Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:April 25, 2011 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 April 25, 2011 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| PUBLIC MEETING WITH ARIZONA PUBLIC SERVICE COMPANY FACILITY: Palo Verde Nuclear Generating Station | | PUBLIC MEETING WITH ARIZONA PUBLIC SERVICE COMPANY FACILITY: Palo Verde Nuclear Generating Station DOCKET: 50-528, 50-529, 50-530 DATE AND TIME: May 11, 2011 6:00 pm to 7:30 pm LOCATION: Palo Verde Energy Education Center 600 North Airport Road Buckeye, AZ 85396 PURPOSE: This is the end-of-cycle public meeting between the NRC and Arizona Public Service Company to present and discuss performance results of the Palo Verde Nuclear Generating Station for the period of January 1 through December 31, 2010. |
| | CATEGORY 3: This is a category 3 meeting. The public is invited to fully participate in this meeting/open house. The meeting is specifically designed to ensure maximum interaction with the NRC Staff. |
| | The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. Braille, large print), please notify the NRCs meeting contact listed below. Determinations on request for reasonable accommodation will be made on a case-by-case basis. |
| | PARTICIPANTS: NRC T. Pruett, Deputy Director, Division of Reactor Projects (DRP) |
| | R. Lantz, Chief, Project Branch D, DRP L. Uselding, Public Affairs, Region IV T. Brown, Senior Resident Inspector J. Bashore, Resident Inspector M. Baquera, Resident Inspector |
|
| |
|
| DOCKET: 50-528 , 50-529, 50-530 DATE AND TIME:
| | LICENSEE R. Edington, Executive Vice President Nuclear, Chief Nuclear Officer B. Bement, Senior Vice President, Site Operations D. Mims, Senior Vice President, Regulatory and Oversight MEETING CONTACT: Don Allen, NRC, RIV 817/276-6574 don.allen@nrc.gov To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html. |
| May 11, 2011 6:00 pm to 7:30 pm LOCATION: Palo Verde Energy Education Center 600 North Airport Road Buckeye, AZ 85396 PURPOSE: This is the end
| | Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above. |
| -of-cycle public meeting between the NRC and Arizona Public Service Company to present and discuss performance results of the Palo Verde Nuclear Generating Station for the period of January 1 through December 31, 2010.
| | cc: Distribution via ListServ |
| | |
| CATEGORY 3:
| |
| This is a category 3 meeting. The public is invited to fully participate in this meeting/open house. The meeting is specifically designed to ensure maximum interaction with the NRC Staff.
| |
| | |
| The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. Braille, large print), please notify the NRC's meeting contact listed below. Determinations on request for reasonable accommodation will be made on a case
| |
| -by-case basis. PARTICIPANTS:
| |
| NRC T. Pruett , Deputy Director, Division of Reactor Projects (DRP)
| |
| R. Lantz, Chief, Project Branch D, DRP L. Uselding, Public Affairs, Region IV T. Brown, Senior Resident Inspector J. Bashore, Resident Inspector M. Baquera, Resident Inspector U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V 6 12 EAST LAMAR BLVD
| |
| , S U I T E 4 0 0 A R L I N G T O N , T E X A S 7 6 0 1 1-4125 LICENSEE R. Edington, Executive Vice President Nuclear, Chief Nuclear Officer B. Bement, Senior Vice President, Site Operations D. Mims, Senior Vice President, Regulatory and Oversight MEETING CONTACT:
| |
| Don Allen, NRC, RIV 817/276-6574 don.allen@nrc.gov To receive a summary of this meeting and begin receiving other plant | |
| -specific e | |
| -mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public | |
| -involve/listserver/plants | |
| -by-region.html. Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above. | |
| | |
| cc: Distribution via ListServ | |
|
| |
|
| Electronic Distribution: | | Electronic Distribution: |
| NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Art Howell, DRA Kriss Kennedy, D:DRP Troy Pruett, DD:DRP Anton Vegel, D:DRS Sue Bogle , OEWEB Resource Stephanie Bush | | NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Art Howell, DRA Kriss Kennedy, D:DRP Troy Pruett, DD:DRP Anton Vegel, D:DRS Sue Bogle, OEWEB Resource Stephanie Bush-Goddard,RIV/OEDO ETA OEMAIL, D/OE Amy Powell, OCA Thomas Combs, Congressional Affairs Officer Lauren Gibson, Project Manager, NRR Ryan Lantz, Branch Chief, PB/D Don Allen, Senior Project Engineer, PB/D Tony Brown, Senior Resident Inspector Zack Hollcraft, Project Engineer, PB/D Victor Dricks, Region IV PAO Lara Uselding, Region IV PAO Bill Maier, Region IV RSLO Karla Fuller, Region IV RC Nick Taylor, Region IV ACES Regina McFadden, Site Administrative Assistant Earnestine Clay, Administrative Officer Ann Mattila, Security Advisor Phil Longdo, Receptionist R:\_REACTORS\EOC 2010\PV EOC MN 05112011.docx SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials RL Publicly Avail Yes No Sensitive Yes No Sens. Type Initials RL RIV/SPE:DRP/D PAO RSLO C:DRP/D DAllen VLDricks WAMaier RLantz |
| -Goddard,RIV/OEDO ETA OEMAIL, D/OE Amy Powell, OCA Thomas Combs, Congressional Affairs Officer Lauren Gibson, Project Manager, NRR Ryan Lantz, Branch Chief, PB/ | | /RA/ /RA/ /RA/ /RA/ |
| D Don Allen, Senior Project Engineer, PB/ | | 4/25/11 4/25/11 4/25/11 4/25/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax}} |
| D Tony Brown, Senior Resident Inspector Zack Hollcraft, Project Engineer, PB/D Victor Dricks, Region IV PAO Lara Uselding, Region IV PAO Bill Maier, Region IV RSLO Karla Fuller, Region IV RC Nick Taylor, Region IV ACES Regina McFadden, Site Administrative Assistant Earnestine Clay, Administrative Officer Ann Mattila, Security Advisor Phil Longdo, Receptionist | |
| | |
| R:\_REACTORS\EOC 2010\PV EOC MN 05112011.docx SUNSI Rev Compl. | |
| Yes No ADAMS Yes No Reviewer Initials RL Publicly Avail Yes No Sensitive Yes No Sens. Type Initials RL RIV/SPE:DRP | |
| /D PAO RSLO C:DRP/D DAllen VLDricks WAMaier RLantz /RA/ /RA/ /RA/ /RA/ 4/25/11 4/25/11 4/25/11 4/25/11 OFFICIAL RECORD COPY T=Telephone E=E | |
| -mail F=Fax}} | |
05/11/2011-Notice of Public Meeting with Arizona Public Service Company, to Present and Discuss Performance Results of Palo Verde for Period of January 1 Through December 31, 2010ML111160162 |
Person / Time |
---|
Site: |
Palo Verde ![Arizona Public Service icon.png](/w/images/9/93/Arizona_Public_Service_icon.png) |
---|
Issue date: |
04/25/2011 |
---|
From: |
NRC Region 4 |
---|
To: |
|
---|
References |
---|
Download: ML111160162 (3) |
|
|
---|
Category:Meeting Notice
MONTHYEARPMNS20240087, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 32024-01-25025 January 2024 Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20231377, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-12-0707 December 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20231177, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 12023-10-19019 October 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 PMNS20230945, Presubmittal Meeting with Arizona Public Service Company to Discuss Alloy 600 Management Program Plan at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-08-18018 August 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss Alloy 600 Management Program Plan at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20230590, Presubmittal Meeting with Arizona Public Service Company to Discuss ASME Appendix L Alternate Approach to Pressurizer Surge Line Inspections at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-05-0404 May 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss ASME Appendix L Alternate Approach to Pressurizer Surge Line Inspections at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20230286, Presubmittal Meeting with Arizona Public Service Company Regarding Planned Containment Temperature and Safety Injection Tank Volume License Amendment Request(S) at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-04-0303 April 2023 Presubmittal Meeting with Arizona Public Service Company Regarding Planned Containment Temperature and Safety Injection Tank Volume License Amendment Request(S) at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20230297, Presubmittal Meeting with Arizona Public Service Company Regarding a Planned License Amendment Request to Adopt TSTF-266 at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-03-22022 March 2023 Presubmittal Meeting with Arizona Public Service Company Regarding a Planned License Amendment Request to Adopt TSTF-266 at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20230166, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned 10 CFR 20.1703 and 20.1705 Requests to Use Supplied Air Suits at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-02-17017 February 2023 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned 10 CFR 20.1703 and 20.1705 Requests to Use Supplied Air Suits at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20221074, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-107 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32022-10-13013 October 2022 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-107 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20220282, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-487 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32022-03-22022 March 2022 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-487 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML22013B2642022-01-13013 January 2022 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned Relief Request for Palo Verde Nuclear Generating Station, Unit 2 ML21342A0502021-12-0808 December 2021 TSTF-567 LAR Pre-submittal Public Meeting Presentation Slides PMNS20211505, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-567 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-11-29029 November 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-567 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20211411, Notice of Second Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-11-16016 November 2021 Notice of Second Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20211230, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Relief Request No. 68 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-10-0606 October 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Relief Request No. 68 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20211082, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-08-17017 August 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20210743, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned Relief Request No. 67 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-06-0202 June 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned Relief Request No. 67 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20210576, Notice of Meeting with Arizona Public Service Company Regarding a License Transfer Associated with Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-05-0303 May 2021 Notice of Meeting with Arizona Public Service Company Regarding a License Transfer Associated with Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek PMNS20210105, Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station2021-02-0303 February 2021 Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station PMNS20210096, Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station2021-01-26026 January 2021 Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station PMNS20201399, Notice of Meeting with Arizona Public Service Company2020-12-15015 December 2020 Notice of Meeting with Arizona Public Service Company ML20245E5832020-09-0101 September 2020 Meeting_Notice_EA-20-054_APS_ADR ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML15217A6312015-08-0505 August 2015 Open House Meeting with Members of the Public to Discuss Issues Related to Palo Verde Nuclear Generating Station ML14240A6132014-08-28028 August 2014 Notice of Open House Meeting with the Public to Discuss Issues Related to Palo Verde Nuclear Generating Station During the Calendar Year 2014 ML14077A3712014-03-18018 March 2014 Notice of Public Meeting with Arizona Public Service Company to Discuss Extension of Authorized Repair to Palo Verde, Unit 3, Bottom-Mounted Instrumentation to End of Unit 3 Operating Life ML13294A3732013-10-21021 October 2013 11/4/13 Notice of Meeting with Arizona Public Service Company to Discuss Non-destructive Examination Efforts, Repairs, and Progress on Root Cause Identified During Inspection of Bottom-Mounted Instrumentation Nozzles at Palo Verde, Unit 3 ML13281A2032013-10-0909 October 2013 11/5/2013 Notice of Preapplication Meeting to Discuss License Amendment Request to Incorporate Nuclear Energy Institute NEI-11-04 Quality Assurance Program at Palo Verde, Units 1, 2, and 3 ML13199A0082013-07-22022 July 2013 Meeting Notice with Arizona Public Service Company Low Pressure Safety Injection Pump Single Failure Analysis for Minimum Required Refueling Water Tank Transfer Volume at Palo Verde, Units 1, 2, and 3 ML13156A2322013-06-13013 June 2013 7/11/13 Notice of Preapplication Meeting with Arizona Public Service Company to Discuss License Amendment Request Related to the Startup Test Activity Reduction Program at Palo Verde, Units 1, 2, and 3 ML13143A0892013-05-23023 May 2013 Meeting Notice with Arizona Public Service Company to Discuss the U.S. Nuclear Regulatory Commission (NRC) Staff'S Draft Request for Additional Information Relating to the February 28, 2013, Submittal ML13135A3702013-05-17017 May 2013 Notice of 5/30/13 Conference Call with Arizona Public Service Company to Discuss Draft Requests for Additional Information for Palo Verde, Units 1, 2, and 3 NRC Order Number EA-12-049 Related to Mitigation Strategies (TAC Nos. MF0829-MF0831 ML13127A2432013-05-0808 May 2013 5/29/13 Meeting Via Conference Call with Arizona Public Service Company to Discuss Palo Verde Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 (TAC ME8160-ME81 ML12227A8562012-08-17017 August 2012 Notice of Meeting with Arizona Public Service Company to Discuss Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Examination Techniques for Palo Verde, Units 1, 2, and 3 ML1111601622011-04-25025 April 2011 Notice of Public Meeting with Arizona Public Service Company, to Present and Discuss Performance Results of Palo Verde for Period of January 1 Through December 31, 2010 ML1108803052011-03-29029 March 2011 Notice of Special Open Meeting with Arizona Corporation Commission ML1107701002011-03-18018 March 2011 Notice of Meeting with Arizona Public Service Company to Discuss Potential Submittal to Revise Technical Specification 3.7.4, Atmospheric Dump Valves for Palo Verde, Units 1, 2, and 3 ML1030900182010-11-0505 November 2010 Notice of Meeting with Arizona Public Service Company to Discuss Palo Verde, Units 1, 2, and 3 License Amendment Request to Revise Technical Specification 3.7.4, Atmospheric Dump Valves. ML1023102542010-08-24024 August 2010 Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement (Dseis) for Palo Verde Nuclear Generating Station ML1009804822010-04-20020 April 2010 05/06/10 Notice of Public Working Meeting with Arizona Public Service to Discuss Issues Related to the Palo Verde Nuclear Generating Station License Renewal Application ML1007401912010-03-15015 March 2010 Notice of End-of-Cycle Meeting with Arizona Public Service Company to Discuss Performance Results of the Palo Verde Nuclear Generating Station for the Period of January 1 Through December 31, 2009 ML0923307792009-08-21021 August 2009 Notice of Public Meeting with Arizona Public Service Company to Discuss Status of Palo Verde Performance Improvement Initiatives ML0914803482009-06-0303 June 2009 06/25/2009 Meeting Notice to Discuss the License Renewal Process and Environmental Scoping for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 License Renewal Application Review ML0906300422009-03-0404 March 2009 Notice of Meeting with Arizona Public Service Company to Discuss the Status of Performance Improvement Actions to Address Revised Confirmatory Action Letter Items ML0833907362008-12-0404 December 2008 Notice of Meeting with Arizona Public Service Company to Discuss the Current Status of the Palo Verde Nuclear Generating Station Site Integrated Improvement Plan ML0826002242008-09-16016 September 2008 Meeting Notice with Arizona Public Service Company, to Discuss the Current Status of the Palo Verde Nuclear Generating Station Site Integrated Improvement Plan ML0816301392008-06-11011 June 2008 Notice of Meeting with Arizona Public Service Company to Discuss the Current Status of the Palo Verde Nuclear Generating Station Site Integrated Improvement Plan ML0807100082008-03-11011 March 2008 Notice of Meeting with Arizona Public Service, Entergy Operations, Inc., Exelon Generation Co., FPL Energy, Luminant Generation Co., South Carolina Electric & Gas Co., STP Electric Generating Co., & Southern Nuclear Operating Co 2024-01-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 April 25, 2011
SUBJECT:
PUBLIC MEETING WITH ARIZONA PUBLIC SERVICE COMPANY FACILITY: Palo Verde Nuclear Generating Station DOCKET: 50-528, 50-529, 50-530 DATE AND TIME: May 11, 2011 6:00 pm to 7:30 pm LOCATION: Palo Verde Energy Education Center 600 North Airport Road Buckeye, AZ 85396 PURPOSE: This is the end-of-cycle public meeting between the NRC and Arizona Public Service Company to present and discuss performance results of the Palo Verde Nuclear Generating Station for the period of January 1 through December 31, 2010.
CATEGORY 3: This is a category 3 meeting. The public is invited to fully participate in this meeting/open house. The meeting is specifically designed to ensure maximum interaction with the NRC Staff.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. Braille, large print), please notify the NRCs meeting contact listed below. Determinations on request for reasonable accommodation will be made on a case-by-case basis.
PARTICIPANTS: NRC T. Pruett, Deputy Director, Division of Reactor Projects (DRP)
R. Lantz, Chief, Project Branch D, DRP L. Uselding, Public Affairs, Region IV T. Brown, Senior Resident Inspector J. Bashore, Resident Inspector M. Baquera, Resident Inspector
LICENSEE R. Edington, Executive Vice President Nuclear, Chief Nuclear Officer B. Bement, Senior Vice President, Site Operations D. Mims, Senior Vice President, Regulatory and Oversight MEETING CONTACT: Don Allen, NRC, RIV 817/276-6574 don.allen@nrc.gov To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
cc: Distribution via ListServ
Electronic Distribution:
NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Art Howell, DRA Kriss Kennedy, D:DRP Troy Pruett, DD:DRP Anton Vegel, D:DRS Sue Bogle, OEWEB Resource Stephanie Bush-Goddard,RIV/OEDO ETA OEMAIL, D/OE Amy Powell, OCA Thomas Combs, Congressional Affairs Officer Lauren Gibson, Project Manager, NRR Ryan Lantz, Branch Chief, PB/D Don Allen, Senior Project Engineer, PB/D Tony Brown, Senior Resident Inspector Zack Hollcraft, Project Engineer, PB/D Victor Dricks, Region IV PAO Lara Uselding, Region IV PAO Bill Maier, Region IV RSLO Karla Fuller, Region IV RC Nick Taylor, Region IV ACES Regina McFadden, Site Administrative Assistant Earnestine Clay, Administrative Officer Ann Mattila, Security Advisor Phil Longdo, Receptionist R:\_REACTORS\EOC 2010\PV EOC MN 05112011.docx SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials RL Publicly Avail Yes No Sensitive Yes No Sens. Type Initials RL RIV/SPE:DRP/D PAO RSLO C:DRP/D DAllen VLDricks WAMaier RLantz
/RA/ /RA/ /RA/ /RA/
4/25/11 4/25/11 4/25/11 4/25/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax