.4 Restore Unit 3 DG to OPERABLE status. 7 days

)Temporary Change: This 7 day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be used only once for each individual diesel.]

AND (continued)

BFN-UNIT 3 3.8-3 Amendment *RI

AC Sources -Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) 14 days from discovery of failure to meet LCO C. One division of 480 V C.1 Restore required 7 days load shed logic division of 480 Y inoperable. load shed logic to OPERABLE status.

D. One di vi s i on of common D.l Restore required 7 days accident signal logic division of common inoperable. accident signal logic to OPERABLE status.

(continued)

BFN-UNIT 3 3.8-3a Amendment

a t gp V

ENCLOSURE 6 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

TS-391T UNITS 2 AND 3 COMMITMENT

SUMMARY

These compensatory measures will be included as activity restrictions in the plant outage schedule for the EDGs and will be applied for any EDG outage time past the current EDG 7-day LCO.

Require that another off-site power source be available to the affected unit in addition to TS requirement off-site sources be available. Requiring a thirdthat two off-site source further reduces the likelihood that EDGs would be needed.

Restrict any work activities that would affect the ability to cross-tie the opposite unit EDG to the 4-kV shutdown board for the EDG in the outage (i.e., EDG A cross-tie capability to 4-kV Shutdown Board 3EA). This would ensure that an on-site power source would be readily available for manual alignment to the affected shutdown board if needed.

3. Restrict work activities on the 500-kV switchyard cross-tie breakers supporting the affected unit. This will ensure the required 500-kV off-site sources have access to both 500-kV buses, reducing the likelihood that a 500-kV source would be lost to the affected unit.
4. No high risk switchyard maintenance will be scheduled during the outage time period when the EDG is unavailable.

High risk emergent work, if any, will be required to be approved by the Plant Manager and Operations Manager.

~ + ~ ~