ML18089A632: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:___________(x)NRC-HQ-25-14-T-0002 x NRC-HQ-25-14-E-0002copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FALURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference  
{{#Wiki_filter:1. CONTRACT D CODE                                    PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1              12
: 2. AMENDMENT/MODIFICATION NO.                                  3. EFFECTIVE DATE                        4. REQUISITION/PURCHASE REQ. NO.                          5. PROJECT NO. (If applicable)
M0006                                                          See Block 16C                          NRO-18-0048                                                EWC
: 6. ISSUED BY                                            CODE  NRCHQ                                    7. ADMINISTERED BY (If other than Item 6)              CODE US NRC - HQ ACQUISITION MANAGEMENT DIVISION MAIL STOP TWFN-07B20M WASHINGTON DC 20555-0001
: 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
(x) 9A. AMENDMENT OF SOLICITATION NO.
ENERGY RESEARCH INC ATTN TRACEY MULLINIX                                                                                        9B. DATED (SEE ITEM 11) 6189 EXECUTIVE BLVD ROCKVILLE MD 208523901 x 10A. MODIFICATION OF CONTRACT/ORDER NO.
NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 10B. DATED (SEE ITEM 13)
CODE                                                          FAC LITY CODE                                09/30/2014 621211259
: 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers                                is extended      is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing tems 8 and 15, and returning          ___________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FA LURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
: 12. ACCOUNT NG AND APPROPRIATION DATA (If required)                                              Net Increase:                                              $20,000.00 See Schedule
: 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE        A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIF ED TO REFLECT THE ADM NISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH N ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
X            52.243-2 Changes - Cost Reimbursement (AUG 1987)
E. IMPORTANT            Contractor                    is not,  x is required to sign this document and return                  1        copies to the issuing office.
: 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
NRC-HQ-25-14-E-0002/NRC-HQ-25-14-T-0002 The purpose of this modification is to A) increase the total task order ceiling in the amount of $29,834.00 (from $330,756.41 to $360,590.41); B) provide incremental funding in the amount of $20,000.00 (from $330,756.41 to $350,756.41); and C) modify the statement of work and deliverable schedule to incorporate additional tasks within the scope of the original statement of work.
Total Task Order Ceiling: $360,590.41 (Changed)
Total Obligated Amount: $350,756.41 (Changed)
Period of Performance: 09/30/2014 through 12/31/2018 (Unchanged)
Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
15A. NAME AND TITLE OF SIGNER (Type or print)                                                            16A. NAME AND TITLE OF CONTRACT NG OFFICER (Type or print)
RICHARD W. ROBINSON 15B. CONTRACTOR/OFFEROR                                                        15C. DATE SIGNED          16B. UNITED STATES OF AMERICA                                        16C. DATE SIGNED 03/30/2018 (Signature of person authorized to sign)                                                              (Signature of Contracting Officer)
NSN 7540-01-152-8070                                                                                                                                          STANDARD FORM 30 (REV. 10-83)
Previous edition unusable                                                                                                                                    Prescribed by GSA FAR (48 CFR) 53.243


to the solicitation and this amendment, and is received prior to the opening hour and date specified.
REFERENCE NO. OF DOCUMENT BEING CONTINUED                                      PAGE      OF CONTINUATION SHEET NRC-HQ-25-14-E-0002/NRC-HQ-25-14-T-0002/M0006                                   2          12 NAME OF OFFEROR OR CONTRACTOR ENERGY RESEARCH INC ITEM NO.                             SUPPL ES/SERVICES            QUANTITY UNIT UNIT PRICE                  AMOUNT (A)                                       (B)                     (C)   (D)     (E)                         (F)
See Schedule 621211259 ENERGY RESEARCH INC NRCHQ WASHINGTON DC 20555-0001 MAIL STOP TWFN-07B20M ACQUISITION MANAGEMENT DIVISION US NRC - HQ EWC NRO-18-0048 See Block 16C M0006 12 113. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.12. ACCOUNTNG AND APPROPRIATION DATA (If required) is not extended.is extended tems 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completingThe above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONSFACLITY CODE CODE 10B. DATED (SEE ITEM 13)10A. MODIFICATION OF CONTRACT/ORDER NO.9B. DATED (SEE ITEM 11)9A. AMENDMENT OF SOLICITATION NO.
See attached pages for specific changes regarding this modification.
CODE 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)7. ADMINISTERED BY (If other than Item 6)
NEW ACCOUNTING CODE ADDED:
CODE 6. ISSUED BYPAGE  OF  PAGES
Account code:
: 4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DA TE2. AMENDMENT/MODIFICATION  NO. 5. PROJECT NO. (If applicable)1. CONTRACT D CODEAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 09/30/2014 ATTN TRACEY MULLINIX 6189 EXECUTIVE BLVD ROCKVILLE MD 208523901 Net Increase:
2018-X0200-FEEBASED-25-25D006-3002-17-4-118-251A-1 7-4-118-3002 All other terms and conditions remain unchanged.
$20,000.00 CHECK ONEA. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)  THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACTB. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFED TO REFLECT THE ADMNISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
Period of Performance: 09/30/2014 to 12/31/2018 NSN 7540-01-152-8067                                                                          OPTIONAL FORM 336 (4-86)
D. OTHER (Specify type of modification and authority) appropriation date, etc.)  SET FORTH N ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).E. IMPORTANT Contractor is not, is required to sign this document and return copies to the issuing office. ORDER NO. IN ITEM 10A.
Sponsored by GSA FAR (48 CFR) 53.110
52.243-2 Changes - Cost Reimbursement (AUG 1987) x14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
)X 1 NRC-HQ-25-14-E-0002/NRC-HQ-25-14-T-0002 The purpose of this modification is to A) increase the total task order ceiling in the
 
amount of $29,834.00 (from $330,756.41 to $360,590.41); B) provide incremental funding in


the amount of $20,000.00 (from $330,756.41 to $350,756.41); and C) modify the statement of
NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 SPECIFIC CHANGES ARE MADE AS FOLLOWS:
: 1. Delete Section B.1 PRICE/COST SCHEDULE in its entirety and replace with the following:
B.1 PRICE/COST SCHEDULE CLIN      DESCRIPTION OF                          ESTIMATED      FIXED FEE    TOTAL SUPPLIES/SERVICES                        COST                        COST PLUS FIXED FEE
                                                                                    $360,590.41
: 2. Delete Section NRCB044 in its entirety and replace with the following:
NRCB040A CONSIDERATION AND OBLIGATIONCOST-PLUS-FIXED-FEE ALTERNATE I (a) The total estimated cost to the Government for full performance of this contract is
$360,590.41 of which the sum of                  represents the estimated reimbursable costs, and of which              represents the fixed-fee.
(b) There shall be no adjustment in the amount of the Contractor's fixed fee.
(c) The amount currently obligated by the Government with respect to this contract is
$350,756.41, of which the sum of                  represents the estimated reimbursable costs, and of which                represents the fixed-fee.
(d) It is estimated that the amount currently obligated will cover performance through July 31, 2018.
(e) This is an incrementally-funded contract and FAR 52.232 Limitation of Funds applies.
(f) In accordance with FAR 52.216 Fixed Fee, it is the policy of the NRC to withhold payment of fee after payment of 85 percent of the fee has been paid in order to protect the Governments interest. The amount of fixed-fee withheld from the contractor will not exceed 15 percent of the total fee or $100,000, whichever is less. Accordingly, the maximum amount of fixed-fee that may be held in reserve is            .
3


work and deliverable schedule to incorporate additional tasks within the scope of the
NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006
: 3. Delete Section C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK FOR TASK ORDER 2 in its entirety and replace with the following:


original statement of work.
Statement of Work for Technical Review of KHNP APR1400 Large Break LOCA Methodology Topical Report This Statement of Work for this Task Order falls within the Small Business Set-Aside part of NRC IDIQ Contract entitled Technical Assistance in Support of Agency Environmental and Reactor Programs, paragraph 3.7, APR-1400 DESIGN CENTER.
Total Task Order Ceiling: $360,590.41 (Changed)
: 1. PROJECT TITLE Technical Review of KHNP APR1400 Large Break LOCA Realistic Evaluation Methodology Topical Report
Total Obligated Amount:  $350,756.41 (Changed)
: 2. BACKGROUND In January 2013, the Applicant, Korea Hydro and Nuclear Power Co., Ltd. (KHNP) submitted topical report APR1400-F-A-TR-12004-P, Revision 0, Realistic Evaluation Methodology for Large Break LOCA of the APR1400, [LBLOCA REM] for review by the Nuclear Regulatory Commission, Office of New Reactors (NRO). The topical report is part of the pre-application package for the APR1400 Design Certification application. Although the Design Certification application package has not been accepted for review by the NRC, the topical report was accepted for review in March 2013. Resubmittal of the Design Certification application is expected in late 2014.
The APR1400 LBLOCA REM follows the concept of Code Scalability, Applicability, and Uncertainty (CSAU) described in NUREG/CR-5249, Quantifying Reactor Safety Margins, and the guidelines of Regulatory Guide (RG) 1.157, Best-Estimate Calculations of Emergency Core Cooling System Performance. The APR1400 LBLOCA REM uses the RELAP5/MOD3.3/K and CONTEMPT4/MOD5 codes for the calculation of the reactor coolant system thermal-hydraulics and containment backpressure, respectively, for the large-break LOCA transient scenarios. Statistical techniques used to quantity the overall uncertainty of the calculation are different from those of the CSAU methodology in order to accommodate the increased number of uncertainty parameters, but still conform to the requirement of RG 1.157.
The LBLOCA REM topical report provides the detailed methodology to be used in the Design Certification Document (DCD), Chapter 15, Section 15.6.5, Loss-of-Coolant Accidents Resulting From Spectrum of Postulated Piping Breaks Within the Reactor Coolant Pressure Boundary. Detailed review guidance is provided in Section 15.6.5 of NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition - Transient and Accident Analysis (SRP 15.6.5). The principal purpose of the SRP is to assure the quality and uniformity of staff safety reviews. Guidance for the LOCA Evaluation Model and analysis methods is provided in SRP 15.0.2, Review of Transient and Accident Analysis Methods and in Regulatory Guide 1.203, Transient and Accident Analysis Methods.
4


Period of Performance: 09/30/2014 through 12/31/2018 (Unchanged)
NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 Independent of the full scope APR1400 DCD review, the staff of NROs Reactor Systems, Nuclear Performance & Code Review Branch (SRSB) will conduct a review of the LBLOCA REM topical report to determine its acceptability to be used for the APR1400 large-break LOCA analysis. Documentation of this review will be provided in a Final Safety Evaluation Report (FSER).
Continued ...16A. NAME  AND TITLE OF CONTRACTNG OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)15C. DATE SIGNED16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR16C. DATE SIGNED (Signature of person authorized to sign)(Signature of Contracting Officer)
The FSER must provide sufficient information to adequately explain the NRC staffs rationale for determining that there is reasonable assurance that public health and safety is protected. The FSER should be written in a manner whereby a person with a technical (non-nuclear) background and unfamiliar with the applicants request could understand the basis for the staffs conclusions. The FSER format is described in Attachment 1 to this task order statement of work (SOW).
RICHARD W. ROBINSON STANDARD FORM 30 (REV. 10-83)
The objective of this task order is to obtain technical expertise from the contractor to assist the staff in determining the adequacy of the KHNP APR1400 Large Break LOCA Realistic Evaluation Model topical report APR1400-F-A-TR-12004-P, Revision 0, for use in the APR1400 Design Certification application. The review will also include Technical Report APR1400-F-C-NR-12001-P, Thermal Design Methodology, which was submitted in support of the topical report.
Prescribed by GSAFAR (48 CFR) 53.243 NSN 7540-01-152-8070
: 3. SCOPE OF WORK The Contractor must provide all resources necessary to accomplish the tasks and deliverables described in this statement of work (SOW).
 
The Contractor must provide individuals who have the required educational background and work experience to meet the objectives of the work specified in this task order. Specific qualifications for this effort include: a) expertise and experience in analysis of nuclear reactor thermal-hydraulics; b) expertise in use of the RELAP5 computer code; c) expertise and familiarity with NRC regulations pertaining to analysis of nuclear reactor thermal-hydraulics, specifically LOCA analyses under the standard review plan (SRP) Sections 4.4 and Sections 15.0.2 and 15.6.5; d) familiarity with requests for additional information (RAI) development; and e) experience and familiarity with development of technical evaluation report (TER) supporting positions developed during the review.
Previous edition unusableExcept as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
NOTE: Work on this task order will involve the handling of proprietary information.
03/30/2018 ITEM NO.SUPPLES/SERVICES QUANTITYUNITUNIT PRICE AMOUNTNAME OF OFFEROR OR CONTRACTOR 2 12CONTINUATION SHEETREFERENCE NO. OF DOCUMENT BEING CONTINUEDPAGEOF ENERGY RESEARCH INC (A)(B)(C)(D)(E)(F)NRC-HQ-25-14-E-0002/NRC-HQ-25-14-T-0002/M0006 See attached pages for specific changes regarding this modification.
The contractor shall provide a contract project manager (PM) to oversee the effort and ensure the timely submittal of quality deliverables so that all information is accurate and complete as defined in the base contract.
NEW ACCOUNTING CODE ADDED:
The NRC will rely on representations made by the contractor concerning the qualifications of the personnel assigned to this task order, including assurance that all information contained in the technical and cost proposals, including resumes, is accurate and truthful. The resume for each professional proposed to work under this task order (contractor, subcontractor, or consultant) shall describe the individual's experience in applying his or her area of engineering specialization to work in the proposed area. The use of particular personnel on this contract is subject to the NRC technical monitors (TM's) approval. This includes any proposed changes to key personnel during the life of the task order.
Account code:
5


2018-X0200-FEEBASED-25-25D006-3002-17-4-118-251A-1
NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 The contractor shall provide at a minimum, monthly letter status reports (MLSRs) to the NRC Technical Monitor and the Contracting Officer. Copies must also be sent to the Division of Contracts at ContractsPOT.Resource@nrc.gov.
: 4. SPECIFIC TASKS Specific tasks are summarized in the table below, along with the expected deliverables and approximate timetable:
Task    Task Description                      Milestone/Deliverable          Due Date
#
1a    Become familiar with KHNPs            An e-mail to the COR            One week after Task LBLOCA REM topical report              detailing the review plan and  Order award.
APR1400-F-A-TR-12004-P and            the completion of the familiarization with the        COMPLETE.
DCD Section 15.6.5 LBLOCA material analysis.
1b    Become familiar with KHNPs            An e-mail to the COR            2 days after completion of Technical Report APR1400-F-C-          detailing the review plan and  Task 1a NR-12001-P, Revision 0, Thermal      the completion of the          COMPLETE.
familiarization with the Design Methodology.
material 2    Participate in an orientation/kick-off N/A                            TBD. Meeting will be meeting with the NRC staff                                            held by teleconference personnel to discuss potential                                        at a date/time issues identified during                                              scheduled by the COR, familiarization tasks 1a and 1b and                                    as soon as possible information needed from NRC staff                                      after completion of or the Applicant.                                                      Tasks 1a and 1b.
COMPLETE.
3a    Review LBLOCA REM Topical              Draft RAIs by e-mail to NRC    Initial RAIs provided 8 Report APR1400-F-A-TR-12004-P.        COR                            weeks after authorization Determine if the methods and          Provide bi-weekly status        to proceed approach proposed by the              reports to the NRC COR (by      COMPLETE.
Applicant meet the applicable          e-mail or phone call) regulations and review guidance.                                      Bi-weekly status update Evaluate the applicants realistic evaluation methodology for the LBLOCA analysis using the APR1400 RELAP5 model (to be provided upon authorization to proceed with the contract Task Order). This task requires thorough review of the KHNP 6


7-4-118-3002 All other terms and conditions remain unchanged.
NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 RELAP5/MOD3.3/K code, assessment of the code against separate and integral effects tests, coupling of the RELAP5/MOD3.3/K and CONTEMPT4/MOD5, implementation of the CSAU steps, and statistical method of uncertainty calculation.
Period of Performance: 09/30/2014 to 12/31/2018 NSN 7540-01-152-8067OPTIONAL FORM 336 (4-86)
Identify any technical issues and the need for any additional or clarifying information (requests for additional information, RAIs).
Sponsored by GSA
3b  Review KHNP Thermal Design            Draft RAIs by e-mail to NRC  Initial RAIs provided 10 Methodology Technical Report          COR                          weeks after authorization APR1400-F-C-NR-12001-P. This                                        to proceed report describes the overall process to be used to perform core                                  COMPLETE.
thermal analysis, the critical heat flux correlation that will be used for APR1400 core design and safety analyses, and the computer codes to be used.
NOTE: This task does not require acceptance/approval of the CHF correlation or of the computer codes. These reviews are being performed by the NRC staff.
Identify any technical issues related to the core thermal design process and the need for any additional or clarifying information (requests for additional information, RAIs).
4   Participate in an audit of the        Audit summary report        Audit tentatively Applicants calculations used in      provided to the NRC          planned for October of preparation of RELAP5 model            Technical Monitor which      2014. A maximum of inputs at the Applicants Vienna,      includes a list of documents 3 days is expected.
Virginia office. Provide a summary    reviewed and identifies open Some documents may 7


FAR (48 CFR) 53.110 NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002
NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 report which identifies documents  issues.                      be made available in audited and describes any open                                  an electronic reading issues which will require the                                    room.
Applicant to submit additional                                  COMPLETED (Jan, 12 information.                                                    thru Jan. 15, 2016 Summary report should be completed one week after audit closure.
COMPLETED.
5  Upon receipt of the Applicants    If the Contractor or the COR Two weeks after receipt of responses to RAIs developed        determines that the          responses (if needed) under Tasks 3a, 3b, and 4,          Applicants responses are    COMPLETED March 17, determine if the responses are      insufficient and that        2016.
complete and sufficient for the NRC supplemental information is to make a safety determination, or  needed, provide draft if further information is needed    supplemental RAIs by e-mail (supplemental RAIs).                to the NRC COR.
6  Based on the review of the topical  Draft TER by e-mail to the  4 weeks after completion report and technical report and the NRC COR                      of Task 5 supplemental information provided                                Rev. 3 of TER completed in the responses to RAIs, prepare a                              3/4/2016 draft Technical Evaluation Report                                TER update is needed (TER) using the format provided in                              to reflect final audit the enclosed TER template.                                      issue response review and resulting audit RAIs for all issues not satisfactorily resolved by KHNP. These RAIs can be considered Open Items in the TER. This TER update should document all issues identified during the Topical Report Revision 0 review and their resolution, except those identified as Open Items.
COMPLETED.
8


M0006 3SPECIFIC CHANGES ARE MADE AS FOLLOWS:1.Delete Section B.1 "PRICE/COST SCHEDULE" in its entirety and replace with the following:"B.1 PRICE/COST SCHEDULE CLINDESCRIPTION OF SUPPLIES/SERVICES ESTIMATED COSTFIXED FEE TOTAL COST PLUS FIXED FEE                                     
NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 7  Review responses to RAIs issued      Draft supplemental RAIs (if    2 weeks after responses in Task 6; determine if responses    needed) by e-mail to NRC      received from KHNP and are satisfactory or if supplemental  COR                            provided by the COR.
information is needed.
COMPLETED.
8  Review LBLOCA REM Topical            E-mail to COR summarizing      3 weeks after receipt of Report APR1400-F-A-TR-12004-P,      the Revision 1 review. If new  Revision 1 of the topical Revision 1.                         issues are identified or audit report Determine if all changes KHNP        issues are not satisfactorily committed to in resolution of audit  resolved, provide new draft    COMPLETED.
issues or RAIs have been properly    RAIs incorporated in the revision.
Confirm that the changes made do not introduce new issues.
9  Update TER revision prepared        Draft TER revision by e-mail  2 weeks after RAI under Task 6 to incorporate          to the NRC COR                responses received discussion on review of Revision 1 of the Topical Report and                                          COMPLETED.
supplemental RAI responses.
10  Upon receipt of NRC staff            Final TER and Cover            Two weeks after receipt comments on the draft TER,          Transmittal Letter provided to of NRC comments on develop and issue a final TER        the NRC. Electronic files      the draft TER prepared which incorporates the staff        shall be submitted in both    under Task 9 or 10 (if a comments. If supplemental RAIs      Microsoft WORD and ADOBE      Revision 2 of the topical are generated in Task 5,            Acrobat format.                report is needed).
incorporate resolution/closure discussion based on the Applicants responses.
10a  Provide in the NRC Final Safety      FSER Draft                    March 22, 2018 Evaluation (FSER) format the technical evaluation provided in the                                Complete TER in Task 9 10b  Provide technical and editorial      Participation by telephone    March 26, 2018 assistance during OGC comment        during comment resolution      Complete resolution                          meetings 9


$360,590.41"2.Delete Section NRCB044 in its entirety and replace with the following:"NRCB040A CONSIDERATION AND OBLIGATION-COST-PLUS-FIXED-FEEALTERNATE I (a) The total estimated cost to the Government for full performance of this contract is $360,590.41 of which the sum of  represents the estimated reimbursable costs, and of which  represents the fixed-fee.(b) There shall be no adjustment in the amount of the Contractor's fixed fee.(c) The amount currently obligated by the Government with respect to this contract is $350,756.41, of which the sum of  represents the estimated reimbursable costs, and of which  represents the fixed-fee.(d) It is estimated that the amount currently obligated will cover performance through July 31, 2018.(e) This is an incrementally-funded contract and FAR 52.232 "Limitation of Funds" applies.(f) In accordance with FAR 52.216 Fixed Fee, it is the policy of the NRC to withhold payment of fee after payment of 85 percent of the fee has been paid in order to protect the Government's interest. The amount of fixed-fee withheld from the contractor will not exceed 15 percent of the total fee or $100,000, whichever is less. Accordingly, the maximum amount of fixed-fee that may be held in reserve is ."
NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 11a    Develop draft Advisory Committee        Slides provided to the NRC       2 weeks prior to ACRS on Reactor Safeguards (ACRS)           COR in Microsoft PowerPoint      meeting (currently presentation slides which               format.                         scheduled for April 17, summarize the TER review.                                               2018) 11b    Upon receipt of NRC staff               Slides provided to the NRC       2 days after receipt of comments, prepare final ACRS           COR in Microsoft PowerPoint     NRC comments presentation slides.                   format.
NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 4 3.Delete Section C" DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK FOR TASK ORDER 2" in its entirety and replace with the following:
12   Provide technical support to the       (If needed) an e-mail to the    April 17, 2018 ACRS staff during related ACRS meeting.     NRC COR providing                Subcommittee Meeting information required to          and May 3, 2018 ACRS This may include addressing ACRS       address ACRS Member              Full Committee Meeting member questions during the             question(s).
"Statement of Work for Technical Review of KHNP APR1400 Large Break LOCA Methodology Topical Report This Statement of Work for this Task Order falls within the Small Business Set-Aside part of NRC IDIQ Contract entitled Technical Assistance in Support of Agency Environmental and Reactor Programs, paragraph 3.7, APR-1400 DESIGN CENTER.1.PROJECT TITLE Technical Review of KHNP APR1400 Large Break LOCA Realistic Evaluation Methodology Topical Report 2.BACKGROUND In January 2013, the Applicant, Korea Hydro and Nuclear Power Co., Ltd. (KHNP) submitted topical report APR1400-F-A-TR-12004-P, Revision 0, "Realistic Evaluation Methodology for Large Break LOCA of the APR1400," [LBLOCA REM] for review by the Nuclear Regulatory Commission, Office of New Reactors (NRO). The topical report is part of the pre-application package for the APR1400 Design Certification application.
meeting and any follow-up letter (if needed).
Although the Design Certification application package has not been accepted for review by the NRC, the topical report was accepted for review in March 2013. Resubmittal of the Design Certification application is expected in late 2014. The APR1400 LBLOCA REM follows the concept of "Code Scalability, Applicability, and Uncertainty (CSAU)" described in NUREG/CR-5249, "Quantifying Reactor Safety Margins," and the guidelines of Regulatory Guide (RG) 1.157, "Best-Estimate Calculations of Emergency Core Cooling System Performance."
: 5. APPLICABLE DOCUMENTS AND STANDARDS Key regulatory requirements are specified in Title 10 of the Code of Federal Regulations, Part 50 - Domestic Licensing of Production and Utilization Facilities. Detailed review guidance for the review is provided in Section 15.6.5 of NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition -
The APR1400 LBLOCA REM uses the RELAP5/MOD3.3/K and CONTEMPT4/MOD5 codes for the calculation of the reactor coolant system thermal-hydraulics and containment backpressure, respectively, for the large-break LOCA transient scenarios.
Transient and Accident Analysis (SRP 15.6.5). The principal purpose of the SRP is to assure the quality and uniformity of staff safety reviews. Guidance for the LOCA Evaluation Model and analysis methods is provided in SRP 15.0.2, Review of Transient and Accident Analysis Methods and in Regulatory Guide 1.203, Transient and Accident Analysis Methods.
Statistical techniques used to quantity the overall uncertainty of the calculation are different from those of the CSAU methodology in order to accommodate the increased number of uncertainty parameters, but still conform to the requirement of RG 1.157.The LBLOCA REM topical report provides the detailed methodology to be used in the Design Certification Document (DCD), Chapter 15, Section 15.6.5, "Loss-of-Coolant Accidents Resulting From Spectrum of Postulated Piping Breaks Within the Reactor Coolant Pressure Boundary".
The above requirements and review guidance are available on the U. S. Nuclear Regulatory Commissions public website at www.nrc.gov.
Detailed review guidance is provided in Section 15.6.5 of NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition - Transient and Accident Analysis" (SRP 15.6.5). The principal purpose of the SRP is to assure the quality and uniformity of staff safety reviews. Guidance for the LOCA Evaluation Model and analysis methods is provided in SRP 15.0.2, "Review of Transient and Accident Analysis Methods" and in Regulatory Guide 1.203, "Transient and Accident Analysis Methods."
10
NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 5 Independent of the full scope APR1400 DCD review, the staff of NRO's Reactor Systems, Nuclear Performance
& Code Review Branch (SRSB) will conduct a review of the LBLOCA REM topical report to determine its acceptability to be used for the APR1400 large-break LOCA analysis. Documentation of this review will be provided in a Final Safety Evaluation Report (FSER).The FSER must provide sufficient information to adequately explain the NRC staff's rationale for determining that there is reasonable assurance that public health and safety is protected.
The FSER should be written in a manner whereby a person with a technical (non-nuclear) background and unfamiliar with the applicant's request could understand the basis for the staff's conclusions.
The FSER format is described in Attachment 1 to this task order statement of work (SOW).The objective of this task order is to obtain technical expertise from the contractor to assist the staff in determining the adequacy of the KHNP APR1400 Large Break LOCA Realistic Evaluation Model topical report APR1400-F-A-TR-12004-P, Revision 0, for use in the APR1400 Design Certification application.
The review will also include Technical Report APR1400-F-C-NR-12001-P, "Thermal Design Methodology", which was submitted in support of the topical report.3.SCOPE OF WORK The Contractor must provide all resources necessary to accomplish the tasks and deliverables described in this statement of work (SOW). The Contractor must provide individuals who have the required educational background and work experience to meet the objectives of the work specified in this task order. Specific qualifications for this effort include: a) expertise and experience in analysis of nuclear reactor thermal-hydraulics; b) expertise in use of the RELAP5 computer code; c) expertise and familiarity with NRC regulations pertaining to analysis of nuclear reactor thermal-hydraulics, specifically LOCA analyses under the standard review plan (SRP) Sections 4.4 and Sections 15.0.2 and 15.6.5; d) familiarity with requests for additional information (RAI) development; and e) experience and familiarity with development of technical evaluation report (TER) supporting positions developed during the review.NOTE:  Work on this task order will involve the handling of proprietary information.
The contractor shall provide a contract project manager (PM) to oversee the effort and ensure the timely submittal of quality deliverables so that all information is accurate and complete as defined in the base contract. The NRC will rely on representations made by the contractor concerning the qualifications of the personnel assigned to this task order, including assurance that all information contained in the technical and cost proposals, including resumes, is accurate and truthful. The resume for each professional proposed to work under this task order (contractor, subcontractor, or consultant) shall describe the individual's experience in applying his or her area of engineering specialization to work in the proposed area. The use of particular personnel on this contract is subject to the NRC technical monitor's (TM's) approval. This includes any proposed changes to key personnel during the life of the task order.
NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 6 The contractor shall provide at a minimum, monthly letter status reports (MLSRs) to the NRC Technical Monitor and the Contracting Officer. Copies must also be sent to the Division of Contracts at ContractsPOT.Resource@nrc.gov
.4.SPECIFIC TASKS Specific tasks are summarized in the table below, along with the expected deliverables and approximate timetable:
Task
#Task Description Milestone/Deliverable Due Date 1a Become familiar with KHNP's LBLOCA REM topical report APR1400-F-A-TR-12004-P and DCD Section 15.6.5 LBLOCA analysis.An e-mail to the COR detailing the review plan and the completion of the familiarization with the material One week after Task Order award.COMPLETE.1b Become familiar with KHNP's Technical Report APR1400-F-C-NR-12001-P, Revision 0, "Thermal Design Methodology".
An e-mail to the COR detailing the review plan and the completion of the familiarization with the material 2 days after completion of Task 1a COMPLETE.2 Participate in an orientation/kick-off meeting with the NRC staff personnel to discuss potential issues identified during familiarization tasks 1a and 1b and information needed from NRC staff or the Applicant.
N/A TBD. Meeting will be held by teleconference at a date/time scheduled by the COR, as soon as possible after completion of Tasks 1a and 1b.COMPLETE.3a Review LBLOCA REM Topical Report APR1400-F-A-TR-12004-P.
Determine if the methods and approach proposed by the Applicant meet the applicable regulations and review guidance. Evaluate the applicant's realistic evaluation methodology for the LBLOCA analysis using the APR1400 RELAP5 model (to be provided upon authorization to proceed with the contract Task Order). This task requires thorough review of the KHNP Draft RAIs by e-mail to NRC COR Provide bi-weekly status reports to the NRC COR (by e-mail or phone call)Initial RAIs provided 8 weeks after authorization to proceed COMPLETE.Bi-weekly status update NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 7 RELAP5/MOD3.3/K code,  assessment of the code against separate and integral effects tests, coupling of the RELAP5/MOD3.3/K and CONTEMPT4/MOD5, implementation of the CSAU steps, and statistical method of uncertainty calculation.
Identify any technical issues and the need for any additional or clarifying information (requests for additional information, RAIs).3b Review KHNP Thermal Design Methodology Technical Report APR1400-F-C-NR-12001-P.
This report describes the overall process to be used to perform core thermal analysis, the critical heat flux correlation that will be used for APR1400 core design and safety analyses, and the computer codes to be used. NOTE: This task does not require acceptance/approval of the CHF correlation or of the computer codes. These reviews are being performed by the NRC staff. Identify any technical issues related to the core thermal design process and the need for any additional or clarifying information (requests for additional information, RAIs).Draft RAIs by e-mail to NRC COR Initial RAIs provided 10 weeks after authorization to proceed COMPLETE.4 Participate in an audit of the Applicant's calculations used in preparation of RELAP5 model inputs at the Applicant's Vienna, Virginia office. Provide a summary Audit summary report provided to the NRC Technical Monitor which includes a list of documents reviewed and identifies open Audit tentatively planned for October of 2014. A maximum of 3 days is expected. Some documents may NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 8 report which identifies documents audited and describes any open issues which will require the Applicant to submit additional information.
issues.be made available in an electronic reading room.COMPLETED (Jan, 12 thru Jan. 15, 2016 Summary report should be completed one week after audit closure.COMPLETED.5 Upon receipt of the Applicant's responses to RAIs developed under Tasks 3a, 3b, and 4, determine if the responses are complete and sufficient for the NRC to make a safety determination, or if further information is needed (supplemental RAIs). If the Contractor or the COR determines that the Applicant's responses are insufficient and that supplemental information is needed, provide draft supplemental RAIs by e-mail to the NRC COR.Two weeks after receipt of responses (if needed)COMPLETED March 17, 2016.6 Based on the review of the topical report and technical report and the supplemental information provided in the responses to RAIs, prepare a draft Technical Evaluation Report (TER) using the format provided in the enclosed TER template.Draft TER by e-mail to the NRC COR 4 weeks after completion of Task 5 Rev. 3 of TER completed 3/4/2016 TER update is needed to reflect final audit issue response review and resulting audit RAIs for all issues not satisfactorily resolved by KHNP. These RAIs can be considered Open Items in the TER. This TER update should document all issues identified during the Topical Report Revision 0 review and their resolution, except those identified as Open Items.COMPLETED.
NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 9 7 Review responses to RAIs issued in Task 6; determine if responses are satisfactory or if supplemental information is needed.Draft supplemental RAIs (if needed) by e-mail to NRC COR 2 weeks after responses received from KHNP and provided by the COR.COMPLETED.
8 Review LBLOCA REM Topical Report APR1400-F-A-TR-12004-P, Revision 1.Determine if all changes KHNP committed to in resolution of audit issues or RAIs have been properly incorporated in the revision. Confirm that the changes made do not introduce new issues. E-mail to COR summarizing the Revision 1 review. If new issues are identified or audit issues are not satisfactorily resolved, provide new draft RAIs 3 weeks after receipt of Revision 1 of the topical report COMPLETED.
9 Update TER revision prepared under Task 6 to incorporate discussion on review of Revision 1 of the Topical Report and supplemental RAI responses.
Draft TER revision by e-mail to the NRC COR 2 weeks after RAI responses received COMPLETED.
10 Upon receipt of NRC staff comments on the draft TER, develop and issue a final TER which incorporates the staff comments. If supplemental RAIs are generated in Task 5, incorporate resolution/closure discussion based on the Applicant's responses.
Final TER and Cover Transmittal Letter provided to the NRC. Electronic files shall be submitted in both Microsoft WORD and ADOBE Acrobat format.Two weeks after receipt of NRC comments on the draft TER prepared under Task 9 or 10 (if a Revision 2 of the topical report is needed).10a Provide in the NRC Final Safety Evaluation (FSER) format the technical evaluation provided in the TER in Task 9 FSER Draft March 22, 2018 Complete 10b Provide technical and editorial assistance during OGC comment resolution Participation by telephone during comment resolution meetings March 26, 2018 Complete NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 10 11a Develop draft Advisory Committee on Reactor Safeguards (ACRS) presentation slides which summarize the TER review.Slides provided to the NRC COR in Microsoft PowerPoint format.2 weeks prior to ACRS meeting (currently scheduled for April 17, 2018)11b Upon receipt of NRC staff comments, prepare final ACRS presentation slides.Slides provided to the NRC COR in Microsoft PowerPoint format.2 days after receipt of NRC comments 12 Provide technical support to the staff during related ACRS meeting.This may include addressing ACRS member questions during the meeting and any follow-up letter (if needed).(If needed) an e-mail to the NRC COR providing information required to address ACRS Member question(s).
April 17, 2018 ACRS Subcommittee Meeting and May 3, 2018 ACRS Full Committee Meeting 5.APPLICABLE DOCUMENTS AND STANDARDS Key regulatory requirements are specified in Title 10 of the Code of Federal Regulations, Part 50 - "Domestic Licensing of Production and Utilization Facilities".
Detailed review guidance for the review is provided in Section 15.6.5 of NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition - Transient and Accident Analysis" (SRP 15.6.5). The principal purpose of the SRP is to assure the quality and uniformity of staff safety reviews. Guidance for the LOCA Evaluation Model and analysis methods is provided in SRP 15.0.2, "Review of Transient and Accident Analysis Methods" and in Regulatory Guide 1.203, "Transient and Accident Analysis Methods." The above requirements and review guidance are available on the U. S. Nuclear Regulatory Commission's public website at www.nrc.gov
.
NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 11 DELIVERABLES AND DELIVERY SCHEDULE/REPORTING REQUIREMENTS All items to be delivered or milestones to be achieved are listed in Section 4. Except as noted for Tasks 7 and 8, deliverables may be provided by e-mail to the COR. For Task 7, the deliverable must be provided in Microsoft WORD and Adobe Acrobat format. Presentation slides for Task 8 must be provided in Microsoft PowerPoint format.Monthly Letter Status Reports must include the information discussed in the base contract.6.REQUIRED LABOR CATEGORIES/
ESTIMATED LEVEL OF EFFORT(Except for Information Technology Services)Labor categories/.Level of effort table Labor Category Minimum Qualification Requirement Estimated Labor Hours Additional Labor Hours (M0002)Additional Labor Hours (M0006)Project Manager Note 1 114 150 32 Subject Matter Expert Note 1 240 0 112 Senior Technical Reviewer Note 1 780 380 36 Technical Reviewer Contractor's


discretion 260 380 0 Administrative Support Contractor's
NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 DELIVERABLES AND DELIVERY SCHEDULE/REPORTING REQUIREMENTS All items to be delivered or milestones to be achieved are listed in Section 4. Except as noted for Tasks 7 and 8, deliverables may be provided by e-mail to the COR. For Task 7, the deliverable must be provided in Microsoft WORD and Adobe Acrobat format.
Presentation slides for Task 8 must be provided in Microsoft PowerPoint format.
Monthly Letter Status Reports must include the information discussed in the base contract.
: 6. REQUIRED LABOR CATEGORIES/ ESTIMATED LEVEL OF EFFORT(Except for Information Technology Services)
Labor categories/.Level of effort table Labor Category            Minimum      Estimated    Additional      Additional Qualification      Labor    Labor Hours      Labor Hours Requirement        Hours      (M0002)          (M0006)
Project Manager              Note 1          114              150              32 Subject Matter Expert        Note 1          240                0              112 Senior Technical              Note 1          780              380              36 Reviewer Technical Reviewer            Contractors    260               380               0 discretion Administrative Support       Contractors    120                90                0 discretion Total                                        1514            1000              180 Note 1: All key technical staff, including the project manager, must have the following technical qualifications:
* Extensive expertise in use of RELAP5/MOD3.3 code to perform realistic PWR            LOCA and AOO analyses;
* Extensive knowledge of RELAP5/MOD3.3 code internal numerical schemes and physical models;
* Extensive expertise in the realistic evaluation methodology and the concept of Code Scalability, Applicability, and Uncertainty (CSAU).
* Extensive regulatory analysis and review experience with SRP Chapter 15 and associated PWR safety systems.
* Extensive expertise in use of the CONTEMPT4/MOD5 code or comparable containment analysis codes.
* Past experience in maintaining RELAP5/MOD3 code for U.S NRC or at least 20 years of industry experience using RELAP5 series of codes to evaluate operating PWR and BWR ECCS performance.
* Past experience performing LOCA topical report reviews for new or operating reactor designs for NRC or experience in responding to NRC requests for additional information (RAIs) regarding vendor LOCA topical reports or technical reports.
: 7. GOVERNMENT-FURNISHED PROPERTY N/A.
11


discretion 120 90 0 Total 1514 1000 180 Note 1: All key technical staff, including the project manager, must have the following technical qualifications:
NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006
* Extensive expertise in use of RELAP5/MOD3.3 code to perform realistic PWR        LOCA and AOO analyses;* Extensive knowledge of RELAP5/MOD3.3 code internal numerical schemes and physical models;* Extensive expertise in the realistic evaluation methodology and the concept of "Code Scalability, Applicability, and Uncertainty (CSAU)."* Extensive regulatory analysis and review experience with SRP Chapter 15 and associated PWR safety systems.
: 8. PERIOD OF PERFORMANCE The estimated period of performance for this work is from October 1, 2014 through December 31, 2018.
* Extensive expertise in use of the CONTEMPT4/MOD5 code or comparable containment analysis codes.* Past experience in maintaining RELAP5/MOD3 code for U.S NRC or at least 20 years of industry experience using RELAP5 series of codes to evaluate operating PWR and BWR ECCS performance.
: 9. PLACE OF PERFORMANCE All work may be performed at the contractors site, with the exception of Task 4 (audit of the Applicants calculations), which must be performed at the Applicants U. S. office in Vienna, Virginia, and Task 13 (Technical support to the NRC staff during ACRS meeting), which will be held at NRCs Rockville, Maryland Headquarters.
* Past experience performing LOCA topical report reviews for new or operating    reactor designs for NRC or experience in responding to NRC requests for additional information (RAIs) regarding vendor LOCA topical reports or technical reports.7.GOVERNMENT-FURNISHED PROPERTY N/A.
: 10. SPECIAL CONSIDERATIONS TRAVEL/MEETINGS Task 4: One, 2-person, 3-day meeting at the Applicants Vienna, Virginia office (COMPLETE)
NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 12 8.PERIOD OF PERFORMANCE The estimated period of performance for this work is from October 1, 2014 through December 31, 2018.9.PLACE OF PERFORMANCE All work may be performed at the contractor's site, with the exception of Task 4 (audit of the Applicant's calculations), which must be performed at the Applicant's U. S. office in Vienna, Virginia, and Task 13 (Technical support to the NRC staff during ACRS meeting), which will be held at NRC's Rockville, Maryland Headquarters.
Task 12: One, 1-person, 1-day meeting at the NRCs Rockville, Maryland headquarters All travel requires prior written approval from the COR.
10.SPECIAL CONSIDERATIONS TRAVEL/MEETINGS Task 4: One, 2-person, 3-day meeting at the Applicant's Vienna, Virginia office (COMPLETE)
SECURITY Work on this task order will involve the handling of proprietary information KEY PERSONNEL The NRC will rely on representations made by the contractor concerning the qualifications of the personnel assigned to this task order, including assurance that all information contained in the technical and cost proposals, including resumes, is accurate and truthful. The resume for each professional proposed to work under this task order (contractor, subcontractor, or consultant) shall describe the individual's experience in applying his or her area of engineering specialization to work in the proposed area. The use of particular personnel on this contract is subject to the CORs. This includes any proposed changes to key personnel during the life of the task order.
Task 12: One, 1-person, 1-day meeting at the NRC's Rockville, Maryland headquarters All travel requires prior written approval from the COR.SECURITY Work on this task order will involve the handling of proprietary information KEY PERSONNEL The NRC will rely on representations made by the contractor concerning the qualifications of the personnel assigned to this task order, including assurance that all information contained in the technical and cost proposals, including resumes, is accurate and truthful. The resume for each professional proposed to work under this task order (contractor, subcontractor, or consultant) shall describe the individual's experience in applying his or her area of engineering specialization to work in the proposed area. The use of particular personnel on this contract is subject to the COR's. This includes any proposed changes to key personnel during the life of the task order.}}
12}}

Revision as of 13:26, 21 October 2019

Modification No. 006 to Task Order No. NRC-HQ-25-14-T-0002 Under Contract No. NRC-HQ-25-14-E-0002
ML18089A632
Person / Time
Issue date: 03/30/2018
From: Rasmey Robinson
Acquisition Management Division
To: Mullinix T
Energy Research
References
NRC-HQ-25-14-E-0002
Download: ML18089A632 (12)


Text

1. CONTRACT D CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 12

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

M0006 See Block 16C NRO-18-0048 EWC

6. ISSUED BY CODE NRCHQ 7. ADMINISTERED BY (If other than Item 6) CODE US NRC - HQ ACQUISITION MANAGEMENT DIVISION MAIL STOP TWFN-07B20M WASHINGTON DC 20555-0001
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

(x) 9A. AMENDMENT OF SOLICITATION NO.

ENERGY RESEARCH INC ATTN TRACEY MULLINIX 9B. DATED (SEE ITEM 11) 6189 EXECUTIVE BLVD ROCKVILLE MD 208523901 x 10A. MODIFICATION OF CONTRACT/ORDER NO.

NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 10B. DATED (SEE ITEM 13)

CODE FAC LITY CODE 09/30/2014 621211259

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing tems 8 and 15, and returning ___________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FA LURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNT NG AND APPROPRIATION DATA (If required) Net Increase: $20,000.00 See Schedule
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIF ED TO REFLECT THE ADM NISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH N ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

X 52.243-2 Changes - Cost Reimbursement (AUG 1987)

E. IMPORTANT Contractor is not, x is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

NRC-HQ-25-14-E-0002/NRC-HQ-25-14-T-0002 The purpose of this modification is to A) increase the total task order ceiling in the amount of $29,834.00 (from $330,756.41 to $360,590.41); B) provide incremental funding in the amount of $20,000.00 (from $330,756.41 to $350,756.41); and C) modify the statement of work and deliverable schedule to incorporate additional tasks within the scope of the original statement of work.

Total Task Order Ceiling: $360,590.41 (Changed)

Total Obligated Amount: $350,756.41 (Changed)

Period of Performance: 09/30/2014 through 12/31/2018 (Unchanged)

Continued ...

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACT NG OFFICER (Type or print)

RICHARD W. ROBINSON 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED 03/30/2018 (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)

Previous edition unusable Prescribed by GSA FAR (48 CFR) 53.243

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF CONTINUATION SHEET NRC-HQ-25-14-E-0002/NRC-HQ-25-14-T-0002/M0006 2 12 NAME OF OFFEROR OR CONTRACTOR ENERGY RESEARCH INC ITEM NO. SUPPL ES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT (A) (B) (C) (D) (E) (F)

See attached pages for specific changes regarding this modification.

NEW ACCOUNTING CODE ADDED:

Account code:

2018-X0200-FEEBASED-25-25D006-3002-17-4-118-251A-1 7-4-118-3002 All other terms and conditions remain unchanged.

Period of Performance: 09/30/2014 to 12/31/2018 NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 SPECIFIC CHANGES ARE MADE AS FOLLOWS:

1. Delete Section B.1 PRICE/COST SCHEDULE in its entirety and replace with the following:

B.1 PRICE/COST SCHEDULE CLIN DESCRIPTION OF ESTIMATED FIXED FEE TOTAL SUPPLIES/SERVICES COST COST PLUS FIXED FEE

$360,590.41

2. Delete Section NRCB044 in its entirety and replace with the following:

NRCB040A CONSIDERATION AND OBLIGATIONCOST-PLUS-FIXED-FEE ALTERNATE I (a) The total estimated cost to the Government for full performance of this contract is

$360,590.41 of which the sum of represents the estimated reimbursable costs, and of which represents the fixed-fee.

(b) There shall be no adjustment in the amount of the Contractor's fixed fee.

(c) The amount currently obligated by the Government with respect to this contract is

$350,756.41, of which the sum of represents the estimated reimbursable costs, and of which represents the fixed-fee.

(d) It is estimated that the amount currently obligated will cover performance through July 31, 2018.

(e) This is an incrementally-funded contract and FAR 52.232 Limitation of Funds applies.

(f) In accordance with FAR 52.216 Fixed Fee, it is the policy of the NRC to withhold payment of fee after payment of 85 percent of the fee has been paid in order to protect the Governments interest. The amount of fixed-fee withheld from the contractor will not exceed 15 percent of the total fee or $100,000, whichever is less. Accordingly, the maximum amount of fixed-fee that may be held in reserve is .

3

NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006

3. Delete Section C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK FOR TASK ORDER 2 in its entirety and replace with the following:

Statement of Work for Technical Review of KHNP APR1400 Large Break LOCA Methodology Topical Report This Statement of Work for this Task Order falls within the Small Business Set-Aside part of NRC IDIQ Contract entitled Technical Assistance in Support of Agency Environmental and Reactor Programs, paragraph 3.7, APR-1400 DESIGN CENTER.

1. PROJECT TITLE Technical Review of KHNP APR1400 Large Break LOCA Realistic Evaluation Methodology Topical Report
2. BACKGROUND In January 2013, the Applicant, Korea Hydro and Nuclear Power Co., Ltd. (KHNP) submitted topical report APR1400-F-A-TR-12004-P, Revision 0, Realistic Evaluation Methodology for Large Break LOCA of the APR1400, [LBLOCA REM] for review by the Nuclear Regulatory Commission, Office of New Reactors (NRO). The topical report is part of the pre-application package for the APR1400 Design Certification application. Although the Design Certification application package has not been accepted for review by the NRC, the topical report was accepted for review in March 2013. Resubmittal of the Design Certification application is expected in late 2014.

The APR1400 LBLOCA REM follows the concept of Code Scalability, Applicability, and Uncertainty (CSAU) described in NUREG/CR-5249, Quantifying Reactor Safety Margins, and the guidelines of Regulatory Guide (RG) 1.157, Best-Estimate Calculations of Emergency Core Cooling System Performance. The APR1400 LBLOCA REM uses the RELAP5/MOD3.3/K and CONTEMPT4/MOD5 codes for the calculation of the reactor coolant system thermal-hydraulics and containment backpressure, respectively, for the large-break LOCA transient scenarios. Statistical techniques used to quantity the overall uncertainty of the calculation are different from those of the CSAU methodology in order to accommodate the increased number of uncertainty parameters, but still conform to the requirement of RG 1.157.

The LBLOCA REM topical report provides the detailed methodology to be used in the Design Certification Document (DCD), Chapter 15, Section 15.6.5, Loss-of-Coolant Accidents Resulting From Spectrum of Postulated Piping Breaks Within the Reactor Coolant Pressure Boundary. Detailed review guidance is provided in Section 15.6.5 of NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition - Transient and Accident Analysis (SRP 15.6.5). The principal purpose of the SRP is to assure the quality and uniformity of staff safety reviews. Guidance for the LOCA Evaluation Model and analysis methods is provided in SRP 15.0.2, Review of Transient and Accident Analysis Methods and in Regulatory Guide 1.203, Transient and Accident Analysis Methods.

4

NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 Independent of the full scope APR1400 DCD review, the staff of NROs Reactor Systems, Nuclear Performance & Code Review Branch (SRSB) will conduct a review of the LBLOCA REM topical report to determine its acceptability to be used for the APR1400 large-break LOCA analysis. Documentation of this review will be provided in a Final Safety Evaluation Report (FSER).

The FSER must provide sufficient information to adequately explain the NRC staffs rationale for determining that there is reasonable assurance that public health and safety is protected. The FSER should be written in a manner whereby a person with a technical (non-nuclear) background and unfamiliar with the applicants request could understand the basis for the staffs conclusions. The FSER format is described in Attachment 1 to this task order statement of work (SOW).

The objective of this task order is to obtain technical expertise from the contractor to assist the staff in determining the adequacy of the KHNP APR1400 Large Break LOCA Realistic Evaluation Model topical report APR1400-F-A-TR-12004-P, Revision 0, for use in the APR1400 Design Certification application. The review will also include Technical Report APR1400-F-C-NR-12001-P, Thermal Design Methodology, which was submitted in support of the topical report.

3. SCOPE OF WORK The Contractor must provide all resources necessary to accomplish the tasks and deliverables described in this statement of work (SOW).

The Contractor must provide individuals who have the required educational background and work experience to meet the objectives of the work specified in this task order. Specific qualifications for this effort include: a) expertise and experience in analysis of nuclear reactor thermal-hydraulics; b) expertise in use of the RELAP5 computer code; c) expertise and familiarity with NRC regulations pertaining to analysis of nuclear reactor thermal-hydraulics, specifically LOCA analyses under the standard review plan (SRP) Sections 4.4 and Sections 15.0.2 and 15.6.5; d) familiarity with requests for additional information (RAI) development; and e) experience and familiarity with development of technical evaluation report (TER) supporting positions developed during the review.

NOTE: Work on this task order will involve the handling of proprietary information.

The contractor shall provide a contract project manager (PM) to oversee the effort and ensure the timely submittal of quality deliverables so that all information is accurate and complete as defined in the base contract.

The NRC will rely on representations made by the contractor concerning the qualifications of the personnel assigned to this task order, including assurance that all information contained in the technical and cost proposals, including resumes, is accurate and truthful. The resume for each professional proposed to work under this task order (contractor, subcontractor, or consultant) shall describe the individual's experience in applying his or her area of engineering specialization to work in the proposed area. The use of particular personnel on this contract is subject to the NRC technical monitors (TM's) approval. This includes any proposed changes to key personnel during the life of the task order.

5

NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 The contractor shall provide at a minimum, monthly letter status reports (MLSRs) to the NRC Technical Monitor and the Contracting Officer. Copies must also be sent to the Division of Contracts at ContractsPOT.Resource@nrc.gov.

4. SPECIFIC TASKS Specific tasks are summarized in the table below, along with the expected deliverables and approximate timetable:

Task Task Description Milestone/Deliverable Due Date

1a Become familiar with KHNPs An e-mail to the COR One week after Task LBLOCA REM topical report detailing the review plan and Order award.

APR1400-F-A-TR-12004-P and the completion of the familiarization with the COMPLETE.

DCD Section 15.6.5 LBLOCA material analysis.

1b Become familiar with KHNPs An e-mail to the COR 2 days after completion of Technical Report APR1400-F-C- detailing the review plan and Task 1a NR-12001-P, Revision 0, Thermal the completion of the COMPLETE.

familiarization with the Design Methodology.

material 2 Participate in an orientation/kick-off N/A TBD. Meeting will be meeting with the NRC staff held by teleconference personnel to discuss potential at a date/time issues identified during scheduled by the COR, familiarization tasks 1a and 1b and as soon as possible information needed from NRC staff after completion of or the Applicant. Tasks 1a and 1b.

COMPLETE.

3a Review LBLOCA REM Topical Draft RAIs by e-mail to NRC Initial RAIs provided 8 Report APR1400-F-A-TR-12004-P. COR weeks after authorization Determine if the methods and Provide bi-weekly status to proceed approach proposed by the reports to the NRC COR (by COMPLETE.

Applicant meet the applicable e-mail or phone call) regulations and review guidance. Bi-weekly status update Evaluate the applicants realistic evaluation methodology for the LBLOCA analysis using the APR1400 RELAP5 model (to be provided upon authorization to proceed with the contract Task Order). This task requires thorough review of the KHNP 6

NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 RELAP5/MOD3.3/K code, assessment of the code against separate and integral effects tests, coupling of the RELAP5/MOD3.3/K and CONTEMPT4/MOD5, implementation of the CSAU steps, and statistical method of uncertainty calculation.

Identify any technical issues and the need for any additional or clarifying information (requests for additional information, RAIs).

3b Review KHNP Thermal Design Draft RAIs by e-mail to NRC Initial RAIs provided 10 Methodology Technical Report COR weeks after authorization APR1400-F-C-NR-12001-P. This to proceed report describes the overall process to be used to perform core COMPLETE.

thermal analysis, the critical heat flux correlation that will be used for APR1400 core design and safety analyses, and the computer codes to be used.

NOTE: This task does not require acceptance/approval of the CHF correlation or of the computer codes. These reviews are being performed by the NRC staff.

Identify any technical issues related to the core thermal design process and the need for any additional or clarifying information (requests for additional information, RAIs).

4 Participate in an audit of the Audit summary report Audit tentatively Applicants calculations used in provided to the NRC planned for October of preparation of RELAP5 model Technical Monitor which 2014. A maximum of inputs at the Applicants Vienna, includes a list of documents 3 days is expected.

Virginia office. Provide a summary reviewed and identifies open Some documents may 7

NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 report which identifies documents issues. be made available in audited and describes any open an electronic reading issues which will require the room.

Applicant to submit additional COMPLETED (Jan, 12 information. thru Jan. 15, 2016 Summary report should be completed one week after audit closure.

COMPLETED.

5 Upon receipt of the Applicants If the Contractor or the COR Two weeks after receipt of responses to RAIs developed determines that the responses (if needed) under Tasks 3a, 3b, and 4, Applicants responses are COMPLETED March 17, determine if the responses are insufficient and that 2016.

complete and sufficient for the NRC supplemental information is to make a safety determination, or needed, provide draft if further information is needed supplemental RAIs by e-mail (supplemental RAIs). to the NRC COR.

6 Based on the review of the topical Draft TER by e-mail to the 4 weeks after completion report and technical report and the NRC COR of Task 5 supplemental information provided Rev. 3 of TER completed in the responses to RAIs, prepare a 3/4/2016 draft Technical Evaluation Report TER update is needed (TER) using the format provided in to reflect final audit the enclosed TER template. issue response review and resulting audit RAIs for all issues not satisfactorily resolved by KHNP. These RAIs can be considered Open Items in the TER. This TER update should document all issues identified during the Topical Report Revision 0 review and their resolution, except those identified as Open Items.

COMPLETED.

8

NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 7 Review responses to RAIs issued Draft supplemental RAIs (if 2 weeks after responses in Task 6; determine if responses needed) by e-mail to NRC received from KHNP and are satisfactory or if supplemental COR provided by the COR.

information is needed.

COMPLETED.

8 Review LBLOCA REM Topical E-mail to COR summarizing 3 weeks after receipt of Report APR1400-F-A-TR-12004-P, the Revision 1 review. If new Revision 1 of the topical Revision 1. issues are identified or audit report Determine if all changes KHNP issues are not satisfactorily committed to in resolution of audit resolved, provide new draft COMPLETED.

issues or RAIs have been properly RAIs incorporated in the revision.

Confirm that the changes made do not introduce new issues.

9 Update TER revision prepared Draft TER revision by e-mail 2 weeks after RAI under Task 6 to incorporate to the NRC COR responses received discussion on review of Revision 1 of the Topical Report and COMPLETED.

supplemental RAI responses.

10 Upon receipt of NRC staff Final TER and Cover Two weeks after receipt comments on the draft TER, Transmittal Letter provided to of NRC comments on develop and issue a final TER the NRC. Electronic files the draft TER prepared which incorporates the staff shall be submitted in both under Task 9 or 10 (if a comments. If supplemental RAIs Microsoft WORD and ADOBE Revision 2 of the topical are generated in Task 5, Acrobat format. report is needed).

incorporate resolution/closure discussion based on the Applicants responses.

10a Provide in the NRC Final Safety FSER Draft March 22, 2018 Evaluation (FSER) format the technical evaluation provided in the Complete TER in Task 9 10b Provide technical and editorial Participation by telephone March 26, 2018 assistance during OGC comment during comment resolution Complete resolution meetings 9

NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 11a Develop draft Advisory Committee Slides provided to the NRC 2 weeks prior to ACRS on Reactor Safeguards (ACRS) COR in Microsoft PowerPoint meeting (currently presentation slides which format. scheduled for April 17, summarize the TER review. 2018) 11b Upon receipt of NRC staff Slides provided to the NRC 2 days after receipt of comments, prepare final ACRS COR in Microsoft PowerPoint NRC comments presentation slides. format.

12 Provide technical support to the (If needed) an e-mail to the April 17, 2018 ACRS staff during related ACRS meeting. NRC COR providing Subcommittee Meeting information required to and May 3, 2018 ACRS This may include addressing ACRS address ACRS Member Full Committee Meeting member questions during the question(s).

meeting and any follow-up letter (if needed).

5. APPLICABLE DOCUMENTS AND STANDARDS Key regulatory requirements are specified in Title 10 of the Code of Federal Regulations, Part 50 - Domestic Licensing of Production and Utilization Facilities. Detailed review guidance for the review is provided in Section 15.6.5 of NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition -

Transient and Accident Analysis (SRP 15.6.5). The principal purpose of the SRP is to assure the quality and uniformity of staff safety reviews. Guidance for the LOCA Evaluation Model and analysis methods is provided in SRP 15.0.2, Review of Transient and Accident Analysis Methods and in Regulatory Guide 1.203, Transient and Accident Analysis Methods.

The above requirements and review guidance are available on the U. S. Nuclear Regulatory Commissions public website at www.nrc.gov.

10

NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006 DELIVERABLES AND DELIVERY SCHEDULE/REPORTING REQUIREMENTS All items to be delivered or milestones to be achieved are listed in Section 4. Except as noted for Tasks 7 and 8, deliverables may be provided by e-mail to the COR. For Task 7, the deliverable must be provided in Microsoft WORD and Adobe Acrobat format.

Presentation slides for Task 8 must be provided in Microsoft PowerPoint format.

Monthly Letter Status Reports must include the information discussed in the base contract.

6. REQUIRED LABOR CATEGORIES/ ESTIMATED LEVEL OF EFFORT(Except for Information Technology Services)

Labor categories/.Level of effort table Labor Category Minimum Estimated Additional Additional Qualification Labor Labor Hours Labor Hours Requirement Hours (M0002) (M0006)

Project Manager Note 1 114 150 32 Subject Matter Expert Note 1 240 0 112 Senior Technical Note 1 780 380 36 Reviewer Technical Reviewer Contractors 260 380 0 discretion Administrative Support Contractors 120 90 0 discretion Total 1514 1000 180 Note 1: All key technical staff, including the project manager, must have the following technical qualifications:

  • Extensive expertise in use of RELAP5/MOD3.3 code to perform realistic PWR LOCA and AOO analyses;
  • Extensive knowledge of RELAP5/MOD3.3 code internal numerical schemes and physical models;
  • Extensive expertise in the realistic evaluation methodology and the concept of Code Scalability, Applicability, and Uncertainty (CSAU).
  • Extensive regulatory analysis and review experience with SRP Chapter 15 and associated PWR safety systems.
  • Extensive expertise in use of the CONTEMPT4/MOD5 code or comparable containment analysis codes.
  • Past experience in maintaining RELAP5/MOD3 code for U.S NRC or at least 20 years of industry experience using RELAP5 series of codes to evaluate operating PWR and BWR ECCS performance.
  • Past experience performing LOCA topical report reviews for new or operating reactor designs for NRC or experience in responding to NRC requests for additional information (RAIs) regarding vendor LOCA topical reports or technical reports.
7. GOVERNMENT-FURNISHED PROPERTY N/A.

11

NRC-HQ-25-14-E-0002 NRC-HQ-25-14-T-0002 M0006

8. PERIOD OF PERFORMANCE The estimated period of performance for this work is from October 1, 2014 through December 31, 2018.
9. PLACE OF PERFORMANCE All work may be performed at the contractors site, with the exception of Task 4 (audit of the Applicants calculations), which must be performed at the Applicants U. S. office in Vienna, Virginia, and Task 13 (Technical support to the NRC staff during ACRS meeting), which will be held at NRCs Rockville, Maryland Headquarters.
10. SPECIAL CONSIDERATIONS TRAVEL/MEETINGS Task 4: One, 2-person, 3-day meeting at the Applicants Vienna, Virginia office (COMPLETE)

Task 12: One, 1-person, 1-day meeting at the NRCs Rockville, Maryland headquarters All travel requires prior written approval from the COR.

SECURITY Work on this task order will involve the handling of proprietary information KEY PERSONNEL The NRC will rely on representations made by the contractor concerning the qualifications of the personnel assigned to this task order, including assurance that all information contained in the technical and cost proposals, including resumes, is accurate and truthful. The resume for each professional proposed to work under this task order (contractor, subcontractor, or consultant) shall describe the individual's experience in applying his or her area of engineering specialization to work in the proposed area. The use of particular personnel on this contract is subject to the CORs. This includes any proposed changes to key personnel during the life of the task order.

12