-;\*I' ...... . General Offices: 212 West Michigan Avenue, Jackson, Michigan 49201.* Area Code 517 788-0550 December 17, 1979 Director, Nuclear Reactor Att Mr Dennis L Ziemann, Chief Operatir,g Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC 20555 DOCKETS 50-155 AND 50-255 -LICENSES A..\ffi DPR-20 -BIG ROCK POINT AND PALISADES PLANTS -COMMITI-!&'fT TO REQUIREMENTS RESULTING FROM REVIEW OF THREE nILE ISLAND ACCIDE:NT Consumers Power Company letters dated Octobet" 17, and October 30, 1979 established the subject commitments for our Pali:;ades arid Big Rock Point Plants, respectively.
                                                          *v :~ ~-,; ':p: ;.l.:~:;)
Subsequently, Consumers Power Company has these commitments with the NRC staff. This review included c:o.nsi:ier.ation of NRC letter dated October 30, 1979 which provided clarification of certain requirements of NUREG-0578, "TI1I-2 Lessons I.earned 7ask Force Statu;:; Report and* Short-Term Recommendations." As a result of this subsequent*::eview, Consumers Power Campany has agreed to implement the NUREG-0578 i.-econunendations consistent with the schedule specified therein. Specifically:
                                                        *=       :q   ~ .~  '? :*
Palisades Plant The Palisades Plant. is currently shut down for a refueling outage. All "implementation Category A" items (ie, those with completion dates of " January 1, 1980) will be completed prior to start-up.
    *..                                            *j  * *1 .. ;::. .. .,i'l . ~ *.. -:; "~~' .;
It should be noted that :Lte:n '2.l.T.a.
        ..'....                                ...:- . *:f *..,..... ;* -:         ,~.: .-: 1
relati::ig.to Auxiliary  
                  ** ** **.i* .......... - ;\*I'
?*<!ed.ws.ter req_uires prior NRC :-eiriew o: Oler proposal; therefore, Consumers Power Company will complete the modifications for this item but. will not place the modified system in service unti:1.. t"eceiving NRC acceptance*
                      ......~-t.d-" .
of our design. Big Rock Point Plant Aov). s The Big Rock Point Plant, which is currently operat.ing, will .shut down prior to January 1, 1980 to complete modifications required by the Category A impiementation schedule.
                                                                                                                                          =-
Completion of the design review for Item 2.1.6.b, "Plant Shielding Review," and Item 2.1.8.a, "Post.-Accident Sampling," are related to ongoing SEP Topics. Design modifications for these items cannot, 1//) Ano: therefore, be fully implemented at this time. :!;&AfO F. Sl(oPEC. L .. ?.1ANI I I 0. VEitl"l.ELLJ I l"/6 . ' .* 7
General Offices: 212 West Michigan Avenue, Jackson, Michigan 49201.* Area Code 517 788-0550 December 17, 1979 Director, Nuclear Reactor ~egulation Att Mr Dennis L Ziemann, Chief Operatir,g Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC 20555 DOCKETS 50-155 AND 50-255 - LICENSES DP~-6 A..\ffi DPR BIG ROCK POINT AND PALISADES PLANTS -
=-0 .0 : . /:): &#xa3;)
COMMITI-!&'fT TO REQUIREMENTS RESULTING FROM ~fRC S1'~"'F REVIEW OF THREE nILE ISLAND ACCIDE:NT                                                                                 "
2 ' ' Consiimers Power Company concludes that the above commitments are completely responsive to the recommendations of NUREG-05 78. . A complete revision of our responses date'd October 17, 1979, for the Palisade.s Plant and Octo.ber 30, . 1979, for the Big Rock Point Plant, the changes briefly reviewed will be submitted before the end of December.
Consumers Power Company letters dated Octobet" 17, ~?79 and October 30, 1979 established the subject commitments for our Pali:;ades arid Big Rock Point Plants, respectively. Subsequently, Consumers Power Company has ~eviewed these commitments with the NRC staff. This review included c:o.nsi:ier.ation of NRC letter dated October 30, 1979 which provided clarification of certain requirements of NUREG-0578, "TI1I-2 Lessons I.earned 7ask Force Statu;:; Report and* Short-Term Recommendations." As a result of this subsequent*::eview, Consumers Power Campany has agreed to implement the NUREG-0578 i.-econunendations consistent with the schedule specified therein. Specifically:
These revisions will include sufficient detail regarding ongoing activities to allow the NRC staff to the appropriateness oi otir . Hust:n Senior Licensing Engineer CC *JGKeppler, USNRC =-}}
Palisades Plant The Palisades Plant. is currently shut down for a refueling outage. All "implementation Category A" items (ie, those with completion dates of January 1, 1980) will be completed prior to start-up. It should be noted that
:Lte:n '2.l.T.a. relati::ig.to Auxiliary ?*<!ed.ws.ter req_uires prior NRC :-eiriew o: Oler proposal; therefore, Consumers Power Company will complete the modifications for this item but. will not place the modified system in service unti:1..
t"eceiving NRC acceptance* of our design.
Big Rock Point Plant The Big Rock Point Plant, which is currently operat.ing, will .shut down prior to January 1, 1980 to complete modifications required by the Category A impiementation schedule. Completion of the design review for Item 2.1.6.b, "Plant Shielding Review," and Item 2.1.8.a, "Post.-Accident Sampling," are Aov).
related to ongoing SEP Topics. Design modifications for these items cannot, s
1//)
therefore, be fully implemented at this time.
Ano:          0
:!;&AfO         I  .0 : .
I  /:):
F. Sl(oPEC.
                                                                                                                                      &#xa3;)
L .. ?.1ANI
: 0. VEitl"l.ELLJ I
                                                                                                  .* 7 Q1~~1ft l"/6             .'
 
2
        '                     '
Consiimers Power Company concludes that the above commitments are completely responsive to the recommendations of NUREG-05 78. . A complete revision of our   =-
responses date'd October 17, 1979, for the Palisade.s Plant and Octo.ber 30, .
1979, for the Big Rock Point Plant, incorporat~ng the changes briefly reviewed ab~ve, will be submitted before the end of December. These revisions will include sufficient detail regarding ongoing activities to allow the NRC staff to revie~ the appropriateness oi otir ~ctions.
            ~//
.           w~
Hust:n Senior Licensing Engineer CC *JGKeppler, USNRC}}

Revision as of 21:08, 21 October 2019

Responds to NRC 791030 Ltr Re TMI-2 Lessons Learned Task Force Status Rept & short-term Recommendations & Provides Implementation Schedule
ML18044A358
Person / Time
Site: Palisades, Big Rock Point  File:Consumers Energy icon.png
Issue date: 12/17/1979
From: Huston R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Ziemann D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0578, RTR-NUREG-578 NUDOCS 7912210146
Download: ML18044A358 (2)


Text

'

'g,

'

.  :.::'..Z:-~\\

'

.

~ ;,.,...._.,.~* *~ ~'-~'°""

  • v :~ ~-,; ':p: ;.l.:~:;)
  • = :q ~ .~ '? :*
  • .. *j * *1 .. ;::. .. .,i'l . ~ *.. -:; "~~' .;

..'.... ...:- . *:f *..,..... ;* -: ,~.: .-: 1

    • ** **.i* .......... - ;\*I'

......~-t.d-" .

=-

General Offices: 212 West Michigan Avenue, Jackson, Michigan 49201.* Area Code 517 788-0550 December 17, 1979 Director, Nuclear Reactor ~egulation Att Mr Dennis L Ziemann, Chief Operatir,g Reactors Branch No 2 US Nuclear Regulatory Commission Washington, DC 20555 DOCKETS 50-155 AND 50-255 - LICENSES DP~-6 A..\ffi DPR BIG ROCK POINT AND PALISADES PLANTS -

COMMITI-!&'fT TO REQUIREMENTS RESULTING FROM ~fRC S1'~"'F REVIEW OF THREE nILE ISLAND ACCIDE:NT "

Consumers Power Company letters dated Octobet" 17, ~?79 and October 30, 1979 established the subject commitments for our Pali:;ades arid Big Rock Point Plants, respectively. Subsequently, Consumers Power Company has ~eviewed these commitments with the NRC staff. This review included c:o.nsi:ier.ation of NRC letter dated October 30, 1979 which provided clarification of certain requirements of NUREG-0578, "TI1I-2 Lessons I.earned 7ask Force Statu;:; Report and* Short-Term Recommendations." As a result of this subsequent*::eview, Consumers Power Campany has agreed to implement the NUREG-0578 i.-econunendations consistent with the schedule specified therein. Specifically:

Palisades Plant The Palisades Plant. is currently shut down for a refueling outage. All "implementation Category A" items (ie, those with completion dates of January 1, 1980) will be completed prior to start-up. It should be noted that

Lte:n '2.l.T.a. relati::ig.to Auxiliary ?*<!ed.ws.ter req_uires prior NRC :-eiriew o: Oler proposal; therefore, Consumers Power Company will complete the modifications for this item but. will not place the modified system in service unti:1..

t"eceiving NRC acceptance* of our design.

Big Rock Point Plant The Big Rock Point Plant, which is currently operat.ing, will .shut down prior to January 1, 1980 to complete modifications required by the Category A impiementation schedule. Completion of the design review for Item 2.1.6.b, "Plant Shielding Review," and Item 2.1.8.a, "Post.-Accident Sampling," are Aov).

related to ongoing SEP Topics. Design modifications for these items cannot, s

1//)

therefore, be fully implemented at this time.

Ano: 0

!;&AfO I .0 : .

I /:):

F. Sl(oPEC.

£)

L .. ?.1ANI

0. VEitl"l.ELLJ I

.* 7 Q1~~1ft l"/6 .'

2

' '

Consiimers Power Company concludes that the above commitments are completely responsive to the recommendations of NUREG-05 78. . A complete revision of our =-

responses date'd October 17, 1979, for the Palisade.s Plant and Octo.ber 30, .

1979, for the Big Rock Point Plant, incorporat~ng the changes briefly reviewed ab~ve, will be submitted before the end of December. These revisions will include sufficient detail regarding ongoing activities to allow the NRC staff to revie~ the appropriateness oi otir ~ctions.

~//

. w~

Hust:n Senior Licensing Engineer CC *JGKeppler, USNRC