05000352/FIN-2018001-02: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 13: Line 13:
| Inspection procedure = IP 71153
| Inspection procedure = IP 71153
| Inspector = S Rutenkroger, M Fannon, H Anagnostopoulos, J Furia, J Krafty
| Inspector = S Rutenkroger, M Fannon, H Anagnostopoulos, J Furia, J Krafty
| CCA = P1d
| CCA =  
| INPO aspect = PI.3
| INPO aspect = PI.3
| description = A self-revealed Green NCV of LGS Unit 1 TS 6.8.1 and TS 3.8.1.1 was identified when Exelon failed to properly maintain an operating procedure to maintain a fail-safe design feature for the EDGs which led to the D12 EDG combustion air overheating and caused the EDG to be inoperable for greater than its TS allowed outage time.
| description = A self-revealed Green NCV of LGS Unit 1 TS 6.8.1 and TS 3.8.1.1 was identified when Exelon failed to properly maintain an operating procedure to maintain a fail-safe design feature for the EDGs which led to the D12 EDG combustion air overheating and caused the EDG to be inoperable for greater than its TS allowed outage time.
}}
}}

Latest revision as of 18:34, 10 September 2018

02
Site: Limerick Constellation icon.png
Report IR 05000352/2018001 Section 4OA3
Date counted Mar 31, 2018 (2018Q1)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: Self-revealing
Inspection Procedure: IP 71153
Inspectors (proximate) S Rutenkroger
M Fannon
H Anagnostopoulos
J Furia
J Krafty
Violation of: Technical Specification
INPO aspect PI.3
'