ML18074A024: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 UNITED STATES NUCLEAR REGULATORY COMMISSION BOILING WATER REACTOR GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION BOILING WATER REACTOR GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A Please Print Name:
- FORM A       Please Print Name:   Docket No.:
Docket No.:
Facility:   Start Time:
Facility:
Stop Time:
Start Time:                                           Stop Time:
 
INSTRUCTIONS TO EXAMINEE Answer all the test items using the answer sheet provided, ensuring a single answer is marked for each test item. Each test item has equal point value. A score of at least 80 percent is required to pass this portion of the NRC operator licensing written examination. All examination materials will be collected 3 hours after the examination begins. This examination applies to a typical U.S.
INSTRUCTIONS TO EXAMINEE Answer all the test items using the answer sheet provided, ensuring a single answer is marked for each test item. Each test item has equal point value. A score of at least 80 percent is required to pass this portion of the NRC operator licensing written examination. All examination materials will be collected 3 hours after the examination begins. This examination applies to a typical U.S.
boiling water reactor (BWR) nuclear power plant.
boiling water reactor (BWR) nuclear power plant.
SECTION                  QUESTIONS            % OF TOTAL              SCORE COMPONENTS                            1 - 22 REACTOR THEORY                        23 - 36 THERMODYNAMICS                        37 - 50 TOTALS                                  50 All work performed on this examination is my own. I have neither given nor received aid.
Examinee's Signature 1


SECTION  QUESTIONS  % OF TOTAL SCORE  COMPONENTS 1 - 22      REACTOR THEORY 23 - 36      THERMODYNAMICS 37 - 50      TOTALS  50     
RULES AND INSTRUCTIONS FOR THE NRC GENERIC FUNDAMENTALS EXAMINATION During the administration of this examination the following rules apply:
 
All work performed on this examination is my own. I have neither given nor received aid.
 
Examinee's Signature
 
RULES AND INSTRUCTIONS FOR THE NRC GENERIC FUNDAMENTALS EXAMINATION During the administration of this examination the following rules apply:
NOTE: The term "control rod" refers to the length of neutron absorber material that can be positioned by the operator to change core reactivity.
NOTE: The term "control rod" refers to the length of neutron absorber material that can be positioned by the operator to change core reactivity.
NOTE: Numerical answers are rounded to the nearest whole number unless otherwise indicated.
NOTE: Numerical answers are rounded to the nearest whole number unless otherwise indicated.
Line 37: Line 32:
: 4. Fill in your start and stop times at the appropriate times.
: 4. Fill in your start and stop times at the appropriate times.
: 5. Two aids are provided for your use during the examination:
: 5. Two aids are provided for your use during the examination:
(1) An Equations and Conversions Sheet contained within the examination copy, and
(1) An Equations and Conversions Sheet contained within the examination copy, and (2) Steam tables and Mollier Diagram provided by your proctor.
 
(2) Steam tables and Mollier Diagram provided by your proctor.
: 6. Place your answers on the answer sheet provided. Credit will only be given for answers properly marked on this sheet. Follow the instructions for filling out the answer sheet.
: 6. Place your answers on the answer sheet provided. Credit will only be given for answers properly marked on this sheet. Follow the instructions for filling out the answer sheet.
: 7. Scrap paper will be provided for calculations.
: 7. Scrap paper will be provided for calculations.
Line 48: Line 41:
: 11. Turn in your examination materials, answer sheet on top, followed by the examination copy and the examination aids, e.g., steam tables, handouts, and scrap paper.
: 11. Turn in your examination materials, answer sheet on top, followed by the examination copy and the examination aids, e.g., steam tables, handouts, and scrap paper.
: 12. After turning in your examination materials, leave the examination area as defined by the proctor. If after leaving you are found in the examination area while the examination is in progress, your examination may be forfeited.
: 12. After turning in your examination materials, leave the examination area as defined by the proctor. If after leaving you are found in the examination area while the examination is in progress, your examination may be forfeited.
2


GENERIC FUNDAMENTALS EXAMINATION EQUATIONS AND CONVERSIONS SHEET EQUATIONS ---------------------------------------------------------------------------------------------------------------------
GENERIC FUNDAMENTALS EXAMINATION EQUATIONS AND CONVERSIONS SHEET EQUATIONS
3 Q=m cT N=S/(1 K)   Q=mh CR 1 K=CR 1 K   Q=UAT 1/M=CR/CR   Qm  A= r T  m F = PA   K=1/(1 ) m= A v  =(K  1)/K W=mP  SUR = P = I 2 R  =    P =  IE  P=3 IE = + 1+   P=3IEpf   =1.0 x 10 sec P=3IEsin   =0.1 sec (for small positive ) Thermal Efficiency  
---------------------------------------------------------------------------------------------------------------------
= Net Work Out/Energy In DRW   / g (z z)g+(v v)2g+ (P P)+(u u)+(q w)=0 P=P e/ P=P10()  A=A e  g = 32.2 ft/sec 2  g c = 32.2 lbm-ft/lbf-sec 2    CONVERSIONS 1 M W =3.41 x 10 Btu/hr     =(5/9)(32) 1 ft   =7.48 gal     1 hp   =2.54 x 10 Btu/hr     =(9/5)()+32 1 gal =8.35 lbm   1 Btu = 778 ft-lbf 1 kg = 2.21 lbm 1 Curie       =3.7 x 10 dps  
Q = m cp T                                    N = S/(1 K eff )
Q = m h                                        CR1 1 K eff1  = CR 2 1 K eff2 Q = UAT                                         1/M = CR1 /CR x Q  m 3Nat Circ                                A = r 2 T  m 2Nat Circ                                F = PA K eff = 1/(1 )                                 m = Av
= (K eff 1)/K eff                            W Pump = m P SUR = 26.06/                                    P = I2R eff                                    P = IE
  =
eff PA = 3IE eff
  =         +
1 + eff                          PT = 3IEpf
= 1.0 x 104 sec                               PR = 3IEsin eff = 0.1 sec 1 (for small positive )         Thermal Efficiency = Net Work Out/Energy In DRW 2tip / 2avg                              g(z2  z1 ) (v   22  v 12 )
                                                              +                  + (P2  P1 ) + (u2  u1 ) + (q w) = 0 gc              2g c P = Po et/
g = 32.2 ft/sec2 SUR(t)
P = Po 10 gc = 32.2 lbm-ft/lbf-sec2 t
A = Ao e CONVERSIONS 1 MW = 3.41 x 106 Btu/hr                         = (5/9)( 32)                       1 ft 3water = 7.48 gal 1 hp     = 2.54 x 103 Btu/hr                   = (9/5)() + 32                       1 galwater = 8.35 lbm 1 Btu = 778 ft-lbf                           1 kg = 2.21 lbm                             1 Curie     = 3.7 x 1010 dps 3


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   4 QUESTION: 1 A completely full water storage tank is being hydrostatically tested to 200 psig using a positive displacement pump (PDP) with a smooth and constant discharge flow rate of 6 gpm. The tank is protected by two relief valves that discharge to the atmosphere. The relief valves have the following characteristics:
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 1 A completely full water storage tank is being hydrostatically tested to 200 psig using a positive displacement pump (PDP) with a smooth and constant discharge flow rate of 6 gpm. The tank is protected by two relief valves that discharge to the atmosphere. The relief valves have the following characteristics:
  $ Relief valve A opening setpoint is 200 psig with an accumulation of 3.0 percent.
    $ Relief valve A opening setpoint is 200 psig with an accumulation of 3.0 percent.
$ Relief valve B opening setpoint is 200 psig with an accumulation of 1.5 percent.
    $ Relief valve B opening setpoint is 200 psig with an accumulation of 1.5 percent.
$ Each valve has linear flow rate characteristics and a maximum discharge flow rate of 9 gpm.
    $ Each valve has linear flow rate characteristics and a maximum discharge flow rate of 9 gpm.
The PDP is inadvertently left running when tank pressure reaches 200 psig.
The PDP is inadvertently left running when tank pressure reaches 200 psig.
With the PDP running continuously, what will be the discharge flow rates of the relief valves when tank pressure stabilizes?
With the PDP running continuously, what will be the discharge flow rates of the relief valves when tank pressure stabilizes?
Relief Valve A Relief Valve B A. 2 gpm 4 gpm B. 3 gpm 6 gpm C. 4 gpm 2 gpm D. 6 gpm 3 gpm QUESTION: 2 A typical motor
Relief        Relief Valve A       Valve B A.       2 gpm         4 gpm B.       3 gpm         6 gpm C.       4 gpm         2 gpm D.       6 gpm         3 gpm QUESTION: 2 A typical motor-operated valve has been returned to service following a complete maintenance overhaul of the valve and actuator. When the valve was remotely opened and closed to verify operability, the measured valve stroke time in each direction was 15 seconds, which is shorter than normal for this valve.
-operated valve has been returned to service following a complete maintenance overhaul of the valve and actuator. When the valve was remotely opened and closed to verify operability, the measured valve stroke time in each direction was 15 seconds, which is shorter than normal for this valve.
 
Which one of the following could have caused the shorter stroke time?
Which one of the following could have caused the shorter stroke time?
A. The valve position limit switches were removed and were not reinstalled.
A. The valve position limit switches were removed and were not reinstalled.
B. The valve torque limit switches were misadjusted to open at twice their normal setpoints.
B. The valve torque limit switches were misadjusted to open at twice their normal setpoints.
C. The valve stem packing gland was overtightened after the packing material was replaced.
C. The valve stem packing gland was overtightened after the packing material was replaced.
D. The valve was packed with improved packing material having a lower friction coefficient.
D. The valve was packed with improved packing material having a lower friction coefficient.
4


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   5  QUESTION: 3 In a comparison between globe valves and gate valves in the same water system application, globe valves...  
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 3 In a comparison between globe valves and gate valves in the same water system application, globe valves...
 
A. are less effective at throttling flow.
A. are less effective at throttling flow.
B. are less effective as pressure regulating valves.
B. are less effective as pressure regulating valves.
C. produce a smaller pressure decrease when fully open.
C. produce a smaller pressure decrease when fully open.
D. require less force to open against large differential pressures.
D. require less force to open against large differential pressures.
 
QUESTION: 4 If the steam pressure input to a density-compensated steam flow instrument fails high, the associated flow rate indication will...
QUESTION: 4 If the steam pressure input to a density
-compensated steam flow instrument fails high, the associated flow rate indication will...
A. decrease, because the density input has decreased.
A. decrease, because the density input has decreased.
B. increase, because the density input has decreased.
B. increase, because the density input has decreased.
C. decrease, because the density input has increased.
C. decrease, because the density input has increased.
D. increase, because the density input has increased.
D. increase, because the density input has increased.
5


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   6 QUESTION: 5 Refer to the drawing of a reactor vessel differential pressure (D/P) level detection system (see figure below).
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 5 Refer to the drawing of a reactor vessel differential pressure (D/P) level detection system (see figure below).
Which one of the following events will result in a reactor vessel level indication that is greater than actual level?
Which one of the following events will result in a reactor vessel level indication that is greater than actual level?
A. The external pressure surrounding the D/P detector decreases by 2 psi.
A. The external pressure surrounding the D/P detector decreases by 2 psi.
B. Reactor vessel pressure increases by 10 psi with no change in actual water level.
B. Reactor vessel pressure increases by 10 psi with no change in actual water level.
C. Actual vessel level increases by 6 inches.
C. Actual vessel level increases by 6 inches.
D. The temperature of the reference leg increases by 20°F.
D. The temperature of the reference leg increases by 20°F.
6


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   7 QUESTION: 6 Because of a thermocouple temperature display failure, the millivolt output of a thermocouple circuit is being converted to a temperature value using conversion tables. The tables are based on a thermocouple reference junction temperature of 32°F. The actual reference junction is located in a panel that is maintained at 120°F. Room temperature surrounding the panel is 80°F.
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 6 Because of a thermocouple temperature display failure, the millivolt output of a thermocouple circuit is being converted to a temperature value using conversion tables. The tables are based on a thermocouple reference junction temperature of 32°F. The actual reference junction is located in a panel that is maintained at 120°F. Room temperature surrounding the panel is 80°F.
 
What adjustment must be made to the temperature value taken from the conversion tables to calculate the actual temperature at the measuring tip of the thermocouple?
What adjustment must be made to the temperature value taken from the conversion tables to calculate the actual temperature at the measuring tip of the thermocouple?
A. Add 48°F.
A. Add 48°F.
B. Subtract 48°F.
B. Subtract 48°F.
C. Add 88°F.
C. Add 88°F.
D. Subtract 88°F.
D. Subtract 88°F.
 
QUESTION: 7 Fission chamber detectors are used to monitor reactor power/neutron level in a shutdown reactor as well as a reactor operating at rated power (and all power levels in between). At what power level(s) is it necessary to compensate the output of the fission chamber detectors for gamma interactions with the detectors and why?
QUESTION: 7 Fission chamber detectors are used to monitor reactor power/neutron level in a shutdown reactor as well as a reactor operating at rated power (and all power levels in between). At what power level(s) is it necessary to compensate the output of the fission chamber detectors for gamma interactions with the detectors and why?
 
A. At all power levels, because gamma interactions produce larger detector pulses than neutron interactions.
A. At all power levels, because gamma interactions produce larger detector pulses than neutron interactions.
B. At all power levels, because gamma interactions produce smaller detector pulses than neutron interactions.
B. At all power levels, because gamma interactions produce smaller detector pulses than neutron interactions.
C. Only when shutdown or at low power levels, because gamma flux is not proportional to reactor power at low power levels.
C. Only when shutdown or at low power levels, because gamma flux is not proportional to reactor power at low power levels.
D. Only when operating at high power levels, because gamma flux is not proportional to reactor power at high power levels.
D. Only when operating at high power levels, because gamma flux is not proportional to reactor power at high power levels.
7


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   8 QUESTION: 8 The level in a drain collection tank is being controlled by an automatic level controller and level is initially at the controller setpoint. Flow rate into the tank causes tank level to increase. The increasing level causes the controller to fully open a tank drain valve. When level decreases below the setpoint, the controller closes the drain valve. Tank level continues to be controlled in this manner within a narrow band above and below the setpoint.
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 8 The level in a drain collection tank is being controlled by an automatic level controller and level is initially at the controller setpoint. Flow rate into the tank causes tank level to increase. The increasing level causes the controller to fully open a tank drain valve. When level decreases below the setpoint, the controller closes the drain valve. Tank level continues to be controlled in this manner within a narrow band above and below the setpoint.
 
The controller in this system uses __________ control.
The controller in this system uses __________ control.
A. on-off B. proportional C. proportional plus integral D. proportional plus integral plus derivative 8


A. on-off B. proportional
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 9 Refer to the drawing of a lube oil temperature control system (see figure below).
 
Given:
C. proportional plus integral
* The lube oil temperature controller setpoint is 90EF.
 
* The heat exchanger lube oil outlet temperature is stable at 93EF.
D. proportional plus integral plus derivative
* The temperature control valve is currently 60 percent open.
 
* The temperature control system uses a direct-acting proportional controller with a 20°F proportional band.
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   9 QUESTION: 9 Refer to the drawing of a lube oil temperature control system (see figure below).  
If the controllers proportional band is changed to 30°F, the heat exchanger lube oil outlet temperature will stabilize __________ than 93°F; and the controller output needed to position the temperature control valve to 60 percent open will be __________.
 
A. lower; the same B. lower; greater C. higher; the same D. higher; greater 9
Given:   The lube oil temperature controller setpoint is 90 E F. The heat exchanger lube oil outlet temperature is stable at 93 E F. The temperature control valve is currently 60 percent open.
The temperature control system uses a direct
-acting proportional controller with a 20°F proportional band.
 
If the controller's proportional band is changed to 30°F, the heat exchanger lube oil outlet temperature will stabilize __________ than 93°F; and the controller output needed to position the temperature control valve to 60 percent open will be __________.
 
A. lower; the same
 
B. lower; greater C. higher; the same
 
D. highe r; greater
 
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A  10 QUESTION: 10  Refer to the drawing of a pump with recirculation line (see figure below).


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 10 Refer to the drawing of a pump with recirculation line (see figure below).
Which one of the following describes the response of the pump if a complete flow blockage occurs in the discharge line just downstream of the flow transmitter?
Which one of the following describes the response of the pump if a complete flow blockage occurs in the discharge line just downstream of the flow transmitter?
A. The pump will overheat after a relatively short period of time, due to a loss of both main flow and recirculation flow.
A. The pump will overheat after a relatively short period of time, due to a loss of both main flow and recirculation flow.
B. The pump will overheat after a relatively long period of time, due to a loss of main flow only.
B. The pump will overheat after a relatively long period of time, due to a loss of main flow only.
C. The pump will overheat after a relatively long period of time, due to a loss of recirculation flow only.
C. The pump will overheat after a relatively long period of time, due to a loss of recirculation flow only.
D. The pump will be able to operate under these conditions indefinitely, due to sustained main flow.
D. The pump will be able to operate under these conditions indefinitely, due to sustained main flow.
10


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   11 QUESTION: 11 The discharge valve for a radial
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 11 The discharge valve for a radial-flow centrifugal cooling water pump is closed in preparation for starting the pump.
-flow centrifugal cooling water pump is closed in preparation for starting the pump.
 
After the pump is started, the pump suction and discharge pressures stabilize as follows:
After the pump is started, the pump suction and discharge pressures stabilize as follows:
Pump suction pressure
Pump suction pressure = 5 psig Pump discharge pressure = 35 psig With the discharge valve still closed, if the pump speed is doubled, what will be the new stable pump discharge pressure?
  = 5 psig Pump discharge pressure  
A. 65 psig B. 120 psig C. 125 psig D. 140 psig QUESTION: 12 In response to a loss of coolant accident, an emergency core cooling pump is taking suction from the bottom of a vented water storage tank and discharging to the downcomer region of a reactor vessel.
= 35 psig With the discharge valve still closed, if the pump speed is doubled, what will be the new stable pump discharge pressure?
 
A. 65 psig B. 120 psig C. 125 psig D. 140 psig
 
QUESTION: 12 In response to a loss of coolant accident, an emergency core cooling pump is taking suction from the bottom of a vented water storage tank and discharging to the downcomer region of a reactor vessel.
Which one of the following will cause the pump to operate closer to cavitation?
Which one of the following will cause the pump to operate closer to cavitation?
A. The pressure in the reactor vessel increases.
A. The pressure in the reactor vessel increases.
B. The level of the water in the reactor vessel increases.
B. The level of the water in the reactor vessel increases.
C. The temperature of the water in the water storage tank increases.
C. The temperature of the water in the water storage tank increases.
D. The ambient pressure surrounding the water storage tank increases.
D. The ambient pressure surrounding the water storage tank increases.
11


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   12  QUESTION: 13 Refer to the graph that represents the head
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 13 Refer to the graph that represents the head-capacity characteristics for a single-speed centrifugal cooling water pump (see figure below).
-capacity characteristics for a single
-speed centrifugal cooling water pump (see figure below).
 
Which one of the following lists a pair of parameters that could be represented by curves A and B?
Which one of the following lists a pair of parameters that could be represented by curves A and B?
(Note: NPSH is net positive suction head.)
(Note: NPSH is net positive suction head.)
Curve A Curve B A. Pump Head Available NPSH B. Available NPSH Required NPSH C. Required NPSH System Head Loss D. System Head Loss Pump Head
Curve A               Curve B A. Pump Head             Available NPSH B. Available NPSH       Required NPSH C. Required NPSH         System Head Loss D. System Head Loss     Pump Head 12
 
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A  13 QUESTION: 14  When a motor
-driven centrifugal pump was started, the motor ammeter reading immediately increased to, and stabilized at, many times the normal operating value. Which one of the following describes a possible cause for the ammeter response?


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 14 When a motor-driven centrifugal pump was started, the motor ammeter reading immediately increased to, and stabilized at, many times the normal operating value. Which one of the following describes a possible cause for the ammeter response?
A. The pump was started with a fully closed discharge valve.
A. The pump was started with a fully closed discharge valve.
B. The pump was started with a fully open discharge valve.
B. The pump was started with a fully open discharge valve.
C. The pump shaft seized upon start and did not rotate.
C. The pump shaft seized upon start and did not rotate.
D. The pump shaft separated from the motor shaft upon start.
D. The pump shaft separated from the motor shaft upon start.
QUESTION: 15 DELETED 13


QUESTION: 15 
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 16 Refer to the drawing of a lube oil heat exchanger (see figure below).
 
DELETED USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   14 QUESTION: 16 Refer to the drawing of a lube oil heat exchanger (see figure below).
 
The lube oil heat exchanger is in service with the following inlet temperatures:
The lube oil heat exchanger is in service with the following inlet temperatures:
Lube oil inlet temperature      = 130°F Cooling water inlet temperature = 70°F Assume that cooling water mass flow rate is less than lube oil mass flow rate, and that both fluids have the same specific heat. Which one of the following pairs of heat exchanger outlet temperatures is not possible?
Lube Oil          Cooling Water Outlet Temp      Outlet Temp A. 100°F            105°F B. 105°F            105°F C. 110°F            90°F D. 115°F            90°F 14


Lube oil inlet temperature
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 17 A nuclear power plant is operating at steady-state 100 percent power when air inleakage causes main condenser vacuum to decrease from 28 inches Hg vacuum to 27 inches Hg vacuum. Assume the main steam inlet pressure, inlet quality, and mass flow rate through the main turbine do not change, and the condenser cooling water inlet temperature and mass flow rate do not change.
  = 130°F Cooling water inlet temperature
= 70°F  Assume that cooling water mass flow rate is less than lube oil mass flow rate, and that both fluids have the same specific heat. Which one of the following pairs of heat exchanger outlet temperatures is not possible?  Lube Oil  Cooling Water Outlet Temp Outlet Temp A. 100°F  105°F  B. 105°F  105°F C. 110°F  90°F D. 115°F  90°F 
 
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   15 QUESTION: 17 A nuclear power plant is operating at steady
-state 100 percent power when air inleakage causes main condenser vacuum to decrease from 28 inches Hg vacuum to 27 inches Hg vacuum. Assume the main steam inlet pressure, inlet quality, and mass flow rate through the main turbine do not change, and the condenser cooling water inlet temperature and mass flow rate do not change.
When the plant stabilizes, turbine exhaust quality will be __________; and turbine exhaust temperature will be __________.
When the plant stabilizes, turbine exhaust quality will be __________; and turbine exhaust temperature will be __________.
A. lower; lower B. lower; higher C. higher; lower D. higher; higher 15


A. lower; lower B. lower; higher
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 18 Refer to the drawing of an operating lube oil heat exchanger (see figure below).
 
If deposits accumulate on the outside of the cooling water tubes, cooling water outlet temperature will
C. higher; lower
__________; and lube oil outlet temperature will __________. (Assume the lube oil and cooling water inlet temperatures and mass flow rates do not change.)
 
A. decrease; increase B. decrease; decrease C. increase; increase D. increase; decrease 16  
D. higher; higher
 
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   16 QUESTION: 18 Refer to the drawing of an operating lube oil heat exchanger (see figure below).
If deposits accumulate on the outside of the cooling water tubes, cooling water outlet temperature will __________; and lube oil outlet temperature will __________. (Assume the lube oil and cooling water inlet temperatures and mass flow rates do not change.)
A. decrease; increase
 
B. decrease; decrease
 
C. increase; increase
 
D. increase; decrease
 
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A  17 QUESTION: 19  A condensate demineralizer differential pressure (D/P) gauge indicates 6.0 psid at 50% flow rate. Which one of the following combinations of condensate flow rate and demineralizer D/P observed at various power levels over the next few days indicates an increase in the accumulation of insoluble corrosion products in the demineralizer?
Condensate Flow Rate  Demineralizer D/P (psid)
A. 100%  23.5  B. 75%  16.5  C. 60%  8.5  D. 25%  1.5 
 
QUESTION: 20 If water containing negatively charged ionic impurities passes through a mixed
-bed ion exchanger, the negatively charged ionic impurities will be removed by the __________ exchange resin, with the corresponding release of __________ ions into the water.
 
A. anion; negative
 
B. anion; positive


C. cation; negative
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 19 A condensate demineralizer differential pressure (D/P) gauge indicates 6.0 psid at 50% flow rate.
 
Which one of the following combinations of condensate flow rate and demineralizer D/P observed at various power levels over the next few days indicates an increase in the accumulation of insoluble corrosion products in the demineralizer?
D. cation; positive
Condensate    Demineralizer Flow Rate      D/P (psid)
 
A.      100%            23.5 B.       75%            16.5 C.        60%            8.5 D.        25%            1.5 QUESTION: 20 If water containing negatively charged ionic impurities passes through a mixed-bed ion exchanger, the negatively charged ionic impurities will be removed by the __________ exchange resin, with the corresponding release of __________ ions into the water.
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   18 QUESTION: 21  Refer to the drawing of a valve motor control circuit (see figure below).
A. anion; negative B. anion; positive C. cation; negative D. cation; positive 17


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 21 Refer to the drawing of a valve motor control circuit (see figure below).
The valve is currently open with the contact configuration as shown. If the S1 pushbutton is depressed, the valve will __________; and when the S1 pushbutton is subsequently released, the valve will __________.
The valve is currently open with the contact configuration as shown. If the S1 pushbutton is depressed, the valve will __________; and when the S1 pushbutton is subsequently released, the valve will __________.
A. remain open; remain open B. close; remain closed C. remain open; close D. close; open 18


A. remain open; remain open
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 22 A 480 VAC motor control center supplies a load through a breaker and a manual disconnect switch.
 
B. close; remain closed
 
C. remain open; close
 
D. close; open
 
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   19 QUESTION: 22 A 480 VAC motor control center supplies a load through a breaker and a manual disconnect switch.
Which one of the following sequences will provide the greatest level of personnel safety when deenergizing the load for maintenance and when reenergizing the load after the maintenance?
Which one of the following sequences will provide the greatest level of personnel safety when deenergizing the load for maintenance and when reenergizing the load after the maintenance?
DEENERGIZING REENERGIZING
DEENERGIZING                           REENERGIZING A. Open breaker first                     Shut breaker first B. Open breaker first                     Shut disconnect switch first C. Open disconnect switch first           Shut breaker first D. Open disconnect switch first           Shut disconnect switch first QUESTION: 23 Which one of the following is the process that produces the majority of prompt neutrons in an operating nuclear plant reactor?
 
A. A thermal neutron is absorbed by a fuel nucleus. Almost immediately, the nucleus fissions and emits one or more prompt neutrons.
A. Open breaker first Shut breaker first
B. A thermal neutron is absorbed by a fuel nucleus. Almost immediately, the fuel nucleus fissions and produces fission products. During the decay of the fission products, one or more prompt neutrons are emitted.
 
B. Open breaker first Shut disconnect switch first
 
C. Open disconnect switch first Shut breaker first
 
D. Open disconnect switch first Shut disconnect switch first QUESTION: 23 Which one of the following is the process that produces the majority of prompt neutrons in an operating nuclear plant reactor?
 
A. A thermal neutron is absorbed by a fuel nucleus. Almost immediately, the nucleus fissions and emits one or more prompt neutrons. B. A thermal neutron is absorbed by a fuel nucleus. Almost immediately, the fuel nucleus fissions and produces fission products. During the decay of the fission products, one or more prompt neutrons are emitted.
 
C. A fast neutron is absorbed by a fuel nucleus. Almost immediately, the nucleus fissions and emits one or more prompt neutrons.
C. A fast neutron is absorbed by a fuel nucleus. Almost immediately, the nucleus fissions and emits one or more prompt neutrons.
D. A fast neutron is absorbed by a fuel nucleus. Almost immediately, the fuel nucleus fissions and produces fission products. During the decay of the fission products, one or more prompt neutrons are emitted.
D. A fast neutron is absorbed by a fuel nucleus. Almost immediately, the fuel nucleus fissions and produces fission products. During the decay of the fission products, one or more prompt neutrons are emitted.
19


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   20 QUESTION: 24 A nuclear power plant is currently operating at steady
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 24 A nuclear power plant is currently operating at steady-state 80 percent power near the end of its fuel cycle. During the next 3 days of steady-state power operation, no operator action is taken.
-state 80 percent power near the end of its fuel cycle. During the next 3 days of steady
How will Keff be affected during the 3-day period?
-state power operation, no operator action is taken. How will Keff be affected during the 3
-day period?
 
A. Keff will gradually increase during the entire period.
A. Keff will gradually increase during the entire period.
B. Keff will gradually decrease during the entire period.
B. Keff will gradually decrease during the entire period.
C. Keff will tend to increase, but inherent reactivity feedback will maintain Keff at 1.0.
C. Keff will tend to increase, but inherent reactivity feedback will maintain Keff at 1.0.
D. Keff will tend to decrease, but inherent reactivity feedback will maintain Keff at 1.0.  
D. Keff will tend to decrease, but inherent reactivity feedback will maintain Keff at 1.0.
 
QUESTION: 25 Given the following data for a reactor:
QUESTION: 25 Given the following data for a reactor:
The average delayed neutron fraction is 0.0068.
* The average delayed neutron fraction is 0.0068.
The effective delayed neutron fraction is 0.0065.
* The effective delayed neutron fraction is 0.0065.
 
The above data indicates that this reactor is operating near the __________ of a fuel cycle; and a typical delayed neutron is __________ likely than a typical prompt neutron to cause another fission in this reactor.
The above data indicates that this reactor is operating near the __________ of a fuel cycle; and a typical delayed neutron is __________ likely than a typical prompt neutron to cause another fission in this reactor.
A. beginning; less B. beginning; more C. end; less D. end; more 20


A. beginning; less B. beginning; more
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 26 Which one of the following describes the change in the moderator temperature coefficient (MTC) of reactivity over core life? (Assume 100 percent power for all cases.)
 
C. end; less D. end; more USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   21 QUESTION: 26 Which one of the following describes the change in the moderator temperature coefficient (MTC) of reactivity over core life?
(Assume 100 percent power for all cases.)
 
A. Control rod withdrawal results in increased thermal neutron utilization, which results in a less negative MTC at end of fuel cycle (EOC).
A. Control rod withdrawal results in increased thermal neutron utilization, which results in a less negative MTC at end of fuel cycle (EOC).
B. Fission product poison buildup results in decreased thermal neutron utilization, which results in a more negative MTC at EOC.
B. Fission product poison buildup results in decreased thermal neutron utilization, which results in a more negative MTC at EOC.
 
C. Burnup of U-235 results in decreased thermal neutron utilization, which results in a more negative MTC at EOC.
C. Burnup of U
-235 results in decreased thermal neutron utilization, which results in a more negative MTC at EOC.
 
D. Decreased voiding in the core results in increased thermal neutron utilization, which results in a less negative MTC at EOC.
D. Decreased voiding in the core results in increased thermal neutron utilization, which results in a less negative MTC at EOC.
QUESTION: 27 If the average temperature of a fuel pellet decreases by 50°F, the microscopic cross-section for absorption of neutrons at a resonance energy of U-238 will __________; and the microscopic cross-sections for absorption of neutrons at energies that are slightly higher or lower than a U-238 resonance energy will __________.
A. increase; increase B. increase; decrease C. decrease; increase D. decrease; decrease 21


QUESTION: 27 If the average temperature of a fuel pellet decreases by 50°F, the microscopic cross
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 28 If the void fraction surrounding several centrally-located fuel bundles decreases, the worth of the associated control rods will...
-section for absorption of neutrons at a resonance energy of U
-238 will __________; and the microscopic cross-sections for absorption of neutrons at energies that are slightly higher or lower than a U
-238 resonance energy will __________.
 
A. increase; increase
 
B. increase; decrease
 
C. decrease; increase
 
D. decrease; decrease
 
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   22 QUESTION: 28 If the void fraction surrounding several centrally
-located fuel bundles decreases, the worth of the associated control rods will...
 
A. increase, because the average neutron energy in the area of the affected control rods increases.
A. increase, because the average neutron energy in the area of the affected control rods increases.
B. increase, because fewer neutrons are resonantly absorbed in the fuel while they are being thermalized, resulting in more thermal neutrons available to be absorbed by the affected control rods.
B. increase, because fewer neutrons are resonantly absorbed in the fuel while they are being thermalized, resulting in more thermal neutrons available to be absorbed by the affected control rods.
C. decrease, because the diffusion length of the thermal neutrons decreases, resulting in fewer thermal neutrons reaching the affected control rods.
C. decrease, because the diffusion length of the thermal neutrons decreases, resulting in fewer thermal neutrons reaching the affected control rods.
D. decrease, because neutrons will experience a shorter slowing down length, resulting in a larger fraction of thermal neutrons being absorbed by the fuel and fewer thermal neutrons available to be absorbed by the affected control rods.
D. decrease, because neutrons will experience a shorter slowing down length, resulting in a larger fraction of thermal neutrons being absorbed by the fuel and fewer thermal neutrons available to be absorbed by the affected control rods.
QUESTION: 29 The main reason for designing and operating a reactor with a flattened neutron flux distribution is to...
QUESTION: 29 The main reason for designing and operating a reactor with a flattened neutron flux distribution is to...
A. provide even burnup of control rods.
A. provide even burnup of control rods.
B. reduce neutron leakage from the core.
B. reduce neutron leakage from the core.
C. achieve a higher average power density.
C. achieve a higher average power density.
D. provide more accurate nuclear power indication.
D. provide more accurate nuclear power indication.
22


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   23 QUESTION: 30 A reactor has been operating at 70 percent power for 20 hours following a one
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 30 A reactor has been operating at 70 percent power for 20 hours following a one-hour power reduction from steady-state 100 percent power. Which one of the following describes the current xenon-135 concentration?
-hour power reduction from steady
-state 100 percent power. Which one of the following describes the current xenon
-135 concentration?
 
A. At equilibrium.
A. At equilibrium.
B. Increasing toward a peak.
B. Increasing toward a peak.
C. Decreasing toward an upturn.
C. Decreasing toward an upturn.
D. Decreasing toward equilibrium.
D. Decreasing toward equilibrium.
QUESTION: 31 A reactor scram occurred from steady-state 100 percent power and a reactor startup is currently in progress. Which one of the following sets of initial startup conditions will require the smallest amount of control rod withdrawal to achieve criticality? (BOC-- beginning of fuel cycle; EOC -- end of fuel cycle.)
Time Since Core Age    Reactor Scram A. BOC          12 hours B. BOC          40 hours C. EOC          12 hours D. EOC          40 hours 23


QUESTION: 31  A reactor scram occurred from steady
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 32 Refer to the curve of Keff versus core age for an operating reactor (see figure below).
-state 100 percent power and a reactor startup is currently in progress. Which one of the following sets of initial startup conditions will require the smallest amount of control rod withdrawal to achieve criticality?  (BOC-- beginning of fuel cycle; EOC
The reactor has been operating at 100 percent power for several weeks and is currently operating between points 2 and 3 on the curve.
-- end of fuel cycle.)
Time Since Core Age  Reactor Scram
 
A. BOC  12 hours B. BOC  40 hours C. EOC  12 hours D. EOC  40 hours USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   24 QUESTION: 32 Refer to the curve of Keff versus core age for an operating reactor (see figure below).
 
The reactor has been operating at 100 percent power for several weeks and is currently operating between points 2 and 3 on the curve.  
 
Assuming reactor recirculation flow rate remains the same, what incremental control rod operation(s) will be needed to maintain 100 percent power until point 3 is reached?
Assuming reactor recirculation flow rate remains the same, what incremental control rod operation(s) will be needed to maintain 100 percent power until point 3 is reached?
A. Withdrawal for the entire period.
A. Withdrawal for the entire period.
B. Withdrawal at first, then insertion.
B. Withdrawal at first, then insertion.
C. Insertion for the entire period.
C. Insertion for the entire period.
D. Insertion at first, then withdrawal.
D. Insertion at first, then withdrawal.
24


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   25 QUESTION: 33 Reactors A and B are identical except that reactor A is operating near the beginning of a fuel cycle, while reactor B is operating near the end of a fuel cycle. Both reactors have the same slightly positive value for Keff.
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 33 Reactors A and B are identical except that reactor A is operating near the beginning of a fuel cycle, while reactor B is operating near the end of a fuel cycle. Both reactors have the same slightly positive value for Keff.
If both reactors pass through 1.0 x 10
If both reactors pass through 1.0 x 10-6 percent reactor power at the same time, which reactor, if any, will reach the point of adding heat (POAH) first, and why?
-6 percent reactor power at the same time, which reactor, if any, will reach the point of adding heat (POAH) first, and why?
A. Reactor A, because it has the shorter reactor period.
A. Reactor A, because it has the shorter reactor period.
B. Reactor B, because it has the shorter reactor period.
B. Reactor B, because it has the shorter reactor period.
C. Both reactors will reach the POAH at the same time because they both have the same value for reactor period.
C. Both reactors will reach the POAH at the same time because they both have the same value for reactor period.
D. Both reactors will reach the POAH at the same time because they are both supercritical by the same amount of positive reactivity.
D. Both reactors will reach the POAH at the same time because they are both supercritical by the same amount of positive reactivity.
 
QUESTION: 34 Initially, a nuclear power plant is operating at steady-state 100 percent power and 100 percent core flow rate. Then, reactor power is reduced to 90 percent by inserting control rods. (Assume that recirculation pump speed and valve positions do not change.)
QUESTION: 34 Initially, a nuclear power plant is operating at steady
-state 100 percent power and 100 percent core flow rate. Then, reactor power is reduced to 90 percent by inserting control rods. (Assume that recirculation pump speed and valve positions do not change.)
What is the effect of the power reduction on core flow rate?
What is the effect of the power reduction on core flow rate?
A. Core flow rate will increase, due to a decrease in recirculation ratio.
A. Core flow rate will increase, due to a decrease in recirculation ratio.
 
B. Core flow rate will increase, due to a decrease in two-phase flow resistance.
B. Core flow rate will increase, due to a decrease in two
-phase flow resistance.
 
C. Core flow rate will decrease, due to an increase in recirculation ratio.
C. Core flow rate will decrease, due to an increase in recirculation ratio.
D. Core flow rate will decrease, due to an increase in two-phase flow resistance.
25


D. Core flow rate will decrease, due to an increase in two
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 35 A reactor was operating for several months at steady-state 100 percent power when a reactor scram occurred. Which one of the following lists the two factors most responsible for the value of the core neutron flux level one hour after the scram?
-phase flow resistance.
 
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   26 QUESTION: 35 A reactor was operating for several months at steady
-state 100 percent power when a reactor scram occurred. Which one of the following lists the two factors most responsible for the value of the core neutron flux level one hour after the scram?
A. Keff and the rate of source neutron production.
A. Keff and the rate of source neutron production.
 
B. Keff and the effective delayed neutron fraction.
B. Keff and the effective delayed neutron fraction.  
 
C. The decay rates of the delayed neutron precursors and the rate of source neutron production.
C. The decay rates of the delayed neutron precursors and the rate of source neutron production.
D. The decay rates of the delayed neutron precursors and the effective delayed neutron fraction.
D. The decay rates of the delayed neutron precursors and the effective delayed neutron fraction.
QUESTION: 36 A nuclear power plant ha d been operating at 100 percent power for six months when a reactor scram occurred. Which one of the following describes the source(s) of core heat generation 30 minutes after the reactor scram?
QUESTION: 36 A nuclear power plant had been operating at 100 percent power for six months when a reactor scram occurred. Which one of the following describes the source(s) of core heat generation 30 minutes after the reactor scram?
A. Fission product decay is the only significant source of core heat generation.
A. Fission product decay is the only significant source of core heat generation.
B. Delayed neutron
B. Delayed neutron-induced fission is the only significant source of core heat generation.
-induced fission is the only significant source of core heat generation.
C. Fission product decay and delayed neutron-induced fission are both significant sources and produce approximately equal rates of core heat generation.
C. Fission product decay and delayed neutron
D. Fission product decay and delayed neutron-induced fission are both insignificant sources and generate core heat at rates that are less than the rate of ambient heat loss from the core.
-induced fission are both significant sources and produce approximately equal rates of core heat generation.
26
D. Fission product decay and delayed neutron
-induced fission are both insignificant sources and generate core heat at rates that are less than the rate of ambient heat loss from the core.
 
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A  27 QUESTION: 37  Refer to the drawing of two water storage tanks with four differential pressure (D/P) level detectors (see figure below).


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 37 Refer to the drawing of two water storage tanks with four differential pressure (D/P) level detectors (see figure below).
The tanks are identical and are being maintained at 2 psig overpressure, 60°F, and the same constant water level. The tanks are located within a sealed containment structure that is being maintained at standard atmospheric pressure. All level detectors have been calibrated and are producing the same level indication.
The tanks are identical and are being maintained at 2 psig overpressure, 60°F, and the same constant water level. The tanks are located within a sealed containment structure that is being maintained at standard atmospheric pressure. All level detectors have been calibrated and are producing the same level indication.
If a ventilation malfunction causes the containment structure pressure to decrease to 13 psia, which detectors will produce the lowest level indications?
If a ventilation malfunction causes the containment structure pressure to decrease to 13 psia, which detectors will produce the lowest level indications?
A. 1 and 3 B. 2 and 4 C. 1 and 4 D. 2 and 3 27


A. 1 and 3 B. 2 and 4 C. 1 and 4 D. 2 and 3 
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 38 Given the following initial conditions for a spent fuel pool:
 
Spent fuel decay heat rate         = 6.0 MW Spent fuel pool water temperature   = 90°F Spent fuel pool water mass         = 2.5 x 106 lbm Spent fuel pool water specific heat = 1.0 Btu/lbm-°F If a complete loss of spent fuel pool cooling occurs, approximately how long will it take for spent fuel pool water temperature to reach 212°F? (Assume the spent fuel pool remains in thermal equilibrium, and there is no heat removal from the spent fuel pool.)
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   28 QUESTION: 38 Given the following initial conditions for a spent fuel pool:
A. 6 hours B. 15 hours C. 26 hours D. 51 hours QUESTION: 39 A nuclear power plant is operating at 90 percent of rated power. Which one of the following effects will result from an improved main condenser vacuum (lower absolute pressure)? (Assume reactor power and main steam mass flow rate are unchanged.)
Spent fuel decay heat rate
  = 6.0 MW Spent fuel pool water temperature
  = 90°F Spent fuel pool water mass
  = 2.5 x 10 6 lbm Spent fuel pool water specific heat
  = 1.0 Btu/lbm
-°F If a complete loss of spent fuel pool cooling occurs, approximately how long will it take for spent fuel pool water temperature to reach 212°F? (Assume the spent fuel pool remains in thermal equilibrium, and there is no heat removal from the spent fuel pool.)
 
A. 6 hours B. 15 hours C. 26 hours D. 51 hours QUESTION: 39 A nuclear power plant is operating at 90 percent of rated power. Which one of the following effects will result from an improved main condenser vacuum (lower absolute pressure)? (Assume reactor power and main steam mass flow rate are unchanged.)
 
A. An increase in condensate temperature.
A. An increase in condensate temperature.
B. An increase in the heat transfer rate in the main condenser.
B. An increase in the heat transfer rate in the main condenser.
C. An increase in main turbine efficiency.
C. An increase in main turbine efficiency.
D. An increase in condensate subcooling.
D. An increase in condensate subcooling.
28


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   29 QUESTION: 40 Initially, a nuclear power plant was operating at steady-state 85 percent reactor power when the extraction steam to a high
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 40 Initially, a nuclear power plant was operating at steady-state 85 percent reactor power when the extraction steam to a high-pressure feedwater heater became isolated. Main generator load was returned to its initial value. When the plant stabilizes, reactor power will be __________ than 85 percent; and the steam cycle thermal efficiency will be __________.
-pressure feedwater heater became isolated. Main generator load was returned to its initial value. When the plant stabilizes, reactor power will be __________ than 85 percent; and the steam cycle thermal efficiency will be __________.
A. greater; lower B. greater; higher C. less; lower D. less; higher QUESTION: 41 Which one of the following describes pump head?
 
A. greater; lower
 
B. greater; higher
 
C. less; lower
 
D. less; higher
 
QUESTION: 41 Which one of the following describes pump head?
 
A. The fluid energy contained at the inlet of a pump.
A. The fluid energy contained at the inlet of a pump.
B. The energy added by a pump in excess of shutoff head.
B. The energy added by a pump in excess of shutoff head.
C. The fluid energy required to ensure a pump does not cavitate.
C. The fluid energy required to ensure a pump does not cavitate.
D. The energy added by a pump to increase fluid pressure or velocity.
D. The energy added by a pump to increase fluid pressure or velocity.
29


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   30 QUESTION: 42 An operating centrifugal water pump has a 26-inch diameter suction nozzle and a 24
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 42 An operating centrifugal water pump has a 26-inch diameter suction nozzle and a 24-inch diameter discharge nozzle. For this pump, the discharge water velocity is __________ the suction water velocity; and the discharge water volumetric flow rate is __________ the suction water volumetric flow rate. (Assume water is incompressible and the suction and discharge water temperatures are the same.)
-inch diameter discharge nozzle. For this pump, the discharge water velocity is __________ the suction water velocity; and the discharge water volumetric flow rate is __________ the suction water volumetric flow rate. (Assume water is incompressible and the suction and discharge water temperatures are the same.)
A. greater than; greater than B. greater than; equal to C. less than; greater than D. less than; equal to QUESTION: 43 A nuclear power plant is operating near 100 percent power. Main turbine extraction steam is being supplied to a feedwater heater. Extraction steam parameters are as follows:
A. greater than; greater than
Steam pressure = 414 psia Steam flow rate = 7.5 x 105 lbm/hr Steam enthalpy = 1,150 Btu/lbm The extraction steam condenses to saturated water at 414 psia, and then leaves the feedwater heater via a drain line.
 
B. greater than; equal to
 
C. less than; greater than
 
D. less than; equal to
 
QUESTION: 43 A nuclear power plant is operating near 100 percent power. Main turbine extraction steam is being supplied to a feedwater heater. Extraction steam parameters are as follows:
Steam pressure
= 414 psia Steam flow rate
= 7.5 x 10 5 lbm/hr Steam enthalpy
= 1,150 Btu/lbm The extraction steam condenses to saturated water at 414 psia, and then leaves the feedwater heater via a drain line.
 
What is the heat transfer rate from the extraction steam to the feedwater in the feedwater heater?
What is the heat transfer rate from the extraction steam to the feedwater in the feedwater heater?
A. 3.8 x 107 Btu/hr B. 8.6 x 107 Btu/hr C. 5.4 x 108 Btu/hr D. 7.2 x 108 Btu/hr 30


A. 3.8 x 10 7 Btu/hr B. 8.6 x 10 7 Btu/hr C. 5.4 x 10 8 Btu/hr D. 7.2 x 10 8 Btu/hr 
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 44 Refer to the drawing of a pool-boiling curve (see figure below).
 
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   31 QUESTION: 44 Refer to the drawing of a pool
-boiling curve (see figure below).
 
In which region of the curve is nucleate boiling the primary mode of heat transfer?
In which region of the curve is nucleate boiling the primary mode of heat transfer?
A. Region I B. Region II C. Region III D. Region IV 31


A. Region I B. Region II C. Region III
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 45 A reactor is initially operating at steady-state 70 percent power when recirculation flow rate is increased by 5 percent.
 
D. Region IV 
 
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A   32 QUESTION: 45 A reactor is initially operating at steady
-state 70 percent power when recirculation flow rate is increased by 5 percent.
Which one of the following statements describes the initial response of the boiling boundary in the core?
Which one of the following statements describes the initial response of the boiling boundary in the core?
A. It physically moves upward, because each unit quantity of coolant must travel farther through a fuel bundle before vaporizing.
A. It physically moves upward, because each unit quantity of coolant must travel farther through a fuel bundle before vaporizing.
B. It physically moves upward, because each unit quantity of coolant enters the core with a larger subcooled margin.
B. It physically moves upward, because each unit quantity of coolant enters the core with a larger subcooled margin.
C. It physically moves downward, because each unit quantity of coolant will vaporize sooner as it travels through a fuel bundle.
C. It physically moves downward, because each unit quantity of coolant will vaporize sooner as it travels through a fuel bundle.
D. It physically moves downward, because each unit quantity of coolant enters the core with a smaller subcooled margin.
D. It physically moves downward, because each unit quantity of coolant enters the core with a smaller subcooled margin.
QUESTION: 46 A reactor was initially operating at steady-state 100 percent power when a loss of offsite power caused a reactor scram and a loss of forced reactor coolant flow. Several minutes later, the occurrence of natural circulation flow will be indicated by a differential __________ across the core plate and coolant flow through the __________ pumps.
QUESTION: 46 A reactor was initially operating at steady-state 100 percent power when a loss of offsite power caused a reactor scram and a loss of forced reactor coolant flow. Several minutes later, the occurrence of natural circulation flow will be indicated by a differential __________ across the core plate and coolant flow through the __________ pumps.
 
A. temperature; recirculation B. temperature; jet C. pressure; recirculation D. pressure; jet 32
A. temperature; recirculation
 
B. temperature; jet
 
C. pressure; recirculation
 
D. pressure; jet
 
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A  33 QUESTION: 47  The radial peaking factor for a fuel bundle is expressed mathematically as...
A. core average bundle power individual bundle power B.      peak nodal power core average nodal power C. core average nodal power peak nodal power D. individual bundle power core average bundle power
 
QUESTION: 48 Which one of the following is responsible for the fuel cladding failure that results from operating the reactor above the limit for linear heat generation rate?


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 47 The radial peaking factor for a fuel bundle is expressed mathematically as...
A. core average bundle power individual bundle power B.      peak nodal power core average nodal power C. core average nodal power peak nodal power D. individual bundle power core average bundle power QUESTION: 48 Which one of the following is responsible for the fuel cladding failure that results from operating the reactor above the limit for linear heat generation rate?
A. Fission product gas expansion causes fuel rod internal design pressure to be exceeded.
A. Fission product gas expansion causes fuel rod internal design pressure to be exceeded.
B. Corrosion buildup on the cladding surface reduces heat transfer and promotes transition boiling.
B. Corrosion buildup on the cladding surface reduces heat transfer and promotes transition boiling.
 
C. The zircaloy-steam reaction causes accelerated oxidation of the cladding at high temperatures.
C. The zircaloy
-steam reaction causes accelerated oxidation of the cladding at high temperatures.
 
D. The difference between thermal expansion rates of the fuel pellets and the cladding causes severe stress.
D. The difference between thermal expansion rates of the fuel pellets and the cladding causes severe stress.
USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A  34 QUESTION: 49  For a reactor operating at 100 percent power, which one of the following combinations of axial power distribution and recirculation system flow rate will result in the smallest critical power ratio in a given fuel bundle?  (Assume the maximum linear heat generation rate in the fuel bundle is the same for all cases.)  Axial Power Recirculation Distribution System Flow Rate
33
 
A. Top-peaked Low B. Top-peaked High C. Bottom-peaked Low D. Bottom-peaked High 
 
QUESTION: 50 A reactor is shut down for refueling following 18 months of operation at an average power level of 85 percent. During the shutdown, a reactor vessel metal specimen is removed from the reactor vessel for testing. The testing indicates that the nil
-ductility transition (NDT) temperature of the specimen has decreased from 44°F to 32°F since the previous refueling shutdown.


USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 49 For a reactor operating at 100 percent power, which one of the following combinations of axial power distribution and recirculation system flow rate will result in the smallest critical power ratio in a given fuel bundle? (Assume the maximum linear heat generation rate in the fuel bundle is the same for all cases.)
Axial Power                Recirculation Distribution            System Flow Rate A. Top-peaked                      Low B. Top-peaked                      High C. Bottom-peaked                  Low D. Bottom-peaked                  High QUESTION: 50 A reactor is shut down for refueling following 18 months of operation at an average power level of 85 percent. During the shutdown, a reactor vessel metal specimen is removed from the reactor vessel for testing. The testing indicates that the nil-ductility transition (NDT) temperature of the specimen has decreased from 44°F to 32°F since the previous refueling shutdown.
Which one of the following conclusions is warranted?
Which one of the following conclusions is warranted?
A. The test results are credible and the reactor vessel is more likely to experience brittle fracture now than after the previous refueling shutdown.
A. The test results are credible and the reactor vessel is more likely to experience brittle fracture now than after the previous refueling shutdown.
B. The test results are credible and the reactor vessel is less likely to experience brittle fracture now than after the previous refueling shutdown.
B. The test results are credible and the reactor vessel is less likely to experience brittle fracture now than after the previous refueling shutdown.
C. The test results are questionable because the actual specimen NDT temperature would not decrease during the described 18
C. The test results are questionable because the actual specimen NDT temperature would not decrease during the described 18-month period of operation.
-month period of operation.
D. The test results are questionable because the actual specimen NDT temperature would decrease by much less than indicated by the test results.
D. The test results are questionable because the actual specimen NDT temperature would decrease by much less than indicated by the test results.
34


*** FINAL ANSWER KEY ***
                  *** FINAL ANSWER KEY ***
MARCH 2017 NRC GENERIC FUNDAMENTALS EXAMINATION BOILING WATER REACTOR  
MARCH 2017 NRC GENERIC FUNDAMENTALS EXAMINATION BOILING WATER REACTOR - ANSWER KEY FORM A   FORM B    ANS.          FORM A  FORM B ANS.
- ANSWER KEY FORM A FORM B ANS. 1 15 A 2 16 D    3 17 D 4 18 D    5 19 D 6 20 C    7 21 C 8 22 A    9 23 C 10 24 B    11 25 C 12 26 C    13 27 B 14 28 C    15 29 Deleted 16 30 C    17 31 D 18 32 A    19 33 B 20 34 A    21 35 B 22 36 B    23 37 A 24 38 D   25 39 A    FORM A FORM B ANS. 26 40 A 27 41 B    28 42 B 29 43 C    30 44 D 31 45 B    32 46 C 33 47 B    34 48 B 35 49 A   36 50 A 37 1 C    38 2 B 39 3 C    40 4 A 41 5 D    42 6 B 43 7 C    44 8 B 45 9 A    46 10 D 47 11 D    48 12 D 49 13 A    50 14 C}}
1       15       A              26      40    A 2       16       D             27      41   B 3       17       D             28      42    B 4       18       D             29      43   C 5       19       D              30      44    D 6       20       C             31      45   B 7       21       C              32      46    C 8       22       A             33      47   B 9       23       C             34      48    B 10       24       B             35      49   A 11       25       C             36      50    A 12       26       C             37        1   C 13       27       B              38        2    B 14       28       C             39        3   C 15       29     Deleted         40        4    A 16       30       C             41        5   D 17       31       D             42        6    B 18       32       A             43        7   C 19       33       B              44        8    B 20       34       A             45        9   A 21       35       B             46      10    D 22       36       B             47      11   D 23       37       A             48      12    D 24       38       D             49       13   A 25      39       A             50       14   C}}

Revision as of 15:59, 21 October 2019

March 2017 BWR GFE (Form a)
ML18074A024
Person / Time
Issue date: 03/31/2017
From: Jacob Dolecki
NRC/NRR/DIRS/IOLB
To:
Dolecki J, NRR/DIRS, 415-2947
References
Download: ML18074A024 (35)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION BOILING WATER REACTOR GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A Please Print Name:

Docket No.:

Facility:

Start Time: Stop Time:

INSTRUCTIONS TO EXAMINEE Answer all the test items using the answer sheet provided, ensuring a single answer is marked for each test item. Each test item has equal point value. A score of at least 80 percent is required to pass this portion of the NRC operator licensing written examination. All examination materials will be collected 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> after the examination begins. This examination applies to a typical U.S.

boiling water reactor (BWR) nuclear power plant.

SECTION QUESTIONS  % OF TOTAL SCORE COMPONENTS 1 - 22 REACTOR THEORY 23 - 36 THERMODYNAMICS 37 - 50 TOTALS 50 All work performed on this examination is my own. I have neither given nor received aid.

Examinee's Signature 1

RULES AND INSTRUCTIONS FOR THE NRC GENERIC FUNDAMENTALS EXAMINATION During the administration of this examination the following rules apply:

NOTE: The term "control rod" refers to the length of neutron absorber material that can be positioned by the operator to change core reactivity.

NOTE: Numerical answers are rounded to the nearest whole number unless otherwise indicated.

1. Print your name in the blank provided on the cover sheet of the examination.
2. Fill in your individual docket number.
3. Fill in the name of your facility.
4. Fill in your start and stop times at the appropriate times.
5. Two aids are provided for your use during the examination:

(1) An Equations and Conversions Sheet contained within the examination copy, and (2) Steam tables and Mollier Diagram provided by your proctor.

6. Place your answers on the answer sheet provided. Credit will only be given for answers properly marked on this sheet. Follow the instructions for filling out the answer sheet.
7. Scrap paper will be provided for calculations.
8. Cheating on the examination will result in the automatic forfeiture of this examination.

Cheating could also result in severe penalties.

9. Restroom trips are limited. Only one examinee may leave the room at a time. In order to avoid the appearance or possibility of cheating, avoid all contact with anyone outside the examination room.
10. After you have completed the examination, sign the statement on the cover sheet indicating that the work is your own and you have neither given nor received any assistance in completing the examination. Either pencil or pen may be used.
11. Turn in your examination materials, answer sheet on top, followed by the examination copy and the examination aids, e.g., steam tables, handouts, and scrap paper.
12. After turning in your examination materials, leave the examination area as defined by the proctor. If after leaving you are found in the examination area while the examination is in progress, your examination may be forfeited.

2

GENERIC FUNDAMENTALS EXAMINATION EQUATIONS AND CONVERSIONS SHEET EQUATIONS


Q = m cp T N = S/(1 K eff )

Q = m h CR1 1 K eff1 = CR 2 1 K eff2 Q = UAT 1/M = CR1 /CR x Q m 3Nat Circ A = r 2 T m 2Nat Circ F = PA K eff = 1/(1 ) m = Av

= (K eff 1)/K eff W Pump = m P SUR = 26.06/ P = I2R eff P = IE

=

eff PA = 3IE eff

= +

1 + eff PT = 3IEpf

= 1.0 x 104 sec PR = 3IEsin eff = 0.1 sec 1 (for small positive ) Thermal Efficiency = Net Work Out/Energy In DRW 2tip / 2avg g(z2 z1 ) (v 22 v 12 )

+ + (P2 P1 ) + (u2 u1 ) + (q w) = 0 gc 2g c P = Po et/

g = 32.2 ft/sec2 SUR(t)

P = Po 10 gc = 32.2 lbm-ft/lbf-sec2 t

A = Ao e CONVERSIONS 1 MW = 3.41 x 106 Btu/hr = (5/9)( 32) 1 ft 3water = 7.48 gal 1 hp = 2.54 x 103 Btu/hr = (9/5)() + 32 1 galwater = 8.35 lbm 1 Btu = 778 ft-lbf 1 kg = 2.21 lbm 1 Curie = 3.7 x 1010 dps 3

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 1 A completely full water storage tank is being hydrostatically tested to 200 psig using a positive displacement pump (PDP) with a smooth and constant discharge flow rate of 6 gpm. The tank is protected by two relief valves that discharge to the atmosphere. The relief valves have the following characteristics:

$ Relief valve A opening setpoint is 200 psig with an accumulation of 3.0 percent.

$ Relief valve B opening setpoint is 200 psig with an accumulation of 1.5 percent.

$ Each valve has linear flow rate characteristics and a maximum discharge flow rate of 9 gpm.

The PDP is inadvertently left running when tank pressure reaches 200 psig.

With the PDP running continuously, what will be the discharge flow rates of the relief valves when tank pressure stabilizes?

Relief Relief Valve A Valve B A. 2 gpm 4 gpm B. 3 gpm 6 gpm C. 4 gpm 2 gpm D. 6 gpm 3 gpm QUESTION: 2 A typical motor-operated valve has been returned to service following a complete maintenance overhaul of the valve and actuator. When the valve was remotely opened and closed to verify operability, the measured valve stroke time in each direction was 15 seconds, which is shorter than normal for this valve.

Which one of the following could have caused the shorter stroke time?

A. The valve position limit switches were removed and were not reinstalled.

B. The valve torque limit switches were misadjusted to open at twice their normal setpoints.

C. The valve stem packing gland was overtightened after the packing material was replaced.

D. The valve was packed with improved packing material having a lower friction coefficient.

4

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 3 In a comparison between globe valves and gate valves in the same water system application, globe valves...

A. are less effective at throttling flow.

B. are less effective as pressure regulating valves.

C. produce a smaller pressure decrease when fully open.

D. require less force to open against large differential pressures.

QUESTION: 4 If the steam pressure input to a density-compensated steam flow instrument fails high, the associated flow rate indication will...

A. decrease, because the density input has decreased.

B. increase, because the density input has decreased.

C. decrease, because the density input has increased.

D. increase, because the density input has increased.

5

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 5 Refer to the drawing of a reactor vessel differential pressure (D/P) level detection system (see figure below).

Which one of the following events will result in a reactor vessel level indication that is greater than actual level?

A. The external pressure surrounding the D/P detector decreases by 2 psi.

B. Reactor vessel pressure increases by 10 psi with no change in actual water level.

C. Actual vessel level increases by 6 inches.

D. The temperature of the reference leg increases by 20°F.

6

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 6 Because of a thermocouple temperature display failure, the millivolt output of a thermocouple circuit is being converted to a temperature value using conversion tables. The tables are based on a thermocouple reference junction temperature of 32°F. The actual reference junction is located in a panel that is maintained at 120°F. Room temperature surrounding the panel is 80°F.

What adjustment must be made to the temperature value taken from the conversion tables to calculate the actual temperature at the measuring tip of the thermocouple?

A. Add 48°F.

B. Subtract 48°F.

C. Add 88°F.

D. Subtract 88°F.

QUESTION: 7 Fission chamber detectors are used to monitor reactor power/neutron level in a shutdown reactor as well as a reactor operating at rated power (and all power levels in between). At what power level(s) is it necessary to compensate the output of the fission chamber detectors for gamma interactions with the detectors and why?

A. At all power levels, because gamma interactions produce larger detector pulses than neutron interactions.

B. At all power levels, because gamma interactions produce smaller detector pulses than neutron interactions.

C. Only when shutdown or at low power levels, because gamma flux is not proportional to reactor power at low power levels.

D. Only when operating at high power levels, because gamma flux is not proportional to reactor power at high power levels.

7

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 8 The level in a drain collection tank is being controlled by an automatic level controller and level is initially at the controller setpoint. Flow rate into the tank causes tank level to increase. The increasing level causes the controller to fully open a tank drain valve. When level decreases below the setpoint, the controller closes the drain valve. Tank level continues to be controlled in this manner within a narrow band above and below the setpoint.

The controller in this system uses __________ control.

A. on-off B. proportional C. proportional plus integral D. proportional plus integral plus derivative 8

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 9 Refer to the drawing of a lube oil temperature control system (see figure below).

Given:

  • The lube oil temperature controller setpoint is 90EF.
  • The heat exchanger lube oil outlet temperature is stable at 93EF.
  • The temperature control valve is currently 60 percent open.
  • The temperature control system uses a direct-acting proportional controller with a 20°F proportional band.

If the controllers proportional band is changed to 30°F, the heat exchanger lube oil outlet temperature will stabilize __________ than 93°F; and the controller output needed to position the temperature control valve to 60 percent open will be __________.

A. lower; the same B. lower; greater C. higher; the same D. higher; greater 9

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 10 Refer to the drawing of a pump with recirculation line (see figure below).

Which one of the following describes the response of the pump if a complete flow blockage occurs in the discharge line just downstream of the flow transmitter?

A. The pump will overheat after a relatively short period of time, due to a loss of both main flow and recirculation flow.

B. The pump will overheat after a relatively long period of time, due to a loss of main flow only.

C. The pump will overheat after a relatively long period of time, due to a loss of recirculation flow only.

D. The pump will be able to operate under these conditions indefinitely, due to sustained main flow.

10

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 11 The discharge valve for a radial-flow centrifugal cooling water pump is closed in preparation for starting the pump.

After the pump is started, the pump suction and discharge pressures stabilize as follows:

Pump suction pressure = 5 psig Pump discharge pressure = 35 psig With the discharge valve still closed, if the pump speed is doubled, what will be the new stable pump discharge pressure?

A. 65 psig B. 120 psig C. 125 psig D. 140 psig QUESTION: 12 In response to a loss of coolant accident, an emergency core cooling pump is taking suction from the bottom of a vented water storage tank and discharging to the downcomer region of a reactor vessel.

Which one of the following will cause the pump to operate closer to cavitation?

A. The pressure in the reactor vessel increases.

B. The level of the water in the reactor vessel increases.

C. The temperature of the water in the water storage tank increases.

D. The ambient pressure surrounding the water storage tank increases.

11

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 13 Refer to the graph that represents the head-capacity characteristics for a single-speed centrifugal cooling water pump (see figure below).

Which one of the following lists a pair of parameters that could be represented by curves A and B?

(Note: NPSH is net positive suction head.)

Curve A Curve B A. Pump Head Available NPSH B. Available NPSH Required NPSH C. Required NPSH System Head Loss D. System Head Loss Pump Head 12

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 14 When a motor-driven centrifugal pump was started, the motor ammeter reading immediately increased to, and stabilized at, many times the normal operating value. Which one of the following describes a possible cause for the ammeter response?

A. The pump was started with a fully closed discharge valve.

B. The pump was started with a fully open discharge valve.

C. The pump shaft seized upon start and did not rotate.

D. The pump shaft separated from the motor shaft upon start.

QUESTION: 15 DELETED 13

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 16 Refer to the drawing of a lube oil heat exchanger (see figure below).

The lube oil heat exchanger is in service with the following inlet temperatures:

Lube oil inlet temperature = 130°F Cooling water inlet temperature = 70°F Assume that cooling water mass flow rate is less than lube oil mass flow rate, and that both fluids have the same specific heat. Which one of the following pairs of heat exchanger outlet temperatures is not possible?

Lube Oil Cooling Water Outlet Temp Outlet Temp A. 100°F 105°F B. 105°F 105°F C. 110°F 90°F D. 115°F 90°F 14

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 17 A nuclear power plant is operating at steady-state 100 percent power when air inleakage causes main condenser vacuum to decrease from 28 inches Hg vacuum to 27 inches Hg vacuum. Assume the main steam inlet pressure, inlet quality, and mass flow rate through the main turbine do not change, and the condenser cooling water inlet temperature and mass flow rate do not change.

When the plant stabilizes, turbine exhaust quality will be __________; and turbine exhaust temperature will be __________.

A. lower; lower B. lower; higher C. higher; lower D. higher; higher 15

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 18 Refer to the drawing of an operating lube oil heat exchanger (see figure below).

If deposits accumulate on the outside of the cooling water tubes, cooling water outlet temperature will

__________; and lube oil outlet temperature will __________. (Assume the lube oil and cooling water inlet temperatures and mass flow rates do not change.)

A. decrease; increase B. decrease; decrease C. increase; increase D. increase; decrease 16

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 19 A condensate demineralizer differential pressure (D/P) gauge indicates 6.0 psid at 50% flow rate.

Which one of the following combinations of condensate flow rate and demineralizer D/P observed at various power levels over the next few days indicates an increase in the accumulation of insoluble corrosion products in the demineralizer?

Condensate Demineralizer Flow Rate D/P (psid)

A. 100% 23.5 B. 75% 16.5 C. 60% 8.5 D. 25% 1.5 QUESTION: 20 If water containing negatively charged ionic impurities passes through a mixed-bed ion exchanger, the negatively charged ionic impurities will be removed by the __________ exchange resin, with the corresponding release of __________ ions into the water.

A. anion; negative B. anion; positive C. cation; negative D. cation; positive 17

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 21 Refer to the drawing of a valve motor control circuit (see figure below).

The valve is currently open with the contact configuration as shown. If the S1 pushbutton is depressed, the valve will __________; and when the S1 pushbutton is subsequently released, the valve will __________.

A. remain open; remain open B. close; remain closed C. remain open; close D. close; open 18

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 22 A 480 VAC motor control center supplies a load through a breaker and a manual disconnect switch.

Which one of the following sequences will provide the greatest level of personnel safety when deenergizing the load for maintenance and when reenergizing the load after the maintenance?

DEENERGIZING REENERGIZING A. Open breaker first Shut breaker first B. Open breaker first Shut disconnect switch first C. Open disconnect switch first Shut breaker first D. Open disconnect switch first Shut disconnect switch first QUESTION: 23 Which one of the following is the process that produces the majority of prompt neutrons in an operating nuclear plant reactor?

A. A thermal neutron is absorbed by a fuel nucleus. Almost immediately, the nucleus fissions and emits one or more prompt neutrons.

B. A thermal neutron is absorbed by a fuel nucleus. Almost immediately, the fuel nucleus fissions and produces fission products. During the decay of the fission products, one or more prompt neutrons are emitted.

C. A fast neutron is absorbed by a fuel nucleus. Almost immediately, the nucleus fissions and emits one or more prompt neutrons.

D. A fast neutron is absorbed by a fuel nucleus. Almost immediately, the fuel nucleus fissions and produces fission products. During the decay of the fission products, one or more prompt neutrons are emitted.

19

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 24 A nuclear power plant is currently operating at steady-state 80 percent power near the end of its fuel cycle. During the next 3 days of steady-state power operation, no operator action is taken.

How will Keff be affected during the 3-day period?

A. Keff will gradually increase during the entire period.

B. Keff will gradually decrease during the entire period.

C. Keff will tend to increase, but inherent reactivity feedback will maintain Keff at 1.0.

D. Keff will tend to decrease, but inherent reactivity feedback will maintain Keff at 1.0.

QUESTION: 25 Given the following data for a reactor:

  • The average delayed neutron fraction is 0.0068.
  • The effective delayed neutron fraction is 0.0065.

The above data indicates that this reactor is operating near the __________ of a fuel cycle; and a typical delayed neutron is __________ likely than a typical prompt neutron to cause another fission in this reactor.

A. beginning; less B. beginning; more C. end; less D. end; more 20

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 26 Which one of the following describes the change in the moderator temperature coefficient (MTC) of reactivity over core life? (Assume 100 percent power for all cases.)

A. Control rod withdrawal results in increased thermal neutron utilization, which results in a less negative MTC at end of fuel cycle (EOC).

B. Fission product poison buildup results in decreased thermal neutron utilization, which results in a more negative MTC at EOC.

C. Burnup of U-235 results in decreased thermal neutron utilization, which results in a more negative MTC at EOC.

D. Decreased voiding in the core results in increased thermal neutron utilization, which results in a less negative MTC at EOC.

QUESTION: 27 If the average temperature of a fuel pellet decreases by 50°F, the microscopic cross-section for absorption of neutrons at a resonance energy of U-238 will __________; and the microscopic cross-sections for absorption of neutrons at energies that are slightly higher or lower than a U-238 resonance energy will __________.

A. increase; increase B. increase; decrease C. decrease; increase D. decrease; decrease 21

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 28 If the void fraction surrounding several centrally-located fuel bundles decreases, the worth of the associated control rods will...

A. increase, because the average neutron energy in the area of the affected control rods increases.

B. increase, because fewer neutrons are resonantly absorbed in the fuel while they are being thermalized, resulting in more thermal neutrons available to be absorbed by the affected control rods.

C. decrease, because the diffusion length of the thermal neutrons decreases, resulting in fewer thermal neutrons reaching the affected control rods.

D. decrease, because neutrons will experience a shorter slowing down length, resulting in a larger fraction of thermal neutrons being absorbed by the fuel and fewer thermal neutrons available to be absorbed by the affected control rods.

QUESTION: 29 The main reason for designing and operating a reactor with a flattened neutron flux distribution is to...

A. provide even burnup of control rods.

B. reduce neutron leakage from the core.

C. achieve a higher average power density.

D. provide more accurate nuclear power indication.

22

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 30 A reactor has been operating at 70 percent power for 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> following a one-hour power reduction from steady-state 100 percent power. Which one of the following describes the current xenon-135 concentration?

A. At equilibrium.

B. Increasing toward a peak.

C. Decreasing toward an upturn.

D. Decreasing toward equilibrium.

QUESTION: 31 A reactor scram occurred from steady-state 100 percent power and a reactor startup is currently in progress. Which one of the following sets of initial startup conditions will require the smallest amount of control rod withdrawal to achieve criticality? (BOC-- beginning of fuel cycle; EOC -- end of fuel cycle.)

Time Since Core Age Reactor Scram A. BOC 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> B. BOC 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> C. EOC 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D. EOC 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> 23

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 32 Refer to the curve of Keff versus core age for an operating reactor (see figure below).

The reactor has been operating at 100 percent power for several weeks and is currently operating between points 2 and 3 on the curve.

Assuming reactor recirculation flow rate remains the same, what incremental control rod operation(s) will be needed to maintain 100 percent power until point 3 is reached?

A. Withdrawal for the entire period.

B. Withdrawal at first, then insertion.

C. Insertion for the entire period.

D. Insertion at first, then withdrawal.

24

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 33 Reactors A and B are identical except that reactor A is operating near the beginning of a fuel cycle, while reactor B is operating near the end of a fuel cycle. Both reactors have the same slightly positive value for Keff.

If both reactors pass through 1.0 x 10-6 percent reactor power at the same time, which reactor, if any, will reach the point of adding heat (POAH) first, and why?

A. Reactor A, because it has the shorter reactor period.

B. Reactor B, because it has the shorter reactor period.

C. Both reactors will reach the POAH at the same time because they both have the same value for reactor period.

D. Both reactors will reach the POAH at the same time because they are both supercritical by the same amount of positive reactivity.

QUESTION: 34 Initially, a nuclear power plant is operating at steady-state 100 percent power and 100 percent core flow rate. Then, reactor power is reduced to 90 percent by inserting control rods. (Assume that recirculation pump speed and valve positions do not change.)

What is the effect of the power reduction on core flow rate?

A. Core flow rate will increase, due to a decrease in recirculation ratio.

B. Core flow rate will increase, due to a decrease in two-phase flow resistance.

C. Core flow rate will decrease, due to an increase in recirculation ratio.

D. Core flow rate will decrease, due to an increase in two-phase flow resistance.

25

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 35 A reactor was operating for several months at steady-state 100 percent power when a reactor scram occurred. Which one of the following lists the two factors most responsible for the value of the core neutron flux level one hour after the scram?

A. Keff and the rate of source neutron production.

B. Keff and the effective delayed neutron fraction.

C. The decay rates of the delayed neutron precursors and the rate of source neutron production.

D. The decay rates of the delayed neutron precursors and the effective delayed neutron fraction.

QUESTION: 36 A nuclear power plant had been operating at 100 percent power for six months when a reactor scram occurred. Which one of the following describes the source(s) of core heat generation 30 minutes after the reactor scram?

A. Fission product decay is the only significant source of core heat generation.

B. Delayed neutron-induced fission is the only significant source of core heat generation.

C. Fission product decay and delayed neutron-induced fission are both significant sources and produce approximately equal rates of core heat generation.

D. Fission product decay and delayed neutron-induced fission are both insignificant sources and generate core heat at rates that are less than the rate of ambient heat loss from the core.

26

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 37 Refer to the drawing of two water storage tanks with four differential pressure (D/P) level detectors (see figure below).

The tanks are identical and are being maintained at 2 psig overpressure, 60°F, and the same constant water level. The tanks are located within a sealed containment structure that is being maintained at standard atmospheric pressure. All level detectors have been calibrated and are producing the same level indication.

If a ventilation malfunction causes the containment structure pressure to decrease to 13 psia, which detectors will produce the lowest level indications?

A. 1 and 3 B. 2 and 4 C. 1 and 4 D. 2 and 3 27

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 38 Given the following initial conditions for a spent fuel pool:

Spent fuel decay heat rate = 6.0 MW Spent fuel pool water temperature = 90°F Spent fuel pool water mass = 2.5 x 106 lbm Spent fuel pool water specific heat = 1.0 Btu/lbm-°F If a complete loss of spent fuel pool cooling occurs, approximately how long will it take for spent fuel pool water temperature to reach 212°F? (Assume the spent fuel pool remains in thermal equilibrium, and there is no heat removal from the spent fuel pool.)

A. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> B. 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> C. 26 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br /> D. 51 hours5.902778e-4 days <br />0.0142 hours <br />8.43254e-5 weeks <br />1.94055e-5 months <br /> QUESTION: 39 A nuclear power plant is operating at 90 percent of rated power. Which one of the following effects will result from an improved main condenser vacuum (lower absolute pressure)? (Assume reactor power and main steam mass flow rate are unchanged.)

A. An increase in condensate temperature.

B. An increase in the heat transfer rate in the main condenser.

C. An increase in main turbine efficiency.

D. An increase in condensate subcooling.

28

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 40 Initially, a nuclear power plant was operating at steady-state 85 percent reactor power when the extraction steam to a high-pressure feedwater heater became isolated. Main generator load was returned to its initial value. When the plant stabilizes, reactor power will be __________ than 85 percent; and the steam cycle thermal efficiency will be __________.

A. greater; lower B. greater; higher C. less; lower D. less; higher QUESTION: 41 Which one of the following describes pump head?

A. The fluid energy contained at the inlet of a pump.

B. The energy added by a pump in excess of shutoff head.

C. The fluid energy required to ensure a pump does not cavitate.

D. The energy added by a pump to increase fluid pressure or velocity.

29

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 42 An operating centrifugal water pump has a 26-inch diameter suction nozzle and a 24-inch diameter discharge nozzle. For this pump, the discharge water velocity is __________ the suction water velocity; and the discharge water volumetric flow rate is __________ the suction water volumetric flow rate. (Assume water is incompressible and the suction and discharge water temperatures are the same.)

A. greater than; greater than B. greater than; equal to C. less than; greater than D. less than; equal to QUESTION: 43 A nuclear power plant is operating near 100 percent power. Main turbine extraction steam is being supplied to a feedwater heater. Extraction steam parameters are as follows:

Steam pressure = 414 psia Steam flow rate = 7.5 x 105 lbm/hr Steam enthalpy = 1,150 Btu/lbm The extraction steam condenses to saturated water at 414 psia, and then leaves the feedwater heater via a drain line.

What is the heat transfer rate from the extraction steam to the feedwater in the feedwater heater?

A. 3.8 x 107 Btu/hr B. 8.6 x 107 Btu/hr C. 5.4 x 108 Btu/hr D. 7.2 x 108 Btu/hr 30

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 44 Refer to the drawing of a pool-boiling curve (see figure below).

In which region of the curve is nucleate boiling the primary mode of heat transfer?

A. Region I B. Region II C. Region III D. Region IV 31

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 45 A reactor is initially operating at steady-state 70 percent power when recirculation flow rate is increased by 5 percent.

Which one of the following statements describes the initial response of the boiling boundary in the core?

A. It physically moves upward, because each unit quantity of coolant must travel farther through a fuel bundle before vaporizing.

B. It physically moves upward, because each unit quantity of coolant enters the core with a larger subcooled margin.

C. It physically moves downward, because each unit quantity of coolant will vaporize sooner as it travels through a fuel bundle.

D. It physically moves downward, because each unit quantity of coolant enters the core with a smaller subcooled margin.

QUESTION: 46 A reactor was initially operating at steady-state 100 percent power when a loss of offsite power caused a reactor scram and a loss of forced reactor coolant flow. Several minutes later, the occurrence of natural circulation flow will be indicated by a differential __________ across the core plate and coolant flow through the __________ pumps.

A. temperature; recirculation B. temperature; jet C. pressure; recirculation D. pressure; jet 32

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 47 The radial peaking factor for a fuel bundle is expressed mathematically as...

A. core average bundle power individual bundle power B. peak nodal power core average nodal power C. core average nodal power peak nodal power D. individual bundle power core average bundle power QUESTION: 48 Which one of the following is responsible for the fuel cladding failure that results from operating the reactor above the limit for linear heat generation rate?

A. Fission product gas expansion causes fuel rod internal design pressure to be exceeded.

B. Corrosion buildup on the cladding surface reduces heat transfer and promotes transition boiling.

C. The zircaloy-steam reaction causes accelerated oxidation of the cladding at high temperatures.

D. The difference between thermal expansion rates of the fuel pellets and the cladding causes severe stress.

33

USNRC GENERIC FUNDAMENTALS EXAMINATION MARCH 2017 BWR - FORM A QUESTION: 49 For a reactor operating at 100 percent power, which one of the following combinations of axial power distribution and recirculation system flow rate will result in the smallest critical power ratio in a given fuel bundle? (Assume the maximum linear heat generation rate in the fuel bundle is the same for all cases.)

Axial Power Recirculation Distribution System Flow Rate A. Top-peaked Low B. Top-peaked High C. Bottom-peaked Low D. Bottom-peaked High QUESTION: 50 A reactor is shut down for refueling following 18 months of operation at an average power level of 85 percent. During the shutdown, a reactor vessel metal specimen is removed from the reactor vessel for testing. The testing indicates that the nil-ductility transition (NDT) temperature of the specimen has decreased from 44°F to 32°F since the previous refueling shutdown.

Which one of the following conclusions is warranted?

A. The test results are credible and the reactor vessel is more likely to experience brittle fracture now than after the previous refueling shutdown.

B. The test results are credible and the reactor vessel is less likely to experience brittle fracture now than after the previous refueling shutdown.

C. The test results are questionable because the actual specimen NDT temperature would not decrease during the described 18-month period of operation.

D. The test results are questionable because the actual specimen NDT temperature would decrease by much less than indicated by the test results.

34

      • FINAL ANSWER KEY ***

MARCH 2017 NRC GENERIC FUNDAMENTALS EXAMINATION BOILING WATER REACTOR - ANSWER KEY FORM A FORM B ANS. FORM A FORM B ANS.

1 15 A 26 40 A 2 16 D 27 41 B 3 17 D 28 42 B 4 18 D 29 43 C 5 19 D 30 44 D 6 20 C 31 45 B 7 21 C 32 46 C 8 22 A 33 47 B 9 23 C 34 48 B 10 24 B 35 49 A 11 25 C 36 50 A 12 26 C 37 1 C 13 27 B 38 2 B 14 28 C 39 3 C 15 29 Deleted 40 4 A 16 30 C 41 5 D 17 31 D 42 6 B 18 32 A 43 7 C 19 33 B 44 8 B 20 34 A 45 9 A 21 35 B 46 10 D 22 36 B 47 11 D 23 37 A 48 12 D 24 38 D 49 13 A 25 39 A 50 14 C