| {{#Wiki_filter:U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001 St. Lucie Unit 2 Docket No. 50-389 . J U N 2 8 201 7 Completion of License Renewal Activities before Period of Extended Operation Phase 2 Inspection Readiness Reference L-2017-115 10 CFR 54 1. NRC Letter from Raj K. Anand to J.A. Stall dated October 2, 2003 Issuance of Renewed Facility Operating License Nos. DPR-67 and NPF-16 for St. Lucie Plant Unit Nos. 1 and 2. 2. FPL Letter from D.E. Jernigan to U.S. Nuclear Regulatory Commission dated March 28, 2003 (L-2003-070) St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 License Renewal Safety Evaluation Report Open Item and Confirmatory Item Responses and Revised License Renewal Application Appendix A. 3. FPL Letter from William Jefferson, Jr. to U.S. Nuclear Regulatoty Commission dated December 2, 2003 (L-2003-289) | | {{#Wiki_filter:U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001 St. Lucie Unit 2 Docket No. 50-389 . J U N 2 8 201 7 Completion of License Renewal Activities before Period of Extended Operation Phase 2 Inspection Readiness Reference L-2017-115 10 CFR 54 1. NRC Letter from Raj K. Anand to J.A. Stall dated October 2, 2003 Issuance of Renewed Facility Operating License Nos. DPR-67 and NPF-16 for St. Lucie Plant Unit Nos. 1 and 2. 2. FPL Letter from D.E. Jernigan to U.S. Nuclear Regulatory Commission dated March 28, 2003 (L-2003-070) St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 License Renewal Safety Evaluation Report Open Item and Confirmatory Item Responses and Revised License Renewal Application Appendix A. 3. FPL Letter from William Jefferson, Jr. to U.S. Nuclear Regulatoty Commission dated December 2, 2003 (L-2003-289) |
| St. Lucie Unit 2 Docket No. 50-389 Updated Final Safety Analysis Report Amendment | | St. Lucie Unit 2 Docket No. 50-389 Updated Final Safety Analysis Report Amendment |
| : 15. 4. Safety Evaluation Report Related to the License Renewal of St. Lucie Nuclear Plant, Units 1 and 2, NUREG-1779, September 2003. 5. FPL Letter from Christopher Costanzo to U.S. Nuclear Regulatoty Commission (L-2015-229) dated September 28, 2015 "St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389, Reactor Vessel Internals Aging Management Plan." The purpose of this letter is to inform the NRC of the status of an obligation in License Condition 3.C for St. Lucie Unit 2 from Reference 1 and to provide notification of the plant's readiness for the License Renewal Implementation Phase 2 Inspection. | | : 15. 4. Safety Evaluation Report Related to the License Renewal of St. Lucie Nuclear Plant, Units 1 and 2, NUREG-1779, September 2003. 5. FPL Letter from Christopher Costanzo to U.S. Nuclear Regulatoty Commission (L-2015-229) dated September 28, 2015 "St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389, Reactor Vessel Internals Aging Management Plan." The purpose of this letter is to inform the NRC of the status of an obligation in License Condition 3.C for St. Lucie Unit 2 from Reference 1 and to provide notification of the plant's readiness for the License Renewal Implementation Phase 2 Inspection. |
| Reference 1 contains the following obligation in the first paragraph of License Condition 3.C for St. Lucie Unit 2 as stated below: "Updated Final Safety Analysis Report FPL's Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d), as revised on March 28, 2003, describes certain future activities to be completed before the period of extended operation. FPL shall complete these activities no later than April 6, 2023, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection. The Updated Final Safety Analysis Report supplement as revised on March 28, 2003, described above, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71 (e)(4), following issuance of tlus renewed license. Until that update is complete, FPL may make changes to the programs described in such supplement witl1out prior Commission approval, provided tl1at FPL evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and othetwise complies with tl1e reqtlirements in tl1at section." Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957 L-2017-115 10 CFR 54 Page 2 of 2 Reference 2 | | Reference 1 contains the following obligation in the first paragraph of License Condition 3.C for St. Lucie Unit 2 as stated below: "Updated Final Safety Analysis Report FPL's Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d), as revised on March 28, 2003, describes certain future activities to be completed before the period of extended operation. FPL shall complete these activities no later than April 6, 2023, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection. The Updated Final Safety Analysis Report supplement as revised on March 28, 2003, described above, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71 (e)(4), following issuance of tlus renewed license. Until that update is complete, FPL may make changes to the programs described in such supplement witl1out prior Commission approval, provided tl1at FPL evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and othetwise complies with tl1e reqtlirements in tl1at section." Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957 L-2017-115 10 CFR 54 Page 2 of 2 Reference 2 |
|
---|
Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-042, Periodic Update of Population Data within 10 and 50 Miles of the Plant2023-03-27027 March 2023 Periodic Update of Population Data within 10 and 50 Miles of the Plant L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-039, Cycle 27 Core Operating Limits Report2023-03-0707 March 2023 Cycle 27 Core Operating Limits Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2023-038, 2022 Annual Operating Report2023-02-28028 February 2023 2022 Annual Operating Report L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan L-2023-019, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20222023-02-15015 February 2023 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2022 L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-08
[Table view] |
Text
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001 St. Lucie Unit 2 Docket No. 50-389 . J U N 2 8 201 7 Completion of License Renewal Activities before Period of Extended Operation Phase 2 Inspection Readiness Reference L-2017-115 10 CFR 54 1. NRC Letter from Raj K. Anand to J.A. Stall dated October 2, 2003 Issuance of Renewed Facility Operating License Nos. DPR-67 and NPF-16 for St. Lucie Plant Unit Nos. 1 and 2. 2. FPL Letter from D.E. Jernigan to U.S. Nuclear Regulatory Commission dated March 28, 2003 (L-2003-070) St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 License Renewal Safety Evaluation Report Open Item and Confirmatory Item Responses and Revised License Renewal Application Appendix A. 3. FPL Letter from William Jefferson, Jr. to U.S. Nuclear Regulatoty Commission dated December 2, 2003 (L-2003-289)
St. Lucie Unit 2 Docket No. 50-389 Updated Final Safety Analysis Report Amendment
- 15. 4. Safety Evaluation Report Related to the License Renewal of St. Lucie Nuclear Plant, Units 1 and 2, NUREG-1779, September 2003. 5. FPL Letter from Christopher Costanzo to U.S. Nuclear Regulatoty Commission (L-2015-229) dated September 28, 2015 "St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389, Reactor Vessel Internals Aging Management Plan." The purpose of this letter is to inform the NRC of the status of an obligation in License Condition 3.C for St. Lucie Unit 2 from Reference 1 and to provide notification of the plant's readiness for the License Renewal Implementation Phase 2 Inspection.
Reference 1 contains the following obligation in the first paragraph of License Condition 3.C for St. Lucie Unit 2 as stated below: "Updated Final Safety Analysis Report FPL's Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d), as revised on March 28, 2003, describes certain future activities to be completed before the period of extended operation. FPL shall complete these activities no later than April 6, 2023, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection. The Updated Final Safety Analysis Report supplement as revised on March 28, 2003, described above, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71 (e)(4), following issuance of tlus renewed license. Until that update is complete, FPL may make changes to the programs described in such supplement witl1out prior Commission approval, provided tl1at FPL evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and othetwise complies with tl1e reqtlirements in tl1at section." Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957 L-2017-115 10 CFR 54 Page 2 of 2 Reference 2
, Attachment 3, Appendix A2 contains the St. Lucie Unit 2 UFSAR Supplement to the License Renewal Application required by 10 CFR 54.21(d) discussed in License Condition 3.C above. Appendix A2 contains (N ew) UFSAR Chapter 18 "Aging Management Programs and Time-Limited Aging Analyses Activities," which includes the future activities to be completed no later than April 6, 2023
. This new Chapter 18 was initially incorporated into the UFSAR via the update submittal made in Reference 3. The described activities in the current revision of St. Lucie Unit 2 UFSAR Chapter 18 have been completed
, with the exception of the inspection of Reactor Vessel Internals (RVI), which in accordance with commitment item 4, in Table 2 of Appendix D of Reference 4
, will be performed during the PEO.
Reference 5 discussed and reaffirmed FPL's adoption of MRP
-227-A which requires the implementation of periodic RVI inspections for both St. Lucie Unit 1 and 2, and supersedes the prior commitment for a on e-time inspection. As also discussed in Reference 5, the first inspection of St. Lucie Unit 2 RVI is currently scheduled f r o m within three years after PEO. Should you have any questions, please contact Mr. Michael J. Snyder , Licensing Manager, at 772-467-7 036. Very truly yours, Daniel DeBoer Site Director St. Lucie Plant DD/lrb Cc: USNRC Regional Administrator, Region II USNRC Senior Resident Inspector, St. Lucie Units 1 and 2