ML18044A358: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:'g, | {{#Wiki_filter:' | ||
' | 'g, | ||
*v | ' | ||
':p: | . :.::'..Z:-~\\ | ||
*= :q '? :* * *1 .. ;::. .. .,i'l . | ' | ||
. | . | ||
.-: 1 ** ** **.i* .......... | ~ ;,.,...._.,.~* *~ ~'-~'°"" | ||
-;\*I' ...... . General Offices: 212 West Michigan Avenue, Jackson, Michigan 49201.* Area Code 517 788-0550 December 17, 1979 Director, Nuclear Reactor Att Mr Dennis L Ziemann, Chief Operatir,g Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC 20555 DOCKETS 50-155 AND 50-255 -LICENSES A..\ffi DPR | *v :~ ~-,; ':p: ;.l.:~:;) | ||
Subsequently, Consumers Power Company has these commitments with the NRC staff. This review included c:o.nsi:ier.ation of NRC letter dated October 30, 1979 which provided clarification of certain requirements of NUREG-0578, "TI1I-2 Lessons I.earned 7ask Force Statu;:; Report and* Short-Term Recommendations." As a result of this subsequent*::eview, Consumers Power Campany has agreed to implement the NUREG-0578 i.-econunendations consistent with the schedule specified therein. Specifically: | *= :q ~ .~ '? :* | ||
Palisades Plant The Palisades Plant. is currently shut down for a refueling outage. All "implementation Category A" items (ie, those with completion dates of | *.. *j * *1 .. ;::. .. .,i'l . ~ *.. -:; "~~' .; | ||
It should be noted that :Lte:n '2.l.T.a. | ..'.... ...:- . *:f *..,..... ;* -: ,~.: .-: 1 | ||
relati::ig.to Auxiliary | ** ** **.i* .......... - ;\*I' | ||
?*<!ed.ws.ter req_uires prior NRC :-eiriew o: Oler proposal; therefore, Consumers Power Company will complete the modifications for this item but. will not place the modified system in service unti:1.. t"eceiving NRC acceptance* | ......~-t.d-" . | ||
of our design. Big Rock Point Plant | =- | ||
Completion of the design review for Item 2.1.6.b, "Plant Shielding Review," and Item 2.1.8.a, "Post.-Accident Sampling," are related to ongoing SEP Topics. Design modifications for these items cannot, 1//) | General Offices: 212 West Michigan Avenue, Jackson, Michigan 49201.* Area Code 517 788-0550 December 17, 1979 Director, Nuclear Reactor ~egulation Att Mr Dennis L Ziemann, Chief Operatir,g Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC 20555 DOCKETS 50-155 AND 50-255 - LICENSES DP~-6 A..\ffi DPR BIG ROCK POINT AND PALISADES PLANTS - | ||
COMMITI-!&'fT TO REQUIREMENTS RESULTING FROM ~fRC S1'~"'F REVIEW OF THREE nILE ISLAND ACCIDE:NT " | |||
2 ' ' Consiimers Power Company concludes that the above commitments are completely responsive to the recommendations of NUREG-05 78. . A complete revision of our responses date'd October 17, 1979, for the Palisade.s Plant and Octo.ber 30, . 1979, for the Big Rock Point Plant, the changes briefly reviewed will be submitted before the end of December. | Consumers Power Company letters dated Octobet" 17, ~?79 and October 30, 1979 established the subject commitments for our Pali:;ades arid Big Rock Point Plants, respectively. Subsequently, Consumers Power Company has ~eviewed these commitments with the NRC staff. This review included c:o.nsi:ier.ation of NRC letter dated October 30, 1979 which provided clarification of certain requirements of NUREG-0578, "TI1I-2 Lessons I.earned 7ask Force Statu;:; Report and* Short-Term Recommendations." As a result of this subsequent*::eview, Consumers Power Campany has agreed to implement the NUREG-0578 i.-econunendations consistent with the schedule specified therein. Specifically: | ||
These revisions will include sufficient detail regarding ongoing activities to allow the NRC staff to the appropriateness oi otir . Hust:n Senior Licensing Engineer CC *JGKeppler, USNRC | Palisades Plant The Palisades Plant. is currently shut down for a refueling outage. All "implementation Category A" items (ie, those with completion dates of January 1, 1980) will be completed prior to start-up. It should be noted that | ||
:Lte:n '2.l.T.a. relati::ig.to Auxiliary ?*<!ed.ws.ter req_uires prior NRC :-eiriew o: Oler proposal; therefore, Consumers Power Company will complete the modifications for this item but. will not place the modified system in service unti:1.. | |||
t"eceiving NRC acceptance* of our design. | |||
Big Rock Point Plant The Big Rock Point Plant, which is currently operat.ing, will .shut down prior to January 1, 1980 to complete modifications required by the Category A impiementation schedule. Completion of the design review for Item 2.1.6.b, "Plant Shielding Review," and Item 2.1.8.a, "Post.-Accident Sampling," are Aov). | |||
related to ongoing SEP Topics. Design modifications for these items cannot, s | |||
1//) | |||
therefore, be fully implemented at this time. | |||
Ano: 0 | |||
:!;&AfO I .0 : . | |||
I /:): | |||
F. Sl(oPEC. | |||
£) | |||
L .. ?.1ANI | |||
: 0. VEitl"l.ELLJ I | |||
.* 7 Q1~~1ft l"/6 .' | |||
2 | |||
' ' | |||
Consiimers Power Company concludes that the above commitments are completely responsive to the recommendations of NUREG-05 78. . A complete revision of our =- | |||
responses date'd October 17, 1979, for the Palisade.s Plant and Octo.ber 30, . | |||
1979, for the Big Rock Point Plant, incorporat~ng the changes briefly reviewed ab~ve, will be submitted before the end of December. These revisions will include sufficient detail regarding ongoing activities to allow the NRC staff to revie~ the appropriateness oi otir ~ctions. | |||
~// | |||
. w~ | |||
Hust:n Senior Licensing Engineer CC *JGKeppler, USNRC}} | |||
Revision as of 21:08, 21 October 2019
| ML18044A358 | |
| Person / Time | |
|---|---|
| Site: | Palisades, Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 12/17/1979 |
| From: | Huston R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Ziemann D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0578, RTR-NUREG-578 NUDOCS 7912210146 | |
| Download: ML18044A358 (2) | |
Text
'
'g,
'
. :.::'..Z:-~\\
'
.
~ ;,.,...._.,.~* *~ ~'-~'°""
- v :~ ~-,; ':p: ;.l.:~:;)
- = :q ~ .~ '? :*
- .. *j * *1 .. ;::. .. .,i'l . ~ *.. -:; "~~' .;
..'.... ...:- . *:f *..,..... ;* -: ,~.: .-: 1
- ** **.i* .......... - ;\*I'
......~-t.d-" .
=-
General Offices: 212 West Michigan Avenue, Jackson, Michigan 49201.* Area Code 517 788-0550 December 17, 1979 Director, Nuclear Reactor ~egulation Att Mr Dennis L Ziemann, Chief Operatir,g Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC 20555 DOCKETS 50-155 AND 50-255 - LICENSES DP~-6 A..\ffi DPR BIG ROCK POINT AND PALISADES PLANTS -
COMMITI-!&'fT TO REQUIREMENTS RESULTING FROM ~fRC S1'~"'F REVIEW OF THREE nILE ISLAND ACCIDE:NT "
Consumers Power Company letters dated Octobet" 17, ~?79 and October 30, 1979 established the subject commitments for our Pali:;ades arid Big Rock Point Plants, respectively. Subsequently, Consumers Power Company has ~eviewed these commitments with the NRC staff. This review included c:o.nsi:ier.ation of NRC letter dated October 30, 1979 which provided clarification of certain requirements of NUREG-0578, "TI1I-2 Lessons I.earned 7ask Force Statu;:; Report and* Short-Term Recommendations." As a result of this subsequent*::eview, Consumers Power Campany has agreed to implement the NUREG-0578 i.-econunendations consistent with the schedule specified therein. Specifically:
Palisades Plant The Palisades Plant. is currently shut down for a refueling outage. All "implementation Category A" items (ie, those with completion dates of January 1, 1980) will be completed prior to start-up. It should be noted that
- Lte:n '2.l.T.a. relati::ig.to Auxiliary ?*<!ed.ws.ter req_uires prior NRC :-eiriew o: Oler proposal; therefore, Consumers Power Company will complete the modifications for this item but. will not place the modified system in service unti:1..
t"eceiving NRC acceptance* of our design.
Big Rock Point Plant The Big Rock Point Plant, which is currently operat.ing, will .shut down prior to January 1, 1980 to complete modifications required by the Category A impiementation schedule. Completion of the design review for Item 2.1.6.b, "Plant Shielding Review," and Item 2.1.8.a, "Post.-Accident Sampling," are Aov).
related to ongoing SEP Topics. Design modifications for these items cannot, s
1//)
therefore, be fully implemented at this time.
Ano: 0
- !;&AfO I .0 : .
I /:):
F. Sl(oPEC.
£)
L .. ?.1ANI
- 0. VEitl"l.ELLJ I
.* 7 Q1~~1ft l"/6 .'
2
' '
Consiimers Power Company concludes that the above commitments are completely responsive to the recommendations of NUREG-05 78. . A complete revision of our =-
responses date'd October 17, 1979, for the Palisade.s Plant and Octo.ber 30, .
1979, for the Big Rock Point Plant, incorporat~ng the changes briefly reviewed ab~ve, will be submitted before the end of December. These revisions will include sufficient detail regarding ongoing activities to allow the NRC staff to revie~ the appropriateness oi otir ~ctions.
~//
. w~