ML18016A740: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML18016A740
| number = ML18016A740
| title = Forwards Rev 1 to Shnpp Cycle 9 Colr.Rev 1 Revises Movable Incore Detection Sys Operability Requirements to Specify That at Least 44 Detector Thimbles Are Required at Beginning of Fuel Cycle
| title = Forwards Rev 1 to Shnpp Cycle 9 Colr.Rev 1 Revises Movable Incore Detection Sys Operability Requirements to Specify That at Least 44 Detector Thimbles Are Required at Beginning of Fuel Cycle
| release date = 08/31/2018
| package contents = {{Adams package content
| package contents = {{Adams package content
| number = ML18016A741
| number = ML18016A741

Revision as of 02:01, 30 September 2018

Forwards Rev 1 to Shnpp Cycle 9 Colr.Rev 1 Revises Movable Incore Detection Sys Operability Requirements to Specify That at Least 44 Detector Thimbles Are Required at Beginning of Fuel Cycle
Date released: 08/31/2018 Download: ML18016A740


Forwards Rev 1 to Shnpp Cycle 9 Colr.Rev 1 Revises Movable Incore Detection Sys Operability Requirements to Specify That at Least 44 Detector Thimbles Are Required at Beginning of Fuel Cycle
ML18016A741
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/25/1998
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18016A741 (13)
Forwards Rev 1 to Shnpp Cycle 9 Colr.Rev 1 Revises Movable Incore Detection Sys Operability Requirements to Specify That at Least 44 Detector Thimbles Are Required at Beginning of Fuel Cycle
ML18016A739
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/25/1998
From: SCAROLA J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18016A739 (3)