| author affiliation = PPL Susquehanna, LLC
| author affiliation = PPL Susquehanna, LLC
| addressee name = Gerlach R M
| addressee name = Gerlach R
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000387
| docket = 05000387

Revision as of 06:00, 11 July 2019

Technical Requirements Manual
ML102300650
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 08/10/2010
From:
Susquehanna
To: Gerlach R
Document Control Desk, Office of Nuclear Reactor Regulation
References
028401, 2010-34173
Download: ML102300650 (29)


Text

Aug. 10, 2010 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2010-34173 USER INFORMATION:

GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSE M 08/10/2010 LOCATION:

USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL' CENTER (NUCSA-2)THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.

WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.TRMI -TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 07/09/2010 ADD MANUAL TABLE OF CONTENTS DATE: 08/09/2010 CATEGORY:

DOCUMENTS TYPE: TRMI A>oc Aug. 10, 2010 Page 2 of 2 ID: TEXT B3.3.10 REMOVE: REV:2 ADD: REV: 3 CATEGORY: ID: TEXT REMOVE: DOCUMENTS TYPE: TRMI LOES REV:61 ADD: REV: 62 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.

UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL Manual Name: TRMI Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date: 08/09 Procedure Name TEXT LOES Title: LIST OF EFFECT:/2010 Rev Issue Date 62 08/09/2010 IVE SECTIONS Change ID Change.Number TEXT TOC Title: TEXT 1.1 Title: 18 04/27/2010 TABLE OF CONTENTS 0 11/18/2002 USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005 Title: PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 Title: TEXT 3. 0 Title: 8 02/12/2010 PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE LDCN 4414 4 05/23/2008 TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY

& SURVEILLANCE (TRS)APPLICABILITY TEXT 3.1.1 1 11/09/2007 Title: REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)

INSTRUMENTATION TEXT 3.1.2 0 11/18/2002 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 5 04/16/2009 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/18/2002 Title: REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION

&CHECK VALVE TEXT 3.2.1 11 03/16/2010 Title: CORE OPERATING LIMITS REPORT (COLR)Page 1 of 16 Report Date: 08/09/10 Page I of .16 Report Date: 08/09/10 SSES MANUAL Manual Name: TRMI Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1 0 11/18/2002 Title: INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 2 11/09/2007 Title: INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007 Title: INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 6 07/09/2010 Title: INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 Title: INSTRUMENTATION 0 11.18/2002 THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3..6 2 10/19/2005:

Title: INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 Title: INSTRUMENTATION 1 11/09/2007 MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003 Title: INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3 04/17/2008 Title: OPRM INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1 12/14/2004 Title: INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003 Title: INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0 04/16/2009 Title: WATER MONITORING INSTRUMENTATION PageZ of 16. Report Date: 08/09/10 Page 2 of 16 Report Date: 08/09/10 SSES MANUAL Manual Name: TRM1 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.4.1 Title: REACTOR TEXT 3.4.2 Title: REACTOR TEXT 3.4.3 Title: REACTOR TEXT 3.4.4 Title: REACTOR TEXT 3.4.5 Title: REACTOR TEXT 3.4.6 Title: REACTOR TEXT 3.5.1 1 04/26/2006 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1 04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1 11/09/2007 COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS 2 04/17/2008 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1 04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1 06/15/2010 RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION 1 02/04/2005 Title: EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007 Title: EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/18/2002 Title: EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/18/2002 Title: CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0 11/18/2002 Title: CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/18/2002 Title: CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page 1 of 16 Report Date: 08/09/10 SSES MANUAL Manual Name: TRM1 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6..4 0 11/18/2002 Title: CONTAINMENTPRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 Title: PLANT TEXT 3.7.2 Title: PLANT TEXT 3.7.3.1 Title: PLANT TEXT 3.7.3.2 Title:,PLANT TEXT 3.7.3.3 Title: PLANT TEXT 3.7.3.4 Title: PLANT TEXT 3.7.3.5 Title: PLANT TEXT 3.7.3.6 Title: PLANT TEXT 3.7.3.7 Title: PLANT TEXT 3.7.3.8 Title: PLANT TEXT 3.7.4 Title: PLANT 0 11/18/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN 0 11/18/2002 SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL 2 04/16/2009 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 3 04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 3 04/16/2009 SYSTEMS C02 SYSTEMS 2 -. 04/16/2009 SYSTEMS HALON SYSTEMS 2 04/16/2009 SYSTEMS FIRE HOSESTATIONS 2 04/16/2009 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1 04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES 7 01/20/2010 SYSTEMS FIRE DETECTION INSTRUMENTATION LDCN 1 04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM 3503 Page 4 of. J4 Report Date: 08/09/10 PageA of-.4 Report Date: 08/09/10 SSES MANUAL O Manual Name: TRMI Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.1 0 m11/18/2002 Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/18/2002 Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006 Title: PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 2 06/27/2008 Title: PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008 Title: PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT -LOGARITHMIC RADIATION MONITORING TEXT 3.7.8 4 06/21/2007 Title: PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006 Title: PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004 Titles PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)TEXT 3.7.11 0 04/16/2009 Title: STRUCTURAL INTEGRITY TEXT 3.8.1 2 04*/05/2010 Titles ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8,2.1 2 11/09/2007 Title: ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION

-CONTINUOUS TEXT 3.8.2.2 2 12/14/2004 Title: ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION

-AUTOMATIC Pagea of 16 Report Date: 08/09/10 SSES MANUAL Manual Name: TRM1 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3 Title: ELECTRICAL TEXT 3.8.4 Title: ELECTRICAL TEXT 3.8.5 Title: ELECTRICAL TEXT 3.8.6 Title: ELECTRICAL TEXT 3.8.7 1 04/05/2010 POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES 0 11/18./2002 POWER 24 VDC ELECTRICAL POWER SUBSYSTEM 0 11/18/2002 POWER DEGRADED VOLTAGE PROTECTION 0 11/18/2002 POWER EMERGENCY SWITCHGEAR ROOM COOLING 1 06/15/2009 Title: BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/18/2002 Title: REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/18/2002 Title: REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/18/2002 Title: REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006 Title: MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 2 08/08/2006 Title: MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010 Title: MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)TEXT 3.10.4 2 04/17/2008 Title: MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)ge ~ of 16 Report Date: 08/09/10'Page6 of Report Date: 08/09/10 SSES MANUAL Manual Name: TRMI Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.1 Title: RADIOACTIVE TEXT 3.11.1.2 Title: RADIOACTIVE TEXT 3.11.1.3 Title: RADIOACTIVE TEXT 3.11.1.4 Title: RADIOACTIVE TEXT 3.11.1.5 Title: RADIOACTIVE TEXT 3.11.2.1 Title: RADIOACTIVE TEXT 3.11.2.2 Title: RADIOACTIVE TEXT 3.11.2.3 Title: RADIOACTIVE FORM TEXT 3.11.2.4 Title: RADIOACTIVE TEXT 3.11.2.5 Title: RADIOACTIVE TEXT 3.11.2.6 Title: RADIOACTIVE TEXT 3.11.3 Title: RADIOACTIVE 1 :04/26/2006 LIQUID EFFLUENTS EFFLUENTS CONCENTRATION EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1 04/26/2006 LIQUID EFFLUENTS DOSE 1 04/26/2006 LIQUID WASTE TREATMENT SYSTEM 1 12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2 05/02/2007 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3 04/26/2006 DOSE RATE 1 04/26/2006 DOSE -NOBLE GASES 1 04/26/2006 DOSE -IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE 0 11/18/2002 GASEOUS RADWASTE TREATMENT SYSTEM 3 11/14/2006 VENTILATION EXHAUST TREATMENT SYSTEM 4 09/16/2009 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 1 04/26/2006 TOTAL DOSE Page 2 of 16~ Report Date: 08/09/10 Page 7 ' of 16'Report Date: 08/09/10 SSES MANUAL Manual Name: TRMI Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.4.1 4 08/08/2006 Title: RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2 2 04/26/2006 Title: RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006 Title: RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002 Title: LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 Title: LOADS CONTROL PROGRAM 4 04/17/2008 HEAVY LOADS REQUIREMENTS 0 11/19/2002 LIGHT LOADS REQUIREMENT TEXT 3.12.3 Title: L()ADS CONTROL PROGRAM TEXT 4.1 Title: ADMINISTRATIVE TEXT 4.2 Title: ADMINISTRATIVE 0 08/31/1998 CONTROLS ORGANIZATION 0 08/31/1998 CONTROLS REPORTABLE EVENT ACTION 0 08/31/1998 CONTROLS SAFETY LIMIT VIOLATION 1 12/18/2008 CONTROLS PROCEDURES

& PROGRAMS TEXT 4.3 Title: TEXT 4.4 Title: TEXT 4.5 Title: TEXT 4.6 Title: ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0 CONTROLS 0 CONTROLS 08/31/1998 REPORTING REQUIREMENTS 08/31/1998 RADIATION PROTECTION PROGRAM Pages of 16 Report Date: 08/09/10 Page 8 of 16 Report Date: 08/09/10 SSES MANUALJ Manual Name: TRMI Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.7 0 .08/31/1998 Title: ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 4 05/23/2008 Title: APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)*APPLICABILITY TEXT B3.1.1 1 11/09/2007 Title: REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)

INSTRUMENTATION TEXT B3.1.2 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 63/31/2006 Title: REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002 Title: REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002 Title: CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)TEXT B3.3.1 Title: INSTRUMENTATION TEXT B3.3.2 Title: INSTRUMENTATION TEXT B3.3.3 Title: INSTRUMENTATION TEXT B3.3.4 Title: INSTRUMENTATION TEXT B3.3.5 Title: INSTRUMENTATION 0 11/19/2002 BASES RADIATION MONITORING INSTRUMENTATION 1 11/09/2007 BASES SEISMIC MONITORING INSTRUMENTATION 3 12/18/2008 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 4 07/09/2010 BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION 2 11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK Pages of 2~. Report Date: 08/09/10 page 9 o f !&-Report Date: 08/09/10 SSES MANUAL Manual Name: TRMI Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.6 Title: INSTRUMENTATION BASES 3 .10/19/2005 TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 1 11/09/2007 Title: INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003 Title: INSTRUMENTATION BASES TRM REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT B3.3.9 Title: OPRM INSTRUMENTATION TEXT B3.3.10 Title: INSTRUMENTATION BASES 3 04/17/2008 3 08/09/2010 REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1 10/22/2003 Title: INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 04/16/2009 Title: WATER MONITORING INSTRUMENTATION TEXT B3.4.1 Title: REACTOR TEXT B3.4.2 Title: REACTOR TEXT B3.4.3 Title: REACTOR TEXT B3.4.4 Title: REACTOR* TEXT B3.4.5*Title: REACTOR 0 11/19/2002 COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 1 04/16/2009 COOLANT SYSTEM BASES STRUCTURAL INTEGRITY 1 11/09/2007 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR 0 11/19/2002 COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0 11/19/2002 COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS PageiQ of 16~ Report Date: 08/09/10 Page 10 Of 19".--Report Date: 08/09/10 SSES MANUA-L Manual Name: TRM1 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.4.6 1 06/15/2010 Title: REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3.5.1 0 11/19/2002 Title: ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007 Title: ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007 Title: ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002 Title: CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002 Title: CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER' POSITION INDICATION TEXT B3.6.3 2 04/17/2008 Title: CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION LDCN 3933 TEXT B3.6.4 1 12/14/2004 Title: CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 Title: PLANT TEXT B3.7.2 Title: PLANT TEXT B3.7.3.1 Title: PLANT TEXT B3.7.3.2 Title: PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0 11/19/2002 EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN) 0 11/19/2002 ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL 3 06/15/2010 FIRE SUPPRESSION WATER SUPPLY SYSTEM 2 04/26/2006 SPRAY AND SPRINKLER SYSTEMS Pageil of 16 Report Date: 08/09/10 Page 11 : of 16 Report Date: 08/09/10 SSES MANTTAIL Manual Name: TRM1 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.3 Title: PLANT TEXT B3.7.3.4 Title: PLANT TEXT B3.7.3.5 Title: PLANT TEXT B3.7.3.6 Title: PLANT TEXT B3.7.3.7 Title: PLANT TEXT B3.7.3.8 Title: PLANT TEXT B3.7.4 Title: PLANT TEXT B3.7.5.1 Title: PLANT TEXT B3.7.5.2 Title: PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0 .11/19/2002 C02 SYSTEMS 1 04/26/2006 HALON SYSTEMS 1 04/26/2006 FIRE HOSE STATIONS 1 04/26/2006 YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0 11/19/2002 FIRE RATED ASSEMBLIES 1 01/12/2004 FIRE DETECTION INSTRUMENTATION 0 11/19/2002 SOLID RADWASTE SYSTEM 0 11/i9/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0 11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 Title: PLANT TEXT B3.7.6 Title: PLANT SYSTEMS BASES SYSTEMS BASES 0 -11/19/2002 LIQUID HOLDUP TANKS 2 06/27/2008 ESSW PUMPHOUSE VENTILATION 2 01/31/2008 MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION TEXT B3.7.7 Title: PLANT SYSTEMS BASES MONITORING INSTRUMENTATION Page 12 of 16ReotDe:0/91 Report Date: 08/09/10 SSES MANUJAL Manual Name: TRMI Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8 Title: PLANT TEXT B3.7.9 Title: PLANT TEXT B3.7.10 Title: PLANT 3 SNUBBERS 06/21/2 007 SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 1 12/14/2004 CONTROL STRUCTURE HVAC 1 12/14/2004 SPENT FUEL STORAGE POOLS TEXT B3.7.11 Title: STRUCTURAL INTEGRITY 1 04/14/2010 TEXT B3.8.1 Title: ELECTRICAL PROTECTIVE TEXT B3.8.2.1 Title: ELECTRICAL CONTINUOUS TEXT B3.8.2.2 Title: ELECTRICAL AUTOMATIC TEXT B3.8.3 Title: ELECTRICAL TEXT B3.8.4 Title: ELECTRICAL TEXT B3.8.5 Title: ELECTRICAL TEXT B3.8.6 Title: ELECTRICAL TEXT B3.8.7 2 03/10/2010 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0 11/i19/2002 POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD 1 09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD 0 z11/19/2002 POWER BASES DIESEL GENERATOR.(DG)

MAINTENANCE ACTIVITIES.

0 11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 0 11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION 1 02/04/2005 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 1 06/15/2009 PROTECTION

-PROTECTION

-Title: BATTERY MAINTENANCE AND MONITORING PROGRAM Page 13 of 16 Report Date: 08/09/10 Page 13 of 16 Report Date: 08/09/10 SSES MANUAL Manual Name: TRMI Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.9.1 0 11/19/2002 Title: REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0 11/19/2002 Title: REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002 Title: REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002 Title: MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 03/31/2006 Title: MISCELLANEOUS BASESSHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002 Title: MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)TEXT B3.10.4 1 04/17/2008 Title: MISCELLANEOUS BASES LEADING EDGE FLOW-METER (LEFM)TEXT B3.11.1.1 Title: RADIOACTIVE TEXT B3.11.1.2 Title: RADIOACTIVE TEXT B3.11.1.3 Title: RADIOACTIVE TEXT B3.11.1.4 Title: RADIOACTIVE TEXT B3.11.1.5 Title: RADIOACTIVE 0 11/19/2002 BASES. LIQUID EFFLUENTS CONCENTRATION EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 0 BASES.11/19/2002 LIQUID EFFLUENTS DOSE 0 1i/19/2002 BASES LIQUID WASTE TREATMENT SYSTEM 0 11/19/2002 BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 0 BASES 11/19/2002 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Page .14 of 16 Report Date: 08/09/10 Page 14 of 16 Report Date: 08/09/10 SSES MANUJAL Manual Name: TRM1 Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.1 Title: RADIOACTIVE EFFLUENTS TEXT B3.11.2.2 Title: RADIOACTIVE EFFLUENTS TEXT B3.11.2.3 Title: RADIOACTIVE EFFLUENTS PARTICULATES FORM TEXT B3.11.2.4 Title: RADIOACTIVE EFFLUENTS TEXT B3.11.2.5 Title: RADIOACTIVE EFFLUENTS TEXT B3.11.2.6 Title: RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.3 Title: RADIOACTIVE EFFLUENTS 1 J' 12/14/2004 BASES DOSE RATE 0 -.11/19/2002 BASES DOSE -NOBLE GASES 0 11/19/2002 BASES DOSE -IODINE, TRITIUM, AND RADIONUCLIDES IN 0 11/19/2002 BASES GASEOUS RADWASTE TREATMENT SYSTEM 4 11/14/2006 BASES VENTILATION EXHAUST 1 01/27/2004 BASES RADIOACTIVE GASEOUS TREATMENT SYSTEM EFFLUENT MONITORING 0 11/19/2002 BASES TOTAL DOSE TEXT B3.11.4.1 3 ' 07/09/2010 Title: RADIOACTIVE EFFLUENTS BASES-MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS

'BASES LAND-USE CENSUS TEXT B3.11.4.3 0 11/19/2002 Title: RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 Title: LOADS CONTROL PROGRAM BASES TEXT B3.12.2 0 Title: LOADS CONTROL PROGRAM BASES 10/04/2007 CRANE TRAVEL-SPENT FUEL STORAGE POOL 11/19/2002 HEAVY LOADS REQUIREMENTS Page .15. of ~ Report Date: 08/09/10 Page 15 of 16 Report Date: 08/09/10 SSES MAANUJAL Manual Name: TRMI Manual Title: TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3 0 11/19/2002 Title: LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 2i of 16 Report Date: 08/0~/10 Page 16 of 16 Report Date: 08/0'9/10 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date TOC TABLE OF CONTENTS 1.0 USE AND APPLICATION Pages TRM / 1.0-1 through TRM / 1.0-3 2.0 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM / 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Page TRM / 2.0-8 Page TRM / 2.0-9 Page TRM /2.0-10 Page TRM /2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM / 2.0-14 Page TRM /2.0-15 3.0 APPLICABILITY Page TRM / 3.0-1 Page TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 04/14/2010 10/04/2002 08/31/1998 01/28/2005 06/25/2002 04/02/1999 03/27/2008 05/15/2008 03/27/2008 11/15/2004 02/02/2010 11/15/2004 03/27/2008 11/15/2004 11/15/2005 04/14/2008 04/12/2007 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/22/2006 04/07/2009 03/27/2008 02/18/1999 02/18/1999 07/07/1999 03/11/2010 07/16/1999 10/31/2007 08/31/1998 10/31/2007 08/31/1998 06/30/2010 3.1 3.2 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 Pages TRM / 3.1-2 through TRM / 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-54 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Page TRM / 3.3-4 and TRM / 3.3-5 Page TRM / 3.3-6 Page TRM / 3.3-7 Page 3.3-8 Pages TRM / 3.3-9 and TRM / 3.3-9a 3.3 SUSQUEHANNA

-UNIT 1 TRM / LOES-1 EFFECTIVE DATE 08/03/2010 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date 3.4 Page TRM / 3.3-10 Pages TRM / 3.3-11 and TRM / 3.3-11a Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Page TRM / 3.3-15 Page TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 through TRM / 3.3-21 Page TRM / 3.3-22 Page TRM / 3.3-22a Pages TRM / 3.3-22b through TRM / 3.3-22d Page TRM / 3.3-23 Pages TRM / 3.3-24 and TRM / 3.3-25 Page TRM / 3.3-26 Pages TRM / 3.3-27 and TRM / 3.3-28 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM / 3.4-6 through TRM / 3.4-8 Page TRM / 3.4-9 Page TRM / 3.4-10 Page TRM / 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 Pages TRM / 3.4-14 and TRM / 3.4-15 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Pages TRM / 3.5-4 and TRM / 3.5-5 Pages 3.5-6 and 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-3 Page TRM / 3.6-4 Page 3.6-5 Pages TRM / 3.6-6 through TRM / 3.6-8 10/31/2007 06/30/2010 03/30/2001 09/13/2005 12/14/1998 10/22/2003 06/27/2001 06/14/2002 10/31/2007 10/22/2003 03/27/2008 11/15/2004 03/22/2006 12/03/2004 05/16/2003 10/22/2003 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 03/27/2008 03/31/2006 06/10/2010 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.5 3.6 SUSQUEHANNA

-UNIT 1 TRM / LOES-2 EFFECTIVE DATE 08/03/2010 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 Page TRM / 3.7-4 Pages TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7.13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Pages TRM / 3.7-25 and TRM 3.7-26 Page TRM 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Pages TRM / 3.7-31 and TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Page TRM / 3.7-34a Page TRM / 3.7-35 Pages TRM / 3.7-36 and TRM / 3.7-37 Pages 3.7-38 and 3.7-39 Page TRM / 3.7-40 Page TRM / 3.7-41 Page TRM / 3.7-41a Page TRM / 3.7-42 Page TRM / 3.7-43 Pages TRM / 3.7-44 through TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Pages TRM / 3.7-55 through TRM / 3.7-57 08/31/1998 03/31/2006 04/07/2009 08/02/1999 04/07/2009 12/29/1999 08/02/1999 04/07/2009 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 10/31/2007 11/29/2006 08/09/2005 01/13/2010 11/16/2001 01/09/2004 11/16/2001 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 06/20/2008 09/04/2008 08/31/1998 10/05/2006 06/07/2007 10/05/2006 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 SUSQUEHANNA

-UNIT 1 TRM / LOES-3 EFFECTIVE DATE 08/03/2010 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date 3.8 3.9 ELECTRICAL POWER Page TRM / 3.8-1 Page TRM / 3.8-2 Pages TRM / 3.8-3 and TRM /3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Page TRM / 3.8-7 Pages TRM / 3.8-8 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Page TRM / 3.8-13 Page TRM / 3.8-14 Pages TRM / 3.8-15 through TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Page TRM / 3.8-26 Page TRM / 3.8-27 Pages TRM / 3.8-28 and TRM / 3.8-29 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 and 3.10-3 Pages 3.10-2 and 3.10-3 Page TRM / 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 and 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM /3.11-6 Pages TRM / 3.11-7 through TRM / 3.11-9 Page TRM /3.11-10 Pages 3.11-11 and 3.11-12 Page TRM /3.11-13 04/02/2002 01/28/2005 03/25/2010 04/02/2002 10/31/2007 12/03/2004 09/03/2004 12/03/2004 03/25/2010 08/31/1998 04/02/2002 08/31/1998 04/02/2002 08/31/1998 06/06/1999 08/31/1998 05/28/2009 11/29/2006 05/28/2009 08/31/1998 03/31/2006 08/31/1998 08/31/1998 08/01/2006 03/22/2006 06/10/2010 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 3.10 3.11 SUSQUEHANNA-UNITI TRM/LOES-4 EFFECTIVE DATE 08/03/2010 SUSQUEHANNA

-UNIT 1 TRM / LOES-4 EFFECTIVE DATE 08/03/2010 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM /3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 and TRM / 3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM / 3.11.30 through TRM / 3.11.32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM /3.11-39 Pages 3.11-40 through 3.11-43 Page TRM / 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4 Pages TRM / 4.0-5 through TRM / 4.0-8 12/03/2004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 08/01/2006 03/31/2006 08/31/1998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 3.12 4.0 SUSQUEHANNA

-UNIT 1 TRM I LOES-5 EFFECTIVE DATE 08/03/2010 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date B 3.0 B 3.1 B 3.2 B 3.3 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Page TRM / B 3.0-5 Page TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Page TRM / B 3.1-5 Pages TRM / B 3.1-6 and TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Pages TRM / B 3.3-2 and TRM / B 3.3-2a Page TRM / B 3.3-3 Page TRM / B 3.3-3a Page TRM / B 3.3-4 Page TRM / B 3.3-5 Page TRM / B 3.3-6 Page TRM / B 3.3-7 Page TRM / B. 3.3-8 Page TRM / B 3.3-9 Page B 3.3-10 Pages TRM / B 3.3-11 and TRM I B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 and TRM / B 3.3-16 Page TRM / B 3.3-17 Pages TRM / B 3.3-17a through TRM / B 3.3-17c Page TRM / B 3.3-17d 08/31/1998 01/10/2007 04/14/2008 08/31/1998 04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 11/15/2005 03/22/2006 02/18/1999 08/31/1998 04/07/2000 10/31/2007 12/11/2008 10/31/2007 06/30/2010 05/30/2006 06/30/2010 10/30/2007 06/30/2010 10/31/2007 08/31/1998 09/13/2005 12/03/2004 06/25/2002 10/31/2007 10/31/2007 10/22/2003 03/22/2006 03/22/2006 03/27/2008 SUSQUEHANNA

-UNIT 1 TRM / LOES-6 EFFECTIVE DATE 08/03/2010 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date B 3.4 B 3.5 B 3.6 Pages TRM / B 3.3-17e and TRM / B 3.3-17f Pages TRM / B 3.3-18 and TRM / B 3.3-19 Page TRM / B 3.3-20 Page TRM / B 3.3-21 Pages TRM / B 3.3-22 and TRM / B 3.3-23 REACTOR COOLANT SYSTEM BASES Page B 3.4-1 Pages TRM / B 3.4-2 and TRM / B 3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 Pages TRM / B 3.4-7 and TRM / B 3.4-8 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 through TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM B B 3.6-5 Page TRM / B 3.6-6 Pages B.3.6-7 through TRM I B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Page TRM / B 3.7-3 Page TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Page TRM / B 3.7-6 Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Page TRM / B 3.7-10a Page TRM / B 3.7-11 Page TRM / B 3.7-11a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Page TRM / B 3.7-14a 03/22/2006 08/03/2010 10/22/2003 05/16/2003 04/07/2009 08/31/1998 04/01/2009 10/31/2007 10/15/1999 08/31/1998 06/10/2010 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/27/2008 04/04/2007 12/03/2004 12/31/2002 08/31/1998 06/10/2010 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 B 3.7 SUSQUEHANNA

-UNIT 1 TRM / LOES-7 EFFECTIVE DATE 08/03/2010 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date Page TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM B B 3.7-21 Page TRM / B 3.7-21a Page TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-28 Pages TRM / B 3.7-29 and TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 Pages TRM / B 3.7-36 through TRM / B 3.7-39 Page TRM / B 3.7-40 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2 Page TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 through TRM / B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 B 3.8 B.3.9 01/09/2004 02/01/1999 08/31/1998 02/14/2005 06/20/2008 01/30/2008 10/05/2006 06/07/2007 10/05/2006 12/03/2004 03/09/2001 04/15/2003 12/03/2004 07/05/2000 04/01/2009 04/08/2010 04/02/2002 01/28/2005 03/01/2010 04/02/2002 04/02/2002 08/10/2004 04/02/2002 08/31/1998 04/02/2002 01/28/2005 11/29/2006 05/28/2009 08/31/1998 08/31/1998 03/22/2006 08/23/1999 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 SUSQUEHANNA

-UNIT 1 TRM / LOES-8 EFFECTIVE DATE 08/03/2010 SUSQUEHANNA

-UNIT 1 TRM / LOES-8 EFFECTIVE DATE 08/03/2010 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 62 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11 a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM /B 3.11-20a Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11.23 Page TRM / B 3.11.23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 and B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages B 3.11-31 and B 3.11-32 Page TRM / B 3.11-33 Pages TRM / B 3.11-34 and TRM / B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Pages TRM / B 3.12-2 and TRM / B 3.12-3 08/30/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/30/1998 04/02/2002 04/02/2002 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/30/1998 11/30/2005 06/30/2010 08/30/1998 06/30/2010 08/30/1998 02/12/1999 09/19/2007 02/05/1999 TRM1 text LOES 8/03/2010 SUSQUEHANNA

-UNIT I TRM / LOES-9 EFFECTIVE DATE 08/03/2010 SUSQUEHANNA

-UNIT 1 TRM / LOES-9 EFFECTIVE DATE 08/03/2010 Reactor Recirculation Pump MG Set Stops PPL Rev. 3 B 3.3.10 B 3.3.10 Reactor Recirculation Pump MG Set Stops BASES TRO In the case of recirculation control system failures (e.g., transistors, resistors, etc.) causing upscale signal failure, the reactor is protected by high pressure or high flux scram. Such faults have been analyzed in Chapter 15 and include both MG sets going to full speed simultaneously.

For this analysis, the Integrated Control System (ICS) Recirculation MG Set Speed Control logic is assumed to fail such that it causes a speed increase for both recirculation pumps.Pump overspeed occurs during the course of a LOCA due to blowdown through the broken loop pump. Design studies determined that rotating component failure missiles caused by the overspeed was not sufficient to cause damage to the containment or to vital equipment, consequently no protective or preventative provision is made for this pump overspeed condition.

Normally, operator implementation or procedural controls maintains the recirculation system within the system design limits and initial conditions of analyzed events. The reactor recirculation pump MG set stops are set with some operating margin above these limits. As such, the stops serve as backups to the operator control over normal operation.

Additionally, in the event of a fault that results in inadvertent MG set speed increases above the normal operating limits, the stops can provide protection from the automatic reactor scram that terminate the analyzed worse case events. Therefore, the MG set stops also serve to provide additional plant reliability protection.

The electrical stop is the primary means for backing up procedural controls and for automatically limiting recirculation flow. The electrical stop is implemented as a high output limiter in the Integrated Control System (ICS)Recirculation MG Set Speed Control logic. This adjustable limiter function is applied to the analog speed demand signal (e.g. Scoop Tube position"command").

The mechanical stop provides a diverse and redundant backup to the electrical stop limiting mechanism.

The mechanical stop is implemented via a physical bolt on the Scoop Tube actuator.ACTIONS The Actions are modified by a Note allowing separate Condition entry for each recirculation pump. The Required Actions provide appropriate compensatory measures for each recirculation loop independent of the other loop.(continued)

SUSQUEHANNA

-UNIT 1 TRM / B 3.3-18 EFFECTIVE DATE 08/03/2010 Reactor Recirculation Pump MG Set Stops PPL Rev. 3 B 3.3.10 B 3.3.10 Reactor Recirculation Pump MG Set Stops BASES ACTIONS A. 1 (continued)

Either the electrical or the mechanical stop can provide backup protection to the procedural controls in place to maintain recirculation pump operation within the system design limits and initial conditions of analyzed events. In the event one of these backup features is inoperable, it is reasonable to extend the restoration time (in the event conditions do not permit more timely corrective action) until the next scheduled required calibration.

With the backup protection of the electrical or mechanical stop remaining OPERABLE, backup protection remains and allows time to schedule and plan appropriate repairs. Since Chapter 15 analyses assume that the MG sets reach full speed, this Completion Time is considered appropriate.

B.1 With both the electrical and mechanical stops inoperable for any recirculation pump MG set, the automatic backup protection is not available.

In this case, the scoop tube is locked in place to protect against unintended

/ inadvertent speed increases.

This action conservatively compensates for lack of backup protection and allows continued operation until at least one MG set stop function (electrical or mechanical) is restored to operable status. The Required Action is modified by a Note allowing intermittent unlocking of the scoop tube. This may be required for power reductions or other power level adjustments.

The administrative control consists of stationing a dedicated operator at the controls while the scoop tube is unlocked and the duration should be limited to the time necessary to complete the change in core flow.TRS The TRS assures that the stops are demonstrated OPERABLE at least once per cycle. Normal scoop tube positioner calibration is performed after each refueling outage. Inoperable stops are detectable on line during scoop tube positioner calibration.

REFERENCES

1. FSAR Section 5.4.1.4.2. FSAR Section 7.7.2.3.1.
3. FSAR Section 15.4.5.SUSQUEHANNA

-UNIT 1 TRM / B 3.3-19 EFFECTIVE DATE 08/03/2010